Attachment 001 - Schedule of Items - Version 2.xlsx

XLSX spreadsheet 26 KB Posted

Attached to
PSICC Certified Water Operator Federal contract opportunity
Solicitation number
1282B125R0004_1141278
Issued by
Department of Agriculture Forest Service

About this file

This is a pricing schedule spreadsheet for water system operation and maintenance services across 11 Forest Service locations. The schedule covers a base year (2025) and four option years (2026-2029), with mandatory and optional line items for each period. The mandatory items include bi-monthly water system operations at multiple work centers including Monument, Lake George, Eleven Mile Canyon, Lake Isabel, Carrizo, AG Ranch, Crystal Lakes, Indian Creek, and Rourke Ranch, plus monthly operations at Bassam Guard Station.

Optional items are consistent across all periods and include specific filter replacements (Pre Filter Graver STC 3-30NN and Final Filter Graver QCR 1-30P8E), water quality testing services (including coliform, nitrate, nitrite, lead/copper, and PFAS testing), water hauling services (troubleshooting and 3,000-gallon potable water delivery), and storage tank inspections. The spreadsheet is structured as a blank pricing template where vendors must input their unit prices for all line items, with quantities pre-defined for each service component. Most operational services are measured in "Each" units on either a 12-month, 8-month, or 7-month frequency depending on the location.

View the file

Other files for this federal contract opportunity

Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Base

Item 0001 - Base Year - Mandatory Items
Item No.DescriptionMethod of MeasurementUnitQtyUnit PriceTotal
0001AMonument Work CenterWater System Operation Cost for the FIRST 15 calendar days of the monthEach12$0.00
0001BMonument Work CenterWater System Operation Cost for the SECOND 15 calendar days of the monthEach12$0.00
0001CLake George Work CenterWater System Operation Cost for the FIRST 15 calendar days of the monthEach12$0.00
0001DLake George Work CenterWater System Operation Cost for the SECOND 15 calendar days of the monthEach12$0.00
0001EEleven Mile Canyon DwellingWater System Operation Cost for the FIRST 15 calendar days of the monthEach12$0.00
0001FEleven Mile Canyon DwellingWater System Operation Cost for the SECOND 15 calendar days of the monthEach12$0.00
0001GLake Isabel Work CenterWater System Operation Cost for the FIRST 15 calendar days of the monthEach12$0.00
0001HLake Isabel Work CenterWater System Operation Cost for the SECOND 15 calendar days of the monthEach12$0.00
0001ICarrizo Work CenterWater System Operation Cost for the FIRST 15 calendar days of the monthEach12$0.00
0001JCarrizo Work CenterWater System Operation Cost for the SECOND 15 calendar days of the monthEach12$0.00
0001KAG RanchWater System Operation Cost for the FIRST 15 calendar days of the monthEach12$0.00
0001LAG RanchWater System Operation Cost for the SECOND 15 calendar days of the monthEach12$0.00
0001MCrystal Lakes Work CenterWater System Operation Cost for the FIRST 15 calendar days of the monthEach7$0.00
0001NCrystal Lakes Work CenterWater System Operation Cost for the SECOND 15 calendar days of the monthEach12$0.00
0001OBrown House Cystal LakesWater System Operation Cost for the FIRST 15 calendar days of the monthEach12$0.00
0001PBrown House Cystal LakesWater System Operation Cost for the SECOND 15 calendar days of the monthEach12$0.00
0001QIndian Creek Work CenterWater System Operation Cost for the FIRST 15 calendar days of the monthEach7$0.00
0001RIndian Creek Work CenterWater System Operation Cost for the SECOND 15 calendar days of the monthEach7$0.00
0001SBassam Guard StationONE MONTH of water system operation at the Bassam Guard StationEach7$0.00
0001TRourke RanchWater System Operation Cost for the FIRST 15 calendar days of the monthEach8$0.00
0001URourke RanchWater System Operation Cost for the SECOND 15 calendar days of the monthEach8$0.00
Base Year - Optional Items
Optional Items - FiltersUnitQtyUnit PriceTotal
0002Pre FilterGraver STC 3-30NNEach102$0.00
0003Final FilterGraver QCR 1-30P8EEach28$0.00
Optional Items - Water Quality Testing
0004Total ColiformSM 9223Each1$0.00
0005NitrateEPA 300.0Each1$0.00
0006NitriteEPA 300.0Each1$0.00
0007Lead and CopperEPA 200.8Each1$0.00
0008Langelier IndexSM 2330-BEach1$0.00
0009MPAMicroparticulate AnalysisEach1$0.00
0010PFASPFOA, PFOS, PFHxS, PFNA, PFBS, GenXEach1$0.00
Optional Items - Water Hauling
0011Troubleshooting MobilizationMiles1$0.00
0012Troubleshooting LaborHours1$0.00
0013Supplying Potable Water3000 gallonsEach1$0.00
Optional Items - Storage Tank Inspections
0014Storage Tank InspectionEach1$0.00

Total: $0.00

OY1

Item 1000 - Option Year 1 - Mandatory Items
Item No.DescriptionMethod of MeasurementUnitQtyUnit PriceTotal
1000AMonument Work CenterWater System Operation Cost for the FIRST 15 calendar days of the monthEach12$0.00
1000BMonument Work CenterWater System Operation Cost for the SECOND 15 calendar days of the monthEach12$0.00
1000CLake George Work CenterWater System Operation Cost for the FIRST 15 calendar days of the monthEach12$0.00
1000DLake George Work CenterWater System Operation Cost for the SECOND 15 calendar days of the monthEach12$0.00
1000EEleven Mile Canyon DwellingWater System Operation Cost for the FIRST 15 calendar days of the monthEach12$0.00
1000FEleven Mile Canyon DwellingWater System Operation Cost for the SECOND 15 calendar days of the monthEach12$0.00
1000GLake Isabel Work CenterWater System Operation Cost for the FIRST 15 calendar days of the monthEach12$0.00
1000HLake Isabel Work CenterWater System Operation Cost for the SECOND 15 calendar days of the monthEach12$0.00
1000ICarrizo Work CenterWater System Operation Cost for the FIRST 15 calendar days of the monthEach12$0.00
1000JCarrizo Work CenterWater System Operation Cost for the SECOND 15 calendar days of the monthEach12$0.00
1000KAG RanchWater System Operation Cost for the FIRST 15 calendar days of the monthEach12$0.00
1000LAG RanchWater System Operation Cost for the SECOND 15 calendar days of the monthEach12$0.00
1000MCrystal Lakes Work CenterWater System Operation Cost for the FIRST 15 calendar days of the monthEach7$0.00
1000NCrystal Lakes Work CenterWater System Operation Cost for the SECOND 15 calendar days of the monthEach12$0.00
1000OBrown House Cystal LakesWater System Operation Cost for the FIRST 15 calendar days of the monthEach12$0.00
1000PBrown House Cystal LakesWater System Operation Cost for the SECOND 15 calendar days of the monthEach12$0.00
1000QIndian Creek Work CenterWater System Operation Cost for the FIRST 15 calendar days of the monthEach7$0.00
1000RIndian Creek Work CenterWater System Operation Cost for the SECOND 15 calendar days of the monthEach7$0.00
1000SBassam Guard StationONE MONTH of water system operation at the Bassam Guard StationEach7$0.00
1000TRourke RanchWater System Operation Cost for the FIRST 15 calendar days of the monthEach8$0.00
1000URourke RanchWater System Operation Cost for the SECOND 15 calendar days of the monthEach8$0.00
Option Year 1 - Optional Items
Optional Items - FiltersUnitQtyUnit PriceTotal
1001Pre FilterGraver STC 3-30NNEach102$0.00
1002Final FilterGraver QCR 1-30P8EEach28$0.00
Optional Items - Water Quality Testing
1003Total ColiformSM 9223Each1$0.00
1004NitrateEPA 300.0Each1$0.00
1005NitriteEPA 300.0Each1$0.00
1006Lead and CopperEPA 200.8Each1$0.00
1007Langelier IndexSM 2330-BEach1$0.00
1008MPAMicroparticulate AnalysisEach1$0.00
1009PFASPFOA, PFOS, PFHxS, PFNA, PFBS, GenXEach1$0.00
Optional Items - Water Hauling
1010Troubleshooting MobilizationMiles1$0.00
1011Troubleshooting LaborHours1$0.00
1012Supplying Potable Water3000 gallonsEach1$0.00
Optional Items - Storage Tank Inspections
1013Storage Tank InspectionEach1$0.00

Total: $0.00

OY2

Item 2000 - Option Year 2 - Mandatory Items
Item No.DescriptionMethod of MeasurementUnitQtyUnit PriceTotal
2000AMonument Work CenterWater System Operation Cost for the FIRST 15 calendar days of the monthEach12$0.00
2000BMonument Work CenterWater System Operation Cost for the SECOND 15 calendar days of the monthEach12$0.00
2000CLake George Work CenterWater System Operation Cost for the FIRST 15 calendar days of the monthEach12$0.00
2000DLake George Work CenterWater System Operation Cost for the SECOND 15 calendar days of the monthEach12$0.00
2000EEleven Mile Canyon DwellingWater System Operation Cost for the FIRST 15 calendar days of the monthEach12$0.00
2000FEleven Mile Canyon DwellingWater System Operation Cost for the SECOND 15 calendar days of the monthEach12$0.00
2000GLake Isabel Work CenterWater System Operation Cost for the FIRST 15 calendar days of the monthEach12$0.00
2000HLake Isabel Work CenterWater System Operation Cost for the SECOND 15 calendar days of the monthEach12$0.00
2000ICarrizo Work CenterWater System Operation Cost for the FIRST 15 calendar days of the monthEach12$0.00
2000JCarrizo Work CenterWater System Operation Cost for the SECOND 15 calendar days of the monthEach12$0.00
2000KAG RanchWater System Operation Cost for the FIRST 15 calendar days of the monthEach12$0.00
2000LAG RanchWater System Operation Cost for the SECOND 15 calendar days of the monthEach12$0.00
2000MCrystal Lakes Work CenterWater System Operation Cost for the FIRST 15 calendar days of the monthEach7$0.00
2000NCrystal Lakes Work CenterWater System Operation Cost for the SECOND 15 calendar days of the monthEach12$0.00
2000OBrown House Cystal LakesWater System Operation Cost for the FIRST 15 calendar days of the monthEach12$0.00
2000PBrown House Cystal LakesWater System Operation Cost for the SECOND 15 calendar days of the monthEach12$0.00
2000QIndian Creek Work CenterWater System Operation Cost for the FIRST 15 calendar days of the monthEach7$0.00
2000RIndian Creek Work CenterWater System Operation Cost for the SECOND 15 calendar days of the monthEach7$0.00
2000SBassam Guard StationONE MONTH of water system operation at the Bassam Guard StationEach7$0.00
2000TRourke RanchWater System Operation Cost for the FIRST 15 calendar days of the monthEach8$0.00
2000URourke RanchWater System Operation Cost for the SECOND 15 calendar days of the monthEach8$0.00
Option Year 2 - Optional Items
Optional Items - FiltersUnitQtyUnit PriceTotal
2001Pre FilterGraver STC 3-30NNEach102$0.00
2002Final FilterGraver QCR 1-30P8EEach28$0.00
Optional Items - Water Quality Testing
2003Total ColiformSM 9223Each1$0.00
2004NitrateEPA 300.0Each1$0.00
2005NitriteEPA 300.0Each1$0.00
2006Lead and CopperEPA 200.8Each1$0.00
2007Langelier IndexSM 2330-BEach1$0.00
2008MPAMicroparticulate AnalysisEach1$0.00
2009PFASPFOA, PFOS, PFHxS, PFNA, PFBS, GenXEach1$0.00
Optional Items - Water Hauling
2010Troubleshooting MobilizationMiles1$0.00
2011Troubleshooting LaborHours1$0.00
2012Supplying Potable Water3000 gallonsEach1$0.00
Optional Items - Storage Tank Inspections
2013Storage Tank InspectionEach1$0.00

Total: $0.00

OY3

Item 3000 - Option Year 3 - Mandatory Items
Item No.DescriptionMethod of MeasurementUnitQtyUnit PriceTotal
3000AMonument Work CenterWater System Operation Cost for the FIRST 15 calendar days of the monthEach12$0.00
3000BMonument Work CenterWater System Operation Cost for the SECOND 15 calendar days of the monthEach12$0.00
3000CLake George Work CenterWater System Operation Cost for the FIRST 15 calendar days of the monthEach12$0.00
3000DLake George Work CenterWater System Operation Cost for the SECOND 15 calendar days of the monthEach12$0.00
3000EEleven Mile Canyon DwellingWater System Operation Cost for the FIRST 15 calendar days of the monthEach12$0.00
3000FEleven Mile Canyon DwellingWater System Operation Cost for the SECOND 15 calendar days of the monthEach12$0.00
3000GLake Isabel Work CenterWater System Operation Cost for the FIRST 15 calendar days of the monthEach12$0.00
3000HLake Isabel Work CenterWater System Operation Cost for the SECOND 15 calendar days of the monthEach12$0.00
3000ICarrizo Work CenterWater System Operation Cost for the FIRST 15 calendar days of the monthEach12$0.00
3000JCarrizo Work CenterWater System Operation Cost for the SECOND 15 calendar days of the monthEach12$0.00
3000KAG RanchWater System Operation Cost for the FIRST 15 calendar days of the monthEach12$0.00
3000LAG RanchWater System Operation Cost for the SECOND 15 calendar days of the monthEach12$0.00
3000MCrystal Lakes Work CenterWater System Operation Cost for the FIRST 15 calendar days of the monthEach7$0.00
3000NCrystal Lakes Work CenterWater System Operation Cost for the SECOND 15 calendar days of the monthEach12$0.00
3000OBrown House Cystal LakesWater System Operation Cost for the FIRST 15 calendar days of the monthEach12$0.00
3000PBrown House Cystal LakesWater System Operation Cost for the SECOND 15 calendar days of the monthEach12$0.00
3000QIndian Creek Work CenterWater System Operation Cost for the FIRST 15 calendar days of the monthEach7$0.00
3000RIndian Creek Work CenterWater System Operation Cost for the SECOND 15 calendar days of the monthEach7$0.00
3000SBassam Guard StationONE MONTH of water system operation at the Bassam Guard StationEach7$0.00
3000TRourke RanchWater System Operation Cost for the FIRST 15 calendar days of the monthEach8$0.00
3000URourke RanchWater System Operation Cost for the SECOND 15 calendar days of the monthEach8$0.00
Option Year 3 - Optional Items
Optional Items - FiltersUnitQtyUnit PriceTotal
3001Pre FilterGraver STC 3-30NNEach102$0.00
3002Final FilterGraver QCR 1-30P8EEach28$0.00
Optional Items - Water Quality Testing
3003Total ColiformSM 9223Each1$0.00
3004NitrateEPA 300.0Each1$0.00
3005NitriteEPA 300.0Each1$0.00
3006Lead and CopperEPA 200.8Each1$0.00
3007Langelier IndexSM 2330-BEach1$0.00
3008MPAMicroparticulate AnalysisEach1$0.00
3009PFASPFOA, PFOS, PFHxS, PFNA, PFBS, GenXEach1$0.00
Optional Items - Water Hauling
3010Troubleshooting MobilizationMiles1$0.00
3011Troubleshooting LaborHours1$0.00
3012Supplying Potable Water3000 gallonsEach1$0.00
Optional Items - Storage Tank Inspections
3013Storage Tank InspectionEach1$0.00

Total: $0.00

OY4

Item 4000 - Option Year 4 - Mandatory Items
Item No.DescriptionMethod of MeasurementUnitQtyUnit PriceTotal
4000AMonument Work CenterWater System Operation Cost for the FIRST 15 calendar days of the monthEach12$0.00
4000BMonument Work CenterWater System Operation Cost for the SECOND 15 calendar days of the monthEach12$0.00
4000CLake George Work CenterWater System Operation Cost for the FIRST 15 calendar days of the monthEach12$0.00
4000DLake George Work CenterWater System Operation Cost for the SECOND 15 calendar days of the monthEach12$0.00
4000EEleven Mile Canyon DwellingWater System Operation Cost for the FIRST 15 calendar days of the monthEach12$0.00
4000FEleven Mile Canyon DwellingWater System Operation Cost for the SECOND 15 calendar days of the monthEach12$0.00
4000GLake Isabel Work CenterWater System Operation Cost for the FIRST 15 calendar days of the monthEach12$0.00
4000HLake Isabel Work CenterWater System Operation Cost for the SECOND 15 calendar days of the monthEach12$0.00
4000ICarrizo Work CenterWater System Operation Cost for the FIRST 15 calendar days of the monthEach12$0.00
4000JCarrizo Work CenterWater System Operation Cost for the SECOND 15 calendar days of the monthEach12$0.00
4000KAG RanchWater System Operation Cost for the FIRST 15 calendar days of the monthEach12$0.00
4000LAG RanchWater System Operation Cost for the SECOND 15 calendar days of the monthEach12$0.00
4000MCrystal Lakes Work CenterWater System Operation Cost for the FIRST 15 calendar days of the monthEach7$0.00
4000NCrystal Lakes Work CenterWater System Operation Cost for the SECOND 15 calendar days of the monthEach12$0.00
4000OBrown House Cystal LakesWater System Operation Cost for the FIRST 15 calendar days of the monthEach12$0.00
4000PBrown House Cystal LakesWater System Operation Cost for the SECOND 15 calendar days of the monthEach12$0.00
4000QIndian Creek Work CenterWater System Operation Cost for the FIRST 15 calendar days of the monthEach7$0.00
4000RIndian Creek Work CenterWater System Operation Cost for the SECOND 15 calendar days of the monthEach7$0.00
4000SBassam Guard StationONE MONTH of water system operation at the Bassam Guard StationEach7$0.00
4000TRourke RanchWater System Operation Cost for the FIRST 15 calendar days of the monthEach8$0.00
4000URourke RanchWater System Operation Cost for the SECOND 15 calendar days of the monthEach8$0.00
Option Year 4 - Optional Items
Optional Items - FiltersUnitQtyUnit PriceTotal
4001Pre FilterGraver STC 3-30NNEach102$0.00
4002Final FilterGraver QCR 1-30P8EEach28$0.00
Optional Items - Water Quality Testing
4003Total ColiformSM 9223Each1$0.00
4004NitrateEPA 300.0Each1$0.00
4005NitriteEPA 300.0Each1$0.00
4006Lead and CopperEPA 200.8Each1$0.00
4007Langelier IndexSM 2330-BEach1$0.00
4008MPAMicroparticulate AnalysisEach1$0.00
4009PFASPFOA, PFOS, PFHxS, PFNA, PFBS, GenXEach1$0.00
Optional Items - Water Hauling
4010Troubleshooting MobilizationMiles1$0.00
4011Troubleshooting LaborHours1$0.00
4012Supplying Potable Water3000 gallonsEach1$0.00
Optional Items - Storage Tank Inspections
4013Storage Tank InspectionEach1$0.00

Total: $0.00

Total Bid Price

Base Price$0.00
OY1 Price$0.00
OY2 Price$0.00
OY3 Price$0.00
OY4 Price$0.00
Total Bid Price:$0.00

File details come from the government source that posted it. Updated .