About this file
This is a pricing schedule spreadsheet for water system operation and maintenance services across 11 Forest Service locations. The schedule covers a base year (2025) and four option years (2026-2029), with mandatory and optional line items for each period. The mandatory items include bi-monthly water system operations at multiple work centers including Monument, Lake George, Eleven Mile Canyon, Lake Isabel, Carrizo, AG Ranch, Crystal Lakes, Indian Creek, and Rourke Ranch, plus monthly operations at Bassam Guard Station.
Optional items are consistent across all periods and include specific filter replacements (Pre Filter Graver STC 3-30NN and Final Filter Graver QCR 1-30P8E), water quality testing services (including coliform, nitrate, nitrite, lead/copper, and PFAS testing), water hauling services (troubleshooting and 3,000-gallon potable water delivery), and storage tank inspections. The spreadsheet is structured as a blank pricing template where vendors must input their unit prices for all line items, with quantities pre-defined for each service component. Most operational services are measured in "Each" units on either a 12-month, 8-month, or 7-month frequency depending on the location.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Base
| Item 0001 - Base Year - Mandatory Items | ||||||
| Item No. | Description | Method of Measurement | Unit | Qty | Unit Price | Total |
| 0001A | Monument Work Center | Water System Operation Cost for the FIRST 15 calendar days of the month | Each | 12 | $0.00 | |
| 0001B | Monument Work Center | Water System Operation Cost for the SECOND 15 calendar days of the month | Each | 12 | $0.00 | |
| 0001C | Lake George Work Center | Water System Operation Cost for the FIRST 15 calendar days of the month | Each | 12 | $0.00 | |
| 0001D | Lake George Work Center | Water System Operation Cost for the SECOND 15 calendar days of the month | Each | 12 | $0.00 | |
| 0001E | Eleven Mile Canyon Dwelling | Water System Operation Cost for the FIRST 15 calendar days of the month | Each | 12 | $0.00 | |
| 0001F | Eleven Mile Canyon Dwelling | Water System Operation Cost for the SECOND 15 calendar days of the month | Each | 12 | $0.00 | |
| 0001G | Lake Isabel Work Center | Water System Operation Cost for the FIRST 15 calendar days of the month | Each | 12 | $0.00 | |
| 0001H | Lake Isabel Work Center | Water System Operation Cost for the SECOND 15 calendar days of the month | Each | 12 | $0.00 | |
| 0001I | Carrizo Work Center | Water System Operation Cost for the FIRST 15 calendar days of the month | Each | 12 | $0.00 | |
| 0001J | Carrizo Work Center | Water System Operation Cost for the SECOND 15 calendar days of the month | Each | 12 | $0.00 | |
| 0001K | AG Ranch | Water System Operation Cost for the FIRST 15 calendar days of the month | Each | 12 | $0.00 | |
| 0001L | AG Ranch | Water System Operation Cost for the SECOND 15 calendar days of the month | Each | 12 | $0.00 | |
| 0001M | Crystal Lakes Work Center | Water System Operation Cost for the FIRST 15 calendar days of the month | Each | 7 | $0.00 | |
| 0001N | Crystal Lakes Work Center | Water System Operation Cost for the SECOND 15 calendar days of the month | Each | 12 | $0.00 | |
| 0001O | Brown House Cystal Lakes | Water System Operation Cost for the FIRST 15 calendar days of the month | Each | 12 | $0.00 | |
| 0001P | Brown House Cystal Lakes | Water System Operation Cost for the SECOND 15 calendar days of the month | Each | 12 | $0.00 | |
| 0001Q | Indian Creek Work Center | Water System Operation Cost for the FIRST 15 calendar days of the month | Each | 7 | $0.00 | |
| 0001R | Indian Creek Work Center | Water System Operation Cost for the SECOND 15 calendar days of the month | Each | 7 | $0.00 | |
| 0001S | Bassam Guard Station | ONE MONTH of water system operation at the Bassam Guard Station | Each | 7 | $0.00 | |
| 0001T | Rourke Ranch | Water System Operation Cost for the FIRST 15 calendar days of the month | Each | 8 | $0.00 | |
| 0001U | Rourke Ranch | Water System Operation Cost for the SECOND 15 calendar days of the month | Each | 8 | $0.00 | |
| Base Year - Optional Items | ||||||
| Optional Items - Filters | Unit | Qty | Unit Price | Total | ||
| 0002 | Pre Filter | Graver STC 3-30NN | Each | 102 | $0.00 | |
| 0003 | Final Filter | Graver QCR 1-30P8E | Each | 28 | $0.00 | |
| Optional Items - Water Quality Testing | ||||||
| 0004 | Total Coliform | SM 9223 | Each | 1 | $0.00 | |
| 0005 | Nitrate | EPA 300.0 | Each | 1 | $0.00 | |
| 0006 | Nitrite | EPA 300.0 | Each | 1 | $0.00 | |
| 0007 | Lead and Copper | EPA 200.8 | Each | 1 | $0.00 | |
| 0008 | Langelier Index | SM 2330-B | Each | 1 | $0.00 | |
| 0009 | MPA | Microparticulate Analysis | Each | 1 | $0.00 | |
| 0010 | PFAS | PFOA, PFOS, PFHxS, PFNA, PFBS, GenX | Each | 1 | $0.00 | |
| Optional Items - Water Hauling | ||||||
| 0011 | Troubleshooting Mobilization | Miles | 1 | $0.00 | ||
| 0012 | Troubleshooting Labor | Hours | 1 | $0.00 | ||
| 0013 | Supplying Potable Water | 3000 gallons | Each | 1 | $0.00 | |
| Optional Items - Storage Tank Inspections | ||||||
| 0014 | Storage Tank Inspection | Each | 1 | $0.00 |
Total: $0.00
OY1
| Item 1000 - Option Year 1 - Mandatory Items | ||||||
| Item No. | Description | Method of Measurement | Unit | Qty | Unit Price | Total |
| 1000A | Monument Work Center | Water System Operation Cost for the FIRST 15 calendar days of the month | Each | 12 | $0.00 | |
| 1000B | Monument Work Center | Water System Operation Cost for the SECOND 15 calendar days of the month | Each | 12 | $0.00 | |
| 1000C | Lake George Work Center | Water System Operation Cost for the FIRST 15 calendar days of the month | Each | 12 | $0.00 | |
| 1000D | Lake George Work Center | Water System Operation Cost for the SECOND 15 calendar days of the month | Each | 12 | $0.00 | |
| 1000E | Eleven Mile Canyon Dwelling | Water System Operation Cost for the FIRST 15 calendar days of the month | Each | 12 | $0.00 | |
| 1000F | Eleven Mile Canyon Dwelling | Water System Operation Cost for the SECOND 15 calendar days of the month | Each | 12 | $0.00 | |
| 1000G | Lake Isabel Work Center | Water System Operation Cost for the FIRST 15 calendar days of the month | Each | 12 | $0.00 | |
| 1000H | Lake Isabel Work Center | Water System Operation Cost for the SECOND 15 calendar days of the month | Each | 12 | $0.00 | |
| 1000I | Carrizo Work Center | Water System Operation Cost for the FIRST 15 calendar days of the month | Each | 12 | $0.00 | |
| 1000J | Carrizo Work Center | Water System Operation Cost for the SECOND 15 calendar days of the month | Each | 12 | $0.00 | |
| 1000K | AG Ranch | Water System Operation Cost for the FIRST 15 calendar days of the month | Each | 12 | $0.00 | |
| 1000L | AG Ranch | Water System Operation Cost for the SECOND 15 calendar days of the month | Each | 12 | $0.00 | |
| 1000M | Crystal Lakes Work Center | Water System Operation Cost for the FIRST 15 calendar days of the month | Each | 7 | $0.00 | |
| 1000N | Crystal Lakes Work Center | Water System Operation Cost for the SECOND 15 calendar days of the month | Each | 12 | $0.00 | |
| 1000O | Brown House Cystal Lakes | Water System Operation Cost for the FIRST 15 calendar days of the month | Each | 12 | $0.00 | |
| 1000P | Brown House Cystal Lakes | Water System Operation Cost for the SECOND 15 calendar days of the month | Each | 12 | $0.00 | |
| 1000Q | Indian Creek Work Center | Water System Operation Cost for the FIRST 15 calendar days of the month | Each | 7 | $0.00 | |
| 1000R | Indian Creek Work Center | Water System Operation Cost for the SECOND 15 calendar days of the month | Each | 7 | $0.00 | |
| 1000S | Bassam Guard Station | ONE MONTH of water system operation at the Bassam Guard Station | Each | 7 | $0.00 | |
| 1000T | Rourke Ranch | Water System Operation Cost for the FIRST 15 calendar days of the month | Each | 8 | $0.00 | |
| 1000U | Rourke Ranch | Water System Operation Cost for the SECOND 15 calendar days of the month | Each | 8 | $0.00 | |
| Option Year 1 - Optional Items | ||||||
| Optional Items - Filters | Unit | Qty | Unit Price | Total | ||
| 1001 | Pre Filter | Graver STC 3-30NN | Each | 102 | $0.00 | |
| 1002 | Final Filter | Graver QCR 1-30P8E | Each | 28 | $0.00 | |
| Optional Items - Water Quality Testing | ||||||
| 1003 | Total Coliform | SM 9223 | Each | 1 | $0.00 | |
| 1004 | Nitrate | EPA 300.0 | Each | 1 | $0.00 | |
| 1005 | Nitrite | EPA 300.0 | Each | 1 | $0.00 | |
| 1006 | Lead and Copper | EPA 200.8 | Each | 1 | $0.00 | |
| 1007 | Langelier Index | SM 2330-B | Each | 1 | $0.00 | |
| 1008 | MPA | Microparticulate Analysis | Each | 1 | $0.00 | |
| 1009 | PFAS | PFOA, PFOS, PFHxS, PFNA, PFBS, GenX | Each | 1 | $0.00 | |
| Optional Items - Water Hauling | ||||||
| 1010 | Troubleshooting Mobilization | Miles | 1 | $0.00 | ||
| 1011 | Troubleshooting Labor | Hours | 1 | $0.00 | ||
| 1012 | Supplying Potable Water | 3000 gallons | Each | 1 | $0.00 | |
| Optional Items - Storage Tank Inspections | ||||||
| 1013 | Storage Tank Inspection | Each | 1 | $0.00 |
Total: $0.00
OY2
| Item 2000 - Option Year 2 - Mandatory Items | ||||||
| Item No. | Description | Method of Measurement | Unit | Qty | Unit Price | Total |
| 2000A | Monument Work Center | Water System Operation Cost for the FIRST 15 calendar days of the month | Each | 12 | $0.00 | |
| 2000B | Monument Work Center | Water System Operation Cost for the SECOND 15 calendar days of the month | Each | 12 | $0.00 | |
| 2000C | Lake George Work Center | Water System Operation Cost for the FIRST 15 calendar days of the month | Each | 12 | $0.00 | |
| 2000D | Lake George Work Center | Water System Operation Cost for the SECOND 15 calendar days of the month | Each | 12 | $0.00 | |
| 2000E | Eleven Mile Canyon Dwelling | Water System Operation Cost for the FIRST 15 calendar days of the month | Each | 12 | $0.00 | |
| 2000F | Eleven Mile Canyon Dwelling | Water System Operation Cost for the SECOND 15 calendar days of the month | Each | 12 | $0.00 | |
| 2000G | Lake Isabel Work Center | Water System Operation Cost for the FIRST 15 calendar days of the month | Each | 12 | $0.00 | |
| 2000H | Lake Isabel Work Center | Water System Operation Cost for the SECOND 15 calendar days of the month | Each | 12 | $0.00 | |
| 2000I | Carrizo Work Center | Water System Operation Cost for the FIRST 15 calendar days of the month | Each | 12 | $0.00 | |
| 2000J | Carrizo Work Center | Water System Operation Cost for the SECOND 15 calendar days of the month | Each | 12 | $0.00 | |
| 2000K | AG Ranch | Water System Operation Cost for the FIRST 15 calendar days of the month | Each | 12 | $0.00 | |
| 2000L | AG Ranch | Water System Operation Cost for the SECOND 15 calendar days of the month | Each | 12 | $0.00 | |
| 2000M | Crystal Lakes Work Center | Water System Operation Cost for the FIRST 15 calendar days of the month | Each | 7 | $0.00 | |
| 2000N | Crystal Lakes Work Center | Water System Operation Cost for the SECOND 15 calendar days of the month | Each | 12 | $0.00 | |
| 2000O | Brown House Cystal Lakes | Water System Operation Cost for the FIRST 15 calendar days of the month | Each | 12 | $0.00 | |
| 2000P | Brown House Cystal Lakes | Water System Operation Cost for the SECOND 15 calendar days of the month | Each | 12 | $0.00 | |
| 2000Q | Indian Creek Work Center | Water System Operation Cost for the FIRST 15 calendar days of the month | Each | 7 | $0.00 | |
| 2000R | Indian Creek Work Center | Water System Operation Cost for the SECOND 15 calendar days of the month | Each | 7 | $0.00 | |
| 2000S | Bassam Guard Station | ONE MONTH of water system operation at the Bassam Guard Station | Each | 7 | $0.00 | |
| 2000T | Rourke Ranch | Water System Operation Cost for the FIRST 15 calendar days of the month | Each | 8 | $0.00 | |
| 2000U | Rourke Ranch | Water System Operation Cost for the SECOND 15 calendar days of the month | Each | 8 | $0.00 | |
| Option Year 2 - Optional Items | ||||||
| Optional Items - Filters | Unit | Qty | Unit Price | Total | ||
| 2001 | Pre Filter | Graver STC 3-30NN | Each | 102 | $0.00 | |
| 2002 | Final Filter | Graver QCR 1-30P8E | Each | 28 | $0.00 | |
| Optional Items - Water Quality Testing | ||||||
| 2003 | Total Coliform | SM 9223 | Each | 1 | $0.00 | |
| 2004 | Nitrate | EPA 300.0 | Each | 1 | $0.00 | |
| 2005 | Nitrite | EPA 300.0 | Each | 1 | $0.00 | |
| 2006 | Lead and Copper | EPA 200.8 | Each | 1 | $0.00 | |
| 2007 | Langelier Index | SM 2330-B | Each | 1 | $0.00 | |
| 2008 | MPA | Microparticulate Analysis | Each | 1 | $0.00 | |
| 2009 | PFAS | PFOA, PFOS, PFHxS, PFNA, PFBS, GenX | Each | 1 | $0.00 | |
| Optional Items - Water Hauling | ||||||
| 2010 | Troubleshooting Mobilization | Miles | 1 | $0.00 | ||
| 2011 | Troubleshooting Labor | Hours | 1 | $0.00 | ||
| 2012 | Supplying Potable Water | 3000 gallons | Each | 1 | $0.00 | |
| Optional Items - Storage Tank Inspections | ||||||
| 2013 | Storage Tank Inspection | Each | 1 | $0.00 |
Total: $0.00
OY3
| Item 3000 - Option Year 3 - Mandatory Items | ||||||
| Item No. | Description | Method of Measurement | Unit | Qty | Unit Price | Total |
| 3000A | Monument Work Center | Water System Operation Cost for the FIRST 15 calendar days of the month | Each | 12 | $0.00 | |
| 3000B | Monument Work Center | Water System Operation Cost for the SECOND 15 calendar days of the month | Each | 12 | $0.00 | |
| 3000C | Lake George Work Center | Water System Operation Cost for the FIRST 15 calendar days of the month | Each | 12 | $0.00 | |
| 3000D | Lake George Work Center | Water System Operation Cost for the SECOND 15 calendar days of the month | Each | 12 | $0.00 | |
| 3000E | Eleven Mile Canyon Dwelling | Water System Operation Cost for the FIRST 15 calendar days of the month | Each | 12 | $0.00 | |
| 3000F | Eleven Mile Canyon Dwelling | Water System Operation Cost for the SECOND 15 calendar days of the month | Each | 12 | $0.00 | |
| 3000G | Lake Isabel Work Center | Water System Operation Cost for the FIRST 15 calendar days of the month | Each | 12 | $0.00 | |
| 3000H | Lake Isabel Work Center | Water System Operation Cost for the SECOND 15 calendar days of the month | Each | 12 | $0.00 | |
| 3000I | Carrizo Work Center | Water System Operation Cost for the FIRST 15 calendar days of the month | Each | 12 | $0.00 | |
| 3000J | Carrizo Work Center | Water System Operation Cost for the SECOND 15 calendar days of the month | Each | 12 | $0.00 | |
| 3000K | AG Ranch | Water System Operation Cost for the FIRST 15 calendar days of the month | Each | 12 | $0.00 | |
| 3000L | AG Ranch | Water System Operation Cost for the SECOND 15 calendar days of the month | Each | 12 | $0.00 | |
| 3000M | Crystal Lakes Work Center | Water System Operation Cost for the FIRST 15 calendar days of the month | Each | 7 | $0.00 | |
| 3000N | Crystal Lakes Work Center | Water System Operation Cost for the SECOND 15 calendar days of the month | Each | 12 | $0.00 | |
| 3000O | Brown House Cystal Lakes | Water System Operation Cost for the FIRST 15 calendar days of the month | Each | 12 | $0.00 | |
| 3000P | Brown House Cystal Lakes | Water System Operation Cost for the SECOND 15 calendar days of the month | Each | 12 | $0.00 | |
| 3000Q | Indian Creek Work Center | Water System Operation Cost for the FIRST 15 calendar days of the month | Each | 7 | $0.00 | |
| 3000R | Indian Creek Work Center | Water System Operation Cost for the SECOND 15 calendar days of the month | Each | 7 | $0.00 | |
| 3000S | Bassam Guard Station | ONE MONTH of water system operation at the Bassam Guard Station | Each | 7 | $0.00 | |
| 3000T | Rourke Ranch | Water System Operation Cost for the FIRST 15 calendar days of the month | Each | 8 | $0.00 | |
| 3000U | Rourke Ranch | Water System Operation Cost for the SECOND 15 calendar days of the month | Each | 8 | $0.00 | |
| Option Year 3 - Optional Items | ||||||
| Optional Items - Filters | Unit | Qty | Unit Price | Total | ||
| 3001 | Pre Filter | Graver STC 3-30NN | Each | 102 | $0.00 | |
| 3002 | Final Filter | Graver QCR 1-30P8E | Each | 28 | $0.00 | |
| Optional Items - Water Quality Testing | ||||||
| 3003 | Total Coliform | SM 9223 | Each | 1 | $0.00 | |
| 3004 | Nitrate | EPA 300.0 | Each | 1 | $0.00 | |
| 3005 | Nitrite | EPA 300.0 | Each | 1 | $0.00 | |
| 3006 | Lead and Copper | EPA 200.8 | Each | 1 | $0.00 | |
| 3007 | Langelier Index | SM 2330-B | Each | 1 | $0.00 | |
| 3008 | MPA | Microparticulate Analysis | Each | 1 | $0.00 | |
| 3009 | PFAS | PFOA, PFOS, PFHxS, PFNA, PFBS, GenX | Each | 1 | $0.00 | |
| Optional Items - Water Hauling | ||||||
| 3010 | Troubleshooting Mobilization | Miles | 1 | $0.00 | ||
| 3011 | Troubleshooting Labor | Hours | 1 | $0.00 | ||
| 3012 | Supplying Potable Water | 3000 gallons | Each | 1 | $0.00 | |
| Optional Items - Storage Tank Inspections | ||||||
| 3013 | Storage Tank Inspection | Each | 1 | $0.00 |
Total: $0.00
OY4
| Item 4000 - Option Year 4 - Mandatory Items | ||||||
| Item No. | Description | Method of Measurement | Unit | Qty | Unit Price | Total |
| 4000A | Monument Work Center | Water System Operation Cost for the FIRST 15 calendar days of the month | Each | 12 | $0.00 | |
| 4000B | Monument Work Center | Water System Operation Cost for the SECOND 15 calendar days of the month | Each | 12 | $0.00 | |
| 4000C | Lake George Work Center | Water System Operation Cost for the FIRST 15 calendar days of the month | Each | 12 | $0.00 | |
| 4000D | Lake George Work Center | Water System Operation Cost for the SECOND 15 calendar days of the month | Each | 12 | $0.00 | |
| 4000E | Eleven Mile Canyon Dwelling | Water System Operation Cost for the FIRST 15 calendar days of the month | Each | 12 | $0.00 | |
| 4000F | Eleven Mile Canyon Dwelling | Water System Operation Cost for the SECOND 15 calendar days of the month | Each | 12 | $0.00 | |
| 4000G | Lake Isabel Work Center | Water System Operation Cost for the FIRST 15 calendar days of the month | Each | 12 | $0.00 | |
| 4000H | Lake Isabel Work Center | Water System Operation Cost for the SECOND 15 calendar days of the month | Each | 12 | $0.00 | |
| 4000I | Carrizo Work Center | Water System Operation Cost for the FIRST 15 calendar days of the month | Each | 12 | $0.00 | |
| 4000J | Carrizo Work Center | Water System Operation Cost for the SECOND 15 calendar days of the month | Each | 12 | $0.00 | |
| 4000K | AG Ranch | Water System Operation Cost for the FIRST 15 calendar days of the month | Each | 12 | $0.00 | |
| 4000L | AG Ranch | Water System Operation Cost for the SECOND 15 calendar days of the month | Each | 12 | $0.00 | |
| 4000M | Crystal Lakes Work Center | Water System Operation Cost for the FIRST 15 calendar days of the month | Each | 7 | $0.00 | |
| 4000N | Crystal Lakes Work Center | Water System Operation Cost for the SECOND 15 calendar days of the month | Each | 12 | $0.00 | |
| 4000O | Brown House Cystal Lakes | Water System Operation Cost for the FIRST 15 calendar days of the month | Each | 12 | $0.00 | |
| 4000P | Brown House Cystal Lakes | Water System Operation Cost for the SECOND 15 calendar days of the month | Each | 12 | $0.00 | |
| 4000Q | Indian Creek Work Center | Water System Operation Cost for the FIRST 15 calendar days of the month | Each | 7 | $0.00 | |
| 4000R | Indian Creek Work Center | Water System Operation Cost for the SECOND 15 calendar days of the month | Each | 7 | $0.00 | |
| 4000S | Bassam Guard Station | ONE MONTH of water system operation at the Bassam Guard Station | Each | 7 | $0.00 | |
| 4000T | Rourke Ranch | Water System Operation Cost for the FIRST 15 calendar days of the month | Each | 8 | $0.00 | |
| 4000U | Rourke Ranch | Water System Operation Cost for the SECOND 15 calendar days of the month | Each | 8 | $0.00 | |
| Option Year 4 - Optional Items | ||||||
| Optional Items - Filters | Unit | Qty | Unit Price | Total | ||
| 4001 | Pre Filter | Graver STC 3-30NN | Each | 102 | $0.00 | |
| 4002 | Final Filter | Graver QCR 1-30P8E | Each | 28 | $0.00 | |
| Optional Items - Water Quality Testing | ||||||
| 4003 | Total Coliform | SM 9223 | Each | 1 | $0.00 | |
| 4004 | Nitrate | EPA 300.0 | Each | 1 | $0.00 | |
| 4005 | Nitrite | EPA 300.0 | Each | 1 | $0.00 | |
| 4006 | Lead and Copper | EPA 200.8 | Each | 1 | $0.00 | |
| 4007 | Langelier Index | SM 2330-B | Each | 1 | $0.00 | |
| 4008 | MPA | Microparticulate Analysis | Each | 1 | $0.00 | |
| 4009 | PFAS | PFOA, PFOS, PFHxS, PFNA, PFBS, GenX | Each | 1 | $0.00 | |
| Optional Items - Water Hauling | ||||||
| 4010 | Troubleshooting Mobilization | Miles | 1 | $0.00 | ||
| 4011 | Troubleshooting Labor | Hours | 1 | $0.00 | ||
| 4012 | Supplying Potable Water | 3000 gallons | Each | 1 | $0.00 | |
| Optional Items - Storage Tank Inspections | ||||||
| 4013 | Storage Tank Inspection | Each | 1 | $0.00 |
Total: $0.00
Total Bid Price
| Base Price | $0.00 |
| OY1 Price | $0.00 |
| OY2 Price | $0.00 |
| OY3 Price | $0.00 |
| OY4 Price | $0.00 |
| Total Bid Price: | $0.00 |