Attachment 0004 - Technical Exhibit 1 (TE 1) Performance Requirements Summary.pdf

PDF 168 KB Posted

Attached to
U. S. Army Garrison Hawaii Pohakuloa Training Area (PTA), Custodial Service
Solicitation number
W912CN-25-Q-SR01
Issued by

About this file

This Technical Exhibit 1 (TE 1) Performance Requirements Summary outlines custodial service performance standards for a federal contract. The document specifies three primary performance objectives: (1) Scheduled custodial services for physical fitness centers, administrative offices, buildings, restrooms, and kitchens, which include tasks like cleaning windows, vacuuming, mopping floors, and emptying trash/recycle bins; (2) Custodial services for special events outside standard cleaning frequencies; and (3) Annual or semi-annual comprehensive cleaning for restroom and general areas.

Each performance requirement includes specific standards, performance thresholds, and remedies. For scheduled services, the contractor must maintain restrooms and kitchens sanitized, floors free of debris, and waste receptacles clean, with a maximum of three valid customer complaints per month. Special event cleaning must be completed four hours before each event, and annual/semi-annual cleaning must meet 100% compliance with the contract's Performance Work Statement. The primary performance remedy for failing to meet these standards is re-performance, with Acceptable Quality Levels (AQLs) ranging from 95% to 100% depending on the specific service requirement.

View the file

Other files

File Type Posted
Attachment 0001 - SCC 25QSR01 AMENDMENT 3.docx DOCX document
Attachment 0020 - W912CN25QSR01 Questions and Answers Part 2.xlsx XLSX spreadsheet
Attachment 0018 - Wage Determination rev25.pdf PDF
Attachment 0001 - CSS 25QSR01 AMENDMENT 2.docx DOCX document
Attachment 0019 - W912CN25QSR01 Questions and Answers.xlsx XLSX spreadsheet
Attachment 0005 - Technical Exhibit 1A (TE 1A) PRS Freq and Sched Listv2.pdf PDF
Attachment 0001 - SCC 25QSR01 AMENDMENT 0001.pdf PDF
Attachment 0017 - Technical Exhibit 8A (TE 8A) PTA Buildings Built Before 1990 With No ACM Survey data.pdf PDF
Attachment 0012 - Technical Exhibit 6B (TE 6B) PTA Theater Cleaning Map-20210528.pdf PDF
Attachment 0011 - Technical Exhibit 6A (TE 6A) PTA Cantonment MAP.pdf PDF
Attachment 0016 - Technical Exhibit 8 (TE 8) PTA Buildings Built Before 1990 With ACM.pdf PDF
Attachment 0009 - Technical Exhibit 5 (TE 5) List of Facilities to receive services.pdf PDF
Attachment 0003 - Work Experience Reference Sheet.pdf PDF
Attachment 0015 - Technical Exhibit 7 (TE 7) USAG-PTA Spill Notification Form (updated 26 FEB 2025).pdf PDF
Attachment 0014 - Technical Exhibit 6D (TE 6D) PTA Custodial Services Building POCs codes rev-20220201-current.pdf PDF
Attachment 0013 - Technical Exhibit 6C (TE 6C) Area Map PTA Fire Station.pdf PDF
Attachment 0008 - Technical Exhibit 4 (TE 4) Annex SA-A_1 to OPORD 24-015 Srvc 402 Custodiall-Performance-Stds 20231218.xlsx XLSX spreadsheet
Attachment 0005 - Technical Exhibit 1A (TE 1A) PRS Freq and Sched List.pdf PDF
Attachment 0002 - Annex SA-A to OPORD 24-015 PWS PTA Custodial Services final 25Jun2025 (002).pdf PDF
Attachment 0001 - SCC 25QSR01.pdf PDF
Attachment 0010 - Technical Exhibit 6 (TE 6) Locations Hours and POCs.pdf PDF
Attachment 0007 - Technical Exhibit 3 (TE 3) Estimated Workload Data_Historical Data.pdf PDF
Attachment 0006 - Technical Exhibit 2 (TE 2) Deliverables Schedule.pdf PDF
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Technical Exhibit 1 (TE 1) Performance Requirements Summary

Performance Objective Standard Performance Threshold

Incentive/Remedy

PRS # 1. Custodial Services for scheduled cleaning physical fitness center, administrative offices, buildings, restrooms and kitchens, removing trash and emptying recycle bins, cleaning windows, vacuuming and spot cleaning carpet, sweeping and mopping floors, buffing, dusting, scrubbing walls, cleaning upholstered furniture, and other associated work.

PWS Paragraph 1.1.

a) Restrooms and kitchens shall be cleaned and sanitized using a germicidal agent and free from water and scale deposits, soil, streaks, and other removable matter.

b) Floors shall be free of free of soil, dirt, debris, litter, and other foreign matter.

c) Waste receptacles shall be left empty, clean, free of foreign matter, and free of odors.

AQL: No more than three (3) valid customer complaints per month.

AQL: 95%

Re-performance.

PRS # 2.

The Contractor shall provide Custodial Services for special events, which shall be outside of the established frequencies for custodial services as directed by the KO.

PWS paragraph 5.2.

The Contractor shall complete all cleaning tasks four

(4) hours prior to each event, and possibly during and after depending on the event situation.

AQL: 95% Re-performance.

PRS # 3.

The Contractor shall provide Annual (A) or Semi-Annual cleaning for all (restroom and General areas).

a) All cleaning is accomplished IAW contract PWS.

AQL: 100% Re-performance.

File details come from the government source that posted it. Updated .