Attachment 0001 - Statement of Work - dated 20 February 2026.pdf

PDF 225 KB Posted

Attached to
Revitalization of the Uninterruptable Power Supply Amendment 0002
Solicitation number
W519TC26QA127
Issued by

About this file

STATEMENT OF WORK: UPS REVITALIZATION PROJECT

This is a Statement of Work issued by the Department of the Army, Headquarters First Army, dated 20 February 2026, for the revitalization of the Uninterruptible Power Supply (UPS) system supporting the First Army Headquarters facility in Building 68 at Rock Island Arsenal, Rock Island, Illinois. The project requires replacement of UPS componentry using original equipment manufacturer parts from Schneider Electric, specifically SKU WMPR505-MP-505 for the Modular Revitalization program. The UPS cabinet and batteries will remain in place during the revitalization.

The scope of work encompasses delivery of all replacement components, including intelligence modules, static switch and H.E. power modules, power view display, network management card, switchgear board, battery monitor board, and system PSU. The contractor must provide on-site certified service professionals to remove existing componentry and install new components, configure the system to meet required supply specifications, dispose of old componentry, and provide a one-year service agreement. The point of contact is LTC Jon W. Hatcher, First Army G-4 Operations, at 520-687-2518 or jon.w.hatcher.mil@army.mil.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF THE ARMY

HEADQUARTERS, FIRST ARMY

1 RODMAN AVENUE BUILDING 68

ROCK ISLAND ARSENAL

ROCK ISLAND, ILLINOIS 61299-8100

AFKA-LG 20 February 2026

MEMORANDUM Army Contracting Command- Rock Island Arsenal, Illinois

SUBJECT: Statement of Work for Revitalization of the Uninterruptable Power Supply for First Army Headquarters.

1. First Army is seeking a revitalization of the Uninterruptable Power Supply (UPS) system that supports the Headquarters facility in building 68 on Rock Island Arsenal

2. The UPS cabinet and batteries are to remain in place. Therefore, we specifically require replacement of componentry with original equipment manufacture parts from Schnieder electric. Schnieder electric Modular Revitalization is performed through purchase of SKU WMPR505-MP-505.

a. Associated components for replacement are as follows: intelligence modules, static switch+ H.E. power modules, power view display, network management card, switchgear board, battery monitor board, system PSU.

b. Associated work for revitalization of the UPS is as follows: delivery of all components, on-site certified service professionals to remove old componentry and install new componentry, configuration of system ensuring it meets required supply specifications, disposal of old componentry, and one year service agreement.

3. Point of Contact. LTC Jon W. Hatcher, First Army G-4 Operations, at 520-687- 2518, jon.w.hatcher.mil@army.mil.

JON W. HATCHER

LTC, LG

Operations Chief, G-4

File details come from the government source that posted it. Updated .