This is a Performance Work Statement (PWS) for a CCTV and Access Control System installation project at Building 4411, Fort Meade, Maryland. The document outlines the technical and operational requirements for establishing a new, standalone security system to be managed by Public Health Command, East, replacing an existing system controlled by another agency that does not meet current security standards.

The PWS specifies that the contractor must provide all personnel, equipment, supplies, transportation, tools, materials, supervision, and services necessary to deliver a complete and operational CCTV and Access Control system. The contract is structured as a total small business set-aside under NAICS code 561621 (Security Systems Services), with a size standard of $25 million. The requirement will be awarded as a single Firm Fixed Price contract with a twelve-month base period and four one-year option periods. The contracting agency is the Department of the Army Materiel Command, Mission and Installation Contracting Command at Fort Sam Houston. The solicitation number is W91QV126RA069, and the government intends to award a single contract to one qualified small business contractor. The project is designed to enhance safety and security for all building personnel and visitors by establishing an independent system with current security capabilities.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE WORK STATEMENT (PWS)

CCTV/Access Control Installation Building 4411

PART 1

GENERAL INFORMATION

1. General: This is a non-personal services contract to provide and install a complete and operational CCTV and Access Control system at 4411 Llewellyn Avenue, Fort Meade, MD 20755. The Government shall not exercise any supervision or control over the contract service providers. Such contract service providers shall be accountable solely to the contractor, who, in turn, is responsible to the Government.

1.1 Description of Services/Introduction: The contractor shall provide all personnel, equipment, supplies, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform the CCTV and Access Control installation as defined in this PWS. The contractor shall perform all work to the standards specified in this contract. The CCTV and access control system will be a standalone system that will not be in connection with Fort George G. Meade military emergency response personnel. The older CCTV and access control system will need to be removed from the space and an off-network CCTV and access control system will have to be installed to connect to rooms 124, 112A, and 106E. The previous system is obsolete and cannot be used to configure new system. Public Health Command, East has dropped ceilings to create space for the standalone system to be installed to the above-mentioned rooms to monitor the capabilities of the system.

1.2 Background: Building 4411 requires a new, standalone security system to be managed by Public Health Command, East. The existing system is in the controlled space of another tenant agency and does not meet current security requirements. This project will establish an independent standalone system to enhance the safety and security of all building personnel and visitors. The older CCTV system will need to be removed from the space, and an off-network CCTV system will have to be installed to connect to rooms 124, 112A, and 106E. The previous system cannot be used to reconfigure wiring for the new system.

1.3 Objectives:

The goal of this contract is to deliver a turnkey security solution. The specific objectives the contractor must achieve are outlined below:

1. Engineer, furnish, and install a fully integrated Access Control, CCTV, and Video Intercom system that functions seamlessly as a unified security platform.

2. Ensure all hardware, software, and edge devices are brand new, fully licensed, and operate strictly in accordance with manufacturer specifications and the performance thresholds defined herein.

3. Deliver a secure, highly reliable, and user-friendly interface optimized for day-to-day monitoring and management by Government personnel.

4. Provide comprehensive, end-to-end operational and administrative training for all installed CCTV and Access Control systems. Training must ensure designated Government personnel are fully proficient in system operation, credential management, video retrieval, and basic troubleshooting.

5. Deliver complete system documentation, including as-built drawings, Operations & Maintenance (O&M) manuals, and database logs to support long-term system sustainment.

6. Provide a comprehensive, one-year (12-month) base installation warranty covering all parts, labor, and software configurations. During this base year, the contractor shall fully remediate and repair any equipment or system failures at no additional cost to the Government.

1.4 Scope: The contractor shall engineer, furnish, install, and test complete Access Control and CCTV system. The work includes providing and installing all required cameras, card readers, control panels, servers, workstations, door hardware, power supplies, and cabling. The system components are detailed in Part 5.

1.5 Key Personnel: The contractor shall provide a contract manager with at least two years of experience who shall be responsible for the performance of the work. The name and resume of this person and an alternate who shall act for the contractor when the manager is absent shall be submitted with the proposal. The contract manager or alternate shall have full authority to act for the contractor on all contract matters relating to daily operation of this contract. The contract manager or alternate shall be available between 0730 - 1630, Monday through Friday except federal holidays or when the government facility is closed for administrative reasons.

1.6 Period of Performance: The period of performance shall be for one (1) base year of 12 months and four (4) option years of maintenance for software/equipment repair. All physical installation, testing, and delivery of documentation shall be completed within the base year period.

Base Year 2026 Option Year I 2027 Option Year II 2028 Option Yeat III 2029 Option Year IIII 2030

1.7 Type of Contract: The Government will award a Firm-Fixed-Price (FFP) contract.

1.8 Place of Performance: Work will be performed at 4411 Llewellyn Avenue, Fort Meade, MD 20755, including the first floor, basement, and building exterior.

1.9 Hours of Operation: The contractor shall conduct business between 0800 and 1600 hours, Monday through Friday, excluding Federal holidays or when the Government facility is closed.

1.9 Federal Government Holidays:

New Year’s Day1st day of January
Martin Luther King Jr. Day3rd Monday of January
Presidents Day3rd Monday of February
Memorial DayLast Monday of May
Juneteenth Day19th day of June
Independence Day4th day of July
Labor Day1st Monday of September
Columbus Day2nd Monday of October
Veterans Day11th day of November
Thanksgiving Day4th Thursday of November
Christmas Day25th day of December

Part 2 Quality & Security Requirements

2.1 Quality Control Plan (QCP): The contractor shall develop, implement, and maintain an effective Quality Control Plan (QCP) and submit it to the Contracting Officer's Representative (COR) prior to project mobilization. The QCP is the contractor’s internal framework for ensuring all work meets the standards of this PWS. The QCP must, at a minimum, include:

2.1.1 Roles & Responsibilities: Definition of a QC Manager and Lead Technician responsible for overseeing quality.

2.1.2 Pre-Installation Checks: A process for inspecting and verifying all materials and equipment upon receipt against the bill of materials to identify shipping damage or discrepancies.

2.1.3 In-Process Inspections: Checklists for verifying installation quality during work, including cable routing, hardware mounting, and weatherproofing.

2.1.4 Configuration & Integration QC: Procedures for testing the logical setup, including software programming, network configuration, and system integrations.

2.1.5 Deficiency Tracking: A log and correction process for any item that fails a quality check. All deficiencies must be corrected and re-tested at the contractor's expense.

2.2. Quality Assurance (QA): The Government will evaluate the contractor’s performance in accordance with the Quality Assurance Surveillance Plan (QASP). The QASP enables the Government to verify that the contractor’s quality control efforts are effective and that services meet the performance standards of the contract, as detailed in Technical Exhibit 1.

2.3 Security Requirements:

2.3.1 Personnel Vetting: All contractor personnel must be thoroughly vetted through the Fort Meade visitor center to gain installation access. A formal security clearance is not required. The Government sponsor for visitor access will be Public Health Command, East Security Manager.

2.3.2 Required Training: All contractor personnel must complete AT Level 1, OPSEC Level 1, iWATCH, and TARP training prior to commencing work on the installation. Certificates of completion must be provided to the COR.

Antiterrorism (AT) Level I Training. This provision is for Contractor HCWs with an area of performance within an Army controlled installation, facility, or area. All Contractor HCWs, to include subcontractor HCWs, requiring access to Army installations, facilities and controlled access areas shall complete AT Level I awareness training within 30 calendar days after start date. The Contractor shall submit certificates of completion for each affected Contractor HCW and subcontractor employee, to the COR or to the contracting officer, if a COR is not assigned, within 7 calendar days after completion of training by all HCWs and subcontractor personnel. AT Level I awareness training is available at the following website: https://jkodirect.jten.mil/Atlas2/page/desktop/DesktopHome.jsf or at https://atlevel1.dtic.mil/at

OPSEC TRAINING. Per AR 530-1 Operations Security, the contractor employees must complete Level I OPSEC Awareness training. New employees must be trained within 30 calendar days of their reporting for duty and annually thereafter. Level I OPSEC training is available at the following website:

http://cdse.edu/catalog/elearning/GS130.html (Duration: 45 minutes).

iWATCH Training: The Government will brief all Contractor personnel on the local iWATCH program. This local developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activities to their COR. Contractor employees must complete iWATCH training within 30 calendar days of reporting to duty.

TARP Training. Per AR 381-12, This regulation applies to all AD, ARNG, USAR, and applies to Department of Army Civilian personnel, Army Contractors as incorporated by the terms of the contract. Training will be either a stand-alone briefing tool (SBT_ and/or a computer Web-based alternative training (CBT) Makes the training and reporting requirements of this regulation applicable to all Army contractors if included in the applicable contract, not just those with security clearances. Subject to the incorporation of these requirements into the contract, ensure that contractors, over whom they have cognizance attends live TARP training at least annually and report threat-related incidents, behavioral indicators, and other matters of CI interest specified in chapter 3, to the facility security officer, the nearest military CI office, the FBI, or the Defense Security Service.

2.3.3 Physical Security: The contractor is responsible for safeguarding all Government property and equipment. All work areas, equipment, and materials shall be secured at the close of each work period.

2.3.4 Key/CAC Control: The contractor will not be provided keys to the building, contractor will be escorted to area of work by Public Health Command, East personnel.

PART 3

GOVERNMENT-FURNISHED ITEMS

3.1 Facilities & Utilities: The Government will provide access to the building and necessary installation spaces, including Rooms 105, 106E, 112A, and 124. The Government will also provide access to existing electrical utilities required for the installation. The contractor shall use utilities conservatively.

PART 4

CONTRACTOR-FURNISHED ITEMS

4.1 General: The contractor shall furnish all supplies, equipment, tools, software, licenses, and services required to perform the work under this contract that are not explicitly listed under Part 3.

PART 5

SPECIFIC TASKS

5.1. Task: Integrated Security System Installation: The contractor shall provide, install, and test the following integrated systems:

5.1.1. Access Control System:

· One (1) Lenel 32ES or equivalent standalone access control system.

· One (1) Lenel or equivalent Intelligent Controller board.

· One (1) Lenel or equivalent Dual Reader Board.

· Four (4) total card readers: two on the first floor (front/rear), one at the basement ambulance entrance, and one in the stairwell.

· Electrified door hardware as required for full functionality.

· Four (4) request-to-exit (REX) motion detectors.

· Seven (7) door contacts.

· One (1) Altronix or equivalent power supply with battery backup.

· One hundred (100) programmed access cards.

5.1.2. CCTV System:

· Twenty (20) total fixed-view cameras: seven (7) exterior, eleven (11) interior, and two (2) 180-degree multiview exterior cameras.

· One (1) Axis or equivalent S1216-series recording tower server with twenty (20) camera licenses.

· One (1) BCDT04 or equivalent video workstation with a 24-inch monitor, to be in room 112A

5.1.3. Video Intercom System:

· Four (4) Aiphone or equivalent video door stations.

· One (1) master intercom unit located in room 124.

· Two (2) submaster stations located in Room 106E and room 112A.

5.2 Post-Award & Progress Meetings: The contractor shall attend a post-award conference and periodic progress meetings (minimum quarterly) with the Contracting Officer and COR to review performance and resolve any issues.

PART 6

APPLICABLE PUBLICATIONS

6.1. Compliance: The contractor must abide by all applicable regulations, publications, and local policies, including but not limited to:

· Army Regulation (AR) 190-13 (Physical Security)

· Army Regulation (AR) 25-2 (Information Assurance)

· Army Regulation (AR) 530-1 (Operations Security)

· FAR 52.222-50 (Combating Trafficking in Persons)

TECHNICAL EXHIBIT 1

Performance Requirements Summary

The Contractor service requirements are summarized into performance objectives that relate directly to mission failure if not accomplished. The performance threshold briefly describes the minimum acceptable levels of service required for each requirement. These thresholds are critical to mission success.

Performance Objective
Standard
Performance Threshold
Method of Surveillance

PRS #1

System Installation (Access Control, CCTV, Intercom) ((Reference PWS Para 1.1, 1.6,5.1)

Provide and install a fully integrated, off-network system. Hardware/software must be brand new and meet manufacturer specs.
100% compliance with Bill of Materials; Zero unauthorized part substitutions.
Pre-installation checks (Para. 2.1.2) & In-process QASP inspections (Para. 2.2).
PRS #2 System Functionality (Reference PWS Para1.2, 1.3(Obj 1-3))
Deliver a secure, highly reliable interface optimized for Government monitoring in Rooms 124, 112A, and 106E.
100% operational capability upon final testing with zero initial critical system failures.
Configuration & Integration QC testing (Para 2.1.4) by Contractor; QASP validation by COR

PRS #3

Training Execution (Reference PWS Para 1.3(Obj 4))

Provide comprehensive, end-to-end operational and administrative training.
100% of designated Government personnel trained prior to final system sign-off.
Verification and sign-in sheet review by COR.
PRS #4 System Documentation (Reference PWS Para. 1.3(Obj 5))
Deliver complete as-built drawings, O&M manuals, and database logs.
100% complete and accurate documentation provided prior to the end of the Base
Document review and acceptance by COR.cards. Manual audit of the database log mapping.
PRS #5 Warranty & Repair (Reference PWS Para 1.3 (Obj 6))
Provide a 12-month base warranty covering all parts, labor, and configurations.
100% of equipment/system failures fully remediated at no additional cost during the base year.
Deficiency tracking log review (Para. 2.1.5) & COR performance monitoring.
Quality Control (QC) (PWS Reference Para 2.1, 2.2)
Develop and maintain an effective Quality Control Plan (QCP).
QCP submitted and approved prior to mobilization; zero uncorrected inspection deficiencies.
QASP evaluation by Government (Para 2.2).
Security & Training Compliance (PWS Reference Para 2.3.1, 2.3.2)
Personnel vetted; complete AT Level 1, OPSEC, iWATCH, and TARP. Secure equipment daily.
100% of personnel complete training within 30 days; zero physical security breaches.

Verification of training certificates; Visual inspections of work areas (Para 2.3.3).

TECHNICAL EXHIBIT 2

DELIVERABLES SCHEDULE

Deliverable
Frequency
# of Copies
Medium/Format
Submit To
Quality Control Plan (QCP) (PWS Para 2.1)
Once, prior to mobilization
1
Electronic (PDF/Word)
Contracting Officer's Representative (COR)
AT Level I Training Certificates (Ref: PWS Para 2.3.2)
Complete within 30 calendar days after start; Submit within 7 calendar days of completion
1 Copy per employee
Electronic (PDF / JKO Export)
Security Manager and COR
OPSEC Level I Training Certificates (Ref: PWS Para 2.3.2)
Within 30 calendar days of reporting; Annually thereafter
1 Copy per employee
Electronic (PDF / CDSE Export)
Security Manager and COR
iWATCH Training Certificates (PWS Reference Para 2.3.2)
Within 30 calendar days of reporting to duty
1 Copy per employee
Electronic (PDF)
Security Manager and COR
TARP Training Verification (Ref: PWS Para 2.3.2)
Annually

1 Copy per employee

Electronic (PDF or live roster)
Security Manager and COR
Integrated Security System Installation (Ref: PWS Para 1.3,1.6,5.1)
Once, physical installation fully completed within Base Year (2026)
1 Complete System
Fully configured physical hardware, software, & licenses
COR
Programmed Access Cards (Ref: PWS Para 5.1.1)
Once, at time of system delivery
100 Cards
Physical Cards
COR, & Security Manager
System Training (Ref: PWS Para 1.3 (Obj 4))
Once, within Base Year (2026) prior to final acceptance
N/A (Event)
Live, hands-on instruction (with sign-in sheet)
Designated Government Personnel (via COR)
System Documentation (As builts/O&M) (Ref: PWS Para 1.3 Obj 5, 1.6)
Once, completed within Base Year (2026)
1 Complete Set

Electronic (PDF/CAD) & Printed Hardcopy

COR

Post-Award & Progress Meetings (Ref: PWS Para 5.2)
Minimum Quarterly, starting with the Post-Award conference
N/A (Event)
In-person or Virtual (with meeting minutes)