Attach3.1240LU26Q0010NinemileTechSpecs.pdf

PDF 41 MB Posted

Attached to
LOLO NATIONAL FOREST - Ninemile Water & Wastewater and St. Regis Wastewater Improvements
Solicitation number
1240LU26Q0010
Issued by

About this file

This is a comprehensive technical specifications document for water and wastewater system improvements at the Ninemile Ranger Station and related facilities on the Lolo National Forest in Montana. The project involves replacement of the water transmission system, water distribution system, sanitary sewer collection system, and installation of a new subsurface wastewater treatment system including a 6,000-gallon septic tank, dosing pump vault with two submersible effluent pumps rated at 37 gallons per minute and 32 feet total dynamic head, and a pressure-dosed drainfield system consisting of five 1.5-inch PVC manifolds with four 110-foot perforated laterals covering 6,600 square feet. The work also includes installation of HDPE water transmission mains, PVC gravity and force sewer mains, concrete and precast manholes, water meters, fire hydrants, gate valves, round rail fencing, and electrical systems with hardwire-based remote monitoring capabilities for the water tanks.

The specifications require strict adherence to Montana Public Works Standard Specifications (Seventh Edition, April 2021), AWWA standards for water systems, ASTM standards for materials and testing, and various codes including the National Electrical Code. The contractor must provide comprehensive testing including hydrostatic and leakage testing of water and sewer lines, television inspection of all sewer mains, bacteriological examination of water supplies, and field density and compaction testing of backfill materials. Special provisions require site restoration of all disturbed areas, dust and erosion control measures, maintenance of wastewater flows through temporary bypass pumping, coordination with Missoula County Health Department for onsite wastewater system inspections, and manufacturer training of at least eight hours for the dosing pump system. The contractor is responsible for all permits, environmental compliance including Storm Water Pollution Prevention Plans, and coordination with utility locating services prior to excavation. Payment will be made based on bid items including mobilization, survey and staking, linear feet of pipe installation, each manhole or valve installed, and lump sum items for septic systems and drainfield work.

View the file

Other files

Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

October 2024

Project Manual

Ninemile Remount Depot and Ranger Station

Water and Sewer Improvements USDA Forest Service Region One

Lolo National Forest

Prepared by:

Set No.: ____________

Project #1-23202

TECHNICAL SPECIFICATIONS

October 2024

NINEMILE HISTORIC REMOUNT DEPOT AND

RANGER STATION

WATER AND WASTEWATER SYSTEM

IMPROVEMENTS

U.S.D.A Forest Service Region One Lolo National Forest

Ninemile Ranger District Missoula County, Montana

Prepared by:

Dan Baum

QAQC by:

Matt Mudd, PE Chad Hanson, PE

TABLE OF CONTENTS

DIVISION – SPECIAL PROVISIONS

Section Title 00910 Special Provisions

DIVISION 1 – GENERAL REQUIREMENTS

Division Title 01010 Summary of Work 01275 Measurement and Payment (Water and Wastewater) 01300 Submittals 01410 Regulatory Requirements 01420 References 01430 Quality Assurance 01450 Quality Control 01500 Temporary Facilities and Controls 01660 Product Storage and Handling 01700 Contract Closeout 01712 Field Engineering 01730 Execution Requirements 01740 Cleaning and Waste Management

DIVISION 2 – SITE CONSTRUCTION

02221 Trench Excavation 02222 Plowing Pipeline Installation 02232 Site Clearing 02300 Earthwork 02615 Piping Valves and Accessories 02650 Temporary By-Pass Pumping 02660 Water Distribution 02665 HDPE Pipe 02730 Sanitary Sewer Collection Systems 02824 Round Rail Fence 02910 Seeding

DIVISION 11 – EQUIPMENT

11600 Subsurface Treatment System

DIVISION 16 – ELECTRICAL

16000 General Electrical Requirements 16060 Grounding and Bonding for Electrical Systems 16070 Hangers and Supports for Electrical Systems 16075 Identification for Electrical Systems 16123 Low-Voltage Electrical Power Conductors and Cables 16130 Raceway and Boxes for Electrical Systems 16150 Equipment Wiring Connections 16411 Enclosed Switches

APPENDIX

Appendix A- Ninemile Transmission Soils Investigation

SPECIAL PROVISIONS

SECTION 00910

SP-01 INCORPORATION OF THE MPWSS

SP-02 QUALIFICATIONS OF CONTRACTOR, SUBCONTRACTORS, SUPPLIERS, AND

OTHERS

SP-03 SUBSURFACE AND PHYSICAL CONDITIONS (Test Pits)

SP-04 PREBID EXPLORATION/SITE INFORMATION

SP-05 SPOIL

SP-06 BEST MANAGEMENT PRACTICES

SP-07 WATER FOR CONSTRUCTION

SP-08 SITE RESTORATION

SP-09 PRIVATE ACCESS

SP-10 LANDSCAPED AREAS

SP-11 REMOVAL AND REPLACEMENT OF FENCES, SIGNS, SIDEWALKS, CURBS,

GUTTERS, POSTS, BARRICADES, ETC

SP-12 REMOVAL AND REPLACEMENT OF EXISTING FENCES

SP-13 STAGING AREA

SP-14 CONFLICTS WITH UTILITIES

SP-15 DEWATERING

SP-16 TESTING

SP-17 CONSTRUCTION STAKING

SP-18 CONTRACT PERIOD SHUTDOWN

SP-19 PERMITS

SP-20 TEMPORARY PROJECT SIGNS

SP-21 EASEMENTS, CONSTRUCTION LIMITS, AND RIGHT-OF-WAY

SP-22 WORKING HOURS

SP-23 CONTRACTOR EMERGENCY CONTACT

SP-24 SEEDING

SP-25 FIELD OFFICES

SP-26 DETECTABLE WARNING TAPE

SP-27 TRACER WIRE

SP-28 SUBCONTRACT LIMITATIONS

SP-29 WATER AND SEWER SERVICE REQUIREMENTS

SP-30 TRAFFIC CONTROL

SP-31 COORDINATION WITH LOCAL POWER SUPPLIER

SP-32 EXPLORATORY EXCAVATION

SP-33 SURFACE RESTORATION/CLEANUP

SP-34 CHANGES OR MODIFICATIONS TO PROJECT PLANS AND/OR SPECIFATIONS 14

SP-35 GROUNDWATER DEPTHS

SP-36 WATER TANK HARDWIRE BASED REMOTE MONITORING AND ALARMS

SP-01 INCORPORATION OF THE MPWSS

All provisions of the Montana Public Works Standard Specifications, Seventh Edition, April 2021, hereafter collectively referred to as the MPWSS, apply to the project, except where portions of the MPWSS are modified or replaced by the Contract Documents. Each Section of the MPWSS that has been modified is listed in the Table of Contents of Section 00950 Standard Modifications to MPWSS. The entire Section from the MPWS has not been rewritten for these modifications. Instead, modifications are indicted for a specific subsection, paragraph, sentence or drawing.

Where a Standard Modification to MPWSS does not exist for a particular Section of MPWSS it shall be assumed the work is to be completed in accordance with the appropriate MPWSS Section. When a Standard Modification to MPWSS does exist the requirements of that modification supersede the related MPWSS requirement. Where paragraphs are specifically deleted or modified, or new paragraphs added, all other parts of the MPWSS will remain in effect unless otherwise modified by the Project Manual in accordance with the order of governance as specified in “Summary of Work”. Forms included in the Project Manual will be used in lieu of similarly titled forms in the MPWSS. Where Technical Specifications follow the Modifications in later Divisions of the Project Manual, those Specifications replace same numbered specifications in the MPWSS.

SP-02 QUALIFICATIONS OF CONTRACTOR, SUBCONTRACTORS, SUPPLIERS, AND

OTHERS

Provide qualifications for the Contractor and all Subcontractors, Suppliers, or other persons or organizations identified in Technical Specifications per the guidelines in the respective specification sections.

Per Article 3.1 of the Instructions to Bidders, within five (5) calendar days of the Government’s or CO’s request, submit the evidence of qualifications listed in the referenced article as well as the following additional information.

• A list of at least three (3) jobs successfully completed within the last five (5) years by the Bidder similar in size and scope to the Work, including references for each project;

• The proposed Superintendent’s name and resume; and

• The general availability of the Bidder to complete the Work within the specified contract timeframe and milestone deadlines.

In accordance with Article 6.06 of the General Conditions and Supplementary Conditions to the General Conditions, provide a list of all Subcontractors, Suppliers, or other persons or organizations providing Work or items of equipment exceeding $5,000 within five (5) calendar days of the Government’s or CO’s request. For each Subcontractor, Supplier, or other person or organization, include on the list the primary contact and phone number, approximate anticipated monetary value of Work, and a list of similar projects over the past three (3) years.

SP-03 SUBSURFACE AND PHYSICAL CONDITIONS (Test Pits)

In the preparation of Drawings and Specifications, the Government or CO’s Consultants relied upon the following reports of exploration and tests of subsurface conditions at the Site:

1. Professional Consultants, INC Soils Report for Ninemile Remount Depot dated 10/30/23

2. 1968 Water System- Ninemile Ranger Station Plan set, prepared for Lolo National Forest, 1968.

These reports and drawings are not part of the Contract Documents, but the “technical data” contained therein upon which the Contractor may rely as identified and the above are incorporated therein by reference. Contractor is not entitled to rely upon other information and data utilized by government and CO’s Consultants in the preparation of Drawings and Specifications. The table below shows the test pit information gathered in the 1967 water system project. Appendix A also has test pit information along the transmission main route as dug by the USFS.

1968 Station STA 11+60 1968 Station STA 27+80 2024 Station Approx. STA 14+00 2024 Station Approx. STA 39+00 Depth Soils Depth Soils 0-1' Topsoil 0-6" Topsoil 1-2' Silt 50%, Rock 0" to 6" 50% 6"-2' Silt Clay 95%, Rock 1" to 6" 5% 2-6' Silty Sand 30%, Rock 0" to 6" 60%, Rock 6" to 12" 10% 2- 3' Silt Clay 50%, Rock 1" to 6" 50%

3-4' Silt Clay 30%, Rock 1/2" to 3" 50%, Rock 6" to 12" 20% 4-6' Silt Clay 100%

1968 Station STA 21+00 2024 Station Approx. STA 26+50 Depth Soils 1968 Station STA 29+95 0-6" Topsoil 2024 Station Approx. STA 40+50 6"-2' Silt 90%, Rock 0" to 6" 10% Depth Soils 2-4' Silt 50%, Rock 1" to 12" 40%, Large Rock +12" 10%, 0-6" Topsoil 4-6' Clay Silt 50%, Rock 1" to 6" 30%, Rock 12" 20% 6"-3' Silt 100%

3-5' Sandy Silt 100% 5-7" Sandy 40%, Rock 1/2" to 2" 60%

1968 Station STA 22+50 2024 Station Approx. STA 29+00 Depth Soils 1968 Station STA 31+30 0-1.5' Topsoil 80%, Rock 6" to 12" 20% 2024 Station Approx. STA 42+30 1.5'-3' Clay 80%, Rock 4" to 12" 20% Depth Soils 3-6' Clay 30%, Rock 1" to 6" 40%, Rock +12" 30% 0-1' Topsoil

1'-3' Silt 100% 3-6' Sandy Silt 100%

1968 Station STA 25+00 2024 Station Approx. STA 31+00 Depth Soils 1968 Station STA 34+00 0-1' Topsoil 90%, Rock 4" to 12" 10% 2024 Station Approx. STA 46+00 1'-3' Dirt 90%, Rock 6" to 12" 10% Depth Soils 3-4' Dirt 70%, Rock 6" to 12" 30% 0-6" Topsoil 4-6' Clay 70%, Rock 6" to 8" 30% 6"-2' Soil 70%, Rock 6" to 12" 20%, Rock +12" 10% 5' Water 2-6' Silt Clay (Hard)

SP-04 PREBID EXPLORATION/SITE INFORMATION

All Bidders are required to visit the site to become familiar and satisfied as to the general, local, and site conditions that may affect cost, progress and the performance of the work. Bidder is recommended to conduct all additional field investigations at their disposal to accurately classify the nature of the work.

Obtain written authorization from the Government utilities, and others who may be directly affected prior to entering the property, conducting field tests, drilling, boring, excavating, or test pumping.

If potential Bidders wish to excavate test pits, the excavations will be limited to the vicinity of those areas that appear on the Drawings to be excavated. Excavations in paved areas will not be allowed without written permission from the Government. Excavations must be backfilled in a reasonably uniform manner and graded to the original ground surface line and grade. Backfill in unpaved streets, parking areas, or alleys must be compacted as specified in the Contract Documents and surfaced with four inches of new or existing gravel.

SP-05 SPOIL

The Contractor will be responsible for the disposal of all excess spoil material. Excess material may not be disposed of on site.

SP-06 BEST MANAGEMENT PRACTICES

Dust Control – Dust control is to be considered an integral part of the Work. Dust Control shall be provided from the start of construction until the Work is complete. Fugitive dust as a result of construction shall be controlled at all times within the subject property. The Contractor shall have a water truck available for dust control prior to beginning any construction tasks. Wetting shall be done a minimum of twice per day in dry conditions or at the direction of the CO or Government as required until the final construction activities are completed. Contractor shall be prepared to provide dust control until the final surface restoration is completed. All costs incurred to meet dust control requirements are incidental to other items of the contract and no separate payment shall be made.

Road and Parking Lot Cleaning – It shall be the sole responsibility of the contractor to keep all roads and parking lots free from mud, gravel, cobbles or other contaminants generated as a result of construction activities. It shall be the responsibility of the contractor to clean all foreign matter from roads and parking areas in a reasonable amount of time as determined by the Government & CO. All costs incurred to meet road and parking lot cleaning requirements are incidental to other items of the contract and no separate payment shall be made.

Erosion Control Measures – Temporary erosion and sediment control measures include the installation and maintenance of temporary structural control measures to reduce or eliminate the erosion of soil and transport of sediment offsite as result of construction activities. This may include, but not be limited to, silt fences, ditch checks, sediment basins, erosion control mats, stabilized construction entrance, temporary diversions, inlet protection, sediment traps, and slope drains. If erosion control measures are required, it shall be the responsibility of the contractor to install and maintain them throughout the construction. The Contractor is required to complete a Storm Water Pollution Prevention Plan – see SP-

19. All costs incurred to meet erosion control requirements are incidental to other items of the contract and no separate payment shall be made.

Noxious Weed Control – Comply with the County Noxious Weed Management Act, Title 7, Chapter 22, Part 21 and all county and contract noxious weed control requirements. Determine the specific noxious weed control requirements of each county where the project is located before submitting a bid.

Equipment and vehicles will be washed prior to entering the project site to remove vegetation to avoid the spread of weeds. All costs incurred to meet noxious weed control requirements are incidental to other items of the contract and no separate payment shall be made.

Failure to Provide Service – If the contractor fails to provide adequate service on the above listed items, the Government reserves the right to contract these activities to a third party, the cost of which will be deducted from the contract amount at the time of the next pay request.

SP-07 WATER FOR CONSTRUCTION

Water for construction is the Contractor’s responsibility. The Contractor shall make all necessary arrangements as such. The Contractor is responsible for providing all required fittings, meters, hoses, backflow assemblies, valves and other appurtenances required for obtaining water for construction.

If water is acquired from metered fire hydrants, Contractor needs to know and understand proper hydrant operation procedures as they are the party ultimately responsible for improper hydrant connections or any other improper operation of a hydrant. The contractor is responsible to teach proper operation procedures to all employees using hydrants. This includes water truck drivers or any other employees of the company that operate hydrants for any reason.

Meter Hydrant Connection Procedures

1. Perform a safety check of the hydrant. Check the hydrant visually, and shake the hydrant with your hands to make sure it is rigid (do not use a movable hydrant – they are dangerous and serious injury to the operator may result). Check the hydrant to ensure the caps are tight.

2. Remove hydrant nozzle cap.

3. Attach metering device and hose and install brace support. All hydrant connections must include a RPZ backflow assembly or device acceptable to the CO at all times.

4. Open hydrant slowly. It should take more than 60 seconds to fully open to prevent surging on the water system. Open completely to shut off drip drain while hydrant is in use. Valves downstream of the hydrant shall not be used to control flow.

5. They discharge end of the hose should not be inserted under any circumstances, into a tank or container underwater or laid on the ground to make and lay in its own pool of water. There must be at all time an air gap between the end of the water hose and the container.

6. Upon filling the tank or upon completion of the permitted use, slowly close hydrant valve.

7. Remove hose

8. Replace nozzle cap and tighten securely.

9. No hydrant shall ever be left without the cap replaced and securely tightened.

The Contractor is required to obtain written permission for obtaining water from any public or private water system and provide documentation to the Government.

SP-08 SITE RESTORATION

Site Restoration is an important part of this project. Site Restoration is replacement or reconstruction of site improvements to rights-of-way, easements, public property, and private property that are affected or altered by construction operations, with improvements restored to a condition which is equal to, or better than, that which existed prior to construction operations. These Site Restoration items include but are not limited to; concrete curb and gutter replacement, sidewalk replacement, concrete surfaces, asphalt replacement, gravel restoration, seeding, sod, and irrigation system repair.

Initial restoration (rough grading, temporary aggregate if necessary, removal of excess excavated material and debris) shall be done each day to the extent necessary to allow the movement of local traffic and permit access to all areas for emergency vehicles. Maintenance of streets, drives, sidewalks, etc. shall be the responsibility of the Contractor (including dust control, grading, stabilization, etc.) until the restoration is complete and has been accepted by the Government and CO. Restoration of each street or section of utility line shall follow the construction in a timely fashion so as to minimize inconvenience to the Government and the general public. The manner in which this restoration is done by the Contractor will be a determining factor in the approval of partial payment requests.

After utility work is completed on underground utilities and submitted on monthly estimate for payment, complete site restoration for those utility segments before next monthly estimate for payment is submitted, unless extended in writing by Government and CO. If site restoration is not completed, the Contractor’s partial payment request may be denied or additional retainage may be withheld.

SP-09 PRIVATE ACCESS

At all times during construction, afford government access to their property to the highest degree possible. Ensure that businesses will have at least one approach open at all times, if possible, and open closed-off approaches as quickly as possible.

The Contractor shall provide a minimum of 48 hour notice to residents of construction in front of their private residents and that access will be impacted.

The maximum un-backfilled open trench within the street sections during each day of construction shall not exceed 50 lineal feet.

SP-10 LANDSCAPED AREAS

Repair any landscaped or vegetated areas on private or public land that are scarred or destroyed during construction to an equal or better condition than that prior to the start of construction. This will include removing, replacing and grading topsoil. Replace all landscaped and/or grass areas disturbed during the construction process with a minimum of 6-inches of topsoil. Furnish and install sod as necessary to replace grass in areas as needed to restore to original condition.

Work to paid for under bid item “Type C Surface Restoration (Lawn)”. See Section 01275: Measurement and Payment for more information.

SP-11 REMOVAL AND REPLACEMENT OF FENCES, SIGNS, SIDEWALKS, CURBS,

GUTTERS, POSTS, BARRICADES, ETC.

Culverts, fences, signs, decorative rocks, newspaper boxes, posts, sidewalks, curbs, gutters, propane tanks, satellite dishes, barricades, etc. may be encountered during construction that may hinder construction operations. Whether on private or public property, remove and replace these objects as necessary to conduct construction operations. Replace objects removed in as good a condition as previously existed and to the satisfaction of the CO.

No additional payment will be allowed the Contractor for this work. See Section 01275: Measurement and Payment and the Drawings for more information.

SP-12 REMOVAL AND REPLACEMENT OF EXISTING FENCES

It is the responsibility of the Contractor to coordinate with Government, prior to removing existing fences, to determine procedures, length of time fence may be removed, and requirements for temporary fencing until permanent fencing is complete.

All fence removed must be reassembled prior to the end of the workday. A secure fence will be required at the end of each workday. The trench under the fencing section must be backfilled at least 20’ either side of the fence at the end of each workday. Removal and replacement of fences and/or gates is considered incidental to the portion of contract work being completed for which the fence or gate removal is required and the cost is included in the bid price for the related item. No additional payment for fence and/or gate removal and replacement will be provided.

SP-13 STAGING AREA

The Contractor is required to make all arrangements for a construction staging area for material, equipment, office and related items as necessary. The Government owns areas that may be used as a location for the construction office and/or as a staging area for materials and equipment storage to the extent area is available. Make all necessary arrangements with the Government or other property Governments as needed. Take care to protect, preserve and/or replace objects and structures encountered within the confines of the staging areas and restore all disturbed areas as close as possible to original condition as possible unless otherwise dictated in these specifications.

Storage of construction materials, equipment, and other items pertinent to the construction of the project will be allowed in the staging areas. However, bulk storage of petroleum based products stored in tanks will not be allowed, unless otherwise accepted by the COR. At all times, spill kits must be available on-site for any accidental spills of petroleum.

No payment will be allowed to the Contractor for any work, including restoration, with regards to the staging areas.

SP-14 CONFLICTS WITH UTILITIES

As shown on the plans, underground utilities may be in conflict with certain areas of the project. Whether on private or public property, Contractor shall relocate, remove, replace, cross, work around, support, or other as necessary to conduct construction operations and properly construct the project. Utilities and other appurtenances may include but are not limited to the following: culverts, propane lines, TV cables, telephone lines and pedestals, electrical boxes and lines, gas mains, street lights, telephone and power poles, water mains and services, sewer mains and services and storm drain pipe and inlets.

Utility locations are based on the best available information which has been provided to or discovered by the CO. There is no guarantee as to the accuracy and completeness thereof is expressly disclaimed.

The Contractor shall coordinate his work with all utility companies or private entities that may be affected by the project. The Contractor will also coordinate with the appropriate utility companies to relocate, remove, replace, cross, work around, support, or other as necessary to conduct construction operations and properly construct the project. The Contractor will pay for any charges associated to relocate, remove, replace, cross, work around, support, or other as necessary to conduct construction operations and properly construct the project. The Contractor shall be solely responsible for any damage to these utilities due to his operations. The Contractor shall work closely with the utilities to ensure their criteria are met and no problems result. No separate payment will be made for this work and the Contractor shall figure the cost of such work into other applicable bid items. The Contractor shall also check with the Utilities Underground Location Center (1-800-424-5555) at least 48 hours in advance so that all utilities are located prior to digging.

SP-15 DEWATERING

The Contractor will be responsible for any dewatering operations which may be necessary to adequately remove water such that construction activities can be completed as specified. The Contractor will be responsible for conveyance and disposal of water to surface watercourses. Make all necessary arrangements for infringements across private property and obtain and adhere to any necessary discharge permits.

The Contractor shall not discharge to the sanitary sewer or the existing storm drain pipe located along Ninemile Road to discharge groundwater during construction.

All temporary above ground piping used for dewatering shall not impede travel in the public right-or-way or existing access for private residents without prior approval.

SP-16 TESTING

Complete testing of all components of the project will be required to the satisfaction of the Government and the CO. Remedy all defects and performance problems revealed by the testing to the satisfaction of the CO by the Contractor at no additional expense to the Government.

The CO will conduct the following tests at no cost to the Contractor:

1. On-site moisture and density testing of trench backfill, embankments, engineered fill placement, crushed base course, and asphalt pavement.

Should the materials fail to meet the test specified, the Contractor will pay the costs of all retests conducted by the CO, or the Contractor may elect to have an approved testing laboratory conduct retests at the Contractor’s expense.

The Contractor will be responsible for conducting and paying for the following tests:

1. Laboratory analysis of concrete aggregate.

2. Slump and Air Entrainment tests for concrete.

3. Taking and breaking of concrete test cylinders.

4. Gradations for gravels, bedding, and base materials as specified.

1. Gradations for seal coat aggregate as specified.

5. Proctors for different materials and gravels used for backfill.

6. Leak testing the sewer mains and manholes.

7. Alignment testing the piping.

8. Pressure testing of mains. (Force mains)

9. TV inspection of all sewer mains.

10. Run tests of all pumps.

11. Marshall and core testing for bituminous asphalt concrete.

12. Re-testing of failed tests that were conducted by the CO.

13. Other tests as outlined in the Technical Specifications.

All tests which are the responsibility of the Contractor must be conducted by an approved, certified testing laboratory or individual. Acceptance or rejection of materials will generally be determined from tests made in-place in the field.

The following is frequency testing table for soils and concrete:

Quality Control Frequency Table

SECTION ITEM DESCRIPTION TEST OR SUBMITTAL FREQUENCY

GENERAL

Varies All Materials Sieve Analysis Every New Material Varies All Materials Atterburg Limits Every New Material Varies All Materials Lab. Max Density Every New Material 02221 Type 'A' Trench Backfill Field Density/Moisture Content 1 test / 200 LF / lift 02221 Type 'B' Trench Backfill Field Density/Moisture Content 1 test / 300 LF / lift 02221 Type 'C' Trench Backfill Field Density/Moisture Content 1 test / 400 LF / lift 02300 Select Fill/Structural Fill Field Density/Moisture Content 1 test / 1,000 SF / lift 02320 Lagoon Embankment Field Density/Moisture Content 1 test / 5,000 SF / lift

GENERAL - ROADWAY

Varies All Materials Sieve Analysis Every New Material Varies All Materials Lab. Max Density Every New Material 02230 Borrow / Embankment Fill Field Density/Moisture Content 1 test / 5,000 SF / lift 02230 Original Ground / Native Subgrade Field Density/Moisture Content 1 test / 5,000 SF / lift 02234 Sub-Base Course(s) Field Density/Moisture Content 1 test / 2,500 SF / lift 02235 Base Course(s) Field Density 1 test / 2,000 SF / lift

STRUCTURES

Varies All Materials Sieve Analysis Every New Material Varies All Materials Lab. Max Density Every New Material

03310 Structural Concrete Mill Certificates With Every Mix Design

Mix Design Every Concrete Class Air Content 1 test / 75CY / Day Slump 1 test / 75CY / Day Compressive Strength 1 test / 75CY / Day Temperature 1 test / 75CY / Day

Original Ground and Base of Cuts (Native Subgrade) Field Density/Moisture Content 1 test / 1,500 SF

SP-17 CONSTRUCTION STAKING

The CO/COR will provide horizontal control for the project consisting of stakes along the project baseline. Vertical control will be provided by benchmarks throughout the project site. All offset staking is the Contractors responsibility. The Contractor is required to provide a qualified surveyor to provide construction staking.

The COR shall provide the following staking consisting of stakes or hubs.

• Vertical Control - Vertical control will be provided by benchmarks throughout the project site.

• Piping - Horizontal control will be given at each change in horizontal alignment, pipe termination, structure, valve and each fitting. Intermediate staking will be placed on centerline a minimum of every 200 feet.

• Structures and Manholes - Horizontal control will be given at the centerline of each new structure and manhole.

• Fence Corners and Gates.

Actual new main locations may vary from either side of the centerline of pipe as shown on the Drawings if it is required to avoid utilities, obstructions, pavement, etc. Since this will be to the benefit of the Contractor, no additional cost will be allowed the Contractor. COR will determine the actual locations of the new mains in the field.

SP-18 CONTRACT PERIOD SHUTDOWN

A shutdown due to inclement weather during the winter months may be requested by the Contractor.

Indicate the number of calendar days being requested in the original shutdown request. This initial request may be extended during the shutdown period as long as such extension is justifiable and requested at least 14 calendar days prior to the date the original extension was to elapse. Any extension of shutdown will require the Contractor to demonstrate that adequate operations can be maintained throughout the extended period. Shutdown extensions may require operation modifications and approval of the Montana DEQ. Only one winter shutdown will be granted during the project.

The Government reserves the right to approve or disapprove any shutdown or extension requests. As a condition of approval of a shutdown, close all open excavations, provide for maintaining traffic, and provide for protection of public property at the work site. The Contractor will not be allowed to perform any work during the shutdown period unless prior approval is granted by the Government.

SP-19 PERMITS

The Contractor is responsible for obtaining all necessary permits, licenses, agreements, insurance, and approvals required by any government authority or agency for the performance of this work at his own expense. Government will allow Contractor access, as appropriate and necessary, for obtaining data in regard to permits and, at its own discretion, may assist Contractor, when necessary, in obtaining such permits. These Permits may include but are not limited to the following:

1. Storm Water Discharge Permit. The work requires a General Permit for Storm Water

Discharges Associated with Construction Activities, and all discharges must be in accordance with the submitted Storm Water Pollution Prevention Plan (SWPPP). The` Contractor is required to develop a construction SWPPP and Erosion Control Plan for the project including submitting a complete Notice of Intent (NOI) package to the Montana Department of Environmental Quality. The Contractor will be responsible for all fees associated with the permit application. Any costs associated with a SWPPP will be part of the mobilization bid item.

2. Missoula County Excavation Permit. The Contractor must complete an excavation permit for the sewer force main to be placed in Munger Road. The permit application must be submitted and approved prior to construction. The permit application can be obtained by calling the Missoula permit coordinator at (406) 258-3701. Submit approved permit to COR prior to beginning work.

3. Building Permit – As required for state, county and local agencies.

4. Electrical Permit – As required for state, local agencies.

SP-20 TEMPORARY PROJECT SIGNS

Construct and install a project sign in accordance with Section 00900: Funding Agency Special Provisions. The sign must acknowledge the Government and any others the CO deems necessary. Submit a proposed sign design in accordance with the referenced conditions, and the CO will fill in the applicable dollar amounts on the submittal and make any other comments or corrections at that time.

No separate payment will be made for this work. The cost of furnishing and installing the signs will be included in the mobilization Bid Item for the base bid.

SP-21 EASEMENTS, CONSTRUCTION LIMITS, AND RIGHT-OF-WAY

Conduct construction operations within the easement, construction limits, and right-of-way limits. Obtain written permission from the adjoining private landowner prior to conducting any operations off the allowed easement. Take care to protect, preserve and/or replace objects and structures encountered within the confines of the easements and restore all disturbed areas restored to the original condition unless otherwise dictated in these specifications.

Contractor is required to submit a haul route plan to the CO for review and approval prior to proceeding with construction. The limitations are specified to limit disturbances to the site to only those areas necessary to complete the work.

SP-22 WORKING HOURS

Regular working hours are defined as an eight-hour period (plus 1 hour lunch allotment) within the bounds of 7:00 AM and 7:00 PM. Work during other hours may be permitted following written approval of the Government. Contractor shall provide the CO a request at least three (3) working days prior to working other hours, or in excess of 8 hours per day. CO shall provide a response to the request within 24 hours of receipt. Emergency work may be done without prior permission.

SP-23 CONTRACTOR EMERGENCY CONTACT

Provide a primary and secondary 24-hour, 7-day a week emergency contact.

SP-24 SEEDING

Furnish a dry land pasture seed mixture below, to be placed around pasture in all disturbed areas (not including landscaped areas in community), and up the transmission main route.

The necessary bulk seed can be calculated by:

SP-25 FIELD OFFICES

Maintain a suitable field office at the site, which will serve as headquarters for the project Superintendent.

All communications, drawings, instructions, and other articles will be delivered to the Contractor’s field office or to the Contractor’s main office as appropriate. Communications delivered to either location will be deemed to have been delivered to the Contractor.

Maintain copies of record drawings, specifications, shop drawings, submittals, and all communications pertinent to the performance of the work at the field office and make them available to the Government or CO for use at all times.

The field office shall be weathertight, heated field office for use as a common facility by all personnel engaged in construction activities; of sufficient size to accommodate required office personnel and meetings of at Project site. Keep office clean and orderly. Furnish and equip offices as follows:

• Desk and four chairs, four-drawer file cabinet, a plan table, a plan rack, and bookcase.

• Provide a room of not less than 100 sq. ft. for COR.

• Furnish room with desk, work table, two chairs, plan rack, and locking storage for surveying equipment.

• The Contractor shall pay all electrical and heating bills.

• Provide an electric heater and air conditioner with thermostat capable of maintaining a uniform indoor temperature of 68 deg F.

• Provide fluorescent light fixtures capable of maintaining average illumination of 20 fc at desk height.

• Provide two 110- to 120-V duplex outlets.

All electrical and heating bills for the field office are the responsibility of the contractor. No separate payment will be made for field offices. The cost of field offices will be included in the mobilization Bid Item for the base bid.

SP-26 DETECTABLE WARNING TAPE

Detectable warning tape will be installed on all new pipes at the lift station, force main and lagoons.

Detectable warning tape to be installed per MPWSS. The cost of furnishing and installing the detectable warning tape shall be incidental to other appropriate bid items. See Section 01275: Measurement and Payment and the Drawings for more information. The warning tape must be installed as a condition for payment for the related bid item.

SP-27 TRACER WIRE

Tracer wires shall be installed on all water mains, sewer force mains, sewer siphons and gravity effluent sewer lines. Tracer wire shall be a jacketed #14 copper wire rated for use in wet or dry locations. Wire shall be provided with a polyvinyl chloride insulation over which a nylon (polyamide) jacket is applied and rated for 600 volts.

Tracer wire risers shall be installed every 500 feet along the pipeline (by station). The tracer wire riser shall consist of a tracer wire installed in a ¾” galvanized conduit for the horizontal wire run and a watertight electrical box mounted on a treated 4” x 4” post. The horizontal tracer wire conduit shall be buried 18” to 24”. The above ground vertical conduit shall be attached to the post with a galvanized conduit clamp and 2” galvanized screws. The box shall be 4” x 4” x 2” (height by width by depth) in dimension, galvanized steel, with a screw mounted cover (4 screws) and gasket. The mounting post shall be installed with a minimum bury of 30 inches and terminate 30” above ground. The top of the post shall be treated. Treat cut or trimmed areas on posts with three applications of a copper naphthenate solution containing a minimum of 2 percent copper metal or with chromated copper arsenate (CCA) meeting AWPA M4 requirements.

The location of the riser box will be determined by the Government during construction. The intent is to locate the riser boxes along right of way or property boundaries. The riser box will be located a maximum horizontal distance of 30 feet from the pipeline.

A continuous run of tracer wire shall be installed between the riser boxes. The tracer wire shall be taped to the top of the pipe with 2” wide duct tape at a maximum spacing of 5 feet along the pipe line. The Contractor shall install the riser conduit, wire, mounting post and box immediately upon laying pipe at the station specified for the tracer wire riser. Tracer wire shall not be left exposed at the surface due to the potential for damage to the wire.

A tracer wire splice may be made with Government approval in the event of a wire break. Authorized tracer wire repairs shall be made using a solderless splice kit. If a splice is authorized to repair a damaged wire, the utility trench must be kept open to allow access to the splice until the run in which the splice is located (box to box) is completed and successfully tested. The Contractor is required to document the location of authorized wire repairs.

All tracer wire shall be successfully tested by the Contractor as a condition for receiving payment for the installation of the pipe line. The Contractor shall test each section in the presence of the Government’s representative.

No separate payment will be made for this work. The cost of furnishing, installing and testing the tracer wire system shall be incidental to other appropriate bid items. See Section 01275: Measurement and Payment and the Drawings for more information.

SP-28 SUBCONTRACT LIMITATIONS

The Contractor shall not sublet Work that accounts for a total of more than 50% of the Total Contract Price.

SP-29 WATER AND SEWER SERVICE REQUIREMENTS

Maintain wastewater flows throughout the project, which will require temporary bypass pumping.

Maintain service to existing service connections throughout construction, except that service connections may be taken out of service one time for a period of up to 8 hours for installation of new sewer services or service connections to new mainlines. Provide the Government with a written 48 hour notice before disrupting service.

Do not interrupt water service except as approved by the CO. Water service locations are unknown. The Contractor shall become familiar with the location of nearby water shut-off valves to isolate work areas as needed to make any necessary water service repairs. If possible use existing line to provide water while installing new transmission line.

The Contractor will be responsible for any damage that occurs to the Government and/or customers on the system due to interruption of service. No additional compensation shall be allowed for installation of any measures required to continue service. These costs shall be distributed within appropriate Bid Items in the contract.

SP-30 TRAFFIC CONTROL

Adhere to all traffic control requirements as set forth in the Manual on Uniform Traffic Control Devices for Streets and Highways (MUTCD), latest edition, published by the U.S. Department of Transportation, Federal Highway Administration. Coordinate with the Government to schedule road closures and/or detours and conduct construction activities so as not to interfere with the traffic control.

SP-31 COORDINATION WITH LOCAL POWER SUPPLIER

Prior to the start of construction, the Government has initiated new electrical and gas service requests with the local power supplier for the dose station. It is the responsibility of the Contractor to coordinate installation of electrical services. All costs incurred to coordinate with local power supplier and install electrical meter are incidental to the related contract bid items and no separate payment shall be made.

SP-32 EXPLORATORY EXCAVATION

The Contractor shall be prepared to provide exploratory excavation as described in the bid form and measurement and payment sections within 72 hours of receipt of a field order from the CO for exploratory excavation.

SP-33 SURFACE RESTORATION/CLEANUP

Surface restoration and cleanup for construction items requiring excavation and backfill including but not limited to piping, manholes, structures and valves is incidental to the related bid item. The bid item will be considered complete and authorized for payment only upon completion of surface restoration and cleanup of the work area. Partial payment for incomplete work items will not be approved.

02221-1 and 02221-1 bid items for Type B and Type C surface restoration, which would indicate the surface restoration is not incidental.

SP-34 CHANGES OR MODIFICATIONS TO PROJECT PLANS AND/OR SPECIFATIONS

Changes to project plans and/or specifications, if approved, will be documented in writing by method of a field order, change order, or work change directive. Changes may be initiated by the Government or proposed by the Contractor for Government consideration. Contractor proposed changes must be submitted to the Project Engineering Manager (Construction Manager) in writing with sufficient detail to clearly define the proposed change. Changes may only be approved by the Project CO or Project Construction Manager. Government concurrence is also required where the change results in a change in contract cost or time.

SP-35 GROUNDWATER DEPTHS

The project area has groundwater. Groundwater monitoring wells have been installed at the Ninemile Remount site. The locations of the monitoring wells are shown on Sheet 4 of the Drawings. The table below provides the groundwater depth below the ground surface recorded at different times.

Date MW 1 MW 2 MW 3 MW 4 MW 5 MW 6

1-Jun-22 10.3' 14.6' 0 0 0 0

1-Jul-22 11.0' 14.3' 14.9' 0 14.9' 0

16-Aug-22 13.3' 13.3' 14.9' 0 14.3' 0

31-Oct-23 11.83' 14.63' 0 0 14.56' 0

6-Nov-23 8.878' 13.42' 0 0 14.29' 0

20-Nov-23 8.42' 14.5' 0 0 14.5' 0

4-Dec-23 12.3' 14.8' 0 0 14.7' 0

13-Dec-23 11.6' 14.8' 0 0 14.8' 0

29-Dec-23 13.6' 14.8' 0 0 14.8' 0

29-Jan-24 14.7 14.8 0 0 14.8' 14'

22-Feb-24 11.1' 8.9' 14.4' 0 14.7' 14.7'

6-Mar-24 10.8' 11.95' 14.7' 14.7' 14.9' 14.7'

This information only reflects the groundwater depths on the dates reported. The bidder is responsible for completing an independent investigation to determine groundwater conditions in the work areas.

SP-36 WATER TANK HARDWIRE BASED REMOTE MONITORING AND ALARMS

The optional bid documents for the project include the installation of a hardwire-based remote monitoring and alarms system. The project bid documents include an additive alternative to install and integrate hardwire-based monitoring and alarm systems at 3 locations in the Ninemile Ranger Station project area that are not currently equipped with this feature. The wired connection shall be placed along the alignment of the new transmission main where installed. The two water tanks shall be integrated for remote monitoring and alarms with a main monitoring panel located at the northeast part of the Barn and Carpenters Shop as shown in the drawings. Other enclosed monitoring panels will be set at the upper and lower water tanks for level viewing.

The contractor must regularly fabricate and install control enclosures and install and service process instrumentation and have completed at least three similar projects in the last three years. The system described in this section is a system as furnished and installed by MET, East Helena, MT, or approved equal. The naming of manufacturer/integrator in this specification is not intended to eliminate competition or prohibit qualified manufacturers from offering specified (or equal) equipment. Rather, the intent is to establish a standard for material used and define the system operational design.

Enclosures must be built in an Underwriter Laboratories listed panel shop and be serialized with a UL 508A label.

The contractor is responsible for a complete and working system that meets the intent of these specifications.

Enclosures

• 2 sized 24 X 20 X 6 P/N SCE-24H2006LP

• 1 Sized 36 X 24 X 8 P/N SCE-36EL2408LP

Applications Designed to house electrical and electronic controls, instrumentation and components.

Provides protection from dust, dirt, oil and water. Construction

• •4-gauge carbon steel • Seams continuously welded and ground smooth

• Flange trough collar around all sides of door opening

• Door clamps are quick and easy to operate.

• Concealed hinges • Hasp and staple for padlocking

• Poured-in-place oil- and water-resistant gasket

• Collar studs for mounting optional subpanels

• Ground studs on door and body

• Removable print pocket furnished if height and width of enclosure is greater than 12in [305mm].

• Mounting provision top and bottom of back

• Provision for lifting lugs included on enclosures with height greater than 48in [1219mm] and with depth greater than 16in [406mm]. - Lifting lug assembly included with the enclosure bolt pack Finish

• ANSI 61 gray powder coated inside and out

• Optional subpanels are powder coated white. Listings

• NEMA Type 3R, 4, 12, and 13

• cULus Listed Type 3R, 4 and 12 [File E69392]

• EC 60529 IP66

Precision Digital Trident Display PD765-6R5-10

• 1/8 DIN Digital Panel Meter with NEMA 4X, IP65 Front

• 4-20 mA, ± 10 V, TC & RTD Field Selectable Inputs

• 4-Digit Display, 0.56" (14.2 mm) or 1.20" (30.5 mm)

• Shallow Depth Case Extends Only 3.6" (91.4 mm) Behind Panel

• Isolated 24 VDC @ 200 mA Transmitter Power Supply (AC Powered Models Only)

• 2 Relays + Isolated 4-20 mA Output Options

• Free PC-Based MeterView Programming & Monitoring Software

• No Assembly Required

• Sunlight Readable Display

• Operating Temperature Range: -40 to 65°C (-40 to 150°F)

• UL & C-UL Listed. E160849; UL 508 Industrial Control Equipment

• Input Power Options: 85-265 VAC or 12-36 VDC

• Duplex Pump Controller with Alternation Capability

• External Contacts for Remote Button Operation (Trident X2 Only)

• USB, RS-232, & RS-485 Serial Communication Adapters Options

• Modbus RTU Communication Protocol Standard

• Copy Meter Settings to Other Trident Meters

• Max/Min Display

• High & Low Alarms with Multiple Reset Actions

• Light/Horn & Button Accessory for Trident X2

• Control Station Accessory For Remote Operation of Trident X2

• Stainless Steel Sun Hood Accessory Available

• 3-Year Warranty

Sun Hood

• Precision Digital Display Sun Hood P/N PDA18DINSH

• Provides Shade for 1/8 DIN Digital Panel Meters

• Made from 18 Gauge 316 Stainless Steel

• Easy Mounting Requires no Drilled Holes in the Panel

• Includes Gasket to Maintain NEMA 4X Seal

The PDA18DINSH Sun Hood improves the readability of 1/8 DIN digital panel meters when they are mounted in direct sunlight by shading the instrument from the sun.

The Sun Hood is made from 18 gauge 316 stainless steel and mounts between the 1/8 DIN digital panel meter and the panel. In addition, a gasket shall be provided that installs between the Sun Hood and the panel to provide a NEMA 4X seal to the panel. The whole assembly is held in place by the panel meter’s mounting brackets.

Alarm Strobe

Brand WERMA

• Item Industrial signal beacon

• Bulb Type Xenon tube

• Operator Size 58mm

• Operator Color Blue

• Light Color(s) Blue

• Light Function Flashing strobe (0.75 Hz flash frequency)

• IP Rating IP65

• Mounting Bracket

• Voltage Rating 115 VAC

Auditory Alarm buzzer (installed with 22mm silence push button) P/N DR22B5-EB

Fuji Electric audible alarm buzzer, 90 dB at 0.1m, 70 dB at 1m, 2.4 kHz to 3.3 kHz tone frequency, continuous/intermittent tone(s), 12 to 24 VAC/VDC, permanent LED indicator(s), red, 22mm, panel mount, plastic housing, black, IP00.

DEHN Signal Isolator and Surge Protection Device at the level sensors P/N 929963

Dehn DPI-CD series data & signal Surge Protective Device (SPD), 24VAC/VDC, parallel circuit, 2 lines or 1 pair, IP67, 1/2in-14 NPSM mount.

• Brand Dehn

• Item Surge Protective Device (SPD)

• Series DPI-CD

• Surge Protection Type Data & signal protection

• Signal Types Protected 0-20mA, 4-20mA, Fieldbus systems, intrinsically safe signals

• Circuit Type Parallel circuit

• Channels 2 lines or 1 pair

• Neutral Ground Protection No

• System Voltage 24VAC/VDC

• Voltage Protection Rating (VPR)58V (L-L), 1700V (L-G)

• Housing Material Stainless steel

• IP Rating IP67

• Mounting 1/2in-14 NPSM

• Connection 3-wire 16 AWG pigtail

• Application Hazardous location rated

DEHN Signal Isolator and Surge Protection Device in the control enclosures P/N 908015

Dehn DG-PLU series protection module, replacement, 550 VAC. For use with Dehn DG-MU or DG-SU series surge protectors.

• Brand Dehn

• Series DG-PLU

• Item Protection module

• Replacement Yes

• Maximum Continuous Operating Voltage 550 VAC

• For Use With Dehn DG-MU or DG-SU series surge protectors

Level RADAR Sensor

• Endress Hauser Micro Pilot FMR 20

• Measuring principle - Level radar

• Characteristic / Application - Water & Wastewater (e.g. basins / channels / rivers / dams / lift stations / storm water basins / pump control)

• Utility applications in all industries - Storage tanks

Specialities

• Bluetooth® commissioning,

• Operation and maintenance SmartBlue App

Supply / Communication

• 2-wire (HART, 4…20 mA, Modbus),

• Bluetooth® wireless technology and App (optional)

• Frequency - K-band (~26 GHz)

• Accuracy - +/- 2 mm (0,08")

• Ambient temperature -40…+80°C (-40…+176°F)

• Process temperature -40…+80°C (-40…+176°F)

• Process pressure / max. overpressure limit: -1…3 bar (-14,5…43 psi)

• Main wetted parts - PVDF, PBT

Process connection

• Thread: G1", NPT1"; G1 1/2", NPT1 1/2", G2", NPT2",

• Flange: UNI DN80….DN150 (3"…6")

Max. measurement distance

• DN40: 15 m (49.2 ft),

• DN80: 20 m (65.6 ft)

Communication

• 4...20mA HART

• Modbus

• Bluetooth® wireless technology

Certificates / Approvals

ATEX, CSA C/US, IEC Ex, NEPSI, EAC, JPN Ex, INMETRO

Options

• Remote operation via SmartBlue App using…

This is the start of the file's text. The full file is on GovTribe.