Attach C Bid Form~1.xlsx

XLSX spreadsheet 12 KB Posted

Attached to
Communication Conduit Installation
Solicitation number
S-14100-00014230
Issued by
Coos County, Cheshire CDP, Oregon

About this file

This document is a Bid Form for a Communications Conduit Installation project, with a structured bid template requiring completion of yellow-highlighted cells. The bid form outlines several key installation components including HDPE Conduit & Fittings (priced per linear foot), Junction Boxes (priced per each), Utility Vaults, Exterior Wall Penetrations, and General Conditions. The form allows bidders to input unit prices (UP) or lump sum (LS) pricing for each specified item, with a total bid amount calculation.

The bid form indicates that pricing should comprehensively reflect all equipment, materials, and labor required to complete the installation according to accompanying drawings and specifications. The document provides a standardized format for contractors to submit detailed cost proposals, with line items that cover infrastructure installation, site preparation, and associated project requirements. While specific project details such as location, timeline, and funding sources are not explicitly stated in this excerpt, the form suggests a structured procurement process for a communications infrastructure project involving conduit and related installation work.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1 Communications Conduit Installation Bid Form

Please fill in the yellow-highlighted cells
QuantityUnitUnit Price (UP) or Lump Sum (LS)Price*Bid Amount
HDPE Conduit & FittingsLinear FtUP$ - 0
Junction BoxEachUP$ - 0
Utility Vault1EachUP
Exterior Wall Penetration (Detail 3/D1)1Lump SumLS$ - 0

General Conditions (mobilization, containment, erosion and sediment control, site restoration, insurance, etc.) 1 Lump Sum LS $ - 0

Bid Total$ - 0
*Prices should reflect all equipment, materials and labor to complete the installation according to drawings

specifications