This document includes a federal contract opportunity solicitation and related traffic control plan for road improvements on National Forest System Road 384 in Idaho. The solicitation seeks a contractor to perform work including traffic control, erosion control, installation of three aquatic organism passage culverts, replacement and installation of drainage culverts, road work, and asphalt paving. The traffic control plan outlines signage, barricades and flaggers to guide vehicle traffic safely around the construction areas. The estimated start date for the 276-day contract is June 8, 2020, with work to be completed by October 8, 2021. The solicitation will be posted on beta.sam.gov within 15 days, and the site visit for interested contractors is scheduled for April 29, 2020. The contract is set aside for small businesses and will be awarded on a firm-fixed price basis.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NEW W20-1 SIGN
TYPE 3 BARRICADE AT
EDGE OF CONSTRUCTION
SOOFT AHEAD, "ROAD _,,,
WORK AHEAD". BLACK _..---
ON ORANGE. *1500FT
---- .-AHEAD WHEN FLAGGING
��l::S_-...,,.._. R.O.W.
IF NECESSARY, W20-7
FLAGGERS SIGN
INSTALLED SOOFT
AHEAD AND W2D-4
ONE LANE ROAD SIGN
INSTALLED 1 OOOFT
AHEAD.
EDGI /
I y· .. _,,.
-------= - . ' - NEW S1EEL STRUCTURAL-:-----
--==----·· -- .. · -- · · · -. PLATE ARCH TO BE INSTALLED _ . __•''--·--·-
.. -···-···-··•-"•1
! l NEW ASPHALT PAVEMENT
TO BE INSTALLED
\ I
NEW W20-1 SIGN 500FT
AHEAD, "ROAD WORK
AHEAD". BLACK ON
ORANGE.*1500FT AHEAD
WHEN FLAGGING
IF NECESSARY, W20-7
FL.AGGERS SIGN
INSTALLED SOOFT ___.
NOTES:
1.
, 2.
ALL TRAFFIC CONTROL MEASURES WILL BE DESIGNED AND IMPLEMENTED TO MEET
REQUIREMENTS AND RECOMMENDATIONS IN THE MANUAL ON UNIFORM TRAFFIC
CONTROL DEVICES (MUTCD).
TYPE 3 BARRICADES AT THE ACTIVE CONSTRUCTION AREA AND CONES, CANDLES,
DRUMS, OR OTHER f..1UTCD APPROPRIATE MARKERS CONTINUING 100FT IN EITHER
DIRECTION TO GUIDE TRAFFIC AWAY FROM THE CONSTRUCTION AREA.
AHEAD AND W20-4 ------
0NE LANE ROAD SIGN
/ INSTALLED 1 OOOFT
/3.
WORK AHEAD SIGNS (W20-1-48X48) WILL BE PLACED 5DO FEET AHEAD OF
CONSTRUCTION IN BOTH DIRECTIONS ALONG STATE HIGHWAY 21.
4. IF ACTIVE CONSTRUCTION ENCROACHES INTO THE ROADWAY ALONG STATE HIGHWAY
21, FL.AGGERS AND FLAGGER AHEAD SIGNS (W20-7- 48X48) AND ONE LANE
ROAD AHEAD (W20-4- 48X48) WILL BE IMPLEMENTED; FL.AGGER AHEAD SIGNS
WILL BE PLACED 500 FEET AHEAD AND ONE LANE ROAD AHEAD SIGNS WILL BE
PLACED 1000FT AHEAD OF CONSTRUCTION IN BOTH DIRECTIONS ALONG STATE
HIGHWAY 21, AND CERTIFIED FL.AGGERS WILL BE AT THE CONSTRUCTION SITE TO
ALLOW ONE LANE OF TRAFFIC TO SAFELY PASS. INSTALLED W20-1 WORK AHEAD
SIGNS WILL BE f..10VED 1 SOOFT AHEAD OF CONSTRUCTION SITE WHEN FLAGGING
TO SPACE SIGNS SUFFICIENTLY.
ALL SIGNS TO BE BLACK ON ORANGE, 48"x48" \IVITH A MINIMUM SPACING OF 500FT
---0-----0----- TAPERED BUFFER ZONE BARRIERS/MARKERS TO GUIDE
TRAFFIC. SEE NOTE 3.
I I I I FULL BARRIERS TD PREVENT TRAFFIC AT WORK ZONE.
----+--+--t-- SEE NOTE 3.
FS VI/ILL BE INTERMITTENLY CLOSING APPROXIMATELY 10 MILES OF NFSR #384 VVITH
ACCOMPANYING PROJECTS. FS \II/ILL PLACE ADDITIONAL SIGNAGE RELATING TO THE
ROAD CLOSURE OF NFSR #384 AND ITS RECREATION ACCESS INCLUDING THE EDNA
CREEK CAMPGROUND. FS TEMPORARY TRAFFIC CONTROL FOR NFSR #384 IMLL
INCLUDE BUT IS NOT LIMITED TO GATE CLOSURE DEVICES, ROAD CLOSURE SIGNS IN
IDAHO CITY, ID AND ON OTHER NFS ACCESS ROADS TO NFSR #384, AND POSTERS.
THIS SIGNAGE DOES NOT AFFECT SH-21 OR THE ENCROACHED ROW AND IS NOT
INCLUDED IN THIS TRAFFIC CONTROL PLAN.
PLAN VIEW OF ROAD NO. 384
BOISE N.ATIONAL FOREST
EDNA CREEK CULVERT
REPLACEMENT-UPPER
0 20 L..i- I
SC.l\LE IN FEET
I
TRAFFIC CONTROL PLAN
Attachment #7-12026120R0004