Amendment 1.pdf

PDF 210 KB Posted

Attached to
National Forest System Road 384 Improvements-Boise NF-Idaho City RD
Solicitation number
12026120R0004
Issued by

About this file

This solicitation is seeking proposals for National Forest System Road 384 Improvements on the Boise National Forest in Idaho. The scope of work includes traffic control, erosion and sediment control, installation of three aquatic organism passage culverts, replacement and installation of road drainage culverts, road construction and surfacing activities. The contractor will furnish all labor, materials, equipment and supplies to complete the project as shown in the drawings and specifications. The project is located on NFSR 384 from Highway 21 to Little Owl Summit. The estimated start date is June 8, 2020, with a contract completion date of October 8, 2021. A site visit is scheduled for April 29, 2020. The estimated value is between $1,000,000 to $5,000,000. Proposals are due May 15, 2020 by email only. The solicitation will be available on beta.sam.gov and the selected contractor must register in SAM before award.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

12026120R0004 x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT

THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

BOISE ID 83709-1663

1249 S VINNELL WAY STE 200

ATTN

SW IDAHO-NEVADA ACQUISITION CENTER

04/01/20200001

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

04/01/2020

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not, is required to sign this document and return __________1________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

National Forest System Road 384 Improvements

1.Change Site Visit to May 5, 2020 at 1000 am meeting at Idaho City Ranger District, Idaho

City, ID

2.Extend Proposal Due Date to May 15, 2020 at 1630 MT, ONLY ACCEPTING PROPOSALS EMAIL

ONLY-tanya.spanfellner@usda.gov

Continued ...

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

TANYA SPANFELLNER

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

NSN 7540-01-152-8070

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

X

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

2 2

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

12026120R0004/0001

3. add the following language:

Work Restrictions (on Page 10 of 44 in the solicitation)

Riprap placement sites on Road 384 along Crooked River between the confluence of Pikes Fork and Willow Creek will be visually surveyed by the fish biologist prior to construction if the work occurs after August 15th. Completing the riprap placement prior to August 15th is highly recommended. The 7 affected locations are at Stations: 248+21, 249+85, 251+50, 274+35, 292+36, 298+00, and 307+70.

Surveys will look for potential evidence of spawning such as pairing fish or redds. If potential spawning is identified, the placement of riprap will not be permitted in that area unless it is certain there would be no disturbance to spawning activity. This could mean completing the work after spawning concludes and only in areas that would have no potential to impact a redd.

4. Add the following language:

Special Contract Requirements for the Edna Creek and Beaver Creek Culvert Replacements Under: Construction and Earthmoving Activities (on Page 14 of 44 in the solicitation)

If the use of explosives is required to excavate down to designed footing elevations: No blasting products that are classified as hazardous to aquatic environments or known to be toxic to aquatic life may be used.

5. Edit the following to the Erosion Control section on Page 13 of 44 of the solicitation.

Remove the text that is stricken through and replace with bold text. There is NO separate document as referenced in Appendix J.

Erosion Control Submit an Erosion Control and Sediment Control Plan which addresses the requirements of the Road 384 Projects Special Contract Requirements for AOP Sites.doc in Appendix J Special Contract Requirements for the Edna Creek and Beaver Creek Culvert Replacements, the Contract Plans, and Section 157 of the FP-14 Specifications and Forest Service Supplemental Specifications (FSSS).