Amendment 2.pdf

PDF 1 MB Posted

Attached to
National Forest System Road 384 Improvements-Boise NF-Idaho City RD
Solicitation number
12026120R0004
Issued by

About this file

This solicitation package is for a National Forest System Road 384 Improvements project located on the Boise National Forest in Idaho. The project involves traffic control, erosion control, installation of three aquatic organism passage culverts, replacement and installation of drainage culverts, road embankment work including screening, hauling, weighing and placement of material, installation of two underdrain systems, placement of riprap, application of aggregate surfacing and asphalt paving. The contractor must furnish all labor, materials, equipment and supplies to complete the project as shown in the plans and specifications. The estimated contract period is from June 8, 2020 to October 8, 2021. The solicitation will be posted on beta.sam.gov with drawings provided as attachments. The project value is between $1-5 million. Davis-Bacon wage rates apply. Responses are due within 15 days of posting. This is a small business set-aside to be awarded as a firm-fixed price contract by the USDA Forest Service.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

12026120R0004 x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT

THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

BOISE ID 83709-1663

1249 S VINNELL WAY STE 200

ATTN

SW IDAHO-NEVADA ACQUISITION CENTER

05/06/20200002

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

04/01/2020

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

TANYA SPANFELLNER

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

NSN 7540-01-152-8070

Previous edition unusable

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

National Forest System Road 384 Improvements

1. Add to Attachment No. 2 NFSR 384 FS Supplemental Specifications:

Add the following to 105.02 Material Sources.

Submit a pit operating plan for both the Kempner Ranch and Lamar Creek pit sites to the

Contracting Officer for approval that addresses at a minimum, a map and explanation of the nature of the access, anticipated activity, surface disturbance, and intended reclamation including removal or retention of structures and facilities. The Forest Service will provide the maps of the Kempner and Lamar pit sites for the contractor to identify the locations of the components of the operations. Submit the operating plan proposal at least

7 days prior to beginning operations.

Continued ...

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

2 7CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

12026120R0004/0002

2. Correction to Attachment No.6, the plans for National Forest System Road 384 Improvements On sheet 4, Construction Notes, and under Pay

Item 20415-Roadway Embankment, delete the text in the first sentence that says, "at the Whoop-um-up parking area" and replace with "at an approved location". The modification allows the contractor to propose the location for setting up scales that is the most convenient to his operations.

3. Attached Sign in Sheet and Q and A from Site

Visit

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

Amendment No.2:

The following questions were brought up during the pre-bid site visit held on 05-05-2020:

Question: Will the contractor have to pay a royalty fee for materials removed from the Lamar and Kempner Ranch pits?

Answer: No. The Forest Service will NOT charge royalty fees for the material.

Question: What government furnished materials utilized in this project will the contractor be required to pay Idaho State sales tax on?

Answer: Yes

Under clause 52.236-7, Permits and Responsibilities, Contractors shall be responsible for complying with any Federal, State, and municipal laws, codes and regulations applicable to the performance of the work. Questions regarding assessment of Idaho Use Tax on Government Furnished Property should be directed to the Idaho State Tax Commission at (208) 334-7660 or 800-97-7660. Or email questions to taxrep@tax.idaho.gov https://tax.idaho.gov/i-2068.cfm

Using contractors on governments projects

Many government agencies use contractors to make improvements to real property. Idaho requires contractors to pay tax on materials they use to alter, improve or repair real property in Idaho. This includes materials that contractors use when they work for government agencies.

Government agencies can buy materials for their construction contracts without owing Idaho sales tax.

But if the government agency provides those untaxed materials to their contractor, the contractor owes use tax.

Contractors owe tax on the materials they use in a real property project. It doesn't matter whether the contractor buys or makes the materials, or the government agency provides the materials for the project. Because of this, contractor bids should include:

• Use tax on materials the government agency bought tax exempt and gave the contractor to use

• Sales tax on materials the contractor buys for real-property improvement contracts

Contractors should include these taxes in the bid because they're part of their cost. The government agency will reimburse contractors for the taxes they paid when they bill the agency for those taxes.

Exception: Materials donated to a government agency for incorporation into a real property project aren't subject to use tax. This is the only exception.

Amendment #2-12026120R0004 mailto:taxrep@tax.idaho.gov https://tax.idaho.gov/i-2068.cfm

Example:

An Idaho government agency requires its contractor, ABC Contractors, to provide a cost breakdown for materials used. ABC bought $50,000 worth of materials and paid 6% sales tax. ABC should show its cost as $53,000 on the bill.

Contractors can read more about their tax responsibilities in our Contractors Working in Idaho guide.

https://tax.idaho.gov/i-1013.cfm

Contractors and crushed rock

A contractor who applies crushed rock or other related real property materials is improving real property. As a result, the contractor who buys this material must pay tax on the purchase price. If this material is provided by the project owner or a government agency (who haven't paid tax on the material), the contractor owes tax on the value of the rock or related real property material. The value of the rock is the "crushed value" – what a buyer would pay to a gravel pit owner for this type of product. If the contractor who applies the rock is also the crusher, the value of the rock is the raw material cost (generally the royalty fee).

When a rock crusher contracts to crush and stockpile rock owned by another, the rock crusher is not a contractor improving real property. Instead, the rock crusher is a retailer of taxable processing services.

The rock crusher must get a seller's permit number and charge sales tax on retail sale of crushing services (including mobilization fees). However, no tax applies if the customer, such as a state or federal government agency, is exempt from paying sales tax.

If the rock crusher is crushing and stockpiling rock for a customer who will resell it, the services aren't taxable if the buyer provides a completed form ST-101. The rock crusher may qualify for the production exemption on equipment, fuel, and certain supplies if the majority of the business is crushing rock that will be resold. This is true even if the crusher isn't the owner of the rock.

There is material piled at Lamar Creek was dumped (donated) by the Idaho Transportation Department for the Forest Service to you use. The Forest Service did NOT pay anything for producing it.

Question: Is it permissible for a contractor to supply and install a temporary stream crossing structure at AOP construction sites to provide a way for equipment and delivery trucks to cross the stream channel?

Answer: A temporary structure may be installed if it lies within the construction limits shown on the drawings. If installed, public use of the structure needs to be barred by the contractor.

Amendment #2-12026120R0004 https://tax.idaho.gov/i-1013.cfm https://tax.idaho.gov/i-1013.cfm https://tax.idaho.gov/s-results-form.cfm?doc=EFO00149

Question: Can a wheel loader scale system be used to measure weights for Pay Item 20415 Roadway Embankment hauled to Road 384 from the Lamar pit?

Answer: No. Per FP-14 specifications under subsection 109.03(c), only platform and belt-conveyor scales are permissible as Project Weighing Systems. Subsections 109.03(c) and 109.04 list the contract requirements, including record keeping, for both weighing of the material after it is loaded into trucks and the delivery to the embankment sections on Road 384.

Amendment #2-12026120R0004

12026120R0004

NATIONAL FOREST SYSTEM ROAD 384 IMPROVEMENTS

Pre-Bid Site Visit Sign-In: 05-05-2020

NAME COMPANY PHONE NUMBER EMAIL

Galen Smolik Forest Service Office:208-373-4212 Cell: 208-850-1030

Galen.Smolik@usda.gov

Rick Stone Forest Service Office: 208-373-4118 Cell: 208-241-5400

Rick.a.stone@usda.gov

Dave Woras Forest Service Office: 208-392-3731 Cell: 208-513-3437

David.Woras@usda.gov

Dan Cook Cook & Sons Construction Office: 208-983-1407 Cell: 208-750-5245 solidground@cookandsonsconstruction.com

Zach Vandenburg Granite Excavation Office: 208-382-4188 Cell: 208-794-4267 zach@graniteexcavation.com

George Collingham, Jr. Capital Paving Company Office: 208-362-9845 Cell: 208-870-1000

George_collingham@yahoo.com

Hal Simmons Teton Prestress Concrete, LLC Office: 208-552-6606 Cell: 208-251-1903 tetonpc@yahoo.com

Jonathan G. Woolworth Seabee Construction Office: 503-512-7647 Cell: 503-740-9564 jw@builtbyseabee.com

Antone Contento Knife River Corporation Office: 208-362-6152 Cell: 907-378-3788

Antone.contento@kniferiver.com

Jim Lauteren Knife River Corporation Office: 208-362-6152 Cell: 208-914-0495

Jim.lauteren@kniferiver.com

NAME COMPANY PHONE NUMBER EMAIL

Loren A. Jalbert TDX Power Services Office: 208-375-5323 Cell: 208-559-0336 ljalbert@tdxpowerservices.com

Joe Ross Treasure Valley Pipe Office: 208-459-7531 Cell: 209-941-1051 joe@tvpipe.us

Jacob Hassard TDX Power Services Office: 208-375-5323 jhassard@tdxpowerservices.com

Aaron Montgomery M & M Excavating 541-490-2800 mandmexcavating@gmail.com