Attach 5 - Key Personnel.pdf

PDF 95 KB Posted

Attached to
AOC Multi-Award E/A IDIQ
Solicitation number
AOCACB23R0122
Issued by

About this file

This document lists key personnel required for a multiple award indefinite delivery/indefinite quantity contract with the Architect of the Capitol. The prime consultant must identify a principal-in-charge, project managers, and quality control manager as key personnel. Additional required key personnel include a senior engineer, senior architect with a minimum of 15 years' experience in that role, senior environmental engineer, senior industrial hygienist, senior plumbing engineer, and senior fire protection engineer. The related federal contract opportunity is a special notice for architectural and engineering services under solicitation number AOCACB23R0122.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

KEY PERSONNEL LIST

Prime Consultant Key Personnel:

a. Principal-in-Charge

b. Project Managers

c. Quality Control Manager

Key Personnel:

a. Senior Engineer

b. Senior Architect

c. Lead Architectural Designer (may be same person as Senior Architect). Minimum of 15 years’ experience in this role.

d. Senior Environmental Engineer

e. Senior Industrial Hygienist

f. Senior Plumbing Engineer

g. Senior Fire Protection Engineer

h. Senior Cost Estimator

File details come from the government source that posted it. Updated .