About this file
This is a Bid Schedule for the initial Task Order under a 5-year Requirements contract (FA4626-26-R-0010) for repair and replacement of HICS gates at Malmstrom Air Force Base's missile complex in Montana. The contract is a 100% Service-Disabled Veteran-Owned Small Business (SDVOSB) set-aside, requiring offerors to be designated in the System for Award Management (SAM) as an SDVOSB concern certified by the Small Business Administration.
The Year 1 Task Order includes eight line items with estimated quantities for gate installation and removal services. Specific requirements include installation of 16-foot barbed wire gates (16 units), 26-foot barbed wire gates (2 units), 16-foot woven wire gates (3 units), 26-foot woven wire gates (3 units), additional wire for oversized gates (22 linear feet), removal of abandoned gates (3 units), mobilization (12 days), and bonding (1 lot). Each line item encompasses all labor, equipment, materials, locates, removal, and disposal services necessary for completion. Unit prices and extended amounts are left blank in the schedule, indicating this is the pricing template where contractors must provide their bid prices. The schedule notes that estimated quantities are historical usage estimates for bidding purposes only and actual quantities ordered may differ; unit prices provided will be used to establish prices for each Task Order based on actual requirements.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Solicitation Amendment FA462626R00100001 SF 30.pdf | ||
| Attach 11. HICS Gates Q&A.xlsx | XLSX spreadsheet | |
| Solicitation - FA462626R0010.pdf | ||
| Attach 1. HICS Gates_SOW.pdf | ||
| Attach 8. Past Performance Reference Sheet.docx | DOCX document | |
| Attach 6. Combined Wage Determinations_05-18-26.pdf | ||
| Attach 10. CEAL_Blank.xlsx | XLSX spreadsheet | |
| Attach 9. Subcontractor Consent.docx | DOCX document | |
| Attach 2. Submittal Schedule.pdf | ||
| Attach 3. Repair HICS Gates Drawings.pdf | ||
| Attach 4. Bid Schedule 5 year.xlsx | XLSX spreadsheet | |
| Attach 7. Section L & M.pdf |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Bid Schedule
| BID SCHEDULE |
| CONTRACT NUMBER: FA4626-26-R-0010 |
| Year 1 - First Task Order | |||
| ITEM | DESCRIPTION | EST. | |
| QTY* | UNIT OF MEASURE | UNIT PRICE | EST. |
EXTENDED AMOUNT
| 0001AA | Install 16 foot wide Barbed Wire Gate. Includes all work, equipment, and materials necessary to call in locates, remove and dispose of the existing gate, posts, wire and ancillary items and install a new gate system to include horizontal bracing and vertical posts, wire, twist stays, gates markers and any other ancillary items. | 16 | EA | $ - 0 |
| 0001AB | Install 26 foot wide Barbed Wire Gate. Includes all work, equipment, and materials necessary to call in locates, remove and dispose of the existing gate, posts, wire and ancillary items and install a new gate system to include horizontal bracing and vertical posts, wire, twist stays, gates markers and any other ancillary items. | 2 | EA | $ - 0 |
| 0001AC | Install 16 foot wide Woven Wire Gate. Includes all work, equipment, and materials necessary to call in locates remove and dispose of the existing gate, posts, wire and ancillary items and install a new gate system to include horizontal bracing and vertical posts, wire, twist stays, gates markers and any other ancillary items. | 3 | EA | $ - 0 |
| 0001AD | Install 26 foot wide Woven Wire Gate. Includes all work, equipment, and materials necessary to call in locates, remove and dispose of the existing gate, posts, wire and ancillary items and install a new gate system to include horizontal bracing and vertical posts, wire, twist stays, gates markers and any other ancillary items. | 3 | EA | $ - 0 |
| 0001AE | Additional Wire for Item 0002 or 0004. Includes all work and equipment necessary to provide extra barbed wire, woven wire, twist stays, staples, labor, and any other ancillary items to construct a gate larger than defined in Item 0002 or 0004 which are typically used to facilitate the movement of large farm equipment. | 22 | LF | $ - 0 |
| 0001AF | Remove Abandoned Gates. Includes all work, equipment, and materials necessary to remove and dispose of the existing gate, posts, wire and ancillary items. | 3 | EA | $ - 0 |
| 0001AG | Mobilization per Day. All costs related to general contract requirements, administration, and overhead shall be merged and included in the contract lump sum costs for "Mobilization". The cost of all insurance, permits, safety, fees, and licenses, shop drawings and samples, general administration and overhead, movement of equipment, tools, and other incidental work required for occupying the site and performing the work shall be merged and included in the contract lump sum price for "Mobilization." The Government will exercise every effort to keep the mobilization from on site to the next to a minimum distance. The Government will only pay for 1 mobilization per day. | 12 | DAY | $ - 0 |
| 0001AH | Bonding. Shall be paid for as a lump sum per Task Order at the amount per Government contract requirements. | 1 | LOT | $ - 0 |
| TOTAL EST. EXTENDED AMOUNT - Year 1 - First Task order | $ - 0 | |||
| * NOTE: ESTIMATED QUANTITIES ARE HISTORICAL USAGE ESTIMATES AND ARE FOR BIDDING PURPOSES ONLY. THE ACTUAL QUANTITIES ORDERED ON THIS CONTRACT MAY DIFFER. THE UNIT PRICES PROVIDED BY CONTRACTORS WILL BE USED TO ESTABLISH PRICES FOR EACH TASK ORDER BASED ON ACTUAL QUANTITIES. |