This is a Schedule of Materials Submittals for the "Repair HICS Gates" project (Contract No. FA4626-26-R-0006). The document specifies all materials and components required for the gate repair project, along with submission and approval requirements for the contractor.

The schedule lists twelve line items spanning Division 01 (General Requirements) and Division 02 (Site Construction). Materials include structural components such as 6-inch diameter wood fence posts, 2 7/8-inch diameter steel horizontal braces, 4-inch diameter wood gate stays, and 42-inch long metal fence stays. Wire materials specified include plain wire, barbed wire, barbless stranded wire, and woven wire, along with staples and fluorescent delineator coil. Each material submittal requires four copies and must be submitted 10 days before the scheduled work, with a prior-to-start-work (PTSW) deadline. The Work Schedule submittal requires three copies with a 15-day submission window, while Landfill Disposal Receipts require two copies with an after-each-occurrence (AEO) deadline. All submittals require contractor certification of compliance, with designated approval and disapproval columns for project engineer review. The document includes a comprehensive tracking system for dates received, civil engineering review dates, return suspense dates, submittal numbers, and contractor resubmittal information to ensure timely processing and project coordination.

View the file

Other files

File Type Posted
Solicitation Amendment FA462626R00100001 SF 30.pdf PDF
Attach 11. HICS Gates Q&A.xlsx XLSX spreadsheet
Attach 3. Repair HICS Gates Drawings.pdf PDF
Attach 4. Bid Schedule 5 year.xlsx XLSX spreadsheet
Attach 7. Section L & M.pdf PDF
Attach 6. Combined Wage Determinations_05-18-26.pdf PDF
Attach 10. CEAL_Blank.xlsx XLSX spreadsheet
Attach 9. Subcontractor Consent.docx DOCX document
Solicitation - FA462626R0010.pdf PDF
Attach 1. HICS Gates_SOW.pdf PDF
Attach 5. Bid Schedule_Initial TO.xlsx XLSX spreadsheet
Attach 8. Past Performance Reference Sheet.docx DOCX document
Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 2

SCHEDULE OF MATERIALS SUBMITTALS

Project Number Project Title:

Repair HICS Gates

Solicitation/Contract

No. FA4626-26-R-0006

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACTOR/ADMINISTRATOR

DATE CONTRACTOR NOTIFIED

APPROVED

DIS-

APPROVED

DIVISION 01-GENERAL REQUIREMENTS

1 01000 9.C Work Schedule 3 15 D

PTSW

2 01000 12.D Landfill Disposal Receipts 2 AEO

3 02000 10.3.A 6" Dia Wood Fence Post 4 10 D

PTSW

4 02000 10.3.B 2 7/8" Dia Steel Horizontal Brace 4 10 D

PTSW

5 02000 10.3.C 4" Dia Wood Gate Stay 4 10 D

PTSW

6 02000 10.3.D 42" Long Metal Fence Stays 4 10 D

PTSW

7 02000 10.3.E Plain Wire 4 10 D

PTSW

8 02000 10.3.F Barbed Wire 4 10 D

PTSW

9 02000 10.3.G Barbless Stranded Wire 4 10 D

PTSW

10 02000 10.3.H Woven Wire 4 10 D

PTSW

11 02000 10.3.I Staples 4 10 D

PTSW

12 02000 10.3.J Fluorescent Delineator Coil 1 4 10 D

PTSW

D - Days PBC - Prior to Beginning Construction PFI - Prior to Final Inspection

AEO- After Each Occurrence PTFP- Prior to Final Payment PPC - Prior to Project Completion ANTP - After Notice to Proceed PSW - Prior to Start Work PT - Prior to Testing

L

IN

E N

U M

B E

R

C E

R T

IF

IC

A T

IO

N

O F

C

M

P L

IA

N

C E

SH

O

P D

R A

W

IN

G S

SA

M

P L

E S

C O

L O

R S

E L

E C

T

IO

N

ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL

M A

N U

F A

C T

U R

E R

'S

W A

R R

A N

T Y

M A

N U

F A

C T

U R

E

'S

E

C O

M M

E N

D A

T

IO

N S

R E

Q U

IR

D

SU

B

M

IS

SI

O

N D

A T

(B Y

C O

N T

R A

C T

O R

Number of Copies Required

O P

E R

A T

IN

G

ST

R

U C

T

IO

N S

N O

T

IF

IC

A

T

IO

N

O T

H E

R

C A

T A

L O

G D

A T

A

REMARKS

D A

T E

R E

C E

IV

C

O N

T R

A C

T

IN

G

D A

T E

T O

C

IV

IL

N

G

IN

E E

R

IN

G

R E

T U

R N

S U

SP

E

SE

T

E

SU

B

M

IT

T

L

U

M B

E R

S

F

IN

A L

A P

P R

O V

A L

C O

N T

R A

C T

SU

B M

IT

T

L

Attch 2, Submittal Schedule