Attach 4. Bid Schedule 5 year.xlsx

XLSX spreadsheet 16 KB Posted

Attached to
Repair HICS Gates
Solicitation number
FA462626R0010
Issued by

About this file

This is a Bid Schedule for a 5-year Requirements contract (FA4626-26-R-0010) for the repair and replacement of HICS gates at Malmstrom Air Force Base's missile complex in Montana. The contract is 100% set aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB) certified by the Small Business Administration. Bidders must submit unit prices for eight line items that repeat across all five contract years, with identical estimated quantities for each year: 65 each of 16-foot barbed wire gates, 9 each of 26-foot barbed wire gates, 13 each of 16-foot woven wire gates, 13 each of 26-foot woven wire gates, 90 linear feet of additional wire for oversized gates, 10 removals of abandoned gates, 50 days of mobilization, and 1 bonding lump sum per task order.

The estimated quantities are historical usage data for bidding purposes only, with actual quantities to be determined through individual task orders. Unit prices provided by the contractor will establish pricing for each task order based on actual requirements. All costs related to general contract requirements, administration, overhead, insurance, permits, safety fees, licenses, shop drawings, samples, and equipment mobilization must be included in the mobilization lump sum price. The government will pay only one mobilization charge per day and will endeavor to minimize the distance between sequential work locations. The contract structure allows for flexible ordering over the five-year period while maintaining fixed unit pricing established during the initial bid process.

View the file

Other files

File Type Posted
Solicitation Amendment FA462626R00100001 SF 30.pdf PDF
Attach 11. HICS Gates Q&A.xlsx XLSX spreadsheet
Attach 2. Submittal Schedule.pdf PDF
Attach 3. Repair HICS Gates Drawings.pdf PDF
Attach 7. Section L & M.pdf PDF
Attach 6. Combined Wage Determinations_05-18-26.pdf PDF
Attach 10. CEAL_Blank.xlsx XLSX spreadsheet
Attach 9. Subcontractor Consent.docx DOCX document
Solicitation - FA462626R0010.pdf PDF
Attach 1. HICS Gates_SOW.pdf PDF
Attach 5. Bid Schedule_Initial TO.xlsx XLSX spreadsheet
Attach 8. Past Performance Reference Sheet.docx DOCX document
Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bid Schedule

BID SCHEDULE
CONTRACT NUMBER: FA4626-26-R-0010
Year 1
ITEMDESCRIPTIONEST.
QTY*UNIT OF MEASUREUNIT PRICEEST.

EXTENDED AMOUNT

0001AAInstall 16 foot wide Barbed Wire Gate. Includes all work, equipment, and materials necessary to call in locates, remove and dispose of the existing gate, posts, wire and ancillary items and install a new gate system to include horizontal bracing and vertical posts, wire, twist stays, gates markers and any other ancillary items.65EA$ - 0
0001ABInstall 26 foot wide Barbed Wire Gate. Includes all work, equipment, and materials necessary to call in locates, remove and dispose of the existing gate, posts, wire and ancillary items and install a new gate system to include horizontal bracing and vertical posts, wire, twist stays, gates markers and any other ancillary items.9EA$ - 0
0001ACInstall 16 foot wide Woven Wire Gate. Includes all work, equipment, and materials necessary to call in locates remove and dispose of the existing gate, posts, wire and ancillary items and install a new gate system to include horizontal bracing and vertical posts, wire, twist stays, gates markers and any other ancillary items.13EA$ - 0
0001ADInstall 26 foot wide Woven Wire Gate. Includes all work, equipment, and materials necessary to call in locates, remove and dispose of the existing gate, posts, wire and ancillary items and install a new gate system to include horizontal bracing and vertical posts, wire, twist stays, gates markers and any other ancillary items.13EA$ - 0
0001AEAdditional Wire for Item 0002 or 0004. Includes all work and equipment necessary to provide extra barbed wire, woven wire, twist stays, staples, labor, and any other ancillary items to construct a gate larger than defined in Item 0002 or 0004 which are typically used to facilitate the movement of large farm equipment.90LF$ - 0
0001AFRemove Abandoned Gates. Includes all work, equipment, and materials necessary to remove and dispose of the existing gate, posts, wire and ancillary items.10EA$ - 0
0001AGMobilization per Day. All costs related to general contract requirements, administration, and overhead shall be merged and included in the contract lump sum costs for "Mobilization". The cost of all insurance, permits, safety, fees, and licenses, shop drawings and samples, general administration and overhead, movement of equipment, tools, and other incidental work required for occupying the site and performing the work shall be merged and included in the contract lump sum price for "Mobilization." The Government will exercise every effort to keep the mobilization from on site to the next to a minimum distance. The Government will only pay for 1 mobilization per day.50DAY$ - 0
0001AHBonding. Shall be paid for as a lump sum per Task Order at the amount per Government contract requirements.1LOT$ - 0
TOTAL EST. EXTENDED AMOUNT - Year 1$ - 0
Year 2
ITEMDESCRIPTIONEST.
QTY*UNIT OF MEASUREUNIT PRICEEST.

EXTENDED AMOUNT

0001AAInstall 16 foot wide Barbed Wire Gate. Includes all work, equipment, and materials necessary to call in locates, remove and dispose of the existing gate, posts, wire and ancillary items and install a new gate system to include horizontal bracing and vertical posts, wire, twist stays, gates markers and any other ancillary items.65EA$ - 0
0001ABInstall 26 foot wide Barbed Wire Gate. Includes all work, equipment, and materials necessary to call in locates, remove and dispose of the existing gate, posts, wire and ancillary items and install a new gate system to include horizontal bracing and vertical posts, wire, twist stays, gates markers and any other ancillary items.9EA$ - 0
0001ACInstall 16 foot wide Woven Wire Gate. Includes all work, equipment, and materials necessary to call in locates remove and dispose of the existing gate, posts, wire and ancillary items and install a new gate system to include horizontal bracing and vertical posts, wire, twist stays, gates markers and any other ancillary items.13EA$ - 0
0001ADInstall 26 foot wide Woven Wire Gate. Includes all work, equipment, and materials necessary to call in locates, remove and dispose of the existing gate, posts, wire and ancillary items and install a new gate system to include horizontal bracing and vertical posts, wire, twist stays, gates markers and any other ancillary items.13EA$ - 0
0001AEAdditional Wire for Item 1002 or 1004. Includes all work and equipment necessary to provide extra barbed wire, woven wire, twist stays, staples, labor, and any other ancillary items to construct a gate larger than defined in Item 1002 or 1004 which are typically used to facilitate the movement of large farm equipment.90LF$ - 0
0001AFRemove Abandoned Gates. Includes all work, equipment, and materials necessary to remove and dispose of the existing gate, posts, wire and ancillary items.10EA$ - 0
0001AGMobilization per Day. All costs related to general contract requirements, administration, and overhead shall be merged and included in the contract lump sum costs for "Mobilization". The cost of all insurance, permits, safety, fees, and licenses, shop drawings and samples, general administration and overhead, movement of equipment, tools, and other incidental work required for occupying the site and performing the work shall be merged and included in the contract lump sum price for "Mobilization." The Government will exercise every effort to keep the mobilization from on site to the next to a minimum distance. The Government will only pay for 1 mobilization per day.50DAY$ - 0
0001AHBonding. Shall be paid for as a lump sum per Task Order at the amount per Government contract requirements.1LOT$ - 0
TOTAL EST. EXTENDED AMOUNT - Year 2$ - 0
Year 3
ITEMDESCRIPTIONEST.
QTY*UNIT OF MEASUREUNIT PRICEEST.

EXTENDED AMOUNT

0001AAInstall 16 foot wide Barbed Wire Gate. Includes all work, equipment, and materials necessary to call in locates, remove and dispose of the existing gate, posts, wire and ancillary items and install a new gate system to include horizontal bracing and vertical posts, wire, twist stays, gates markers and any other ancillary items.65EA$ - 0
0001ABInstall 26 foot wide Barbed Wire Gate. Includes all work, equipment, and materials necessary to call in locates, remove and dispose of the existing gate, posts, wire and ancillary items and install a new gate system to include horizontal bracing and vertical posts, wire, twist stays, gates markers and any other ancillary items.9EA$ - 0
0001ACInstall 16 foot wide Woven Wire Gate. Includes all work, equipment, and materials necessary to call in locates remove and dispose of the existing gate, posts, wire and ancillary items and install a new gate system to include horizontal bracing and vertical posts, wire, twist stays, gates markers and any other ancillary items.13EA$ - 0
0001ADInstall 26 foot wide Woven Wire Gate. Includes all work, equipment, and materials necessary to call in locates, remove and dispose of the existing gate, posts, wire and ancillary items and install a new gate system to include horizontal bracing and vertical posts, wire, twist stays, gates markers and any other ancillary items.13EA$ - 0
0001AEAdditional Wire for Item 2002 or 2004. Includes all work and equipment necessary to provide extra barbed wire, woven wire, twist stays, staples, labor, and any other ancillary items to construct a gate larger than defined in Item 2002 or 2004 which are typically used to facilitate the movement of large farm equipment.90LF$ - 0
0001AFRemove Abandoned Gates. Includes all work, equipment, and materials necessary to remove and dispose of the existing gate, posts, wire and ancillary items.10EA$ - 0
0001AGMobilization per Day. All costs related to general contract requirements, administration, and overhead shall be merged and included in the contract lump sum costs for "Mobilization". The cost of all insurance, permits, safety, fees, and licenses, shop drawings and samples, general administration and overhead, movement of equipment, tools, and other incidental work required for occupying the site and performing the work shall be merged and included in the contract lump sum price for "Mobilization." The Government will exercise every effort to keep the mobilization from on site to the next to a minimum distance. The Government will only pay for 1 mobilization per day.50DAY$ - 0
0001AHBonding. Shall be paid for as a lump sum per Task Order at the amount per Government contract requirements.1LOT$ - 0
TOTAL EST. EXTENDED AMOUNT - Year 3$ - 0
Year 4
ITEMDESCRIPTIONEST.
QTY*UNIT OF MEASUREUNIT PRICEEST.

EXTENDED AMOUNT

0001AAInstall 16 foot wide Barbed Wire Gate. Includes all work, equipment, and materials necessary to call in locates, remove and dispose of the existing gate, posts, wire and ancillary items and install a new gate system to include horizontal bracing and vertical posts, wire, twist stays, gates markers and any other ancillary items.65EA$ - 0
0001ABInstall 26 foot wide Barbed Wire Gate. Includes all work, equipment, and materials necessary to call in locates, remove and dispose of the existing gate, posts, wire and ancillary items and install a new gate system to include horizontal bracing and vertical posts, wire, twist stays, gates markers and any other ancillary items.9EA$ - 0
0001ACInstall 16 foot wide Woven Wire Gate. Includes all work, equipment, and materials necessary to call in locates remove and dispose of the existing gate, posts, wire and ancillary items and install a new gate system to include horizontal bracing and vertical posts, wire, twist stays, gates markers and any other ancillary items.13EA$ - 0
0001ADInstall 26 foot wide Woven Wire Gate. Includes all work, equipment, and materials necessary to call in locates, remove and dispose of the existing gate, posts, wire and ancillary items and install a new gate system to include horizontal bracing and vertical posts, wire, twist stays, gates markers and any other ancillary items.13EA$ - 0
0001AEAdditional Wire for Item 3002 or 3004. Includes all work and equipment necessary to provide extra barbed wire, woven wire, twist stays, staples, labor, and any other ancillary items to construct a gate larger than defined in Item 3002 or 3004 which are typically used to facilitate the movement of large farm equipment.90LF$ - 0
0001AFRemove Abandoned Gates. Includes all work, equipment, and materials necessary to remove and dispose of the existing gate, posts, wire and ancillary items.10EA$ - 0
0001AGMobilization per Day. All costs related to general contract requirements, administration, and overhead shall be merged and included in the contract lump sum costs for "Mobilization". The cost of all insurance, permits, safety, fees, and licenses, shop drawings and samples, general administration and overhead, movement of equipment, tools, and other incidental work required for occupying the site and performing the work shall be merged and included in the contract lump sum price for "Mobilization." The Government will exercise every effort to keep the mobilization from on site to the next to a minimum distance. The Government will only pay for 1 mobilization per day.50DAY$ - 0
0001AHBonding. Shall be paid for as a lump sum per Task Order at the amount per Government contract requirements.1LOT$ - 0
TOTAL EST. EXTENDED AMOUNT - Year 4$ - 0
Year 5
ITEMDESCRIPTIONEST.
QTY*UNIT OF MEASUREUNIT PRICEEST.

EXTENDED AMOUNT

0001AAInstall 16 foot wide Barbed Wire Gate. Includes all work, equipment, and materials necessary to call in locates, remove and dispose of the existing gate, posts, wire and ancillary items and install a new gate system to include horizontal bracing and vertical posts, wire, twist stays, gates markers and any other ancillary items.65EA$ - 0
0001ABInstall 26 foot wide Barbed Wire Gate. Includes all work, equipment, and materials necessary to call in locates, remove and dispose of the existing gate, posts, wire and ancillary items and install a new gate system to include horizontal bracing and vertical posts, wire, twist stays, gates markers and any other ancillary items.9EA$ - 0
0001ACInstall 16 foot wide Woven Wire Gate. Includes all work, equipment, and materials necessary to call in locates remove and dispose of the existing gate, posts, wire and ancillary items and install a new gate system to include horizontal bracing and vertical posts, wire, twist stays, gates markers and any other ancillary items.13EA$ - 0
0001ADInstall 26 foot wide Woven Wire Gate. Includes all work, equipment, and materials necessary to call in locates, remove and dispose of the existing gate, posts, wire and ancillary items and install a new gate system to include horizontal bracing and vertical posts, wire, twist stays, gates markers and any other ancillary items.13EA$ - 0
0001AEAdditional Wire for Item 4002 or 4004. Includes all work and equipment necessary to provide extra barbed wire, woven wire, twist stays, staples, labor, and any other ancillary items to construct a gate larger than defined in Item 4002 or 4004 which are typically used to facilitate the movement of large farm equipment.90LF$ - 0
0001AFRemove Abandoned Gates. Includes all work, equipment, and materials necessary to remove and dispose of the existing gate, posts, wire and ancillary items.10EA$ - 0
0001AGMobilization per Day. All costs related to general contract requirements, administration, and overhead shall be merged and included in the contract lump sum costs for "Mobilization". The cost of all insurance, permits, safety, fees, and licenses, shop drawings and samples, general administration and overhead, movement of equipment, tools, and other incidental work required for occupying the site and performing the work shall be merged and included in the contract lump sum price for "Mobilization." The Government will exercise every effort to keep the mobilization from on site to the next to a minimum distance. The Government will only pay for 1 mobilization per day.50DAY$ - 0
0001AHBonding. Shall be paid for as a lump sum per Task Order at the amount per Government contract requirements.1LOT$ - 0
TOTAL EST. EXTENDED AMOUNT - Year 5$ - 0
TOTAL EST. EXTENDED AMOUNT (All 5 Years)$ - 0

* NOTE: ESTIMATED QUANTITIES ARE HISTORICAL USAGE ESTIMATES AND ARE FOR BIDDING PURPOSES ONLY. THE ACTUAL QUANTITIES ORDERED ON THIS CONTRACT MAY DIFFER. THE UNIT PRICES PROVIDED BY CONTRACTORS WILL BE USED TO ESTABLISH PRICES FOR EACH TASK ORDER BASED ON ACTUAL QUANTITIES.

File details come from the government source that posted it. Updated .