Attach 5 - DD Form 1664 - CNC Press Brake.pdf

DoD Form PDF 13 KB Posted

Attached to
CNC Press Brake
Solicitation number
W911KF-23-Q-0033
Issued by

About this file

This Data Item Description specifies technical data requirements for manuals related to a Computer Numerical Control Press Brake. The contractor must provide an Operator's Manual, Maintenance Manual, Programming Manual, and Safety Manual with the CNC Press Brake. Three copies of each manual must be furnished on CD-ROM along with one electronic copy of all delivered documentation. The documentation must be in English and meet the requirements of MIL-M-7298.

The related federal contract opportunity is a solicitation from the Department of the Army Materiel Command Contracting Command Detroit Arsenal for a CNC Press Brake under solicitation number W911KF-23-Q-0033. The required technical data includes manuals to evaluate the equipment's acceptability for government use.

View the file

Other versions and copies of DD Form 1664

File Revision Posted Attached to
Attachment 4-DD Form 1664 for NBC Components Test Stand 08FEB23.pdf Feb 8, 2023 NBC Component Test Stand for The Anniston Army Depot
Attachment 4 DD Form 1664 Manuals.pdf Revision not stated Fiber Laser Cutting Machine
Attachment 4-DD Form 1664.pdf Revision not stated X1100 Oil Pump Test Stand
Attachment 5 - DD Form 1664.pdf Revision not stated 450Kv X-Ray System
6. DD Form 1664 Laser Cutter Bldg 134.pdf Revision not stated 4kw Laser Cutting System
8. DD Form 1664 for EDM Project.pdf Revision not stated CNC Wire Electric Discharge Machines
Attachment 4 DD1664.pdf Revision not stated Compact Track Loader
Attachment 5-DD Form 1664 - Bldg 409 Cranes.pdf Revision not stated 2-Ton Crane & Hoist for the Anniston Army Depot
Attachment 9 DD Form 1664.pdf Revision not stated Rooftop Fall Protection Systems
6. DD Form 1664 Aqueous Washer Heated.pdf Revision not stated Aqueous Washers
Attachment 4-DD Form 1664 - CNC Plasma Cutter.pdf Revision not stated CNC Plasma Cutter for The Anniston Army Depot
Attachment 4-DD Form 1664.pdf Revision not stated CNC JIG Grinder
Attach 5-DD Form 1664 Gymnasticators.pdf Revision not stated Modernization of three (3) Mandus Group Model MG 3000 Gymnasticators
Attachment 4-DD Form 1664.pdf Revision not stated CNC Vertical Grinding Center for The Anniston Army Depot
Attach 5-DD Form 1664-Tritium Fume Hoods.pdf Revision not stated Tritium Fume Hoods
Attachment 7-DD Form 1664 Spring Tester and Spring Tester Upgrade.pdf Revision not stated Automatic Spring Tester & Upgrade
Attach 5 -DD Form 1664.pdf Revision not stated Vacuum Chamber Leakage Detection System
5. DD1664.pdf Revision not stated Shock and Vibration Testing Table
Attachment 4-DD Form 1664 for X1100 Oil Pump Test Stand.pdf Revision not stated X1100 Oil Pump Test Stand for the Anniston Army Depot
Attach 4-DD Form 1664.pdf Revision not stated Hydraulic Test & Flush System
Show all 20

Who attaches DD Form 1664

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Form Approved OMB No. 0704-0188

Page ___ of _____ Pages Designed using Perform Pro, WHS/DIOR, Aug 96

PREVIOUS EDITION MAY BE USED.DD FORM 1664, AUG 96 (EG)

DATA ITEM DESCRIPTION

1. TITLE 2. IDENTIFICATION NUMBER

3. DESCRIPTION/PURPOSE

4. APPROVAL DATE

(YYYYMMDD)

5. OFFICE OF PRIMARY RESPONSIBILITY (OPR) 6a. DTIC APPLICABLE 6b. GIDEP APPLICABLE

7. APPLICATION/INTERRELATIONSHIP

8. APPROVAL LIMITATION 9a. APPLICABLE FORMS 9b. AMSC NUMBER

10. PREPARATION INSTRUCTIONS

11. DISTRIBUTION STATEMENT

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0704-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. PLEASE DO NOT RETURN YOUR FORM TO THE ABOVE ADDRESS.

1 TITLE: Commercial off the Shelf Manuals
2 IDENTIFICATION NUMBER: Operator' Manual CDRL A01 DI-TMSS-80527A

Electrical Drawings CDRL A02 DI-SESS-81003B Equipment Manuals CDRL A03 DI-TMSS-80527A Equipment Drawings CDRL A04 DI-SESS-81003B

3 DESCRIPTIONPURPOSE: 7.1 Content. The documentation furnished with the machine shall include the following as a minimum: operator’s manual, maintenance manual, spare parts lists, catalogs, and programming/software manuals. In addition, any other documentation normally furnished with the machine shall be provided. All documentation shall be furnished in the English language only. The documentation shall meet the requirements of the following paragraphs.
4 APPROVAL DATE YYYYMMDD:
5 OFFICE OF PRIMARY RESPONSIBILITY OPR:
6a DTIC APPLICABLE:
6b GIDEP APPLICABLE:
7 APPLICATIONINTERRELATIONSHIP: This Data Item Description (DID) is applicable when existing COTS manuals are acquired in order to evaluate their acceptability for Government use.

COTS mauals are acceptable for Government use when they conform to applicable requirements of 6.1 of MIL-M-7298.

8 APPROVAL LIMITATION:
9a APPLICABLE FORMS:
9b AMSC NUMBER:
10 PREPARATION INSTRUCTIONS: 4.1.6 Manuals. All Operator Manuals, Maintenance Manuals, Programming Manuals and Safety Manuals shall be supplied with the CNC Press Brake.

7.0 Documentation. The contractor shall provide documentation to the government as listed below. Three copies each of the following technical data shall be provided as specified on the attached DD Form 1423 with the Computer Numerical Control Plasma Cutter. The contractor shall also provide one compact disc/electronic that each contains copies of the delivered documentation.

11 DISTRIBUTION STATEMENT:
of:

File details come from the government source that posted it. Updated .