Amendment 0001.pdf

PDF 371 KB Posted

Attached to
CNC Press Brake Federal contract opportunity
Solicitation number
W911KF-23-Q-0033
Issued by
Department of the Army Materiel Command Contracting Command Detroit Arsenal

About this file

This modification amends a solicitation for a CNC press brake. The Army Materiel Command Contracting Command Detroit Arsenal seeks a down-acting hydraulic press brake with a tempered steel frame compatible with the Universal Press Brake Concept. The press brake must accept both American style and New Standard style tooling via a hydraulic New Standard Clamping System. The modification clarifies specifications, adds information on the wye power configuration, and incorporates a revised statement of work with changes highlighted in yellow. No other terms or conditions were altered by this amendment.

View the file

Other files for this federal contract opportunity

Other files attached to CNC Press Brake, newest first.
File Type Posted
b108-21-Default-000.pdf PDF
Amend 0003.pdf PDF
e108-2018-Default-000.pdf PDF
Amendment 0002.pdf PDF
SOW - Press Brake Machine - Building 108 - Rev 1.docx DOCX document
Attach 5 - DD Form 1664 - CNC Press Brake.pdf PDF
Attach 4 - DD Form 1423 - CNC Press Brake.pdf PDF
Attach 2-Requirements Memo (Technical Literature Delivery) - CNC Press Brake.pdf PDF
Attach 1-SOW - Press Brake Machine - Building 108.docx DOCX document
W911KF-23-Q-0033.pdf PDF
Attach 3-Evidence of Authority To Sign Offers.pdf PDF
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W31G1Y310100GO

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

See page tw o

1. CONTRACT ID CODE PAGE OF PAGES

1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 07-Aug-2023

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W911KF23Q0033

X 9B. DATED (SEE ITEM 11)

21-Jul-2023

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

07-Aug-2023

CODE

DOC-ANNISTON ARMY DEPOT

DIRECTORATE OF CONTRACTING

7 FRANKFORD AVENUE

ANNISTON AL 36201-4199

W911KF 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W911KF23Q0033

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

The following items are applicable to this modification:

CHANGES IN SOW

1. The purpose of this amendment is to answer questions asked by Contractor and to incorporate a revised Statement of Work (SOW).

2. The contractor requested clarification on the last sentence in 4.2.4. Press Brake Frame which states, “The CNC Press Brake Frame shall be equipped to accept both American and European style tooling.”

The paragraph in 4.2.4 Press Brake Frame was changed FROM: 4.2.4. Press Brake Frame. The CNC Press Brake shall be a down-acting hydraulic Press Brake designed to withstand heavy bending loads and to maintain accuracy throughout its service life. The main frame shall be constructed from tempered steel. The main frame and side frames shall be designed and manufactured to eliminate welding stresses and to prevent frame cracking or bending to ensure long-lasting performance. The CNC Press Brake frame shall be equipped to accept both American and European style tooling.

TO: 4.2.4. Press Brake Frame. The CNC Press Brake shall be a down-acting hydraulic Press Brake designed to withstand heavy bending loads and to maintain accuracy throughout its service life. The main frame shall be constructed from tempered steel. The main frame and side frames shall be designed and manufactured to eliminate welding stresses and to prevent frame cracking or bending to ensure long-lasting performance. The CNC Press Brake frame shall be compatible with the Universal Press Brake Concept (UPB) and equipped with a hydraulic New Standard Clamping System that accepts both American style and New Standard style (a.k.a. Wila/Trumpf style) tooling.

2. The second question was, “Does the building have Wye, or Delta Power?”

Answer: “Wye configuration” was added to Sections 3.2.5, 4.2.14 and 4.2.15 in revised SOW.

3. Sections 4.1.1, 4.1.4, and 4.2.2 had additional information added for better clarification.

4. All the changes made are in yellow in the attached revised SOW.

5. All other terms and conditions remain unchanged.

File details come from the government source that posted it. Updated .