Attach 4.3 UFGS 32 01 17.61.pdf
PDF 126 KB Posted
- Attached to
- Pavement Maintenance and Marking Federal contract opportunity
- Solicitation number
- FA663321Q0007
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 20210428 FA6633-21-Q-0007 Combo Revised1.pdf | ||
| Attachment 6 EAL.xlsx | XLSX spreadsheet | |
| 20210420 MFR.pdf | ||
| 20210420 FA6633-21-Q-0007 Combo.pdf | ||
| 20210413 Q and A.pdf | ||
| Attachment 2 Price Book.xlsx | XLSX spreadsheet | |
| Attachment 4.7 UFGS 32 11 23.pdf | ||
| Attachment 4.6 UFGS 32 11 20.pdf | ||
| 20210414 MFR.pdf | ||
| Attachment 4.10 UFGS 32 12 16.pdf | ||
| Attachment 4.9 UFGS 32 12 13.pdf | ||
| Attachment 4.8 UFGS 32 11 26.pdf | ||
| Attachment 1 SOW- Pavement Repair 20210414.pdf | ||
| Attach 4.4 UFGS 32 12 36.13.pdf | ||
| Attach 4.1 UFGS 01 42 00.pdf | ||
| Attachment 5 Wage Determination.pdf | ||
| Attach 4.2 UFGS 32 01 16.71.pdf | ||
| Attachment 3 Clause and Provisions.pdf | ||
| Attachment 1 SOW- Pavement Repair.pdf | ||
| Attach 4.5 UFGS 32 17 23.pdf | ||
| Attachment 2 Price Book.xlsx | XLSX spreadsheet | |
| 20210331 FA6633-21-Q-0007 Combo.pdf |
Show all 22
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION 32 01 17.61 Page 1
Revised March 15, 2021
USACE / NAVFAC / AFCEC / NASA UFGS-32 01 17.61 (May 2017)
Preparing Activity: USACE Superseding UFGS-32 01 17.16 (August 2008)
UNIFIED FACILITIES GUIDE SPECIFICATIONS
References are in agreement with UMRL dated October 2020
SECTION TABLE OF CONTENTS
DIVISION 32 - EXTERIOR IMPROVEMENTS
SECTION 32 01 17.61
SEALING CRACKS IN ASPHALT PAVING
05/17
PART 1 GENERAL
1.1 UNIT PRICES
1.1.1 Measurement
1.1.2 Payment
1.2 REFERENCES
1.3 SUBMITTALS
1.4 QUALITY ASSURANCE
1.5 DELIVERY, STORAGE, AND HANDLING
1.6 EQUIPMENT, TOOLS, AND MACHINES
1.6.1 Routing Equipment
1.6.2 Concrete Saw
1.6.3 Sandblasting Equipment
1.6.4 Waterblasting Equipment
1.6.5 Hand Tools
1.6.6 Crack Sealing Equipment
1.7 ENVIRONMENTAL REQUIREMENTS
PART 2 PRODUCTS
2.1 SEALANTS
2.2 BACKER ROD MATERIALS
PART 3 EXECUTION
3.1 PREPARATION OF CRACKS
3.1.1 Cracks
3.1.1.1 Hairline Cracks
3.1.1.2 Small Cracks
3.1.1.3 Medium Cracks
3.1.1.4 Large Cracks
3.1.2 Existing Sealant Removal
3.1.3 Routing
3.1.4 Sawing
3.1.5 [Sandblasting][Waterblasing]
3.1.6 Backer Rod Material
SECTION 32 01 17.61 Page 2
3.1.7 Rate of Progress of Crack Preparation
3.2 PREPARATION OF SEALANT
3.3 INSTALLATION OF SEALANT
3.3.1 Time of Application
3.3.2 Sealing the Crack
3.4 CRACK SEALANT INSTALLATION TEST SECTION
3.5 CLEANUP
3.6 QUALITY CONTROL PROVISIONS
3.6.1 Crack Cleaning
3.6.2 Crack Seal Application Equipment
3.6.3 Crack Sealant
-- End of Section Table of Contents --
SECTION 32 01 17.61 Page 3
USACE / NAVFAC / AFCEC / NASA UFGS-32 01 17.61 (May 2017)
Preparing Activity: USACE Superseding UFGS-32 01 17.16 (August 2008)
UNIFIED FACILITIES GUIDE SPECIFICATIONS
References are in agreement with UMRL dated October 2020
SECTION 32 01 17.61
SEALING CRACKS IN ASPHALT PAVING
05/17
NOTE: This guide specification covers the Requirements for sealing cracks in bituminous pavements.
Adhere to UFC 1-300-02 Unified Facilities Guide Specifications (UFGS) Format Standard when editing this guide specification or preparing new project specification sections. Edit this guide specification for project specific requirements by adding, deleting, or revising text. For bracketed items, choose applicable item(s) or insert appropriate information.
PART 1 GENERAL
NOTE: For additional information concerning crack sealing of bituminous pavements see UFC 3-250-08FA "Standard Practice for Sealing Joints and Cracks in Rigid and Flexible Pavements."
1.1 UNIT PRICES
1.1.1 Measurement
Determine the quantity of each sealing item to be paid for by actual measurement of the number of linear feet of in-place material that has been approved.
1.1.2 Payment
Payment will be made at the contract unit bid prices per linear foot for the sealing items scheduled. Include in the unit bid prices the cost of all labor, materials, and the use of all equipment and tools required to complete the work.
1.2 REFERENCES
SECTION 32 01 17.61 Page 4
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
ASTM INTERNATIONAL (ASTM)
ASTM C509 (2006; R 2015) Elastomeric Cellular
Preformed Gasket and Sealing Material
ASTM D789 (2015) Determination of Relative Viscosity and Moisture Content of Polyamide (PA)
ASTM D6690 (2015) Standard Specification for Joint and Crack Sealants, Hot Applied, for Concrete and Asphalt Pavements
1.3 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for Contractor Quality Control approval. When used, a designation following the "G" designation identifies the office that will review the submittal. Submittals with an "S" are for inclusion in the Sustainability e-Notebook, in conformance to Section 01 33 29 SUSTAINABILITY REPORTING. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-03 Product Data
Installation of Sealant
1.4 QUALITY ASSURANCE
Test the crack sealant and backup material, when required, for conformance with the referenced applicable material specification. No material will be allowed to be used until it has been approved. Final acceptance will be based on the performance of materials that have been satisfactorily installed.
1.5 DELIVERY, STORAGE, AND HANDLING
Inspect materials delivered to the job site for defects; unload, and store them with a minimum of handling to avoid damage. Provide storage facilities at the job site to protect materials from weather and maintain them at the temperatures recommended by the manufacturer.
1.6 EQUIPMENT, TOOLS, AND MACHINES
Equipment, tools, and machines used in performance of the work are subject to approval by the Contracting Officer. Maintain in a satisfactory working condition at all times.
1.6.1 Routing Equipment
NOTE: Rotary impact routers that are equipped with Vertical sided, carbide tipped bits have been used successfully to rout cracks in bituminous pavements. Impact routers that are not equipped
SECTION 32 01 17.61 Page 5 with carbide tipped bits normally chip and damage the surrounding pavement and should not be permitted.
Provide routing equipment which is a self-powered machine operating a power driven tool or bit specifically designed for routing bituminous pavements. Use a bit rotating about a vertical axis at sufficient speed to cut a smooth vertical-walled reservoir in the pavement surface and maintain accurate cutting without damaging the sides or top edges of the reservoir. Provide a router capable of following the trace of the crack without deviation. The use of rotary impact routing devices will not be permitted for cleaning cracks.
1.6.2 Concrete Saw
Provide a self-propelled power saw with small diameter (152 mm 6 inches or less) water-cooled diamond or abrasive saw blades for cutting cracks to the depths and widths specified and for removing filler that is embedded in the cracks or adhered to the crack faces. Use a saw blade with a diameter small enough to allow the saw to closely follow the trace of the crack.
1.6.3 Sandblasting Equipment- NOT Permitted
1.6.4 Water-blasting Equipment
Include with the water-blasting equipment a trailer-mounted water tank, pumps, high-pressure hose, wand with safety release cutoff control, nozzle, and auxiliary water resupply equipment. Use water tank and auxiliary resupply equipment with sufficient capacity to permit continuous operations. Use hoses, wands, and nozzles capable of cleaning the crack faces and the pavement surface on both sides of the crack for a width of at least 1/2 inch beyond the crack. Use pump with a mounted pressure gauge that shows the pressure in psi at which the equipment is operating at all times. Limit the pressure so that the sides of the crack are not damaged during the cleaning operation.
1.6.5 Hand Tools
NOTE: In areas that have cracks larger than 1-1/2 inches, it may be necessary to employ other types of small tools to remove damaged asphalt or crack sealant material.Such tools should be carefully evaluated for potential damaging effects to adjacent pavement prior to approval for use. For sealing cracks in bituminous pavements, the Designer is referred to UFC 3-250- 08FA Standard Practice for Sealing Joints and Cracks in Rigid and Flexible Pavements.
Hand tools may be used, when approved, for removing defective sealant from cracks and repairing or cleaning the crack faces.
1.6.6 Crack Sealing Equipment
Provide unit applicators, used for heating and installing the hot-poured crack sealant materials, that are mobile and equipped with a double-boiler, agitator-type kettle with an oil medium in the outer space or heat transfer; a direct-connected pressure-type extruding device with
SECTION 32 01 17.61 Page 6 a nozzle shaped for inserting in the crack to be filled; positive temperature devices for controlling the temperature of the transfer oil and sealant; and a recording type thermometer for indicating the temperature of the sealant. Allow the sealant to circulate through the delivery hose and return to the inner kettle when not in use, due to the applicator unit design.
1.7 ENVIRONMENTAL REQUIREMENTS
Apply the materials only when the ambient air temperature and the pavement temperature within the joint wall are at least 10 degrees C 50 degrees F and rising. Do not apply sealant if moisture is observed in the crack.
PART 2 PRODUCTS
2.1 SEALANTS
NOTE: Select crack sealants based on the proposed use and local experience. The local Department of Transportation (MNDOT) is an excellent resource for what materials are available and how well they have worked for the MNDOT.
Provide sealants conforming to ASTM D6690, Type II or ASTM D6690, Type I.
2.2 BACKER ROD MATERIALS
NOTE: The use of backer rod materials in bituminous pavements is to minimize waste of sealant material.
Backer rod material is not required in cracks with a sealant reservoir depth of less than 20 mm 3/4 inch unless the crack width is sufficiently large resulting in excessive sealant being wasted.
Provide backer rod material that is a compressible, non-shrinking, non-staining, non-absorptive material and nonreactive with the crack sealant.
Use backer rod with a melting point temperature of at least 2 degrees C 5 degrees F greater than the maximum pouring temperature of the sealant being used, when tested in accordance with ASTM D789. Use material that has a water absorption of not more than 5 percent by weight when tested in accordance with ASTM C509. Use backer rod material that is 25 percent (plus or minus 5 percent) larger in diameter than the nominal width of the crack.
PART 3 EXECUTION
3.1 PREPARATION OF CRACKS
Immediately before the installation of the crack sealant, thoroughly dry and clean the cracks to remove oxidized pavement, loose aggregate and foreign debris. Prepare cracks as follows:
3.1.1 Cracks
SECTION 32 01 17.61 Page 7
3.1.1.1 Hairline Cracks
Cracks that are less than 1/4 inch wide do not need to be sealed.
3.1.1.2 Small Cracks
Route cracks that are 1/4 to 3/4 inch wide to a nominal width 1/8 inch greater than the existing nominal width and to a depth not less than 3/4 inch, [water-blasted] [wire brushed] and cleaned and dried using compressed air.
SECTION 32 01 17.61 Page 8
3.1.1.3 Medium Cracks
[Waterblast] [Wire brush] cracks that are 3/4 to 2 inches wide and clean and dry using compressed air.
3.1.1.4 Large Cracks
Repair cracks that are greater than 1 inch wide using pothole repair (partial mill and overlay) techniques instead of sealing.
3.1.2 Existing Sealant Removal
Cut loose the in-place sealant from both crack faces and to a depth shown on the drawings using a concrete saw or hand tools as specified in paragraph EQUIPMENT, TOOLS, AND MACHINES. Remove sealant to a depth sufficient to accommodate any backer rod material that is required to maintain the depth of new sealant to be installed. Prior to further cleaning operations, remove all old loose sealant remaining in the crack opening by blowing with compressed air.
3.1.3 Routing
Perform routing of the cracks using a rotary router with a bit that is at least 1/8 inch wider than the nominal width of the crack to remove all residual old sealant (resealing), oxidized pavement and any loose aggregate in the crack wall.
3.1.4 Sawing
Perform sawing of the cracks using a power-driving concrete saw as specified in paragraph EQUIPMENT, TOOLS, AND MACHINES. Stiffen the blade as necessary with suitable dummy (or used) blades or washers. Immediately following the sawing operation, clean the crack opening using a water jet to remove all saw cuttings and debris.
3.1.5 Water-blasting
[Waterblast] clean the crack faces and the pavement surfaces extending a minimum of 1/2 inch from the crack edges. Use a multiple-pass technique until the surfaces are free of dust, dirt, old sealant residue, or foreign debris that might prevent the sealant material from bonding to the asphalt pavement. After final cleaning and immediately prior to sealing, blow out the cracks with compressed air and leave them completely free of debris and water. Ensure that water-blasting does not damage the pavement.
3.1.6 Backer Rod Material
When required, use backer rod material in all cracks that otherwise would require excessive sealant. Insert the backer rod material into the lower portion of the crack as shown on the drawings. Place the backer rod so that the top of the backer rod is at least 19 mm 3/4 inch below the top of the pavement. Ensure that the backer rod material is placed at the specified depth and is not stretched or twisted during installation.
SECTION 32 01 17.61 Page 9
3.1.7 Rate of Progress of Crack Preparation
Limit the stages of crack preparation, which include routing, of the crack faces, air pressure cleaning and placing of the backer rod material, to only that linear footage that can be sealed during the same day.
3.2 PREPARATION OF SEALANT
Do not heat hot-poured sealants in excess of the safe heating temperature recommended by the manufacturer, as shown on the sealant containers.
Withdraw and waste sealant that has been overheated or subjected to application temperatures for over 4 hours or that has remained in the applicator at the end of the day's operation.
3.3 INSTALLATION OF SEALANT
Submit manufacturer's instructions [ 10 ] days prior to the use of the material on the project. Installation of the material will not be allowed until the instructions are received.
3.3.1 Time of Application
Seal cracks immediately following final cleaning and drying of the crack walls and following the placement of the backer rod material (when required). Place sealant only when cracks are dry. Re-clean cracks that cannot be sealed under the conditions specified, or when rain interrupts sealing operations, and allow to dry or dry by mechanical means prior to installing the sealant.
3.3.2 Sealing the Crack
NOTE: Cracks should be slightly under-filled to preclude tracking the material onto the pavement surface. For airfield pavements, the sealant should be recessed 1/8 inch below the pavement surface; for roads, streets and parking lots, the sealant should be recessed 1/4 inch. For pavements that are to receive an overlay, the sealant should be recessed a minimum of 1/4 inch and a maximum of 1/2 inch below the pavement surface.
Immediately preceding, but not more than 50 feet ahead of the crack sealing operations, perform a final cleaning and drying with compressed air. Fill the cracks from the bottom of reservoir formed by the routing or the top of the backer rod up to [1/4] below the pavement surface.
Remove excess or spilled sealant from the pavement by approved methods and discard it. Install the sealant in a manner which prevents the formation of voids and entrapped air. Several passes with the applicator wand may be necessary to obtain the specified sealant depth from the pavement surface. Do not use gravity methods or pouring pots to install the sealant material. Do not permit traffic over newly sealed pavement until authorized by the Contracting Officer. Check cracks frequently to ensure that the newly installed sealant is cured to a tack-free condition within 3 hours. Immediately notify the Contracting
SECTION 32 01 17.61 Page 10
Officer of the location of any sealant that has not cured to a tack-free condition within 3 hours.
3.4 CRACK SEALANT INSTALLATION TEST SECTION
Prior to the cleaning and sealing of the cracks for the entire project, construct a test section at least 100 feet long using the specified materials and approved equipment to demonstrate the proposed sealing of all cracks of the project. Following the completion of the test section and before any other crack is sealed, inspect the test section to determine that the materials and installation meet the requirements specified. If materials or installation do not meet requirements, remove the materials and re-clean and reseal the cracks at no cost to the Government. [When the test section meets the requirements, it may be incorporated into the permanent work and paid for at the contract unit price per linear foot for sealing items scheduled. Seal all other cracks in the manner approved and successfully completed for sealing the test section.]
3.5 CLEANUP
Upon completion of the project, remove unused materials from the site and leave the pavement in a clean condition.
3.6 QUALITY CONTROL PROVISIONS
3.6.1 Crack Cleaning
Provide quality control provisions during the crack cleaning process to correct improper equipment and cleaning techniques that damage the bituminous pavement in any manner. Cleaned cracks must be approved by the Contracting Officer prior to installation of the crack sealant.
3.6.2 Crack Seal Application Equipment
Inspect the application equipment to ensure conformance to temperature requirements and proper installation. Evidences of bubbling, improper installing, and failing to cure or set will cause to suspend operations until causes of the deficiencies are determined and corrected.
3.6.3 Crack Sealant
Inspect the crack sealant for proper cure and set rating, tack free surface, bonding to the bituminous pavement, cohesive separation within the sealant, reversion to liquid, and entrapped air and voids. Remove sealants exhibiting any of these deficiencies, at any time prior to the final acceptance of the project, and replace as specified herein at no additional cost to the Government.
-- End of Section --
File details come from the government source that posted it. Updated .