Attach-03a_Proposal Price Sheet (CONUS).xlsx

XLSX spreadsheet 29 KB Posted

Attached to
Facility Condition Assessment Support (FCA) - IDIQ for Air Force Civil Engineering Center (AFCEC)
Solicitation number
FA805123R4005
Issued by

About this file

This document contains a price proposal sheet for a firm fixed price indefinite delivery indefinite quantity contract to provide facility condition assessment services for the Air Force Civil Engineering Center. The contract has a one year base period and four one-year option periods, with a potential six-month extension. Services include on-site facility condition assessments, data collection and reporting for various facility types located throughout the continental United States. Pricing is provided for multiple contract line items covering different facility groupings and quantities on an annual basis. All costs for management, labor, travel, materials and equipment are to be included in the fixed unit prices. The solicitation number is FA805123R4005 and was issued by the Department of the Air Force Materiel Command Installation and Mission Support Center Installation Contracting Agency for facility condition assessment support.

View the file

Other files

File Type Posted
FCA IDIQ - Questions from Offerors 13JUN23.pdf PDF
Attach-03b_Proposal Price Sheet (OCONUS).xlsx XLSX spreadsheet
Attach-01_Provisions and Clauses.pdf PDF
Attach-02_PWS FCA IDIQ Rev. 8 Jun 23.pdf PDF
FCA RFP Final 13JUN23_Signed.pdf PDF
FCA RFP Amendment 1_8Jun23.pdf PDF
FCA RFP Final 25MAY23 Amendment 1.pdf PDF
FCA RFP - Amended 16MAY23.pdf PDF
FCA RFP - Amended 24APR23.pdf PDF
Apndx-B (A10) Foundations r5.pdf PDF
Apndx-F (B30) Roofing r5.pdf PDF
Apndx-C (A20) Basement Construction r4.pdf PDF
Attach-01_Provisions and Clauses.pdf PDF
Attach-03b_Proposal Price Sheet (OCONUS).xlsx XLSX spreadsheet
Apndx-O (G20) - Site Improvements r1.pdf PDF
Apndx-A SMS Playbook Consolidated.pdf PDF
Apndx-D (B10) Superstructure r5.pdf PDF
Apndx-K (D20) Plumbing r5.pdf PDF
FCA RFP Final 19APR23.pdf PDF
Apndx-I (C30) Interior Finishes r5.pdf PDF
Attach-02_PWS FCA IDIQ Rev. 30 Jan 23.pdf PDF
Apndx-H (C20) Staircases r5.pdf PDF
Apndx-M (D40) - Fire Protection r5.pdf PDF
Exhibit A_CDRLs.pdf PDF
Apndx-J (D10) Conveying Systems r4.pdf PDF
Apndx-L (D30) HVAC r5.pdf PDF
Apndx-N (D50) - Facility Electrical r5.pdf PDF
Apndx-G (C10) Interior Construction r5.pdf PDF
Apndx-E (B20) Exterior Enclosure r5.pdf PDF
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONUS

Solicitation# FA805123R4005 / Attachment - 03 (a) Enterprise Facility Condition Assessments (FCA) Support - Single-Award Indefinite Delivery Indefinite Quantity (IDIQ) Proposal Price Schedule - SDVOSB Set-Aside for Continental United States (CONUS) Directions to Offerors. Only enter unit price in highlighted cells.

**NOTE: The quantities listed below are for evaluation purposes only and may not reflect the actual CLIN usage under the final IDIQ.

FFP CLIN Description - CONUS Base Year

(1 Oct 2023 to 30 Sept 2024)UnitQtyUnit Price <10,000 SF FacilityQtyUnit Price 10,000-100,000 SF FacilityQtyUnit Price > 100,000 SF FacilityTotal Price
0001The Contractor shall provide FCA services for A10, A20, B10, C20, & C30 (5-Systems) IAW basic PWS and specified tasks in TO PWS for base facilities located throughout the CONUS. All management, labor, tools, travel, G&A, profit, and fees shall be included in this FFP CLIN. All costs associated with materials, equipment, and supplies shall be included in this FFP CLIN. Associated costs may include, for example, rental/purchase of lifts, ladders, scaffolding, safety equipment, gear, personal protective equipment, and/or data collection platforms needed to perform the FCA tasks identified in the PWS. PoP identified in each individual TO is NTE 180 calendar days.SF3,000,000$0.004,000,000$0.005,600,000$0.00$0.00
0002The Contractor shall provide FCA services for B20, B30, C10, D20, D30, D40, & D50 (7-Systems) IAW basic PWS and specified tasks in TO PWS for base facilities located throughout the CONUS. All management, labor, tools, travel, G&A, profit, and fees shall be included in this FFP CLIN. All costs associated with materials, equipment, and supplies shall be included in this FFP CLIN. Associated costs may include, for example, rental/purchase of lifts, ladders, scaffolding, safety equipment, gear, personal protective equipment, and/or data collection platforms needed to perform the FCA tasks identified in the PWS. PoP identified in each individual TO is NTE 180 calendar days.SF1,500,000$0.002,700,000$0.003,600,000$0.00$0.00
0003The Contractor shall provide FCA services for A10, A20, B10, B20, B30, C10, C20, C30, D20, D30, D40 & D50 (12-Systems) IAW basic PWS and specified tasks in TO PWS for base facilities located throughout the CONUS. All management, labor, tools, travel, G&A, profit, and fees shall be included in this FFP CLIN. All costs associated with materials, equipment, and supplies shall be included in this FFP CLIN. Associated costs may include, for example, rental/purchase of lifts, ladders, scaffolding, safety equipment, gear, personal protective equipment, and/or data collection platforms needed to perform the FCA tasks identified in the PWS. PoP identified in each individual TO is NTE 180 calendar days.SF1,000,000$0.001,400,000$0.002,600,000$0.00$0.00
0004CONUS - Main CLIN for Data. The Contractor shall provide data IAW the Contract Data Requirements List (CDRL) DD Form 1423, designated as Exhibit A. NOTE: This CLIN is Not Separately Priced (NSP). The price(s) associated with this CLIN are to be included in the FFP of each FCA CLIN.NSP
Total Price
Base Year CONUS$0.00
Directions to Offerors. Only enter unit price in highlighted cells.

**NOTE: The quantities listed below are for evaluation purposes only and may not reflect the actual CLIN usage under the final IDIQ.

FFP CLIN Description - CONUS Option Year One (1)

(1 Oct 2024 to 30 Sept 2025)UnitQtyUnit Price <10,000 SF FacilityQtyUnit Price 10,000-100,000 SF FacilityQtyUnit Price > 100,000 SF FacilityTotal Price
1001The Contractor shall provide FCA services for A10, A20, B10, C20, & C30 (5-Systems) IAW basic PWS and specified tasks in TO PWS for base facilities located throughout the CONUS. All management, labor, tools, travel, G&A, profit, and fees shall be included in this FFP CLIN. All costs associated with materials, equipment, and supplies shall be included in this FFP CLIN. Associated costs may include, for example, rental/purchase of lifts, ladders, scaffolding, safety equipment, gear, personal protective equipment, and/or data collection platforms needed to perform the FCA tasks identified in the PWS. PoP identified in each individual TO is NTE 180 calendar days.SF3,000,000$0.004,000,000$0.005,600,000$0.00$0.00
1002The Contractor shall provide FCA services for B20, B30, C10, D20, D30, D40, & D50 (7-Systems) IAW basic PWS and specified tasks in TO PWS for base facilities located throughout the CONUS. All management, labor, tools, travel, G&A, profit, and fees shall be included in this FFP CLIN. All costs associated with materials, equipment, and supplies shall be included in this FFP CLIN. Associated costs may include, for example, rental/purchase of lifts, ladders, scaffolding, safety equipment, gear, personal protective equipment, and/or data collection platforms needed to perform the FCA tasks identified in the PWS. PoP identified in each individual TO is NTE 180 calendar days.SF1,500,000$0.002,700,000$0.003,600,000$0.00$0.00
1003The Contractor shall provide FCA services for A10, A20, B10, B20, B30, C10, C20, C30, D20, D30, D40 & D50 (12-Systems) IAW basic PWS and specified tasks in TO PWS for base facilities located throughout the CONUS. All management, labor, tools, travel, G&A, profit, and fees shall be included in this FFP CLIN. All costs associated with materials, equipment, and supplies shall be included in this FFP CLIN. Associated costs may include, for example, rental/purchase of lifts, ladders, scaffolding, safety equipment, gear, personal protective equipment, and/or data collection platforms needed to perform the FCA tasks identified in the PWS. PoP identified in each individual TO is NTE 180 calendar days.SF1,000,000$0.001,400,000$0.002,600,000$0.00$0.00
1004CONUS - Main CLIN for Data. The Contractor shall provide data IAW the Contract Data Requirements List (CDRL) DD Form 1423, designated as Exhibit A. NOTE: This CLIN is Not Separately Priced (NSP). The price(s) associated with this CLIN are to be included in the FFP of each FCA CLIN.NSP
Total Price
Option Year One (1) CONUS$0.00
Directions to Offerors. Only enter unit price in highlighted cells.

**NOTE: The quantities listed below are for evaluation purposes only and may not reflect the actual CLIN usage under the final IDIQ.

FFP CLIN Description - CONUS Option Year Two (2)

(1 Oct 2025 to 30 Sept 2026)UnitQtyUnit Price <10,000 SF FacilityQtyUnit Price 10,000-100,000 SF FacilityQtyUnit Price > 100,000 SF FacilityTotal Price
2001The Contractor shall provide FCA services for A10, A20, B10, C20, & C30 (5-Systems) IAW basic PWS and specified tasks in TO PWS for base facilities located throughout the CONUS. All management, labor, tools, travel, G&A, profit, and fees shall be included in this FFP CLIN. All costs associated with materials, equipment, and supplies shall be included in this FFP CLIN. Associated costs may include, for example, rental/purchase of lifts, ladders, scaffolding, safety equipment, gear, personal protective equipment, and/or data collection platforms needed to perform the FCA tasks identified in the PWS. PoP identified in each individual TO is NTE 180 calendar days.SF3,000,000$0.004,000,000$0.005,600,000$0.00$0.00
2002The Contractor shall provide FCA services for B20, B30, C10, D20, D30, D40, & D50 (7-Systems) IAW basic PWS and specified tasks in TO PWS for base facilities located throughout the CONUS. All management, labor, tools, travel, G&A, profit, and fees shall be included in this FFP CLIN. All costs associated with materials, equipment, and supplies shall be included in this FFP CLIN. Associated costs may include, for example, rental/purchase of lifts, ladders, scaffolding, safety equipment, gear, personal protective equipment, and/or data collection platforms needed to perform the FCA tasks identified in the PWS. PoP identified in each individual TO is NTE 180 calendar days.SF1,500,000$0.002,700,000$0.003,600,000$0.00$0.00
2003The Contractor shall provide FCA services for A10, A20, B10, B20, B30, C10, C20, C30, D20, D30, D40 & D50 (12-Systems) IAW basic PWS and specified tasks in TO PWS for base facilities located throughout the CONUS. All management, labor, tools, travel, G&A, profit, and fees shall be included in this FFP CLIN. All costs associated with materials, equipment, and supplies shall be included in this FFP CLIN. Associated costs may include, for example, rental/purchase of lifts, ladders, scaffolding, safety equipment, gear, personal protective equipment, and/or data collection platforms needed to perform the FCA tasks identified in the PWS. PoP identified in each individual TO is NTE 180 calendar days.SF1,000,000$0.001,400,000$0.002,600,000$0.00$0.00
2004CONUS - Main CLIN for Data. The Contractor shall provide data IAW the Contract Data Requirements List (CDRL) DD Form 1423, designated as Exhibit A. NOTE: This CLIN is Not Separately Priced (NSP). The price(s) associated with this CLIN are to be included in the FFP of each FCA CLIN.NSP
Total Price
Option Year Two (2) CONUS$0.00
Directions to Offerors. Only enter unit price in highlighted cells.

**NOTE: The quantities listed below are for evaluation purposes only and may not reflect the actual CLIN usage under the final IDIQ.

FFP CLIN Description - CONUS Option Year Three (3)

(1 Oct 2026 to 30 Sept 2027)UnitQtyUnit Price <10,000 SF FacilityQtyUnit Price 10,000-100,000 SF FacilityQtyUnit Price > 100,000 SF FacilityTotal Price
3001The Contractor shall provide FCA services for A10, A20, B10, C20, & C30 (5-Systems) IAW basic PWS and specified tasks in TO PWS for base facilities located throughout the CONUS. All management, labor, tools, travel, G&A, profit, and fees shall be included in this FFP CLIN. All costs associated with materials, equipment, and supplies shall be included in this FFP CLIN. Associated costs may include, for example, rental/purchase of lifts, ladders, scaffolding, safety equipment, gear, personal protective equipment, and/or data collection platforms needed to perform the FCA tasks identified in the PWS. PoP identified in each individual TO is NTE 180 calendar days.SF3,000,000$0.004,000,000$0.005,600,000$0.00$0.00
3002The Contractor shall provide FCA services for B20, B30, C10, D20, D30, D40, & D50 (7-Systems) IAW basic PWS and specified tasks in TO PWS for base facilities located throughout the CONUS. All management, labor, tools, travel, G&A, profit, and fees shall be included in this FFP CLIN. All costs associated with materials, equipment, and supplies shall be included in this FFP CLIN. Associated costs may include, for example, rental/purchase of lifts, ladders, scaffolding, safety equipment, gear, personal protective equipment, and/or data collection platforms needed to perform the FCA tasks identified in the PWS. PoP identified in each individual TO is NTE 180 calendar days.SF1,500,000$0.002,700,000$0.003,600,000$0.00$0.00
3003The Contractor shall provide FCA services for A10, A20, B10, B20, B30, C10, C20, C30, D20, D30, D40 & D50 (12-Systems) IAW basic PWS and specified tasks in TO PWS for base facilities located throughout the CONUS. All management, labor, tools, travel, G&A, profit, and fees shall be included in this FFP CLIN. All costs associated with materials, equipment, and supplies shall be included in this FFP CLIN. Associated costs may include, for example, rental/purchase of lifts, ladders, scaffolding, safety equipment, gear, personal protective equipment, and/or data collection platforms needed to perform the FCA tasks identified in the PWS. PoP identified in each individual TO is NTE 180 calendar days.SF1,000,000$0.001,400,000$0.002,600,000$0.00$0.00
3004CONUS - Main CLIN for Data. The Contractor shall provide data IAW the Contract Data Requirements List (CDRL) DD Form 1423, designated as Exhibit A. NOTE: This CLIN is Not Separately Priced (NSP). The price(s) associated with this CLIN are to be included in the FFP of each FCA CLIN.NSP
Total Price
Option Year Three (3) CONUS$0.00
Directions to Offerors. Only enter unit price in highlighted cells.

**NOTE: The quantities listed below are for evaluation purposes only and may not reflect the actual CLIN usage under the final IDIQ.

FFP CLIN Description - CONUS Option Year Four (4)

(1 Oct 2027 to 30 Sept 2028)UnitQtyUnit Price <10,000 SF FacilityQtyUnit Price 10,000-100,000 SF FacilityQtyUnit Price > 100,000 SF FacilityTotal Price
4001The Contractor shall provide FCA services for A10, A20, B10, C20, & C30 (5-Systems) IAW basic PWS and specified tasks in TO PWS for base facilities located throughout the CONUS. All management, labor, tools, travel, G&A, profit, and fees shall be included in this FFP CLIN. All costs associated with materials, equipment, and supplies shall be included in this FFP CLIN. Associated costs may include, for example, rental/purchase of lifts, ladders, scaffolding, safety equipment, gear, personal protective equipment, and/or data collection platforms needed to perform the FCA tasks identified in the PWS. PoP identified in each individual TO is NTE 180 calendar days.SF3,000,000$0.004,000,000$0.005,600,000$0.00$0.00
4002The Contractor shall provide FCA services for B20, B30, C10, D20, D30, D40, & D50 (7-Systems) IAW basic PWS and specified tasks in TO PWS for base facilities located throughout the CONUS. All management, labor, tools, travel, G&A, profit, and fees shall be included in this FFP CLIN. All costs associated with materials, equipment, and supplies shall be included in this FFP CLIN. Associated costs may include, for example, rental/purchase of lifts, ladders, scaffolding, safety equipment, gear, personal protective equipment, and/or data collection platforms needed to perform the FCA tasks identified in the PWS. PoP identified in each individual TO is NTE 180 calendar days.SF1,500,000$0.002,700,000$0.003,600,000$0.00$0.00
4003The Contractor shall provide FCA services for A10, A20, B10, B20, B30, C10, C20, C30, D20, D30, D40 & D50 (12-Systems) IAW basic PWS and specified tasks in TO PWS for base facilities located throughout the CONUS. All management, labor, tools, travel, G&A, profit, and fees shall be included in this FFP CLIN. All costs associated with materials, equipment, and supplies shall be included in this FFP CLIN. Associated costs may include, for example, rental/purchase of lifts, ladders, scaffolding, safety equipment, gear, personal protective equipment, and/or data collection platforms needed to perform the FCA tasks identified in the PWS. PoP identified in each individual TO is NTE 180 calendar days.SF1,000,000$0.001,400,000$0.002,600,000$0.00$0.00
4004CONUS - Main CLIN for Data. The Contractor shall provide data IAW the Contract Data Requirements List (CDRL) DD Form 1423, designated as Exhibit A. NOTE: This CLIN is Not Separately Priced (NSP). The price(s) associated with this CLIN are to be included in the FFP of each FCA CLIN.NSP
Total Price
Option Year Four (4) CONUS$0.00
Directions to Offerors. Only enter unit price in highlighted cells.

**NOTE: The quantities listed below are for evaluation purposes only and may not reflect the actual CLIN usage under the final IDIQ.

FFP CLIN Description - CONUS Six (6) Month Extension ( FAR 52.217-8, Option to Extend Services)

**NOT part award. This section is added to the total evaluated price (TEP) for evaluation purposes only.UnitQtyUnit Price <10,000 SF FacilityQtyUnit Price 10,000-100,000 SF FacilityQtyUnit Price > 100,000 SF FacilityTotal Price
5001The Contractor shall provide FCA services for A10, A20, B10, C20, & C30 (5-Systems) IAW basic PWS and specified tasks in TO PWS for base facilities located throughout the CONUS. All management, labor, tools, travel, G&A, profit, and fees shall be included in this FFP CLIN. All costs associated with materials, equipment, and supplies shall be included in this FFP CLIN. Associated costs may include, for example, rental/purchase of lifts, ladders, scaffolding, safety equipment, gear, personal protective equipment, and/or data collection platforms needed to perform the FCA tasks identified in the PWS. PoP identified in each individual TO is NTE 180 calendar days.SF3,000,000$0.004,000,000$0.005,600,000$0.00$0.00
5002The Contractor shall provide FCA services for B20, B30, C10, D20, D30, D40, & D50 (7-Systems) IAW basic PWS and specified tasks in TO PWS for base facilities located throughout the CONUS. All management, labor, tools, travel, G&A, profit, and fees shall be included in this FFP CLIN. All costs associated with materials, equipment, and supplies shall be included in this FFP CLIN. Associated costs may include, for example, rental/purchase of lifts, ladders, scaffolding, safety equipment, gear, personal protective equipment, and/or data collection platforms needed to perform the FCA tasks identified in the PWS. PoP identified in each individual TO is NTE 180 calendar days.SF1,500,000$0.002,700,000$0.003,600,000$0.00$0.00
5003The Contractor shall provide FCA services for A10, A20, B10, B20, B30, C10, C20, C30, D20, D30, D40 & D50 (12-Systems) IAW basic PWS and specified tasks in TO PWS for base facilities located throughout the CONUS. All management, labor, tools, travel, G&A, profit, and fees shall be included in this FFP CLIN. All costs associated with materials, equipment, and supplies shall be included in this FFP CLIN. Associated costs may include, for example, rental/purchase of lifts, ladders, scaffolding, safety equipment, gear, personal protective equipment, and/or data collection platforms needed to perform the FCA tasks identified in the PWS. PoP identified in each individual TO is NTE 180 calendar days.SF1,000,000$0.001,400,000$0.002,600,000$0.00$0.00
5004CONUS - Main CLIN for Data. The Contractor shall provide data IAW the Contract Data Requirements List (CDRL) DD Form 1423, designated as Exhibit A. NOTE: This CLIN is Not Separately Priced (NSP). The price(s) associated with this CLIN are to be included in the FFP of each FCA CLIN.NSP
Total Price
6-Month Extension - CONUS$0.00
Total Evaluated Price (TEP) CONUS
(Including 6-month Extension)$0.00

File details come from the government source that posted it. Updated .