ATT10_240148-Drawings_Final.pdf
PDF 4 MB Posted
- Solicitation number
- FA813726R0014
About this file
This is a 35% Design construction document set for a federal military project at Tinker Air Force Base in Oklahoma. The project, designated WWYK240148, involves installing electrical infrastructure from the Facility Hardened Power (FHP) enclosure and Operations Control (OPCON) at Building 829 to support operations at the site. The design is controlled by NIWC PAC and classified as controlled unclassified information (CUI) with OPSEC and DCIP categorization.
The project encompasses structural and electrical demolition and new construction work. Structural work includes demolishing existing generator housing, enclosure foundations, and concrete pads, then constructing new foundations comprising a 5-inch concrete slab-on-grade reinforced with #3 rebar at 12-inch spacing, thickened slab edges, footings (1'-8" x 4'-3" x 4'-3"), and a pilaster (1'-8" x 1'-8" x 3'-8") to support enclosure posts and safety bollards. Electrical work involves demolishing existing disconnect switches, panels, and a 100-gallon diesel fuel tank, then installing a new 200-amp 208Y/120-volt disconnect, running 650 feet of 3-1/2-inch PVC Schedule 40 conduit with handholes every 150 feet from the FHP location to the disconnect, installing four 300-KMIL conductors and one #2 ground conductor, and providing supporting infrastructure including junction boxes and grounding. The project requires coordination with ongoing facility operations, with power downtime approval potentially requiring up to one month, and electrical downtime requests exceeding 8 hours likely to be denied.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REVIEWED BY:
REVIEWED BY:
USING AGENCY:
ASBESTOS EVALUATION:
SAFETY:
DATE:
DATE:
DATE:
DATE:
DATE:
DATE:
DATE:
DATE:
DATE:
DATE:
DATE:
DATE:
DATE:
DATE:
DATE:
DATE:
INDUSTRIAL HYGIENE:
DATE:
PROJECT DRAWING INDEX SIGNATURES
CORROSION ENGINEER: (CECE)
CE OPERATIONS: (CECO)
COMMUNICATIONS: (COMM)
CHIEF ENGINEER DIR: (CECE)
CHIEF DESIGN BRANCH: (CECE)
DESIGN MANAGER: (CECE)
ZONE MANAGER:
CONSTRUCTION MANAGEMENT: (CECE)
ENVIRONMENTAL:
BASE CIVIL ENGINEER: (CE)
FIRE DEPARTMENT
GENERAL1. BRAND NAMES: REFERENCE TO SPECIFIC BRAND NAMES
OR COMPANIES IS FOR THE PURPOSE OF ESTABLISHING
MINIMUM QUALITY STANDARDS, IDENTIFICATION AND
GUIDANCE AND IS NOT INTENDED TO LIMIT SELECTION OF
OTHER MANUFACTURERS THAT ARE EQUAL OR EXCEED
THE SPECIFIED ITEMS IN TERMS OF PHYSICAL
PROPERTIES, INCLUDING, COLOR RANGE, FINISH,
DURABILITY, APPEARANCE, PERFORMANCE
CHARACTERISTICS, AND OTHER FACTORS. OTHER
PRODUCTS, MATERIALS, COLORS AND SYSTEMS, MAY BE
SUBMITTED FOR EVALUATION AND
APPROVAL/DISAPPROVAL BY THE CONTRACTING OFFICER.
2. THIS SET OF CONSTRUCTION DOCUMENTS SHALL BE
CONSIDERED AS A WHOLE IN THAT THE GENERAL
CONTRACTOR AND ALL THE SUB-CONTRACTORS ARE
RESPONSIBLE FOR THE INFORMATION PRESENTED ON ALL
SHEETS ON THE SET OF DRAWINGS AND ALL SECTIONS OF
THE SPECIFICATIONS.
3. THE CONTRACTOR IS RESPONSIBLE FOR ERECTING ALL
CONSTRUCTION FENCING AND BARRICADES AS REQUIRED
TO PROTECT CONSTRUCTION MATERIAL AND TO PREVENT
ANY UNAUTHORIZED PERSONNEL FROM ENTERING THE
CONSTRUCTION SITE.
4. ANY DAMAGE TO THE EXISTING GROUNDS OR FACILITIES
CAUSED BY CONSTRUCTION TRAFFIC OR ANY
CONSTRUCTION OPERATION SHALL BE REPAIRED OR
REPLACED BY THE CONTRACTOR TO MATCH OR EXCEED
EXISTING CONDITIONS AT NO ADDITIONAL COST TO THE
GOVERNMENT.
5. ALL WORK NOTED & LOCATED IN THESE DOCS SHALL BE
UNDERSTOOD BY THE CONTRACTOR TO REQUIRE ALL NEW
LABOR & MATERIALS UNLESS SPECIFICALLY NOTED TO BE
"EXISTING" OR "BY OTHERS".
WWYK240148
INSTALL ELECTRICAL FROM
FAB-T AND OPCON, B829
KEY PLAN:
GENERAL NOTES:
DISCIPLINE
PROJECT
LOCATION
1 G-101 GENERAL NOTES & VICINITY MAP
SHT.SEQ. SHEET TITLE
OF
TI
NK
ER
A
IR
F
OR
CE
B
AS
E, O
KL
AH
OM
A
PR
O
JE
C
T
IN
FO
R
M
AT
IO
N
D
ES
IG
N
F
IL
E
LO
C
AT
IO
N
R
EV
IS
IO
N S
M
AR
K
D
ES
IG
N
G R
O U
P:
D R
AW
N
B Y:
C H
EC
KE
D B
Y:
D
ES
IG
N
ED
B
Y:
D
AT
E D
ES
C
R
IP
TI
O
N
1 2 3 4 5
E
D
C
B
A
M
AN
AG
EM
EN
T
IN
FO
R M
AT
IO
N
1 2 3 4 5
E
D
C
B
A
IS
SU
E D
AT
E:
SHEET
SHEET NUMBER
SH
EE
T
TI
TL
E
AIR FORCE MATERIEL COMMAND
72 ABW CIVIL ENGINEER DIRECTORATE
TINKER AFB, OK
35%
DESIGN
W W
YK
IN
ST
AL
L E
LE
CT
RI
CA
L F
RO
M
FA
B- T
AN
D
OP
CO
N, B
0-
N O
VE
M
BE
R
-2
TE
PA
-S R
M
G-101
P G
O U
C H
ER
B
SH
AN
N
O N
En gr
\D es ig n\ s\
\2
8\
0_ Su pp or t\0 _3
_D ra w in gs
GE
NE
RA
L N
OT
ES
AN
D
VI
CI
NI
TY
M
AP
01 11
S-001 STRUCTURAL GENERAL NOTES
S-002 SPECIAL INSPECTIONS
SD-101 STRUCTURAL DEMOLITION PLAN AND AERIAL IMAGE WITH UTILITIES
5 S-101 NEW STRUCTURAL FOUNDATN PLAN AND AERIAL IMAGE WITH UTILITIES
6 S-501 STRUCTURAL DETAILS
7 ED-101 ELECTRICAL DEMOLITION SITE PLAN B820
8 E-101 NEW WORK ELECTRICAL SITE PLAN B820
E-501 ELECTRICAL DETAILS10
E-601 FHP ONE-LINE DIAGRAM
E-102
CUI
CUI
ELECTRICAL GENERATOR LAYOUT
CONTROLLED BY: NIWC PAC
CONTROLLED BY: SPECIAL PROJECTS BRANCH 41170
CUI CATEGORY: OPSEC, DCIP
DISTRIBUTION STATEMENT D
POC: CHRISTIAN FIGUEROA, 619-885-5439
Ea st
C ru tc ho
C re ek
838837
11824
Mercury Rd.
95039505
R U
N W
AY
8/
RUNWAY 13/31
TA
XI
W
AY
G
TAXIW
AY H
TAXIWAY B
TAXIWAY C
TAXIWAY M
TA
XI
W
AY
K
TAXIWAY E
TAXIWAY A
TA
XIW
AY E
E
TAXIWAY F
TAXIWAY D
TAXIWAY E
TAXIWAY J
TA
XI
W
AY
G
TAXIWAY A
TAXIW
AY H
TAXIWAY C
TAXIWAY D
TAXIWAY EE
TAXIWAY F
Elm C reek
Crutcho Creek
Kuhlman Creek
Soldier Creek
Kuhlman Creek
Elm C reek
East Crutcho Creek
Elm Creek
El m
C re ek
Elm Creek
Elm C reek
Elm CreekElm C reek
Ku hlm an C re ek
Ea st
C ru tc ho
C re ek
Elm C ree k
West Crutcho Creek
W es t C ru tc ho
C re ek
Elm Creek
Soldier Creek
Elm C reek
Soldier CreekSoldier Creek
Ea st
C ru tc ho
C re ek
Elm Creek
Ea st
C ru tc ho
C re ek
East C rutcho C reek
Soldier Creek
So ld ie r C re ek
East C rutch o Creek
Soldier C reek
Soldier C reek
So ld ie r C re ek
East Crutcho Creek
416506
21222121
59475946
11401128
62540
61089
838837
62509
62528
62523
62501X
43774
62512
62516
62525
3592135916
99999
62543
32101
71086
53902
50414
55300
56601
930G
948-E
911-E
948-W
61019
911-W
33001
35913
62501
65672
930S
45134
43609
42116
62517
62515
62526
62527
62503
62513
61289
62542
62501OK
11289
62501
15930
15908
15904
15904
15908
15908
15904
15904
15908
62502
41046
62501
62514
62501
61018
71089
45134
96022
43120
41157
44045
45815
40592
43610
62522
41163
15930
15930
11824
Arnold St.
Ea st
D r.
SE 74th St
SE 59th St.
Ai r D ep ot
Patrol Rd.
St af f D r.
Reserve Rd.
5th Ave
"A " A ve
M un iti on s R d.
W ar eh ou se R d.
"B " A ve
7th St.
"H " A ve
M cN ar ne y Av e.
Mitchell Ave
Al er t R d.
Co ok
A ve
W es t D r.
"E "A ve
Extender Dr.
Sentry Rd.
34th St.
Twining Dr.
5th Ave.
Jo ne s
Globemaster Dr.
To w er R d.
Vanaman Rd.
In du st ria l B lv d.
So ut h St
1st St.
Do ol itt le
A ve
Pi cn ic R d.
Ja m es D r.
W ol fe D r.
Ai r D ep ot
Ai r D ep ot
"D " A ve
Perimeter Rd.
Rapcon Rd.
Reserve Rd
"L " A ve
Mercury Rd.
1st St.
Br ow n Dr
Po nd
R d.
O ld
A ir
De po t
Airey Dr.
Bradley Dr.
Entrance Road "C"
Entrance Road "A"
"C " A ve
"C " A ve
Vandenberg Dr.
Hi llt op R d.
Do rm ito ry
R d.
Dormitory Rd.
"M " A ve
Chennault Dr.
M itc he ll A ve
Spaatz Dr.
Co m m od ity D r.
Doolittle Ave
W hi te D r.
3rd Ave.
"D " D riv e
Ba ll
Pa rk
R d.
Joint STARS Dr.
Ai r D ep ot
B lv d
Turbine Dr. Turbine Dr.
Central Plant Dr.
6th St.6th St.
Falco n Dr.
Blackb ird
Dr.
W ey la nd
L oo p
Pegasus Dr.
Thunderbolt D r.
Munitions Rd. Ext.
Codding Rd.
Starlifter Dr.
Chidlaw Ct.
Co rs ai r D r.
Ra pt or Ct
N ig ht H aw k
Ct
Ph an to m
D r.
Fr an kl in
Po w er ho us e
Dr
Sk ym as te r D r.
Spaatz Ct.
La w re nc e
M un de ll
Nabors Dr.
In tr ud er
D r.
M cN ic kl e
M ill er D r.
Ta il
Fe at he r D r.
Holden Dr.
Ai re y C ir.
Smith Ct.
Ra ve n Ct
Air Dep ot Ai r D ep ot
Vanaman Rd.
1st St.
1st St.
TAXIWAY F
Ra w li ng s A ve
Mitc he ll A ve
Mercury Rd.
Ra ily ar d
Rd
He rc ul es
R d.
"F " A ve
Pr op ul sio n Dr
Stratofortress Dr.
96021
Arnold St.
62501W 62501E
TINKER AFB, OK
VICINITY MAP
BASE
OPERATIONS
B240
CONTRACTING
B3
GOTT
GATE
TINKER GATE
PASS & ID B6611
HRUSKOCY
GATE
EAKER GATE
FIRE DEPARTMENT
B117
VANCE
GATE
LIBERATOR GATE
HOPE
GATE
LEGEND
CONTRACTOR
HAUL ROUTE
LANCER
GATE
TRUCK GATE
PIAZZA GATE
BASE CIVIL
ENGINEER
B400
PROJECT
LOCATION
(FUTURE
HAUL ROUTE)
(F
UT
UR
E
HA
UL
R
OU
TE
FUTURE
TRUCK GATE
FUTURE
HAUL ROUTE
OF
TI
NK
ER
A
IR
F
OR
CE
B
AS
E, O
KL
AH
OM
A
PR
O
JE
C
T
IN
FO
R
M
AT
IO
N
D
ES
IG
N
F
IL
E
LO
C
AT
IO
N
R
EV
IS
IO
N S
M
AR
K
D
ES
IG
N
G R
O U
P:
D R
AW
N
B Y:
C H
EC
KE
D B
Y:
D
ES
IG
N
ED
B
Y:
D
AT
E D
ES
C
R
IP
TI
O
N
1 2 3 4 5
E
D
C
B
A
M
AN
AG
EM
EN
T
IN
FO
R M
AT
IO
N
1 2 3 4 5
E
D
C
B
A
IS
SU
E D
AT
E:
SHEET
SHEET NUMBER
SH
EE
T
TI
TL
E
AIR FORCE MATERIEL COMMAND
72 ABW CIVIL ENGINEER DIRECTORATE
TINKER AFB, OK
35%
DESIGN
W W
YK
IN
ST
AL
L E
LE
CT
RI
CA
L F
RO
M
FA
B- T
AN
D
OP
CO
N, B
0-
N O
VE
M
BE
R
-2
TE
PA
-S R
M
L
LU
KE
S-001
P G
O U
C H
ER
B
SH
AN
N
O N
En gr
\D es ig n\ s\
\2
8\
0_ Su pp or t\0 _3
_D ra w in gs
ST
RU
CT
UR
AL
GE
NE
RA
L N
OT
ES
02 11
CUI
CUI
GENERAL NOTES
1. ALL MATERIALS AND WORKMANSHIP SHALL BE IN ACCORDANCE WITH LOCAL STANDARDS AND
APPLICABLE PROVISIONS OF THE UFC 3-301-01 (IBC 2024).
2. ANY DEVIATION FROM THE APPROVED CONTRACT STRUCTURAL DRAWINGS SHALL ONLY BE
MADE AFTER WRITTEN APPROVAL BY THE ENGINEER OF RECORD.
3. ALL OMISSIONS OR CONFLICTS BETWEEN THE VARIOUS ELEMENTS OF THE WORKING
DRAWINGS SHALL BE IMMEDIATELY BROUGHT TO THE ATTENTION OF THE ENGINEER OF
RECORD AND WORK SHALL NOT PROCEED UNTIL WRITTEN DIRECTION IS PROVIDED BY THE
ENGINEER OF RECORD.
4. PROJECT SPECIFICATIONS ARE PART OF THE CONSTRUCTION DOCUMENTS AND ARE TO BE
USED IN CONJUNCTION WITH THE PROJECT DRAWINGS.
5. NOTES AND DETAILS ON THE DRAWINGS SHALL TAKE PRECEDENCE OVER THESE GENERAL
NOTES AND TYPICAL DETAILS IN CASE OF CONFLICT.
6. DETAILS LABELED "TYPICAL" APPLY TO SITUATIONS OCCURRING THAT ARE THE SAME OR
SIMILAR TO THOSE SPECIFICALLY SHOWN. SUCH DETAILS APPLY WHEREVER THEY OCCUR,
EVEN WHEN NOT SPECIFICALLY REFERENCED ON THE DRAWINGS.
7. WHERE NO CONSTRUCTION DETAILS ARE SHOWN, NOTED, AND DON'T APPEAR TO ALIGN WITH
TYPICAL DETAILS, CONTACT THE STRUCTURAL ENGINEER OF RECORD.
8. IN NO CASE SHALL WORKING DIMENSIONS BE SCALED FROM PLANS, SECTIONS OR DETAILS ON
THESE STRUCTURAL DRAWINGS.
9. ELEVATIONS GIVEN ON THE STRUCTURAL DRAWINGS ARE REFERENCED FROM FINISHED
FLOOR, UNLESS OTHERWISE NOTED.
10. THE CONTRACT STRUCTURAL DRAWINGS AND SPECIFICATIONS REPRESENT THE FINISHED
STRUCTURE, UNLESS OTHERWISE NOTED. THEY DO NOT INDICATE THE MEANS OR METHODS
OF CONSTRUCTION. THE CONTRACTOR SHALL PERFORM ALL MEASURES NECESSARY TO
PROTECT THE STRUCTURE, WORKMEN, AND OTHER PERSONS DURING CONSTRUCTION. SUCH
MEASURES SHALL INCLUDE, BUT ARE NOT LIMITED TO THE DESIGN, ERECTION, AND REMOVAL
OF TEMPORARY BRACING, SHORING, FALSEWORK, ETC. THE CONTRACTOR SHALL SUPERVISE
AND DIRECT THE WORK AND BE SOLELY RESPONSIBLE FOR ALL CONSTRUCTION MEANS,
METHODS, TECHNIQUES, SEQUENCES, AND PROCEDURES. OBSERVATION VISITS BY THE
ENGINEER OF RECORD OR THEIR DELEGATE DO NOT CONSTITUTE INSPECTION OR APPROVAL
OF THE ABOVE ITEMS.
11. VERIFICATION: THE DETAILING AND DIMENSIONS OF EXISTING STRUCTURES DO NOT
NECESSARILY REPRESENT THE AS-CONSTRUCTED CONDITIONS. THE CONTRACTOR SHALL
VERIFY ALL DIMENSIONS, ELEVATIONS, AND SITE CONDITIONS BEFORE STARTING WORK.
NOTIFY THE ENGINEER OF RECORD IMMEDIATELY OF ANY DISCREPANCIES. IN INSTANCES
WHERE DISCREPANCIES ARE IDENTIFIED, WORK SHALL NOT PROCEED UNTIL WRITTEN
DIRECTION IS PROVIDED BY THE ENGINEER OF RECORD.
12. THE CONTRACTOR IS RESPONSIBLE FOR COORDINATION OF DETAILS, DIMENSIONS AND SITE
CONDITIONS TO AVOID THE INTERFERENCE OF MATERIALS EMBEDDED IN CONCRETE OR
MASONRY INCLUDING BUT NOT LIMITED TO REINFORCING STEEL, PRESTRESSING STEEL AND
HARDWARE, MISCELLANEOUS STEEL AND CONDUITS.
13. PRIOR TO BEGINNING EXCAVATION, THE CONTRACTOR SHALL LOCATE AND PROTECT
UNDERGROUND OR CONCEALED UTILITIES WHERE NEW WORK IS BEING PERFORMED. THE
CONTRACTOR IS RESPONSIBLE FOR PROTECTING EXISTING UTILITIES IN THE WORK AREA AND
SHALL REPAIR ANY DAMAGE CAUSED BY THEIR OPERATIONS AT THEIR COST.
14. CONSTRUCTION MATERIALS SHALL BE EVENLY DISTRIBUTED IF PLACED ON FLOORS OR ROOFS
DURING CONSTRUCTION. LOADS SHALL NOT EXCEED THE DESIGN LIVE LOAD PER SQUARE
FOOT. PROVIDE ADEQUATE SHORING AND/OR BRACING WHERE STRUCTURE HAS NOT
ATTAINED DESIGN STRENGTH. CONCRETE SLAB ON GRADE IS TO HAVE REACHED IT'S FULL
28-DAY COMPRESSIVE STRENGTH BEFORE LOADING.
15. PROVIDE A LIST OF ALL PROPOSED SUBSTITUTIONS AND MANUFACTURER'S ICC ES REPORTS
TO THE ENGINEER OF RECORD FOR REVIEW AND APPROVAL BEFORE FABRICATION OR
INSTALLATION.
16. OPENINGS, POCKETS, SLEEVES, BLOCK-OUTS, ETC. SHALL NOT BE PLACED IN SLABS,
FOUNDATIONS, ETC. UNLESS SPECIFICALLY DETAILED ON THESE STRUCTURAL DRAWINGS. THE
ENGINEER OF RECORD SHALL BE NOTIFIED WHEN OTHER DRAWINGS SHOW OPENINGS,
POCKETS, SLEEVES, BLOCK-OUTS, ETC. THAT ARE NOT SHOWN ON THESE STRUCTURAL
DRAWINGS.
17. NO STRUCTURAL MEMBER SHALL BE CUT OR MODIFIED FOR PIPES, DUCTS, ETC., UNLESS
SPECIFICALLY SHOWN ON THESE STRUCTURAL DRAWINGS.
18. THESE STRUCTURAL DRAWINGS ILLUSTRATE THE NEW STRUCTURAL MEMBERS. REFER TO
ARCHITECTURAL, MECHANICAL AND ELECTRICAL DRAWINGS FOR NON-STRUCTURAL ITEMS
WHICH REQUIRE SPECIAL PROVISIONS DURING CONSTRUCTION OF THE STRUCTURAL
MEMBERS.
19. REFER TO ARCHITECTURAL DRAWINGS FOR FLOOR DEPRESSIONS, SLOPES, DRAINS, CURBS, PADS, EMBEDDED ITEMS, NON-BEARING PARTITIONS, AND LOCATION AND DETAILS FOR ALL
MISCELLANEOUS HANDRAILS, LADDERS, HANGERS AND STEEL GRATINGS. REFER TO
MECHANICAL AND ELECTRICAL DRAWINGS FOR SLEEVES AND HANGARS FOR PIPES, DUCTS,
AND EQUIPMENT.
20. SEE PLUMBING, FIRE PROTECTION, MECHANICAL, ELECTRICAL AND MANUFACTURER'S
DRAWINGS FOR TYPE, SIZE, LOCATION, ANCHORAGE REQUIREMENTS AND PADS FOR ALL
EQUIPMENT. MANUFACTURER'S TEMPLATES SHOWING ANCHOR BOLT LOCATIONS SHALL BE
OBTAINED FOR ALL EQUIPMENT. COORDINATE WITH THE EQUIPMENT SUPPLIER PRIOR TO
PLACING SLABS, WALLS AND FOUNDATIONS.
21. THESE STRUCTURAL DRAWINGS INDICATE ONLY THE APPROXIMATE LOCATION OF
MECHANICAL, ELECTRICAL AND OTHER EQUIPMENT AS WELL AS THEIR RELATED AUXILIARY
FRAMING NECESSARY TO SUPPORT THE EQUIPMENT. THE FINAL POSITIONING OF THESE ITEMS
IS DEPENDENT UPON THE EQUIPMENT PROVIDED. THE CONTRACTOR IS RESPONSIBLE FOR
COORDINATING WORK BETWEEN SUBCONTRACTORS IN THIS REGARD AND PROVIDING
NECESSARY INFORMATION AND DIMENSIONS IN A TIMELY MANNER TO ALL PARTIES INVOLVED.
22. OBSERVATION VISITS TO THE SITE BY THE ENGINEER OF RECORD OR THEIR DELEGATE SHALL
NOT CONSTITUTE REQUIRED SPECIAL INSPECTIONS NOTED HEREIN.
23. THE CONCRETE SLABS ON GRADE HAVE NOT BEEN DESIGNED TO SUPPORT CONSTRUCTION
EQUIPMENT. THE CONTRACTOR IS RESPONSIBLE FOR THE DESIGN OF THE SLAB WHERE
CONSTRUCTION EQUIPMENT IS TO BE PLACED THAT EXCEED THE DESIGN FLOOR LIVE LOAD.
ANY DAMAGE TO THE CONCRETE SLAB AS A RESULT OF CONSTRUCTION EQUIPMENT IS THE
RESPONSIBILITY OF THE CONTRACTOR AND SHALL BE REPAIRED AT THEIR COST. CONCRETE
SLAB ON GRADE IS TO HAVE REACHED IT'S FULL 28-DAY COMPRESSIVE STRENGTH BEFORE
LOADING.
SHOP DRAWINGS AND PRODUCT DATA
1. THE REVIEW OF SHOP DRAWINGS AND OTHER SUBMITTALS IS ONLY FOR REVIEW OF GENERAL
COMPLIANCE WITH THE DESIGN CONCEPT OF THE PROJECT AND THE INFORMATION PROVIDED
IN THE CONTRACT DOCUMENTS. IT IS THE GENERAL CONTRACTOR'S RESPONSIBILITY TO
REVIEW THE SHOP DRAWINGS PRIOR TO SUBMITTING TO THE ARCHITECT. THE GENERAL
CONTRACTOR IS RESPONSIBLE FOR CONFIRMING AND CORRELATING ALL QUANTITIES AND
DIMENSIONS, SELECTING FABRICATION PROCESSES AND TECHNIQUES OF CONSTRUCTION;
COORDINATING THE WORK WITH THAT OF ALL OTHER TRADES; AND PERFORMING THE WORK IN
A SAFE AND SATISFACTORY MANNER.
2. SHOP DRAWINGS SHALL BE SUBMITTED FOR ALL STRUCTURAL ITEMS IN ADDITION TO ANY
ITEMS REQUIRED BY THE SPECIFICATIONS. THE SUBMITTALS, TESTING & INSPECTION MATRIX IS PROVIDED AS A GUIDE ONLY, AND MAY NOT BE ALL-INCLUSIVE. CONSTRUCTION DOCUMENTS
SHALL NOT BE REPRODUCED FOR USE AS SHOP DRAWINGS.
3. THE GENERAL CONTRACTOR SHALL REVIEW AND STAMP ALL SHOP DRAWINGS AND PRODUCT
DATA FOR CONFORMANCE WITH THE CONSTRUCTION DOCUMENTS PRIOR TO SUBMITTAL. ANY
SHOP DRAWINGS OR PRODUCT DATA NOT REVIEWED AND STAMPED BY THE GENERAL
CONTRACTOR WILL BE RETURNED WITHOUT REVIEW. THE CONTRACTOR SHALL CLOUD OR
FLAG ALL ITEMS NOT IN ACCORDANCE WITH THE CONTRACT DOCUMENTS.
4. ANY CHANGES, SUBSTITUTIONS, OR DEVIATIONS FROM THE ORIGINAL CONTRACT DRAWINGS
SHALL BE CLOUDED BY THE MANUFACTURER OR FABRICATOR. THE STRUCTURAL ENGINEER
RESERVES THE RIGHT TO ALLOW OR NOT ALLOW ANY CHANGES TO THE ORIGINAL CONTRACT
DRAWINGS AT ANY TIME BEFORE OR AFTER SHOP DRAWING REVIEW.
5. THE SHOP DRAWINGS DO NOT REPLACE THE ORIGINAL CONTRACT DRAWINGS. ITEMS OMITTED
OR SHOWN INCORRECTLY AND WHICH ARE NOT NOTED AS ALLOWED BY THE STRUCTURAL
ENGINEER OR ARCHITECT ARE NOT TO BE CONSIDERED CHANGES TO THE ORIGINAL
CONTRACT DRAWINGS.
6. SHOP DRAWINGS WILL BE RETURNED FOR RESUBMITTAL IF MAJOR ERRORS OR OMISSIONS
ARE FOUND DURING REVIEW.
7. SUBMIT NOT MORE THAN FIVE (5) SETS FOR ANY ONE SUBMITTAL. ONE COPY WILL BE
RETAINED BY THE STRUCTURAL ENGINEER AND THE BALANCE RETURNED.
8. ALLOW A MINIMUM OF FIVE WORKING DAYS FOR REVIEW OF SHOP DRAWINGS BY THE
STRUCTURAL ENGINEER.
DESIGN CRITERIA
1. THE DESIGN SHALL CONFORM TO THE PROVISIONS OF THE 2024 INTERNATIONAL BUILDING
CODE (IBC), AS AMENDED BY UFC 1-200-01 (CHANGE 4, 2024), UFC 3-301-01 (CHANGE 4, 2025), 2020 TAFB FACILITY STANDARD, AND ALL STANDARDS REFERENCED HEREIN.
2. DEAD LOADS :
ACTUAL WEIGHT OF MATERIALS
FHP ENCLOSURE 33 KIPS
3. LIVE LOADS:
ROOF LIVE LOAD 20 PSF/300LB
GENERATOR FLOOR 200 PSF
SLAB 250 PSF
4. SNOW LOADS:
A. RISK CATEGORY IV
B. GROUND SNOW LOAD, pg 22 PSF C. MINIMUM ROOF SNOW LOAD, ps 18.5 PSF D. SNOW EXPOSURE FACTOR, Ce 1.0 E. THERMAL FACTOR, Ct 1.2 F. SLOPE FACTOR, Cs 1.0
G. DRIFT CRITERIA N/A
5. WIND DESIGN CRITERIA:
A. RISK CATEGORY IV
B. DESIGN WIND SPEED (VULT) 120 MPH
C. DESIGN WIND SPEED (VASD) 93 MPH
D. EXPOSURE CATEGORY C
E. TOPOGRAPHIC FACTOR (KZT) 1.0
F. GCPI +/-0.18
G. GUST FACTOR 0.85
H. WIND BASE SHEAR 7.0 KIPS
6. TORNADO DESIGN CRITERIA:
A. RISK CATEGORY IV
B. DESIGN WIND SPEED (VULT) 113 MPH
C. DESIGN WIND SPEED (VASD) 88 MPH
D. EFFECTIVE PLAN AREA (Ae) 250,000 SF
E. EXPOSURE CATEGORY C
F. TOPOGRAPHIC FACTOR (KZTOR) 1.0
G. GCPITOR +/-0.55
H. GUST FACTOR 0.85
I. WIND BASE SHEAR 8.1 KIPS
7. SEISMIC DESIGN CRITERIA:
A. RISK CATEGORY IV
B. IMPORTANCE FACTOR 1.50
C. SITE CLASS D
D. SS 0.32
E. SMS 0.35
F. SDS 0.23
G. S1 0.081
H. SM1 0.17
I. SD1 0.11
J. SEISMIC DESIGN CATEGORY C
K. STRUCTURAL SYSTEM: STEEL SYSTEMS NOT SPECIFICALLY DETAILED FOR SEISMIC
L. RESPONSE MODIFICATION COEFFIENT (R): 3.0
M. OVERSTRENGTH FACTOR (W0): 3.0
N. ANALYSIS AND DESIGN CRITERIA
a. ANALYSIS PROCEDURE: EQUIVALENT LATERAL FORCE PROCEDURE
O. RESPONSE COEFFICIENT (CS) 0.115
P. SEISMIC BASE SHEAR 3.8 KIPS
8. ROOF DRAIN LOAD DATA
A. 15-MINUTE RAIN INTENSITY 9.84 IN/HR
B. 60-MINUTE RAIN INTENSITY 5.07 IN/HR
9. FLOOD DESIGN DATA, NOT IN FLOOD ZONE
GEOTECHNICAL DESIGN CRITERIA
1. THE FOUNDATION DESIGN IS BASED UPON THE IBC PRESUMPTIVE LOAD-BEARING VALUES.
STRUCTURAL ENGINEER IS NOT RESPONSIBLE FOR ANY GEOTECHNICAL ASPECT OF THIS
PROJECT.
2. OWNER SHALL EMPLOY A GEOTECHNICAL ENGINEER LICENSED IN THE STATE OF JURISDICTION
TO PERFORM NECESSARY TESTING AND INSPECTIONS FOR QUALITY CONTROL AND TO ENSURE
THAT THE REQUIREMENTS OF THE PROJECT ARE COMPLIED WITH. TEST REPORTS SHALL BE
SUBMITTED DIRECTLY TO THE ARCHITECT AND ENGINEER FROM THE GEOTECHNICAL
ENGINEER, WITH A COPY TO THE CONTRACTOR.
3. FILLED EXCAVATIONS OR BURIED STRUCTURES SUCH AS CESSPOOLS, CISTERNS, EXISTING
FOUNDATIONS, ETC., OR ANY UNUSUAL SOILS CONDITIONS ENCOUNTERED DURING SITE
CLEARING OR EXCAVATION SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT
IMMEDIATELY. DO NOT PROCEED UNTIL WRITTEN INSTRUCTIONS TO REMEDY ARE RECEIVED.
ABANDONED FOOTINGS, NEW OR EXISTING UTILITIES, ETC., THAT INTERFERE WITH NEW
CONSTRUCTION SHALL BE REROUTED OR REMOVED AS DIRECTED BY THE ARCHITECT.
4. SLOPE ALL EXTERIOR FINISHED GRADES AWAY FROM THE BUILDING TO ENSURE NO PONDING
OF WATER OCCURS AROUND BUILDINGS.
5. INSTALL ALL UNDERSLAB PIPING AND ELECTRICAL WORK AND RECOMPACT ANY DISTURBED
COMPACTED MATERIAL BEFORE PLACEMENT OF CONCRETE SLAB ON GRADE.
6. CONTRACTOR IS RESPONSIBLE FOR ALL SHORING, CRIBBING, SHEET PILING, ETC. AS REQUIRED
TO SAFELY RETAIN EXCAVATIONS AND TRENCHES DURING CONSTRUCTION. CONTRACTOR
SHALL RETAIN A PROFESSIONAL ENGINEER LICENSED IN THE STATE OF JURISDICTION TO
DESIGN ALL SHORING, TIE BACKS, ETC. WHERE SHORING IS TO BE PERMANENT, THE DESIGN
MUST MEET ALL REQUIREMENTS OF THE BUILDING CODE.
7. EXCAVATION DEPTH AND SIDEWALL INCLINATION SHALL NOT EXCEED THOSE SPECIFIED IN
LOCAL, STATE OR FEDERAL REGULATIONS INCLUDING THOSE DEFINED IN SUBPART P OF
CHAPTER 27, 29 CFR PART 1926 (OF FEDERAL REGISTER). EXCAVATIONS MAY NEED TO BE
WIDENED AND SLOPED, OR TEMPORARILY BRACED TO MAINTAIN OR DEVELOP A SAFE WORK
ENVIRONMENT. CONTRACTOR IS SOLELY RESPONSIBLE FOR ASSESSING STABILITY UNDER
"MEANS AND METHODS."
8. REFER TO THE PLANS FOR PERIMETER INSULATION REQUIREMENTS.
9. SOIL DESIGN PARAMETERS (SHALLOW FOUNDATIONS):
A. MINIMUM DEPTH OF BOTTOM OF FOOTINGS = 2'-0" BELOW LOWEST ADJACENT GRADE
B. MINIMUM WIDTH OF COLUMN FOOTINGS = 2'-6"
C. MINIMUM WIDTH OF CONTINUOUS FOOTINGS = 1'-4"
D. FROST DEPTH = 1'-6"
E. ALLOWABLE NET VERTICAL BEARING PRESSURE FOR ISOLATED/PAD FOOTINGS = 1500
PSF
F. ALLOWABLE NET VERTICAL BEARING PRESSURE FOR CONTINUOUS FOOTINGS = 1500
PSF
G. COEFFICIENT OF FRICTION BETWEEN AGGREGATE BASE AND CONCRETE = 0.3
(ULTIMATE VALUE)
H. PASSIVE EARTH PRESSURE = 100 PCF (NON-EXPANSIVE CLAY)
I. UNIT WEIGHT = 120 PCF (NON-EXPANSIVE CLAY)
J. SOIL SITE CLASS = D
CAST IN PLACE CONCRETE
1. CONCRETE WORK SHALL CONFORM TO ALL REQUIREMENTS OF ACI 301, "SPECIFICATIONS FOR
STRUCTURAL CONCRETE FOR BUILDINGS" AND ACI 318, "BUILDING CODE REQUIREMENTS FOR
REINFORCED CONCRETE", EXCEPT AS MODIFIED BY THE CONTRACT DOCUMENTS.
2. CONCRETE SHALL BE READY MIXED CONCRETE IN ACCORDANCE WITH ASTM C94. MINIMUM 28
DAY COMPRESSIVE STRENGTH SHALL BE 4000 PSI EXCEPT AS FOLLOWS:
A. CONCRETE EXPOSED TO FREEZE/THAW CYLCLE 4,500 PSI
3. CEMENT SHALL CONFORM TO ASTM C150, TYPE I, TYPE II, OR TYPE V IF RECOMMENDED BY
GEOTECHNICAL ENGINEER FOR FOUNDATION ELEMENTS. CONCRETE EXPOSED TO SOIL SHALL
HAVE TYPE II CEMENT AND A MAXIMUM W/C RATIO OF 0.5 . AGGREGATE PER ASTM C33.
LIGHTWEIGHT AGGREGATE PER ASTM C330. MAXIMUM 4" SLUMP FOR ALL CONCRETE. DO NOT
TAMP SLABS (USE ROLLER BUG, VIBRATING SCREED OR BULL FLOAT ONLY). CONCRETE
CONTAINING SUPERPLASTICIZING ADMIXTURE SHALL HAVE FIELD-VERIFIED 3" MAXIMUM SLUMP
PRIOR TO ADDING ADMIXTURE AND 8" MAXIMUM SLUMP AT PLACEMENT. MIX DESIGNS SHALL
BE DESIGNED BY THE CONCRETE PRODUCTION FACILITY IN ACCORDANCE WITH ACI 301 AND
APPROVED BY THE STRUCTURAL ENGINEER PRIOR TO CONSTRUCTION. PROVIDE
AIR-ENTRAINING ADMIXTURE AT ALL CONCRETE EXPOSED TO FREEZE/THAW CYCLES AT A RATE
ADEQUATE TO PROVIDE 6.0% AIR AT POINT OF PLACEMENT. DO NOT ALLOW AIR CONTENT OF
INTERIOR TROWEL FINISHED SLABS TO EXCEED 3.0%.
4. WHERE INDICATED FIBER MESH REINFORCEMENT IN SLABS ON GRADE SHALL CONFORM TO
ASTM C1116, TYPE III, SYNTHETIC FIBERS OF 100 PERCENT VIRGIN POLYPROPYLENE
FIBRILLATED FIBERS CONTAINING NO REPROCESSED OLEFIN MATERIALS. PROVIDE MINIMUM OF
1.5 POUNDS OF FIBERS PER CUBIC YARD OF CONCRETE USED.
5. CONCRETE SHALL BE FREE OF CALCIUM CHLORIDE. NO FLY ASH ADDITIVES SHALL BE
PERMITTED IN CONCRETE FLATWORK OR ARCHITECTURALLY EXPOSED CONCRETE. WHEN
USED, FLY ASH SHALL CONFORM TO ASTM C618, CLASS F OR C. FLY ASH SHALL NOT REPLACE
MORE THAN 25% OF CEMENT BY WEIGHT.
6. CONTINUOUS SPECIAL INSPECTION: REQUIRED FOR DESIGN STRENGTHS EXCEEDING 2500 PSI.
7. PROVIDE SLEEVES FOR UTILITY OPENINGS IN CONCRETE BEFORE PLACING CONCRETE. DO NOT
CUT ANY CONFLICTING REINFORCING.
8. NO CONSTRUCTION JOINTS OTHER THAN THOSE SHOWN ON THE DRAWINGS SHALL BE
INSTALLED WITHOUT APPROVAL OF THE STRUCTURAL ENGINEER. PROVIDE 3/4" CHAMFER AT
ALL EXTERIOR CORNERS AND EDGES OF PERMANENTLY EXPOSED CONCRETE.
9. DO NOT SUBJECT CONCRETE TO ANY PROCEDURE THAT WILL CAUSE SEGREGATION. DEPOSIT
CONCRETE AS NEAR AS PRACTICABLE TO THE FINAL POSITION TO AVOID SEGREGATION.
10. CONCRETE FOOTINGS AND PADS MAY BE POURED AGAINST NEAT EXCAVATIONS PROVIDED
THE REQUIRED CONCRETE COVERAGE FOR REINFORCING IS MAINTAINED.
11. MECHANICALLY VIBRATE ALL CONCRETE WHEN PLACED, EXCEPT THAT SLABS ON GRADE NEED
BE VIBRATED ONLY AROUND EMBEDDED ITEMS AND UNDERFLOOR DUCTS, ETC. MECHANICALLY
VIBRATE ONLY THE TOP 5 FEET OF DRILLED PIER CONCRETE. REVIBRATE TOP OF DRILLED PIER
15 MINUTES AFTER PLACING CONCRETE.
12. MIXING AND DELIVERY AS MEASURED FROM BATCH TIME TO COMPLETION OF DISCHARGE
FROM TRUCK SHALL NOT EXCEED 90 MINUTES. WHEN AIR TEMPERATURE IS ABOVE 90 DEG F (32
DEG C), REDUCE MIXING, DELIVERY TIME AND DISCHARGE TO 60 MINUTES.
13. CURE EXPOSED CONCRETE FOR A MINIMUM OF 7 DAYS IN ACCORDANCE WITH ACI 308.1
PROCEDURES IN ORDER TO PREVENT CRACKING. CURE WITH CURING AND SEALING
COMPOUND, MOIST CURING, MOISTURE-RETAINING COVER CURING, OR COMBINATIONS
THEREOF. IF CURING COMPOUND IS USED, APPLY AT A RATE SPECIFIED BY THE
MANUFACTURER. CONCRETE SHALL BE MAINTAINED ABOVE 50 DEGREES F AND IN A MOIST
CONDITION FOR A MINIMUM OF 7 DAYS AFTER PLACEMENT.ALL CONCRETE SHALL BE TESTED
BY AN INDEPENDENT TESTING AGENCY AND RESULTS REPORTED TO THE ARCHITECT.
14. FOR PLACEMENT OF CONCRETE IN EITHER HOT OR COLD WEATHER CONDITIONS FOLLOW THE
ACI STANDARD PROCEDURES.
15. REINFORCING BARS, ANCHOR BOLTS, REBAR DOWELS, AND OTHER CONCRETE INSERTS SHALL
BE WELL SECURED IN POSITION PRIOR TO PLACEMENT OF CONCRETE AND STABBING INTO WET
CONCRETE IS NOT ALLOWED.
16. CHAMFER: 3/4 INCH ON EXPOSED CORNERS.
REINFORCING
1. REINFORCING AND ACCESSORIES SHALL BE DETAILED, FABRICATED AND INSTALLED PER ACI
315, ACI 318 AND CRSI "MANUAL OF STANDARD PRACTICE FOR REINFORCED CONCRETE
CONSTRUCTION.
2. REINFORCING BARS SHALL BE MADE USING NEW BILLET STEEL IN ACCORDANCE WITH ASTM
A615 GRADE 60 fy = 60 KSI. WELDED WIRE FABRIC PER ASTM A185, WIRE PER ASTM A82, FABRICATED IN FLAT SHEETS (NOT ROLLED)
3. WELDING OF REINFORCING IS NOT PERMITTED UNLESS SPECIFICALLY DETAILED. WELDED
SHALL BE ACCORDING TO AWS D1.4.
4. ALL REINFORCING SHALL BE COLD BENT.
5. PROVIDE CLASS B SPLICES IN REINFORCING FOR CONTINUOUS REINFORCING. PROVIDE
STANDARD 90 DEGREE HOOKS IN ACCORDANCE WITH ACI 318 UNLESS SPECIFICALLY DETAILED.
REFER TO TYPICAL DETAIL FOR REQUIRED LAP LENGTHS.
6. MAINTAIN THE FOLLOWING REINFORCEMENT COVERAGE FOR REINFORCING STEEL UNLESS
NOTED OTHERWISE.
CAST AGAINST OR PERMANENTY
EXPOSED TO SOIL: 3 INCHES
EXPOSED TO SOIL OR WEATHER:
NO. 6 AND LARGER: 2 INCHES
NO. 5 AND SMALLER: 1-1/2 INCHES
NOT EXPOSED TO SOIL OR WEATHER
NO. 11 AND SMALLER 1" WALL, 1-1/2" SLAB
COLUMNS (TO TIES) 1 1/2"
BEAMS (TO STIRRUPS) 1 1/2"
SUSPENDED SLABS 3/4"
ALL OTHER PER LATEST EDITION OF ACI 318
7. PROVIDE CONTINUOUS HORIZONTAL WALL AND CONTINUOUS FOOTING REINFORCEMENT WITH
90 DEGREE BENDS AT CORNERS AND INTERSECTIONS AS SHOWN ON TYPICAL DETAILS.
8. ALL CONCRETE SLAB ON GRADE, RAISED CONCRETE SLAB, AND MAT REINFORCING IS TO BE
SUPPORTED ON BOLSTERS AND CHAIRS SPACED NO FURTHER THAN 4 FEET ON CENTER.
REINFORCING SHALL BE LOCATED 1 1/2" INCHES MINIMUM CLEAR FROM TOP OF SLAB.
9. STAGGER ALTERNATE SPLICES A MINIMUM OF ONE LAP LENGTH. LAP WELDED WIRE FABRIC SO
THAT THE OVERLAP BETWEEN OUTERMOST CROSS WIRES OF EACH SHEET IS NOT LESS THAN
THE CROSS WIRE SPACING BUT NOT LESS THAN 6 INCHES. ALL SPLICE LOCATIONS SUBJECT TO
APPROVAL AND SHALL BE MADE IN ACCORDANCE WITH THE DRAWINGS. EXTEND ALL
HORIZONTAL REINFORCING CONTINUOUS AROUND CORNERS AND INTERSECTIONS OR
PROVIDE BENT CORNER BARS TO MATCH AND LAP WITH HORIZONTAL BARS AT CORNERS AND
INTERSECTIONS OF FOOTINGS AND WALLS.
10. REINFORCING BAR SPACINGS GIVEN ARE MAXIMUM ON CENTERS. DOWEL ALL VERTICAL
REINFORCING TO FOUNDATION. SKEW HOOKS AS REQUIRED FOR CONCRETE COVER.
SECURELY TIE ALL BARS IN POSITION BEFORE PLACING CONCRETE. "WET STICKING" OF
DOWELS IS NOT PERMITTED.
11. SPLICED BARS SHALL BE PLACED AT THE SAME EFFECTIVE DEPTH UNLESS NOTED OTHERWISE.
REINFORCING BARS NOTED "CONTINUOUS" OR WITH LENGTH NOT SHOWN SHALL BE FULLY
CONTINUOUS AND SPLICED ONLY AS SHOWN, OR WHERE APPROVED BY THE ENGINEER.
12. REINFORCING BAR HOOKS SHALL BE STANDARD ACI HOOKS UNLESS NOTED OTHERWISE.
STRUCTURAL STEEL
1. STRUCTURAL STEEL SHALL BE DETAILED, DESIGNED, FABRICATED AND ERECTED IN
ACCORDANCE WITH THE REQUIREMENTS OF AISC SPECIFICATION FOR THE DESIGN,
FABRICATION, AND ERECTION OF STRUCTURAL STEEL BUILDINGS, AISC MANUAL OF STEEL
CONSTRUCTION (ALLOWABLE STRESS DESIGN), AISC CODE OF STANDARD PRACTICE FOR
STEEL BUILDINGS AND BRIDGES, AND THE AWS STRUCTURAL WELDING CODE. ALL CODES AND
MANUALS SHALL BE THE LATEST ADOPTED EDITIONS.
2. STRUCTURAL STEEL SHALL CONFORM TO THE FOLLOWING ASTM DESIGNATIONS:
WIDE FLANGE SHAPES: A992 (FY = 50 KSI)
CHANNELS AND ANGLES: A36 (FY = 36 KSI)
PLATES: A572 GR 50 (FY = 50 KSI)
HOLLOW STRUCTURAL SECTIONS: A500 GRADE C (FY = 50 KSI)
ANCHOR RODS: F1554 (GRADE PER DETAILS)
BOLTS: F3125 GRADE A325-TC OR GRADE F1852-TC
WELDING ELECTRODES: E70XX
3. ANCHOR BOLTS AND PLAIN THREADED RODS AND ANCHORS SHALL BE ASTM A36 OR A307,
GRADE A.BOLTS, ANCHOR BOLTS, EXPANSION BOLTS, ETC., SHALL BE INSTALLED WITH STEEL
WASHERS.
4. WHERE CONNECTIONS ARE NOT FULLY DETAILED IN DRAWINGS INCLUDE ALL STEEL-TO-STEEL
CONNECTIONS AND STEEL-TO-STEEL PORTION OF ALL CONNECTIONS TO OTHER MATERIALS.
DESIGN CONNECTIONS FOR SPECIFIC FORCES WHERE SHOWN ON THE DRAWINGS. WHERE
SPECIFIC FORCES ARE NOT SHOWN, DESIGN SHALL BE FOR MAXIMUM CONDITIONS BASED ON
CAPACITIES OF CONNECTING MEMBERS
5. CONNECTION MATERIALS FOR STRUCTURAL STEEL SHALL CONFORM TO THE FOLLOWING
DESIGNATIONS:
A. BEAM OR COLUMN STIFFENER PLATES SHALL BE OF THE SAME YIELD STRESS, FY OF
STEEL AS THE STRUCTURAL ELEMENT.
B. ALL BOLTED CONNECTIONS ARE TO BE ERECTED WITH HIGH STRENGTH TENSION
CONTROL BOLTS.
C. HARDENED STEEL WASHERS ASTM F436 OR F959 AT TENSION CONTROL CONNECTIONS.
6. BOLTS SHALL BE ASTM A325N. ALL HIGH-STRENGTH BOLTS SHALL BE TIGHTENED TO THE
SNUG-TIGHT CONDITION AS DEFINED BY AISC UNLESS NOTED OTHERWISE.
7. ALL STRUCTURAL STEEL AND ANY PORTION THEREOF EXPOSED TO WEATHER, LOCATED IN
NON-AIR-CONDITIONED SPACES, EXPOSED TO MOISTURE OUTSIDE THE BUILDING ENVELOPE,
LOCATED INSIDE EXTERIOR CFS STUD WALLS, AND SPECIFIED AS GALVANIZED IN THE PLANS
AND DETAILS SHALL BE HOT DIPPED GALVANIZED. PROVIDE BOLTS, NUTS AND WASHERS THAT
ARE HOT DIPPED GALVANIZED ACCORDING TO ASTM A153, CLASS C. ALL NUTS, BOLTS,
WASHERS, AND OTHER CONNECTION HARDWARE USED IN THE CONNECTIONS OF HOT-DIPPED
GALVANIZED MEMBERS SHALL ALSO BE HOT-DIPPED GALVANIZED.
8. WELDING ELECTRODES SHALL CONFORM TO AWS D1.1, GRADE E70XX. E90 SERIES
ELECTRODES SHALL BE USED FOR ASTM A706 REINFORCING BARS. ALL WELDING SHALL BE
DONE BY WELDERS HOLDING VALID CERTIFICATES ISSUED BY AN ACCEPTED TESTING AGENCY
AND HAVING CURRENT EXPERIENCE IN TYPE OF WELDS SHOWN ON THE DRAWINGS OR NOTES.
ALL WELDING PER AMERICAN WELDING SOCIETY STANDARDS. CONTRACTOR MAY SHOP WELD
OR FIELD WELD AT THEIR DISCRETION. SHOP WELDS OR FIELD WELDS SHALL BE SHOWN ON
SHOP DRAWINGS. FULL PENETRATION WELDS SHALL BE TESTED AND CERTIFIED BY AN
INDEPENDENT TESTING LABORATORY.
9. SPLICING OF STRUCTURAL STEEL MEMBERS IS NOT ALLOWED UNO.
10. STRUCTURAL STEEL SHALL BE CLEANED OF RUST, LOOSE MILL SCALE, AND OTHER FOREIGN
MATERIALS WHERE REQUIRED FOR FABRICATION, FITTING UP OR WELDING. PROVIDE PAINT AS
REQUIRED IN THE SPECIFICATIONS.
11. PROVIDE WASHERS FOR CONNECTIONS WITH STANDARD OVERSIZE AND SHORT-SLOTTED
HOLES. FOR LONG-SLOTTED HOLES PROVIDE WASHERS OR A CONTINUOUS BAR OF SUFFICIENT
SIZE TO COMPLETELY COVER THE SLOT. FOR LONG-SLOTTED HOLES PROVIDE PLATE
WASHERS OR BARS WITH A MINIMUM 5/16 INCH THICKNESS.
12. DEFORMED BAR ANCHOR STUDS SHALL BE NELSON D2L GRANULAR FLUX-FILLED REBAR STUDS
OR APPROVED EQUAL MADE FROM LOW CARBON COLD ROLLED STEEL WITH A MINIMUM
TENSILE STRENGTH OF 70,000 PSI. STUD WELDING INSPECTION AND TESTING SHALL CONFORM
TO AWS D1.1.
13. HEADED STUDS SHALL BE NELSON GRANULAR FLUX-FILLED HEADED ANCHOR STUDS OR
APPROVED EQUIVALENT, MADE FROM COLD FINISHED LOW CARBON STEEL, AND SHALL
CONFORM TO ASTM A108, GRADES 1015 OR 1020 WITH A MINIMUM TENSILE STRENGTH OF 60,000
PSI. STUD WELDING INSPECTION AND TESTING SHALL CONFORM TO AWS D1.1.
14. DO NOT FIELD CUT ANY STRUCTURAL STEEL MEMBERS IN CONFLICT WITH THE WORK WITHOUT
APPROVAL BY THE ENGINEER OR UNLESS SPECIFICALLY SHOWN ON THE CONSTRUCTION
DOCUMENTS.
15. PROVIDE STRUCTURAL STEEL SHOP DRAWINGS FOR ARCHITECTS AND ENGINEERS REVIEW
PRIOR TO FABRICATION.
16. WELDING SHALL BE PERFORMED BY CERTIFIED WELDERS OR AT A SHOP CERTIFIED TO DO
SUCH WORK USING THE ELECTRIC ARC WELDING PROCESS AND SHALL CONFORM TO AISC AND
AWS STANDARDS.
17. ALL HOLES IN STEEL MEMBERS SHALL BE DRILLED OR PUNCHED. TORCH CUT HOLES ARE NOT
ALLOWED.
18. TEMPORARY BRACING DESIGNED BY OTHERS SHALL BE REQUIRED TO INSURE THE ALIGNMENT
AND STABILITY OF THE STRUCTURAL STEEL DURING ERECTION AND SHALL REMAIN IN PLACE
UNTIL PERMANENT CONDITIONS AS SHOWN ON THE CONSTRUCTION DOCUMENTS ARE IN
PLACE.
19. PROVIDE GROUT FOR BASE PLATES THAT IS NON-SHRINK, NON-METALIC GROUT WITH A
MINIMUM 28 DAY COMPRESSIVE STRENGTH OF 5000 PSI.
A/E ARCHITECT/ENGINEER
AB ANCHOR BOLT
ADDL ADDITIONAL
ADH ADHESIVE
AFF ABOVE FINISH FLOOR
AFG ABOVE FINISH GRADE
ALUM ALUMINUM
ANC ANCHOR
APRX APPROXIMATE
APVD APPROVED
ARCH ARCHITECTURAL
BC BOTTOM CHORD
BLDG BUILDING
BLKG BLOCKING
BM BEAM
BOL BOLLARD
BOT BOTTOM
BP BASE PLATE
BRG BEARING
BTB BACK TO BACK
BTW BETWEEN
C CHANNEL SHAPE
CHD CHORD
CIP CAST-IN-PLACE
CJ CONSTRUCTION JOINT
CL CENTERLINE
CLJ CONTROL JOINT
CLR CLEAR
CMU CONCRETE MASONRY
UNIT
COL COLUMN
CONC CONCRETE
CONN CONNECTION
CONST CONSTRUCTION
CONT CONTINUOUS
CTC CENTER TO CENTER
CTR CENTER
CY CUBIC YARD
D DEEP
DBA DEFORMED BAR
ANCHOR
DBL DOUBLE
DEMO DEMOLITION
DIA DIAMETER
DIAG DIAGONAL
DIM DIMENSION
DIST DISTANCE
DL DEAD LOAD
DT DOUBLE TEE
DTL DETAIL
DWG DRAWING
DWL DOWEL
E EAST
EA EACH
ECC ECCENTRIC
EF EACH FACE
EJ EXPANSION JOINT
EL ELEVATION
ELEC ELECTRICAL
ENGR ENGINEER
EQ EQUAL
EQUIP EQUIPMENT
ES EACH SIDE
EW EACH WAY
EWEF "EACH WAY, EACH
FACE"
EWTB "EACH WAY, TOP AND
BOTTOM"
EXP EXPANSION
EXST EXISTING
FAB FABRICATOR
FD FLOOR DRAIN
FDTN FOUNDATION
FG FINISHED GRADE
FIG FIGURE
FIN FINISH
FLR FLOOR
FOC "FACE OF CONCRETE,
FACE OF CURB"
FR FRAME
FRP FIBERGLASS
REINFORCED
PLASTIC
FT "FEET, FOOT"
FTG FOOTING
FV FIELD VERIFY
GA GAGE (METAL
THICKNESS)
GALV GALVANIZED
GEN GENERAL
GR GRADE
GRTG GRATING
HC HOLLOW CORE
HDR HEADER
HORIZ HORIZONTAL
HP HIGH POINT
HS HEADED STUD
HSS HOLLOW
STRUCTURAL SHAPE
HT HEIGHT
ID INSIDE DIAMETER
IF INSIDE FACE
IN INCH
INT "INTERIOR,
INTERSECTION"
INV INVERT
JF JOINT FILLER
JST JOIST
JT JOINT
K KIP
KB KNEE BRACE
KLF KIPS PER LINEAR
FOOT
KSI KIPS PER SQUARE
INCH
L "ANGLE, LENGTH"
LAD LADDER
LB POUND
LF LINEAR FOOT
LG LONG
LIN LINEAR
LLH LONG LEG
HORIZONTAL
MEMBER
MC MOMENT
CONNECTION
MCJ MASONRY CONTROL
JOINT
MECH MECHANICAL
MFR MANUFACTURER
MIN MINIMUM
MISC MISCELLANEOUS
ML MASONRY LINTEL
N NORTH
NIC NOT IN CONTRACT
NOM NOMINAL
NTS NOT TO SCALE
OC ON CENTER
OD OUTSIDE DIAMETER
OF OUTSIDE FACE
OH OVERHEAD
OPNG OPENING
OPP OPPOSITE
OVHG OVERHANG
PAR PARALLEL
PCF POUNDS PER CUBIC
FOOT
PCLJ PARTIAL CONTROL
JOINT
PEN PENETRATION
PL PLATE
PLBG PLUMBING
PLF POUNDS PER LINEAR
FOOT
PREFAB PREFABRICATED
PRELIM PRELIMINARY
PS "PIPE SUPPORT,
PUMP STATION "
PSF POUNDS PER
SQUARE FOOT
PSI POUNDS PER
SQUARE INCH
PT POINT
PVC POLYVINYL CHLORIDE
QTY QUANTITY
RECT RECTANGULAR
REF REFERENCE
REINF REINFORCING
REQD REQUIRED
REV REVISION
RO ROUGH OPENING
RTW RETAINING WALL
S SOUTH
SCH SCHEDULE
SECT SECTION
SF SQUARE FOOT
SHT SHEET
SIM SIMILAR
SL SLOPE
SLTD SLOTTED
SOG SLAB ON GRADE
SPA SPACING
SPEC SPECIFICATION
SQ SQUARE
SST STAINLESS STEEL
STD STANDARD DETAIL
STIR STIRRUP
STL STEEL
STR "STRUCTURAL,
STRAIGHT"
SUSP SUSPENDED
T&B TOP AND BOTTOM
T/ TOP OF
TD TRENCH DRAIN
TEMP TEMPORARY
THK THICK
TOB TOP OF BEAM
TOC TOP OF CONCRETE
TOF TOP OF FOOTING
TOG TOP OF GRATING
TOM TOP OF MASONRY
TOS "TOP OF SLAB, TOP
OF STEEL"
TOW TOP OF WALL
TPG "TOPPING, THROUGH
PLATE GIRDER"
TYP TYPICAL
ULT ULTIMATE
UNO UNLESS NOTED
OTHERWISE
VERT VERTICAL
VOL VOLUME
W "WEST, WIDE, WIDE
FLANGE BEAM"
W/ WITH
W/O WITHOUT
WF WIDE FLANGE
WLD WELDED
WM WIRE MESH
WP WORK POINT
WS WATERSTOP
WT WEIGHT
WWF WELDED WIRE
FABRIC
GENERAL STRUCTURAL ABBREVIATIONS
NK
ER
A
IR
F
OR
CE
B
AS
E, O
KL
AH
OM
A
PR
O
JE
C
T
IN
FO
R
M
AT
IO
N
D
ES
IG
N
F
IL
E
LO
C
AT
IO
N
R
EV
IS
IO
N S
M
AR
K
D
ES
IG
N
G R
O U
P:
D R
AW
N
B Y:
C H
EC
KE
D B
Y:
D
ES
IG
N
ED
B
Y:
D
AT
E D
ES
C
R
IP
TI
O
N
1 2 3 4 5
E
D
C
B
A
M
AN
AG
EM
EN
T
IN
FO
R M
AT
IO
N
1 2 3 4 5
E
D
C
B
A
IS
SU
E D
AT
E:
SHEET
SHEET NUMBER
SH
EE
T
TI
TL
E
AIR FORCE MATERIEL COMMAND
72 ABW CIVIL ENGINEER DIRECTORATE
TINKER AFB, OK
35%
DESIGN
W W
YK
IN
ST
AL
L E
LE
CT
RI
CA
L F
RO
M
FA
B- T
AN
D
OP
CO
N, B
0-
N O
VE
M
BE
R
-2
TE
PA
-S R
M
L
LU
KE
S-002
P G
O U
C H
ER
B
SH
AN
N
O N
En gr
\D es ig n\ s\
\2
8\
0_ Su pp or t\0 _3
_D ra w in gs
ST
RU
CT
UR
AL
SP
EC
IA
L I
NS
PE
CT
IO
N
NO
TE
S
03 11
CUI
CUI
STATEMENT OF QUALITY ASSURANCE / SPECIAL INSPECTIONS
1. QUALITY ASSURANCE / SPECIAL INSPECTION IS REQUIRED IN ACCORDANCE WITH THE UFC
3-301-01 AND IBC 2024, AS SUMMARIZED BELOW.
2. THE SPECIAL INSPECTORS MUST BE QUALIFIED TO PERFORM THE TYPES OF INSPECTION
SPECIFIED.
3. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO INFORM THE SPECIAL INSPECTOR OR
INSPECTING AGENCY AT LEAST ONE WORKING DAY PRIOR TO PERFORMING ANY WORK THAT
REQUIRES SPECIAL INSPECTION. ALL WORK PERFORMED WITHOUT SPECIAL INSPECTION IS
SUBJECT TO REMOVAL.
4. THE SPECIAL INSPECTOR(S) SHALL OBSERVE THE INDICATED WORK FOR COMPLIANCE WITH THE
CONTRACT DOCUMENTS AND SUBMIT RECORDS OF INSPECTION TO THE OWNER, ENGINEER OF
RECORD AND AUTHORITY HAVING JURISDICTION.
5. SPECIAL INSPECTIONS SHALL BE PERFORMED BY A CERTIFIED OR QUALIFIED SPECIAL
INSPECTOR(S), AS DETERMINED AND TO THE SATISFACTION OF THE OWNER, ENGINEER OF
RECORD AND AUTHORITY HAVING JURISDICTION.
6. PERIODIC SPECIAL INSPECTION IS DEFINED AS THE PART-TIME OR INTERMITTENT INSPECTION
OF THE WORK BY AN APPROVED INSPECTOR WHO IS PRESENT IN THE AREA WHERE THE WORK
HAS BEEN OR IS BEING PERFORMED AND AT THE COMPLETION OF WORK. CONTINUOUS SPECIAL
INSPECTION IS DEFINED AS THE FULL-TIME INSPECTION OF THE WORK BY AN APPROVED
INSPECTOR WHO IS CONTINUOUSLY PRESENT AND MONITORING THE WORK PERFORMED. IN ALL
CASES, THE INSPECTION SHALL BE COORDINATED AND PERFORMED SO THAT WORK CAN BE
CORRECTED PRIOR TO OTHER RELATED WORK PROCEEDING AND COVERING THE INSPECTED
WORK.
7. ASSOCIATED TESTING SHALL BE PERFORMED AS INDICATED IN THE FOLLOWING TABLES BY AN
APPROVED AND ACCREDITED AGENCY AS DETERMINED AND TO THE SATISFACTION OF THE
OWNER, ENGINEER OF RECORD AND AUTHORITY HAVING JURISDICTION.
8. SPECIAL INSPECTION AND ASSOCIATED TESTING REPORTS SHALL BE SUBMITTED TO THE
ENGINEER OF RECORD, CONTRACTOR, AUTHORITY HAVING JURISDICTION, AND OWNER WITHIN
ONE WEEK OF INSPECTION OR WITHIN ONE WEEK OF TEST COMPLETION.
9. AT THE CONCLUSION OF CONSTRUCTION, A FINAL REPORT SHALL BE SUBMITTED BY THE
SPECIAL INSPECTOR(S) WHICH DOCUMENTS THE REQUIRED SPECIAL INSPECTIONS AND
CORRECTION OF PREVIOUSLY NOTED DISCREPANCIES. THE FINAL REPORT SHALL BE
SUBMITTED TO THE ENGINEER OF RECORD, CONTRACTOR, AUTHORITY HAVING JURISDICTION
AND OWNER.
10.WORK REQUIRING SPECIAL INSPECTION THAT IS INSTALLED OR COVERED WITHOUT THE
APPROVAL OF THE SPECIAL INSPECTOR IS SUBJECT TO REMOVAL OR EXPOSURE.
11.REFER TO THE FOLLOWING TABLES AND SPECIFICATIONS FOR SPECIFIC
INSPECTION/TESTING REQUIREMENTS AND FREQUENCIES.
STRUCTURAL OBSERVATIONS
1. STRUCTURAL OBSERVATIONS SHALL BE PERFORMED IN ACCORDANCE WITH INTERNATIONAL
BUILDING CODE (2024) AND STANDARDS REFERENCED THERIN WITH MODIFICATIONS PER UFC
1-200-01 DOD BUILDING CODE, WITH CHANGE 4 AND UFC-3-301-01 STRUCTURAL ENGINEERING, WITH CHANGE 4.
2. ON-SITE STRUCTURAL OBSERVATIONS SHALL BE PERFORMED AS NOTED IN THE STRUCTURAL
OBSERVATION TABLE ON THIS SHEET.
3. STRUCTURAL OBSERVATION SHALL BE PERFORMED BY THE STRUCTURAL ENGINEER OF
RECORD OR SELECTED DELEGATE TO VERIFY GENERAL CONFORMANCE WITH THE APPROVED
CONSTRUCTION DOCUMENTS. STRUCTURAL OBSERVATION DOES NOT INCLUDE OR WAIVE THE
RESPONSIBILITY FOR ANY REQUIRED SPECIAL INSPECTIONS OR INSPECTIONS BY A THIRD
PARTY AGENCY OR THE BUILDING OFFICIAL.
4. STRUCTURAL OBSERVATION REPORTS, NOTING ANY DEFICIENCIES IN CONSTRUCTION, SHALL BE
DELIVERED TO THE CONTRACTOR, BUILDING OFFICIAL, AND ENGINEER FOLLOWING EACH
OBSERVATION. THE CONTRACTOR SHALL BE NOTIFIED ON-SITE, BY PHONE, OR EMAIL WITHIN 24
HOURS OF FINDING ANY DEFICIENCIES.
5. AT THE CONCLUSION OF CONSTRUCTION, A WRITTEN STATEMENT IS REQUIRED TO BE
PROVIDED BY THE PERSON(S) PROVIDING THE STRUCTURAL OBSERVATION. THIS STATEMENT
SHALL VERIFY WHETHER THE NECESSARY STRUCTURAL OBSERVATION SITE VISITS WERE MADE
AND WHETHER THERE REMAIN ANY STRUCTURAL DEFICIENCIES THAT HAVE NOT BEEN
RESOLVED. THE CONTRACTOR SHALL PROVIDE ALL NECESSARY INFORMATION REQUESTED BY
THE STRUCTURAL OBSERVER TO MAKE THIS STATEMENT.
6. THE CONTRACTOR SHALL SCHEDULE AND FACILITATE STRUCTURAL OBSERVATION FOR THE
ITEMS LISTED IN THE STRUCTURAL OBSERVATION TABLE ON THIS SHEET.
STRUCTURAL OBSERVATION TABLE
OBSERVATION ITEM STAGE OF CONSTRUCTION DESCRIPTION
SOILS AND REINF. PRIOR TO CONC. POUR OBSERVE SOIL COMPACTION
AND REINFORCEMENT
CONCRETE AT 50%
INSTALLATION
50% OF INSTALLATION OBSERVE CONCRETE
CONSTRUCTION
CONTINUOUS PERIODIC REFERENCED STANDARD
1. INSPECTION OF REINFORCING STEEL, INCLUDING PLACEMENT.
2. INSPECTION OF ANCHORS CAST IN CONCRETE
3. INSPECT ANCHOR POST-INSTALLED IN HARDENED CONCRETE MEMBERS.
a. ADHESIVE ANCHORS INSTALLED IN HORIZONTALLY OR UPWARDLY INCLINED
ORIENTATION TO RESIST SUSTAINED TENSION LOADS.
b. MECHANICAL ANCHORS AND ADHESIVE ANCHORS NOT DEFINED IN 3.a.
4. VERIFYING USE OF REQUIRED DESIGN MIX.
5. PRIOR TO CONCRETE PLACEMENT, FABRICATE SPECIMENS FOR STRENGTH TESTS,
PERFORM SLUMP AND AIR CONTENT TESTS, AND DETERMINE THE TEMPERATURE
OF THE CONCRETE.
6. INSPECTION OF CONCRETE PLACEMENT FOR PROPER APPLICATION TECHNIQUES.
7. INSPECTION FOR MAINTENANCE OF SPECIFIED CURING TEMPERATURE AND
TECHNIQUES.
8. INSPECT FORMWORK FOR SHAPE, LOCATION AND DIMENSIONS OF THE CONCRETE
MEMBER BEING FORMED.
- X ACI 318: CH. 20, 25.2, 25.3, 26.6.1-26.6.3
IBC 1908.4
- X ACI 318: 17.8.2
IBC: -
- X ACI 318: CH. 19, 26.4.3, 26.4.4
IBC 1904.1, 1904.2, 1908.2, 1908.3
X - ASTM C172, ASTM C31
ACI 318: 26.4, 26.12
IBC 1908.10
X - ACI 318: 26.5
IBC 1908.6, 1908.7, 1908.8
- X ACI 318: 26.5.3-26.535
IBC 1908.9
- X ACI 318: 26.11.1.2(b)
IBC: -
VERIFICATION AND INSPECTION
TABLE 1705.3
REQUIRED VERIFICATION AND INSPECTION OF CONCRETE CONSTRUCTION
X - ACI 318: 17.8.2.4
IBC: -
- X ACI 318: 17.8.2
IBC: -
TABLE 1705.6
REQUIRED VERIFICATION AND INSPECTION OF SOILS (BY GEOTECHNICAL ENGINEER)
VERIFICATION AND INSPECTION TASK CONTINUOUS PERIODIC
- X
- X
- X
X -
- X
1. VERIFY MATERIALS BELOW SHALLOW
FOUNDATION ARE ADEQUATE TO ACHIEVE THE
DESIGN BEARING CAPACITY.
2. VERIFY EXCAVATIONS ARE EXTENDED TO PROPER
DEPTH AND HAVE REACHED PROPER MATERIAL.
3. PERFORM CLASSIFICATION AND TESTING OF
COMPACTED FILL MATERIALS.
4. VERIFY USE OF PROPER MATERIALS, DENSITIES
AND LIFT THICKNESSES DURING PLACEMENT AND
COMPACTION OF COMPACTED FILL.
5. PRIOR TO PLACEMENT OF COMPACTED FILL,
OBSERVE SUBGRADE AND VERIFY THAT SITE HAS
BEEN PREPARED PROPERLY.
STRUCTURAL STEEL
REFERENCE: IBC SECTION 1705.2.1. INSPECTIONS AND NON-DESTRUCTIVE TESTING OF STRUCTURAL
STEEL ELEMENTS SHALL BE IN ACCORDANCE
WITH THE QUALITY ASSURANCE REQUIREMENTS OF AISC 360, CHAPTER N.
FABRICATOR AND ERECTOR QUALITY CONTROL PROGRAM
REFERENCE AISC 360, CHAPTER N, SECTION N2.
FABRICATOR AND ERECTOR DOCUMENTS
REFERENCE AISC 360, CHAPTER N, SECTION N3.
SUBMITTALS FOR STEEL CONSTRUCTION AND AVAILABLE DOCUMENTS FOR STEEL CONSTRUCTION
SHALL CONFORM TO AISC 360, SECTION N3.
INSPECTION AND NONDESTRUCTIVE TESTING PERSONNEL
REFERENCE AISC 360, CHAPTER N, SECTION N4
QUALITY CONTROL INSPECTOR (FABRICATOR OR ERECTOR) QUALIFICATIONS, QUALITY ASSURANCE INSPECTOR (SPECIAL INSPECTOR) QUALIFICATIONS AND NONDESTRUCTIVE TESTING PERSONNEL (INSPECTION AGENCY PERSONNEL) QUALIFICATIONS SHALL CONFORM TO AISC 360, SECTION N4.
MINIMUM REQUIREMENTS FOR INSPECTION OF STRUCTURAL STEEL BUILDINGS
REFERENCE AISC 360, CHAPTER N, SECTION N5.
QUALITY CONTROL INSPECTIONS BY THE FABRICATOR’S OR ERECTOR’S QUALITY CONTROL INSPECTOR (QCI) AND QUALITY ASSURANCE INSPECTIONS OF FABRICATED ITEMS AND THE ERECTED STEEL SYSTEM BY THE SPECIAL INSPECTOR (SI), SHALL CONFORM TO AISC 360, SECTION N5 AND TABLES
N5.4-1, N5.4-2, N5.4-3, N5.6-1, N5.6-2 AND N5.6-3. IN THESE TABLES INSPECTION
TASKS ARE AS FOLLOWS:
O-OBSERVE THESE ITEMS ON A RANDOM BASIS. OPERATIONS NEED NOT BE DELAYED PENDING THESE
INSPECTIONS.
P-PERFORM THESE TASKS FOR EACH WELDED JOINT OR MEMBER.
NONDESTRUCTIVE TESTING OF WELDED JOINTS
NONDESTRUCTIVE TESTING OF WELDED JOINTS SHALL CONFORM TO AISC 360, SECTION N5 AND
SHALL BE PERFORMED BY THE SPECIAL INSPECTOR (QUALITY ASSURANCE INSPECTOR) IN
ACCORDANCE WITH AWS D1.1.
THE FABRICATOR’S QUALITY CONTROL INSPECTOR SHALL INSPECT THE FOLLOWING AS A MINIMUM, AS APPLICABLE:
1. SHOP WELDING, HIGH-STRENGTH BOLTING, AND DETAILS IN ACCORDANCE WITH AISC 360
SECTION N5.
2. SHOP CUT AND FINISHED SURFACES IN ACCORDANCE IN ACCORDANCE WITH AISC 360, SECTION M2.
3. SHOP HEATING FOR STRAIGHTENING, CAMBERING AND CURVING IN ACCORDANCE WITH AISC
360, SECTION M2.1.
4. TOLERANCES FOR SHOP FABRICATION IN ACCORDANCE WITH SECTION 6 OF THE CODE OF
STANDARD PRACTICE.
THE ERECTOR’S QUALITY CONTROL INSPECTOR SHALL INSPECT THE FOLLOWING AS A MINIMUM, AS
APPLICABLE:
1. FIELD WELDING, HIGH-STRENGTH BOLTING, AND DETAILS IN ACCORDANCE WITH AISC 360, SECTION N5.
2. STEEL DECK AND HEADED STEEL STUD ANCHOR PLACEMENT AND ATTACHMENT IN
ACCORDANCE WITH AISC 360, SECTION N6. FIELD CUT SURFACES IN ACCORDANCE WITH AISC
360, SECTION M2.2.
3. FIELD HEATING FOR STRAIGHTENING IN ACCORDANCE WITH AISC 360, SECTION M2.1.
TOLERANCES FOR FIELD ERECTION IN ACCORDANCE WITH SECTION 7.13 OF THE CODE OF
STANDARD PRACTICE.
TABLE N5.4-1, AISC 360-22 INSPECTION TASKS PRIOR TO WELDING
INSPECTION TASKS PRIOR TO WELDING QC QA
WELDING PROCEDURES SPECIFICATIONS (WPSs) AVAILABLE P P
MANUFACTURER CERTIFICATIONS FOR WELDING CONSUMABLES AVAILABLE
MATERIAL IDENTIFICATION (TYPE/GRADE)
WELDER IDENTIFICATION SYSTEM1
FIT-UP OF GROOVE WELDS (INCLUDING JOINT GEOMETRY)
- JOINT PREPARATION
- DIMENSIONS (ALIGNMENT, ROOT OPENING,
ROOT FACE, BEVEL)
- CLEANLINESS (CONDITION OF STEEL SURFACES)
- SHIELDING GAS TYPE/FLOW RATE
- TACKING (TACK WELD QUALITY AND LOCATION)
- BACKING TYPE AND FIT (IF APPLICABLE)
P P
O O
O O
O O
CONFIGURATION AND FINISH OF ACCESS HOLES O O
FIT-UP OF FILLET WELDS
- DIMENSIONS (ALIGNMENT, GAPS, AT ROOT)
- CLEANLINESS (CONDITION OF STEEL SURFACES)
- TACKING (TACK WELD QUALITY AND LOCATION)
O O
CHECK WELDING EQUIPMENT O -
1 THE FABRICATOR OR ERECTOR, AS APPLICABLE, SHALL MAINTAIN A SYSTEM BY
WHICH A WELDER WHO HAS WELDED A JOINT OR MEMBER CAN BE IDENTIFIED.
STAMPS, IF USED SHALL BE THE LOW-STRESS TYPE.
TABLE N5.4-3, AISC 360-22 INSPECTION TASKS AFTER WELDING
INSPECTION TASKS AFTER WELDING QC QA
WELDS CLEANED O O
SIZE, LENGTH AND LOCATION OF WELDS
WELDS MEET VISUAL ACCEPTANCE CRITERIA
- CRACK PROHIBITION
- WELD/BASE-METAL FUSION
- CRATER CROSS SECTION
- WELD PROFILES
- WELD SIZE
- UNDERCUT
- POROSITY
P P
1 WHEN WELDING OF DOUBLER PLATES, CONTINUITY PLATES OR STIFFENERS HAS BEEN PERFORMED IN THE k-AREA, VISUALLY INSPECT THE WEB k-AREA FOR CRACKS WITHIN 3 INCHES (75 mm) OF THE
WELD.
P P
ARC STRIKES P P
k-AREA1 P P
BACKING REMOVED & WELD TABS REMOVED (IF REQUIRED) P P
REPAIR ACTIVITIES P P
DOCUMENT ACCEPTANCE OR REJECTION OF WELDED
JOINT OR MEMBER
P P
TABLE N5.4-2, AISC 360-22 INSPECTION TASKS DURING WELDING
INSPECTION TASKS DURING WELDING QC QA
USE OF QUALIFIED WELDERS O O
CONTROL AND HANDLING OF WELDING CONSUMABLES
- PACKAGING
- EXPOSURE CONTROL
NO WELDING OVER CRACKED TACK WELDS
ENVIRONMENTAL CONDITIONS
- WIND SPEED WITHIN LIMITS
- PRECIPITATION AND TEMPERATURE
O O
O O
O O
WPS FOLLOWED
- SETTINGS ON WELDING EQUIPMENT
- TRAVEL SPEED
- SELECTED WELDING MATERIALS
- SHIELDING GAS TYPE/FLOW RATE
- PREHEAT APPLIED
- INTERPASS TEMPERATURE MAINTAINED (MIN/MAX)
- PROPER POSITION (F,V, H, OH)
O O
WELDING TECHNIQUES
- INTERPASS AND FINAL CLEANING
- EACH PASS WITHIN PROFILE LIMITATIONS
- EACH PASS MEETS QUALITY REQUIREMENTS
O O
NK
ER
A
IR
F
OR
CE
B
AS
E, O
KL
AH
OM
A
PR
O
JE
C
T
IN
FO
R
M
AT
IO
N
D
ES
IG
N
F
IL
E
LO
C
AT
IO
N
R
EV
IS
IO
N S
M
AR
K
D
ES
IG
N
G R
O U
P:
D R
AW
N
B Y:
C H
EC
KE
D B
Y:
D
ES
IG
N
ED
B
Y:
D
AT
E D
ES
C
R
IP
TI
O
N
1 2 3 4 5
E
D
C
B
A
M
AN
AG
EM
EN
T
IN
FO
R M
AT
IO
N
1 2 3 4 5
E
D
C
B
A
IS
SU
E D
AT
E:
SHEET
SHEET NUMBER
SH
EE
T
TI
TL
E
AIR FORCE MATERIEL COMMAND
72 ABW CIVIL ENGINEER DIRECTORATE
TINKER AFB, OK
35%
DESIGN
W W
YK
IN
ST
AL
L E
LE
CT
RI
CA
L F
RO
M
FA
B- T
AN
D
OP
CO
N, B
0-
N O
VE
M
BE
R
-2
TE
PA
-S R
M
L
LU
KE
SD-101
P G
O U
C H
ER
B
SH
AN
N
O N
En gr
\D es ig n\ s\
\2
8\
0_ Su pp or t\0 _3
_D ra w in gs
ST
RU
CT
UR
AL
DE
MO
LIT
IO
N
PL
AN
AN
D
AE
RI
AL
IM
AG
E
W
IT
H
UT
ILI
TI
ES
04 11
GENERAL NOTES
KEYED NOTES
1. THE DRAWING WAS PREPARED FROM EXISTING DRAWINGS AND LIMITED ACCESS
FOR FIELD OBSERVATIONS. CONTRACTOR SHALL FIELD VERIFY EXISTING
CONDITIONS FOR ACCURACY.
2. DO NOT DAMAGE EXISTING BUILDING FOUNDATIONS OR UNDERGROUND UTILITIES.
3. DO NOT UNDERMINE EXISTING CONSTRUCTION WITHOUT UNDERPINNING. DO NOT
DAMAGE EXISTING CONSTRUCTION DURING NEW WORK.
4. REPLACE CONCRETE SIDEWALK AS REQUIRED TO INSTALL NEW FOUNDATIONS.
REMOVE EXISTING GENERATOR. REFER TO ELECTRICAL.
DEMOLISH AND REMOVE EXISITNG ENCLOSURE PRE-CAST CONCRETE
WALLS. NO ASBUILTS AVAILABLE.
DEMOLISH AND REMOVE EXISITNG CONCRETE FOUNDATONS OF ENCLOSURE.
NO ASBUILTS AVAILABLE. ASSUMED FOUNDATIONS INCLUDE CONCRETE
STRUCTURAL SLAB, PAD, GRADE BEAMS, AND PIERS. IF PIERS ARE PRESENT
DEMOLISH 6'-0" BELOW GRADE.
SD-101
STRUCTURAL DEMOLITION PLAN
SCALE: 3/16" = 1'-0"
SD-101
AERIAL IMAGE WITH UTILITIES
NTS
CUI
CUI
B820 - E
EXISITNG WALKWAY - E
EXISITNG EAST ELECTRICAL ROOMEXISITNG EAST MECHANICAL ROOM POWER PLANTS
OFFICE
U05
EXISITNG
STORM WATER
EXISITNG
CURB
EXISITNG
CURB
EXISTING
SOD
EXISITNG
DRIVE
EXISTING
CONCRETE PAD
TO REMAIN
UTILITY
BOX
NK
ER
A
IR
F
OR
CE
B
AS
E, O
KL
AH
OM
A
PR
O
JE
C
T
IN
FO
R
M
AT
IO
N
D
ES
IG
N
F
IL
E
LO
C
AT
IO
N
R
EV
IS
IO
N S
M
AR
K
D
ES
IG
N
G R
O U
P:
D R
AW
N
B Y:
C H
EC
KE
D B
Y:
D
ES
IG
N
ED
B
Y:
D
AT
E D
ES
C
R
IP
TI
O
N
1 2 3 4 5
E
D
C
B
A
M
AN
AG
EM
EN
T
IN
FO
R M
AT
IO
N
1 2 3 4 5
E
D
C
B
A
IS
SU
E D
AT
E:
SHEET
SHEET NUMBER
SH
EE
T
TI
TL
E
AIR FORCE MATERIEL COMMAND
72 ABW CIVIL ENGINEER DIRECTORATE
TINKER AFB, OK
35%
DESIGN
W W
YK
IN
ST
AL
L E
LE
CT
RI
CA
L F
RO
M
FA
B- T
AN
D
OP
CO
N, B
0-
N O
VE
M
BE
R
-2
TE
PA
-S R
M
L
LU
KE
S-101
P G
O U
C H
ER
B
SH
AN
N
O N
En gr
\D es ig n\ s\
\2
8\
0_ Su pp or t\0 _3
_D ra w in gs
NE
W
S
TR
UC
TU
RA
L
FO
UN
DA
TI
ON
P
LA
N
AN
D
AE
RI
AL
IM
AG
E
W
IT
H
UT
ILI
TI
ES
05 11
KEYED NOTES
5” CONCRETE SLAB-ON-GRADE REINFORCE WITH #3 AT 12” O.C. E.W. MID-DEPTH.
THICKENED SLAB EDGE 12”x18” REINFORCE WITH (2) - #5 CONTINUOUS AND #3
DOWELS AT 12" O.C.
PROVIDE SLAB OPENING REINFORCING PER 4/S-501.
1'-8” x 4'-3” x 4'-3” FOOTING REINFORCE WITH (6)-#5 E.W. BOTTOM AND (4) - #4
E.W. TOP.
1'-8” x 1'-8” x 3'-8” PILASTER REINFORCE WITH (8) - #7 VERTICAL DOWELS AND #4
TIES AT 3” O.C. TOP 1'-0” THEN 12” O.C.
ENCLOSURE POSTS, BASE PLATES, AND ANCHORS (BY OTHERS).
4 12" Ø x 2'-0” REMOVEABLE SAFETY BOLLARDS, BASE, AND ANCHORS (BY
OTHERS). `
S-101
NEW STRUCTURAL FOUNDATON PLAN
SCALE: 3/16" = 1'-0"
GENERAL NOTES
1. THE DRAWING WAS PREPARED FROM EXISTING DRAWINGS AND LIMITED ACCESS
FOR FIELD OBSERVATIONS. CONTRACTOR SHALL FIELD VERIFY EXISTING
CONDITIONS FOR ACCURACY.
2. DO NOT DAMAGE EXISTING BUILDING FOUNDATIONS OR UNDERGROUND UTILITIES.
3. DO NOT UNDERMINE EXISTING CONSTRUCTION WITHOUT UNDERPINNING. DO NOT
DAMAGE EXISTING CONSTRUCTION DURING NEW WORK.
4. REPLACE CONCRETE SIDEWALKS AS REQUIRED TO INSTALL NEW FOUNDATIONS.
S-101
AERIAL IMAGE WITH UTILITIES
NTS
CUI
CUI
36'-0"
'-9
4'- 5"
4'- 5"
6" TY
P
3'-2"7'-5"7'-5"7'-5"7'-5"3'-2"
RE
SE
RV
ED
FO
R
FU
TU
RE
FU
EL
T
AN
K
EXISITNG
STORM
WATER
EXISITNG
CURB
EXISTING
CONCRETE
PAD TO
REMAIN
UTILITY
BOX
EXISITNG
CURB
EXISTING
SOD
EXISITNG
DRIVE
B820 - E
EXISITNG WALKWAY - E
EXISITNG EAST ELECTRICAL ROOMEXISITNG EAST MECHANICAL ROOM
1'-6"
POWER PLANTS
OFFICE
EXISITNG WALKWAY - E
5'-0"
FHP PAD
12'-0" 12'-0"
7'-
61 2" CJ CJ
12'-0"
2'-5"
1'-
1 2" 1'-
1 2"
S-501
S-501
S-501
12'-0"12'-0"9'-7"
RE
SE
RV
ED
FO
R
FU
TU
RE
FU
EL
T
AN
K
EXISITNG
STORM
WATER
EXISITNG
CURB
EXISTING
CONCRETE
PAD TO
REMAIN
UTILITY
BOX
EXISITNG
CURB
EXISTING
SOD
EXISITNG
DRIVE
B820 - E
EXISITNG WALKWAY - E
EXISITNG EAST ELECTRICAL ROOMEXISITNG EAST MECHANICAL ROOM
POWER PLANTS
OFFICE
EXISITNG WALKWAY - E
FHP PAD
NK
ER
A
IR
F
OR
CE
B
AS
E, O
KL
AH
OM
A
PR
O
JE
C
T
IN
FO
R
M
AT
IO
N
D
ES
IG
N
F
IL
E
LO
C
AT
IO
N
R
EV
IS
IO
N S
M
AR
K
D
ES
IG
N
G R
O U
P:
D R
AW
N
B Y:
C H
EC
KE
D B
Y:
D
ES
IG
N
ED
B
Y:
D
AT
E D
ES
C
R
IP
TI
O
N
1 2 3 4 5
E
D
C
B
A
M
AN
AG
EM
EN
T
IN
FO
R M
AT
IO
N
1 2 3 4 5
E
D
C
B
A
IS
SU
E D
AT
E:
SHEET
SHEET NUMBER
SH
EE
T
TI
TL
E
AIR FORCE MATERIEL COMMAND
72 ABW CIVIL ENGINEER DIRECTORATE
TINKER AFB, OK
35%
DESIGN
W W
YK
IN
ST
AL
L E
LE
CT
RI
CA
L F
RO
M
FA
B- T
AN
D
OP
CO
N, B
0-
N O
VE
M
BE
R
-2
TE
PA
-S R
M
L
LU
KE
S-501
P G
O U
C H
ER
B
SH
AN
N
O N
En gr
\D es ig n\ s\
\2
8\
0_ Su pp or t\0 _3
_D ra w in gs
ST
RU
CT
UR
AL
DE
TA
ILS
06 11
CUI
CUI
BAR SIZE
#3 THRU #5
ALL OTHER BARS
TABLE 2 - STIRRUP & TIE REINF
MIN BEND DIA *
4 BAR DIA
SEE TABLE 1
BEND DIA
TABLE 1 - PRIMARY REINF
BAR BEND
ALL GRADES OF
REINFORCEMENT
BAR SIZE MIN BEND DIA *
6 BAR DIA
8 BAR DIA
10 BAR DIA
#3 THRU #8
#9, #10, & #11
#14 & #18
NOTES:
* MEASURED ON INSIDE OF BAR
1. ALL REINF BENT COLD FIELD
2. BENDING NOT PERMITTED UNO
B
AR
D
IA
BA
R
SI
ZE
BEND DIA
BA
R
SI
ZE
6 B
AR
D
IA
OR
4"
M
IN
BA
R
SI
ZE
BEND DIA
4 BAR DIA
OR 2 1/2" MIN
BA
R
SI
ZE
BEND DIA 6 B
AR DIA
OR 4"
MIN
S-501
REINFORCING BEND DETAIL
BAR SIZE TOP BARS OTHER BARS
HOOKED DEVELOPMENT
LENGTH, Ldh
LAP SPLICE LENGTH/
DEVELOPMENT LENGTH
#3
#4
#5
#6
#7
#8
#9
#10
#11
24" 18" 6"
32" 25" 8"
40" 31" 10"
48" 31" 12"
70" 54" 14"
80" 62" 16"
95" 73" 18"
117" 90" 20"
113" 87" 22"
NOTES:
1. TABULATED VALUES ARE FOR NORMAL WEIGHT CONCRETE. DIVIDE BY
0.75 FOR LIGHTWEIGHT CONCRETE.
2. TABULATED VALUES ARE FOR UNCOATED BARS.
3. TABULATED VALUES ASSUME CLEAR COVER IS AT LEAST 1 BAR
DIAMETER AND CLEAR SPACING IS AT LEAST 2 BAR DIAMETERS.
4. TOP BARS ARE HORIZONTAL BARS WITH MORE THAN 12" OF…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .