Att.9_Contractor Work Surveillance Checklist (ROB).pdf

PDF 45 KB Posted

Attached to
Amendment 0002 - Richmond Hazardous Waste Removal and Disposal Combined Synopsis/Solicitation SP450024R0002
Solicitation number
SP450024R0002
Issued by

About this file

This document contains a contractor work surveillance checklist for placement or removal of empty rented rolloff boxes or vacuum boxes. The checklist specifies that the contractor must arrive on site at the scheduled time and date with the appropriately ordered and sized empty container, plastic liner, and watertight tarp cover in acceptable condition. It requires inspection and approval by a designated government representative and documentation of any noteworthy defects or damage. The checklist is to be used under solicitation number SP450024R0002 issued by the Defense Logistics Agency for hazardous waste removal and disposal services in Richmond.

View the file

Other files

File Type Posted
SF 30 Amendment 0002.doc DOC document
SF 30 Amendment 0001.doc DOC document
Order History SP450019D0006 15Jun21-15Dec23.xlsx XLSX spreadsheet
Att.7_CAC Application Process.pdf PDF
Att.12_DLA Form 2505 Oct 2023.xlsx XLSX spreadsheet
Att.6_Additional Contract Terms and Conditions.docx DOCX document
Att.4_PPI Questionnaire.pdf PDF
Att.1_Richmond_PWS.docx DOCX document
Att.3_Richmond_PUL.xlsx XLSX spreadsheet
Att.8_Contractor Work Surveillance Checklist (ICS).pdf PDF
Att.10_Addenda to 52.212-1 Instructions to Offerors.pdf PDF
Att.5_WD 1996-0223 REV 60 6-30-2023.pdf PDF
Att.11_ Addenda to 52.212-2 Evaluation.pdf PDF
Att.2_Richmond _Price Schedule.xlsx XLSX spreadsheet
Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Contractor Work Surveillance Checklist

Placement or Removal of Empty Rented Rolloff Box (ROB) or Vacuum Box

Date(s) of Work Surveillance: _________________ Start Time: ___________ Stop Time: ___________

Contract Number: SP4500-______-D-___________ TO #: ________________ CLIN: ______________

Name of Designated Government Representative: ___________________________________________

Title of Designated Government Representative: ____________________________________________

Phone Number of Designated Government Representative: (______) _______-___________ Ext.______

Yes No N/A Description of Contractor Work Surveillance: [ROB] or [Vac Box] (Circle one)

Did the Contractor arrive on site at the scheduled time and date?

Did the Contractor arrive on site with all of the requisite equipment, including

- One ROB or Vacuum Box container of the appropriately ordered size, with

- One plastic liner of sufficient size and thickness to adequately contain the waste for which it was intended (ROB only), and

- One watertight tarp cover that was generally free of rips and tears (ROB only)?

Does the Contractor have an approved weight ticket showing the empty (tare) weight of the container?

Was the container inspected by a Designated Government Representative upon arrival at the designated location?

Was the container of acceptable appearance and integrity, with minimal evidence of corrosion, visibly void of waste residue and legible/offensive graffiti upon delivery?

Was the ROB, bows and cover free of any defects or damage, other than those attributable to normal wear and tear, and determined acceptable for Government use? Please document below any noteworthy defects or damage and have driver initial for acknowledgment.

Note: Failure of the driver to acknowledge any existing noteworthy defects or damage will be cause for rejection of the ROB and liner.

Did the equipment operate properly without causing a delay in work?

Was the work performed safely and did the equipment meet the satisfaction of the Designated Government Representative?

Comments:

Signature of Designated Government Representative Date