Att.8_Contractor Work Surveillance Checklist (ICS).pdf

PDF 96 KB Posted

Attached to
Amendment 0002 - Richmond Hazardous Waste Removal and Disposal Combined Synopsis/Solicitation SP450024R0002
Solicitation number
SP450024R0002
Issued by

About this file

This document is a contractor work surveillance checklist for industrial cleaning services. The checklist outlines requirements for contractor work crews performing hazardous waste removal and disposal. It requires crews to arrive on time with the proper equipment, including a 3,500 gallon vacuum truck with 300 feet of hoses, a self-contained heated power washing unit, a liquid transfer pump with 300 feet of hoses, and appropriate PPE and tools. The vacuum truck must provide a weight ticket showing its empty weight and be inspected by a government representative. It must arrive with a clean tank and fittings compatible with the waste, and be free of residue unless cleaning multiple sites with the same waste stream when it need only meet the RCRA empty definition. The work must be performed satisfactorily according to the government representative. This checklist corresponds to a solicitation from the Defense Logistics Agency for hazardous waste removal and disposal services in Richmond under solicitation number SP450024R0002.

View the file

Other files

File Type Posted
SF 30 Amendment 0002.doc DOC document
SF 30 Amendment 0001.doc DOC document
Order History SP450019D0006 15Jun21-15Dec23.xlsx XLSX spreadsheet
Att.9_Contractor Work Surveillance Checklist (ROB).pdf PDF
Att.7_CAC Application Process.pdf PDF
Att.12_DLA Form 2505 Oct 2023.xlsx XLSX spreadsheet
Att.6_Additional Contract Terms and Conditions.docx DOCX document
Att.4_PPI Questionnaire.pdf PDF
Att.1_Richmond_PWS.docx DOCX document
Att.3_Richmond_PUL.xlsx XLSX spreadsheet
Att.10_Addenda to 52.212-1 Instructions to Offerors.pdf PDF
Att.5_WD 1996-0223 REV 60 6-30-2023.pdf PDF
Att.11_ Addenda to 52.212-2 Evaluation.pdf PDF
Att.2_Richmond _Price Schedule.xlsx XLSX spreadsheet
Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Contractor Work Surveillance Checklist

Industrial Cleaning Services (ICS) – CLINs 1002SV-1004SV & 1007SV-1009SV

Date(s) of Work Surveillance: _________________ Start Time: ___________ Stop Time: ___________

Name of Designated Government Representative: ___________________________________________

Title of Designated Government Representative: ____________________________________________

Phone Number of Designated Government Representative: (______) ________-___________

Yes No N/A Description of Contractor Work Surveillance

Did the work crew arrive on site at the scheduled time and date?

Did the crew arrive on site with all of the requisite equipment, including

- One standard vacuum truck (3,500-gal capacity) w/ 300 feet of hoses,

- One self-contained heated power washing unit,

- One liquid transfer pump w/ 300 feet of hoses, and

- All appropriate PPE and tools?

Did the vacuum truck driver provide a weight ticket showing the empty (tare) weight of the vacuum truck?

Was the vacuum truck inspected by a designated Government representative prior to use?

Did the vacuum truck arrive with a clean tank and hose fittings that were constructed of material that that was chemically compatible with the waste to be removed?

Did the vacuum truck arrive free of visible waste residue unless the truck was being used for multiple removals from the same project involving the same waste stream

(in which case it arrived as meeting definition of RCRA empty per 40 CFR 261.7)?

Did all of the equipment operate properly without causing delay in work?

Was the work performed to the satisfaction of the designated Government representative?

Comments:

Signature of Designated Government Representative Date