This document contains three Contract Data Requirements Lists (CDRLs) related to a federal contract for paint services on Bombardier Challenger 605/650 series aircraft.

CDRL A001 requires the submission of final aircraft paint scheme drawings for approval prior to painting. CDRL A002 requires weekly progress reports providing status updates, schedules, issues and costs. CDRL P001 requires a draft Project Management Plan with the contractor's proposal, and design and critical design reviews to take place after contract award and aircraft arrival.

The related federal contract opportunity is for strip, prime and paint services on up to four Bombardier Challenger aircraft. The solicitation is set aside for small businesses. The Federal Aviation Administration seeks to award a firm fixed price contract, with line items for each aircraft and potential over and above work with a not to exceed value. The contract type will be fixed price. The principal NAICS code is 488190 and the size standard is $35M. Proposals are due by specified date and time. The agency reserves the right to review program eligibility and communicate with offerors. The document provides relevant details on the required products and services, response dates, small business set aside, pricing structure, federal agency and NAICS code.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

OMB Control No. 2120-0595 (DD Form 1423-1) FAA Template No. 59 (6/98)

CONTRACT DATA REQUIREMENTS LIST (CDRL) Page 1 of

A. Contract line Item No. B. Exhibit C. Category (Check appropriate one) CLIN 0001 TDP TM Other

D. System/Item E. Contract/PR No. F. Contractor

1. Data Item No. 2. Title of Data Item 3. Subtitle A001 8110-3 or STC Form

4. Authority 5. Contact Reference 6. Requiring Office

PWS 3.6 AJF-2

7. DD 250 Req’d 8. APP Code 9. Distribution Statement Required 10. Frequency 11. As of Date (AOD)

N/A As needed

12. Date of First

Submission

13. Date of Subsequent

15. Distribution

14. REMARKS: a. b. Draft c. Final Copies

Addressee Copies Reg. Repro

Contractor will submit final dimensions paint scheme layout drawings to the Contracting Officer Rep (COR) for approval prior to starting the first aircraft.

The contractor must verify each aircraft N-Number being painted. Each aircraft must have the correct N Number for the specific Paint Scheme as identified in either Appendix A or Appendix B for the specific aircraft being painted.

Deliver to:

Federal Aviation Administration Flight Program Operations Aircraft Maintenance Support Team Attn: Darrell Chitwood, AJW-3430 Mike Monroney Aeronautical Center 6500 South MacArthur Blvd.

Oklahoma City, OK 73125

AJF-2

AAQ-732

16. Total 2 G. Prepared By: H. Date I. Approved By J. Date

Douglas Vaz 10/18/20 Micke Bianchi 10/18/21

17. Price Group 18. Estimated Total Price

A002 8110-3 or STC Form

4. Authority 5. Contact Reference 6. Requiring Office

AJF-2

7. DD 250 Req’d 8. APP Code 9. Distribution Statement Required 10. Frequency 11. As of Date (AOD)

N/A As needed

Addressee Copies Reg. Repro

Contractor will submit weekly progress reports on each Monday, or next business day for the previous week. Report may be in contractor format, but must provide a status update of the project, including schedule, open operational issues, and over and aboves costs.

Deliver to:

Federal Aviation Administration Flight Program Operations Attn: Douglas Vaz, AJW-2 Mike Monroney Aeronautical Center 6500 South MacArthur Blvd.

Oklahoma City, OK 73125

Douglas Vaz 10/18/20 Micke Bianchi 10/18/21

P001 8110-3 or STC Form

4. Authority 5. Contact Reference 6. Requiring Office

AJF-2

7. DD 250 Req’d 8. APP Code 9. Distribution Statement Required 10. Frequency 11. As of Date (AOD)

N/A As needed

Addressee Copies Reg. Repro

Contractor will provide a draft Project Management Plan (PMP) with contractor proposal due at the closing date and tme in the SIR.

Contractor proposal will contain both a Technical Proposal, Draft Project Management Pan, and Cost proposal as a separate document.

Preliminary Design Review/Post Award Conference - 10 Calendar days after contract award. Crtitical Design review due with arrival of first aircrfat after award. Review will be accomplished at the contractor facility.

AJF-21

Douglas Vaz 10/18/21 Mike Bianchi 10/18/21

OMB Control No. 2120-0595 (DD Form 1423-1) FAA Template No. 59 (reverse) (6/98)

INSTRUCTIONS FOR COMPLETING FAA Template No. 59 (6/98) A. Contract Line Item No.. Contract Line Item Number (CLIN) associated with this Contract Data Requirements List (CDRL).

B. Exhibit. Exhibit identifier for this CDRL item.

C. Category. TDP, TM, or Other.

D. System/Item. System, item, project designator or name, or title of services being acquired that the data will support.

E. Contract/PR No. Procurement Instrument Identification Number (PIIN) (i.e., the contract number, the Purchase Request (PR) number, the screening Information Request (SIR) number, or other appropriate designator.

F. Contractor. Contractor’s name.

G. Prepared by. Preparer’s organization responsible for preparing the CDRL.

H. Date. Date the form was prepared.

I. Approved by. Office responsible for approving the CDRL. The approving official’s signature appears on the last page of exhibit.

J. Date. The date the CDRL was approved.

1. Data Item No. The 4-character Exhibit Line Item Number (ELIN). The first position consists of the exhibit identifier and the remaining positions are assigned sequentially.

2. Title of Data Item. The title of the Data Item Description (DID) cited in item 4.

3. Subtitle. Further identification of the data item to supplement the title, if required.

4. Authority (Data Acquisition Document No.) DID identification number where detailed preparation instructions are provided.

5. Contract Reference. The specific paragraph number of the applicable contractual document that contains the tasking that generates a requirement for the data item. Normally, this will be a Statement of Work (SOW) paragraph.

6. Requiring Office. The technical office having responsibility for ensuring the technical adequacy of the data.

7. DD 250 Required.

8. APP Code. Identification, by entry of an “A,” of a requirement for advance written approval prior to final distribution of an item of data. An “A” in this item indicates that one or more draft submittals are required. Item 14 will show length of turn-around time for the contractor to resubmit the data after Government approval/disapproval has been issued.

9. Distribution Statement Required.

10. Frequency. The frequency of data submittal. Entries in this item are explained in Table 1. If the data is of a recurring type, it is to be submitted at the end of the reporting period established in this item unless otherwise indicated in item 14.

Table 1. Data Submittal Frequency Codes

CODE FREQUENCY CODE FREQUENCY

ANNLY Annually ASGEN As generated ASREQ As required BI-MO Every two months

BI-WE Every two weeks CP/RQ Change pages as required DAILY Daily DFDEL Deferred delivery

MTHLY Monthly ONE/R One time with revisions OTIME One time (does not include draft submissions QRTLY Quarterly R/ASR Revisions as required SEMIA Every six months

WEKLY Weekly “N”TIME Multiple separate submittals (2time, 3time, etc.)

See Item #14 Requirement is described in item #14. Used in lieu of other codes where such are inadequate to define requirement, or used in addition to other codes requiring amplification in item #14.

11. As of Date. Date for cutting off collection of the data. If the data is to be submitted multiple times, a numeral will be entered to indicate the number of calendar days prior to the end of the reporting period, established in item 10, that data collection will be cut off. For example, “15” would place the “as of date” for the data at 15 days before the end of the month, quarter, or year, depending upon the frequency established in item 10; a “0 or blank” would place the “as of” date at the end of each month, quarter, etc.

12. Date of First Submission. Due date for initial data submission. This is normally the postage date or date the data is delivered to the Contracting Officer or keyed to a specific event or milestone, using a code from Table 2.

Table 2. Data Submission Codes Code Definition Code Definition

ASGEN As generated ASREQ As required DFDEL Deferred delivery “N”DAC Days after contract award

“N”DACM Days after contract modification “N”DARP Days after reporting period “N”DARC Days after receipt of comments “N”DTC Days after test completion

NLT No later than EOC End of contract EOM End of month EOQ End of quarter

See item #14 Use to indicate requirement is described in item 14. Used in lieu of other codes where such are inadequate to define requirement or used in addition to other codes when amplification is included in item 14.

The “N” is assigned a value indicating the number of days, e.g., 30 DAC

13. Date of Subsequent Submission. Due date(s) for subsequent data submission(s), if data is to be submitted more than once. If submittal is constrained by a specific event or milestone, the constraint will be given using a code from Table 2.

14. Remarks. Contains all pertinent information not specified elsewhere and any amplification of other items on this format (e.g., DID tailoring, approva criteria and authority, inspection and acceptance clarification, distributions statements, specific submission instructions, explanation of reproducible copy and delivery requirements, alternative medium for delivery of the data item, etc.)

15. Distribution. Addressees and the number of draft and final copies (regular or reproducible) to be provided to each. FAA facility designator and/or office symbols/codes may be used; however, an explanation of these will be provided in the Addressee Listing. When reproducible copies (e.g., magnetic diskettes/tape, vellum, negative, etc.) are required, an explanation will be provided in item 14. If deferred delivery is required, amplification will be given in item 14.

16. Total. Total number of draft and final (regular/reproducible) copies required.

17. Price Group. Not used. 18. Estimated Total Price. Not used.