About this file
This document contains a template schedule for a federal contract solicitation seeking strip and paint services for Bombardier Challenger aircraft. The solicitation seeks firm fixed price proposals for painting up to four aircraft over a potential four option years, with line items for each aircraft and estimated over and above repair efforts. Offerors must propose fully burdened labor rates and potential material handling fees for repairs. The work is set aside for small businesses with a NAICS code of 488190 and size standard of $35 million. Proposals are due by November 18, 2021 to the Federal Aviation Administration for consideration as best value determinations. The contract will require $15 million in aircraft liability insurance per aircraft.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Instruction
| *** NOTICE *** | |
| *** | COMPLETE FOR FOR BASE AND EACH OPTION YEAR ON APPLICABLE TAB |
| ************** | |
| For CLINS* 0001, 0003, 0005, & 0007 | |
| The offeror must bid a unit Price for the complete Strip and Paint effort for a Bombardier Challenger Series 600 Aircraft in accordance with the PWS |
| For CLINS* 0002, 0004, 0006, & 0008 | |
| Potential need for Over and Above effort(s), contengent upon aircraft condition, of disassembly, assembly, repair or replacement/overhaul of any items, panels, seals of areas of corrosion found during the painting process. CONTRACTOR IS TO PROPOSE a Fully Burdened Labor Hour Rate, and potential handling factor (%) for materials if applicable. |
Any O&A effort will be negotiated, the request here is to gain insight for potential funding needs.
| *Note: Government has hard-coded a Mock-scenario for the full period of performance per aircraft. | |
| CLIN* 0009 | |
| Effort for this CLIN is not separately Priced and must be accounded for within the Aircraft CLINS |
* TOTAL CLINS 0001 - 0045 Thru Option Year IV (See all Excel TABS)
Schedule B Table - BASE YR
| Section B - Supplies or Services/Prices | ||||||
| CLIN | Supplies or Services | Estimated | ||||
| Quantity/ Hours | Est. Hourly Rate OR | Est. MTRL Cost | Unit Price | |||
| / O&A Handling Fee | Total Item Amount | |||||
| 0001 | Challenger CL-605/650 Tail Code N91 Fixed Unit Price, Contractor will prepare and paint FAA's Bombardier Challenger SN# (TBD), in accordance with the attached PWS. FIRM FIXED PRICE | 1 | $ - 0 | $ - 0 | ||
| 0002 | N91 OVER and ABOVE (O&A) |
Potential need of disassembly, assembly, repair or replacement/overhaul of any items, panels, seals of areas of corrosion found during the painting process. CONTRACTOR IS TO PROPOSE Fully Burdened Labor Hour Rate, potential handling factor (%) for materials. NTE $48,000.00
| LABOR HOUR/TIME AND MATERIALS | 250 | $ - 0 | $ - 0 | 0.00% | $ - 0 | ||
| 0003 | Challenger CL-605/650 Tail Code NXX (TBD) Fixed Unit Price, Contractor will prepare and paint FAA's Bombardier Challenger SN# (TBD), in accordance with the attached PWS. FIRM FIXED PRICE | 1 | $ - 0 | $ - 0 | |||
| 0004 | NXX (TBD) OVER and ABOVE (O&A) |
Potential need of disassembly, assembly, repair or replacement/overhaul of any items, panels, seals of areas of corrosion found during the painting process. CONTRACTOR IS TO PROPOSE Fully Burdened Labor Hour Rate, potential handling factor (%) for materials. NTE $48,000.00
| LABOR HOUR/TIME AND MATERIALS | 250 | $ - 0 | $ - 0 | 0.00% | $ - 0 | ||
| 0005 | Challenger CL-605/650 Tail Code NXX (TBD) Fixed Unit Price, Contractor will prepare and paint FAA's Bombardier Challenger SN# (TBD), in accordance with the attached PWS. FIRM FIXED PRICE | 1 | $ - 0 | $ - 0 | |||
| 0006 | NXX (TBD) OVER and ABOVE (O&A) |
Potential need of disassembly, assembly, repair or replacement/overhaul of any items, panels, seals of areas of corrosion found during the painting process. CONTRACTOR IS TO PROPOSE Fully Burdened Labor Hour Rate, potential handling factor (%) for materials. NTE $48,000.00
| LABOR HOUR/TIME AND MATERIALS | 250 | $ - 0 | $ - 0 | 0.00% | $ - 0 | ||
| 0007 | Challenger CL-605/650 Tail Code NXX (TBD) Fixed Unit Price, Contractor will prepare and paint FAA's Bombardier Challenger SN# (TBD), in accordance with the attached PWS. FIRM FIXED PRICE | 1 | $ - 0 | $ - 0 | |||
| 0008 | NXX (TBD) OVER and ABOVE (O&A) |
Potential need of disassembly, assembly, repair or replacement/overhaul of any items, panels, seals of areas of corrosion found during the painting process. CONTRACTOR IS TO PROPOSE Fully Burdened Labor Hour Rate, potential handling factor (%) for materials. NTE $48,000.00
| LABOR HOUR/TIME AND MATERIALS | 250 | $ - 0 | $ - 0 | 0.00% | $ - 0 | |
| 0009 | Submission of Reports and Data, In accordance with PWS | NSP | ||||
| **In Accordance with Clause 3.4.1-12 INSURANCE - (OCT 2019) paragraph (b)(4) Aircraft Liability--The contractor shall be required to provide Proof of insurance in the amount of $15,000,000 per aircraft for Property Damage to FAA aircraft when in their possession. (SEE SECTION H, H.1 SPECIAL INSURANCE REQUIREMENT - GOVERNMENT OWNED PROPERTY) |
OPT YR I
| Section B - Supplies or Services/Prices | ||||||
| CLIN | Supplies or Services | Estimated | ||||
| Quantity/ Hours | Est. Hourly Rate OR | Est. MTRL Cost | Unit Price | |||
| / O&A Handling Fee | Total Item Amount | |||||
| 0010 | Challenger CL-605/650 Tail Code N91 Fixed Unit Price, Contractor will prepare and paint FAA's Bombardier Challenger SN# (TBD), in accordance with the attached PWS. FIRM FIXED PRICE | 1 | $ - 0 | $ - 0 | ||
| 0011 | N91 OVER and ABOVE (O&A) |
Potential need of disassembly, assembly, repair or replacement/overhaul of any items, panels, seals of areas of corrosion found during the painting process. CONTRACTOR IS TO PROPOSE Fully Burdened Labor Hour Rate, potential handling factor (%) for materials. NTE $48,000.00
| LABOR HOUR/TIME AND MATERIALS | 250 | $ - 0 | $ - 0 | 0.00% | $ - 0 | ||
| 0012 | Challenger CL-605/650 Tail Code NXX (TBD) Fixed Unit Price, Contractor will prepare and paint FAA's Bombardier Challenger SN# (TBD), in accordance with the attached PWS. FIRM FIXED PRICE | 1 | $ - 0 | $ - 0 | |||
| 0013 | NXX (TBD) OVER and ABOVE (O&A) |
Potential need of disassembly, assembly, repair or replacement/overhaul of any items, panels, seals of areas of corrosion found during the painting process. CONTRACTOR IS TO PROPOSE Fully Burdened Labor Hour Rate, potential handling factor (%) for materials. NTE $48,000.00
| LABOR HOUR/TIME AND MATERIALS | 250 | $ - 0 | $ - 0 | 0.00% | $ - 0 | ||
| 0014 | Challenger CL-605/650 Tail Code NXX (TBD) Fixed Unit Price, Contractor will prepare and paint FAA's Bombardier Challenger SN# (TBD), in accordance with the attached PWS. FIRM FIXED PRICE | 1 | $ - 0 | $ - 0 | |||
| 0015 | NXX (TBD) OVER and ABOVE (O&A) |
Potential need of disassembly, assembly, repair or replacement/overhaul of any items, panels, seals of areas of corrosion found during the painting process. CONTRACTOR IS TO PROPOSE Fully Burdened Labor Hour Rate, potential handling factor (%) for materials. NTE $48,000.00
| LABOR HOUR/TIME AND MATERIALS | 250 | $ - 0 | $ - 0 | 0.00% | $ - 0 | ||
| 0016 | Challenger CL-605/650 Tail Code NXX (TBD) Fixed Unit Price, Contractor will prepare and paint FAA's Bombardier Challenger SN# (TBD), in accordance with the attached PWS. FIRM FIXED PRICE | 1 | $ - 0 | $ - 0 | |||
| 0017 | NXX (TBD) OVER and ABOVE (O&A) |
Potential need of disassembly, assembly, repair or replacement/overhaul of any items, panels, seals of areas of corrosion found during the painting process. CONTRACTOR IS TO PROPOSE Fully Burdened Labor Hour Rate, potential handling factor (%) for materials. NTE $48,000.00
| LABOR HOUR/TIME AND MATERIALS | 250 | $ - 0 | $ - 0 | 0.00% | $ - 0 | |
| 0018 | Submission of Reports and Data, In accordance with PWS | NSP | ||||
| **In Accordance with Clause 3.4.1-12 INSURANCE - (OCT 2019) paragraph (b)(4) Aircraft Liability--The contractor shall be required to provide Proof of insurance in the amount of $15,000,000 per aircraft for Property Damage to FAA aircraft when in their possession. (SEE SECTION H, H.1 SPECIAL INSURANCE REQUIREMENT - GOVERNMENT OWNED PROPERTY) |
OPT YR II
| Section B - Supplies or Services/Prices | ||||||
| CLIN | Supplies or Services | Estimated | ||||
| Quantity/ Hours | Est. Hourly Rate OR | Est. MTRL Cost | Unit Price | |||
| / O&A Handling Fee | Total Item Amount | |||||
| 0019 | Challenger CL-605/650 Tail Code N91 Fixed Unit Price, Contractor will prepare and paint FAA's Bombardier Challenger SN# (TBD), in accordance with the attached PWS. FIRM FIXED PRICE | 1 | $ - 0 | $ - 0 | ||
| 0020 | N91 OVER and ABOVE (O&A) |
Potential need of disassembly, assembly, repair or replacement/overhaul of any items, panels, seals of areas of corrosion found during the painting process. CONTRACTOR IS TO PROPOSE Fully Burdened Labor Hour Rate, potential handling factor (%) for materials. NTE $48,000.00
| LABOR HOUR/TIME AND MATERIALS | 250 | $ - 0 | $ - 0 | 0.00% | $ - 0 | ||
| 0021 | Challenger CL-605/650 Tail Code NXX (TBD) Fixed Unit Price, Contractor will prepare and paint FAA's Bombardier Challenger SN# (TBD), in accordance with the attached PWS. FIRM FIXED PRICE | 1 | $ - 0 | $ - 0 | |||
| 0022 | NXX (TBD) OVER and ABOVE (O&A) |
Potential need of disassembly, assembly, repair or replacement/overhaul of any items, panels, seals of areas of corrosion found during the painting process. CONTRACTOR IS TO PROPOSE Fully Burdened Labor Hour Rate, potential handling factor (%) for materials. NTE $48,000.00
| LABOR HOUR/TIME AND MATERIALS | 250 | $ - 0 | $ - 0 | 0.00% | $ - 0 | ||
| 0023 | Challenger CL-605/650 Tail Code NXX (TBD) Fixed Unit Price, Contractor will prepare and paint FAA's Bombardier Challenger SN# (TBD), in accordance with the attached PWS. FIRM FIXED PRICE | 1 | $ - 0 | $ - 0 | |||
| 0024 | NXX (TBD) OVER and ABOVE (O&A) |
Potential need of disassembly, assembly, repair or replacement/overhaul of any items, panels, seals of areas of corrosion found during the painting process. CONTRACTOR IS TO PROPOSE Fully Burdened Labor Hour Rate, potential handling factor (%) for materials. NTE $48,000.00
| LABOR HOUR/TIME AND MATERIALS | 250 | $ - 0 | $ - 0 | 0.00% | $ - 0 | ||
| 0025 | Challenger CL-605/650 Tail Code NXX (TBD) Fixed Unit Price, Contractor will prepare and paint FAA's Bombardier Challenger SN# (TBD), in accordance with the attached PWS. FIRM FIXED PRICE | 1 | $ - 0 | $ - 0 | |||
| 0026 | NXX (TBD) OVER and ABOVE (O&A) |
Potential need of disassembly, assembly, repair or replacement/overhaul of any items, panels, seals of areas of corrosion found during the painting process. CONTRACTOR IS TO PROPOSE Fully Burdened Labor Hour Rate, potential handling factor (%) for materials. NTE $48,000.00
| LABOR HOUR/TIME AND MATERIALS | 250 | $ - 0 | $ - 0 | 0.00% | $ - 0 | |
| 0027 | Submission of Reports and Data, In accordance with PWS | NSP | ||||
| **In Accordance with Clause 3.4.1-12 INSURANCE - (OCT 2019) paragraph (b)(4) Aircraft Liability--The contractor shall be required to provide Proof of insurance in the amount of $15,000,000 per aircraft for Property Damage to FAA aircraft when in their possession. (SEE SECTION H, H.1 SPECIAL INSURANCE REQUIREMENT - GOVERNMENT OWNED PROPERTY) |
OPT YR III
| Section B - Supplies or Services/Prices | ||||||
| CLIN | Supplies or Services | Estimated | ||||
| Quantity/ Hours | Est. Hourly Rate OR | Est. MTRL Cost | Unit Price | |||
| / O&A Handling Fee | Total Item Amount | |||||
| 0028 | Challenger CL-605/650 Tail Code N91 Fixed Unit Price, Contractor will prepare and paint FAA's Bombardier Challenger SN# (TBD), in accordance with the attached PWS. FIRM FIXED PRICE | 1 | $ - 0 | $ - 0 | ||
| 0029 | N91 OVER and ABOVE (O&A) |
Potential need of disassembly, assembly, repair or replacement/overhaul of any items, panels, seals of areas of corrosion found during the painting process. CONTRACTOR IS TO PROPOSE Fully Burdened Labor Hour Rate, potential handling factor (%) for materials. NTE $48,000.00
| LABOR HOUR/TIME AND MATERIALS | 250 | $ - 0 | $ - 0 | 0.00% | $ - 0 | ||
| 0030 | Challenger CL-605/650 Tail Code NXX (TBD) Fixed Unit Price, Contractor will prepare and paint FAA's Bombardier Challenger SN# (TBD), in accordance with the attached PWS. FIRM FIXED PRICE | 1 | $ - 0 | $ - 0 | |||
| 0031 | NXX (TBD) OVER and ABOVE (O&A) |
Potential need of disassembly, assembly, repair or replacement/overhaul of any items, panels, seals of areas of corrosion found during the painting process. CONTRACTOR IS TO PROPOSE Fully Burdened Labor Hour Rate, potential handling factor (%) for materials. NTE $48,000.00
| LABOR HOUR/TIME AND MATERIALS | 250 | $ - 0 | $ - 0 | 0.00% | $ - 0 | ||
| 0032 | Challenger CL-605/650 Tail Code NXX (TBD) Fixed Unit Price, Contractor will prepare and paint FAA's Bombardier Challenger SN# (TBD), in accordance with the attached PWS. FIRM FIXED PRICE | 1 | $ - 0 | $ - 0 | |||
| 0033 | NXX (TBD) OVER and ABOVE (O&A) |
Potential need of disassembly, assembly, repair or replacement/overhaul of any items, panels, seals of areas of corrosion found during the painting process. CONTRACTOR IS TO PROPOSE Fully Burdened Labor Hour Rate, potential handling factor (%) for materials. NTE $48,000.00
| LABOR HOUR/TIME AND MATERIALS | 250 | $ - 0 | $ - 0 | 0.00% | $ - 0 | ||
| 0034 | Challenger CL-605/650 Tail Code NXX (TBD) Fixed Unit Price, Contractor will prepare and paint FAA's Bombardier Challenger SN# (TBD), in accordance with the attached PWS. FIRM FIXED PRICE | 1 | $ - 0 | $ - 0 | |||
| 0035 | NXX (TBD) OVER and ABOVE (O&A) |
Potential need of disassembly, assembly, repair or replacement/overhaul of any items, panels, seals of areas of corrosion found during the painting process. CONTRACTOR IS TO PROPOSE Fully Burdened Labor Hour Rate, potential handling factor (%) for materials. NTE $48,000.00
| LABOR HOUR/TIME AND MATERIALS | 250 | $ - 0 | $ - 0 | 0.00% | $ - 0 | |
| 0036 | Submission of Reports and Data, In accordance with PWS | NSP | ||||
| **In Accordance with Clause 3.4.1-12 INSURANCE - (OCT 2019) paragraph (b)(4) Aircraft Liability--The contractor shall be required to provide Proof of insurance in the amount of $15,000,000 per aircraft for Property Damage to FAA aircraft when in their possession. (SEE SECTION H, H.1 SPECIAL INSURANCE REQUIREMENT - GOVERNMENT OWNED PROPERTY) |
OPT YR IV
| Section B - Supplies or Services/Prices | ||||||
| CLIN | Supplies or Services | Estimated | ||||
| Quantity/ Hours | Est. Hourly Rate OR | Est. MTRL Cost | Unit Price | |||
| / O&A Handling Fee | Total Item Amount | |||||
| 0037 | Challenger CL-605/650 Tail Code N91 Fixed Unit Price, Contractor will prepare and paint FAA's Bombardier Challenger SN# (TBD), in accordance with the attached PWS. FIRM FIXED PRICE | 1 | $ - 0 | $ - 0 | ||
| 0038 | N91 OVER and ABOVE (O&A) |
Potential need of disassembly, assembly, repair or replacement/overhaul of any items, panels, seals of areas of corrosion found during the painting process. CONTRACTOR IS TO PROPOSE Fully Burdened Labor Hour Rate, potential handling factor (%) for materials. NTE $48,000.00
| LABOR HOUR/TIME AND MATERIALS | 250 | $ - 0 | $ - 0 | 0.00% | $ - 0 | ||
| 0039 | Challenger CL-605/650 Tail Code NXX (TBD) Fixed Unit Price, Contractor will prepare and paint FAA's Bombardier Challenger SN# (TBD), in accordance with the attached PWS. FIRM FIXED PRICE | 1 | $ - 0 | $ - 0 | |||
| 0040 | NXX (TBD) OVER and ABOVE (O&A) |
Potential need of disassembly, assembly, repair or replacement/overhaul of any items, panels, seals of areas of corrosion found during the painting process. CONTRACTOR IS TO PROPOSE Fully Burdened Labor Hour Rate, potential handling factor (%) for materials. NTE $48,000.00
| LABOR HOUR/TIME AND MATERIALS | 250 | $ - 0 | $ - 0 | 0.00% | $ - 0 | ||
| 0041 | Challenger CL-605/650 Tail Code NXX (TBD) Fixed Unit Price, Contractor will prepare and paint FAA's Bombardier Challenger SN# (TBD), in accordance with the attached PWS. FIRM FIXED PRICE | 1 | $ - 0 | $ - 0 | |||
| 0042 | NXX (TBD) OVER and ABOVE (O&A) |
Potential need of disassembly, assembly, repair or replacement/overhaul of any items, panels, seals of areas of corrosion found during the painting process. CONTRACTOR IS TO PROPOSE Fully Burdened Labor Hour Rate, potential handling factor (%) for materials. NTE $48,000.00
| LABOR HOUR/TIME AND MATERIALS | 250 | $ - 0 | $ - 0 | 0.00% | $ - 0 | ||
| 0043 | Challenger CL-605/650 Tail Code NXX (TBD) Fixed Unit Price, Contractor will prepare and paint FAA's Bombardier Challenger SN# (TBD), in accordance with the attached PWS. FIRM FIXED PRICE | 1 | $ - 0 | $ - 0 | |||
| 0044 | NXX (TBD) OVER and ABOVE (O&A) |
Potential need of disassembly, assembly, repair or replacement/overhaul of any items, panels, seals of areas of corrosion found during the painting process. CONTRACTOR IS TO PROPOSE Fully Burdened Labor Hour Rate, potential handling factor (%) for materials. NTE $48,000.00
| LABOR HOUR/TIME AND MATERIALS | 250 | $ - 0 | $ - 0 | 0.00% | $ - 0 | |
| 0045 | Submission of Reports and Data, In accordance with PWS | NSP | ||||
| **In Accordance with Clause 3.4.1-12 INSURANCE - (OCT 2019) paragraph (b)(4) Aircraft Liability--The contractor shall be required to provide Proof of insurance in the amount of $15,000,000 per aircraft for Property Damage to FAA aircraft when in their possession. (SEE SECTION H, H.1 SPECIAL INSURANCE REQUIREMENT - GOVERNMENT OWNED PROPERTY) |
File details come from the government source that posted it. Updated .