Trickel Park Road Asphalt Grand Mesa, Uncompahgre, and Gunnison National Forest, Colorado
Solicitation number
1240LT26Q0156
Issued by

About this file

This is a bidding schedule and quantity summary document for the Trickel Park Road Asphalt project on the Grand Mesa, Uncompahgre, and Gunnison National Forest in Colorado, issued as RFQ 1240LT26Q0156 by the Department of Agriculture Forest Service.

The document outlines detailed estimated quantities for all pay items across multiple bid schedules (A, X, and optional schedules). Schedule A includes mobilization, survey and staking, clearing and grubbing, roadway excavation (450 cubic yards), asphalt concrete pavement (2,750 tons of PG 58-28), pipe culverts in multiple sizes totaling 590 linear feet, roadway aggregate (2,300 tons), concrete headwalls, pavement markings (4.5 miles), topsoil placement (1.0 acre), mulching, fertilizer, sign systems, object markers, and temporary traffic control. Schedule X (optional work) includes additional signing and striping work with 9.0 miles of pavement markings, 26 sign systems, and marker installations. Key specifications reference the Forest Service Supplemental Specifications (FSSS) and engineering maps and plans. This is a Total Small Business Set-Aside with a $45M size standard. Bidders must submit a 20% bid bond on SF 24 and 100% Performance and Payment Bonds on SF 25 and SF 25A. A mandatory site visit is required. This is a Request for Quotation for road rehabilitation services including asphalt pavement, subgrade improvement, and culvert installations.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet and Description

B4 B5 B6 B7-B9 B10-B12 B13

Schedule A Surfacing Summary

Schedule A Approach Roads & Pullouts Summary

Schedule A Grading

Summary

Schedule A Miscellaneous

Quantities

Schedule A Signing and

Striping Summaries

Schedule A Temporary

Traffic Control Summary

Allowances Bid

Schedule

A0020 15101-0000 MOBILIZATION LPSM ALL

A0040 15215-3000 SURVEY AND STAKING, DRAINAGE STRUCTURE EACH 17 17

A0060 15225-0000 SLOPE, REFERENCE, AND CLEARING AND GRUBBING

CONTROL MILE 1.003 1.003

A0080 15236-2000 SURVEY CONTROL, GRADE FINISHING MILE 1.003 1.003

A0100 15301-0000 CONTRACTOR QUALITY CONTROL LPSM ALL

A0120 15401-0000 CONTRACTOR TESTING LPSM ALL

A0140 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL

A0160 15701-0000 SOIL EROSION CONTROL LPSM ALL

A0180 15720-0000 STORM WATER POLLUTION PREVENTION PLAN LPSM ALL

A0200 15802-0000 WATERING FOR DUST CONTROL LPSM ALL

A0220 20102-0000 CLEARING AND GRUBBING LPSM ALL

A0240 20120-1000 REMOVAL, INDIVIDUAL TREE EACH 2 2

A0260 20301-0700 REMOVAL OF DELINEATOR EACH 13 2 15

A0280 20301-1900 REMOVAL OF PIPE CULVERT EACH 15 15

A0300 20301-2400 REMOVAL OF SIGN EACH 2 2

A0320 20401-0000 ROADWAY EXCAVATION CUYD 437 13 450

A0340 20402-0000 SUBEXCAVATION CUYD 37 63 100

A0360 20815-0000 COFFERDAMS LPSM All ALL

A0380 20820-0000 DEWATERING LPSM All ALL

A0400 25101-0200 PLACED RIPRAP, METHOD A, CLASS 2 CUYD 18 2 20

A0420 30202-2000 ROADWAY AGGREGATE, METHOD 2 TON 1,342 589 253 116 2,300

A0440 40301-0000 ASPHALT CONCRETE PAVEMENT (PG 58-28) TON 2,469 176 105 2,750

A0460 40601-0000 FOG SEAL TON 7.2 0.9 0.4 8.5

A0480 41101-1000 PRIME COAT, METHOD 1 TON 10.0 1.1 0.4 11.5

A0500 41105-0000 BLOTTER TON 5

A0520 41201-0000 TACK COAT TON 5.1 0.5 0.4 6.0

A0540 60103-0100 CONCRETE, HEADWALL FOR 18-INCH PIPE CULVERT EACH 1 1

A0560 60103-0140 CONCRETE, HEADWALL FOR 24-INCH PIPE CULVERT EACH 6 6

A0580 60201-0400 12-INCH PIPE CULVERT LNFT 176 59 235

A0600 60201-0600 18-INCH PIPE CULVERT LNFT 122 8 130

A0620 60201-0800 24-INCH PIPE CULVERT LNFT 215 10 225

A0640 60210-0400 END SECTION FOR 12-INCH PIPE CULVERT EACH 12 12

A0660 60210-0600 END SECTION FOR 18-INCH PIPE CULVERT EACH 6 6

A0680 60210-0800 END SECTION FOR 24-INCH PIPE CULVERT EACH 7 7

A0700 61401-0000 LEAN CONCRETE BACKFILL CUYD 66 4 70

A M E N D

Line Item No.

Pay Item Number

SUMMARY OF QUANTITIES - Schedule A

Remarks and/or Determination of Estimated QuantityPay Item Description Unit

Estimated Quantities

STATE PROJECT

B1

FTFS 121(1)

TRICKEL PARK ROADCO

SHEET

NUMBER

Sheet and Description

B4 B5 B6 B7-B9 B10-B12 B13

Schedule A Surfacing Summary

Schedule A Approach Roads

& Pullouts Summary

Schedule A Grading

Summary

Schedule A Miscellaneous

Quantities

Schedule A Signing and

Striping Summaries

Schedule A Temporary

Traffic Control Summary

Allowances Bid

Schedule

A0900 62406-0100 PLACING CONSERVED TOPSOIL, 2-INCH DEPTH ACRE 0.91 0.09 1.00

A0920 62510-2000 ACRE 0.91 0.09 1.00

A0940 62515-3000 MULCHING, HYDRAULIC METHOD, BONDED FIBER

MATRIX ACRE 0.91 0.09 1.00

A0960 62520-0000 FERTILIZER ACRE 0.91 0.09 1.00

A0980 63301-0000 SIGN SYSTEM EACH 1 1

A1000 63308-2000 OBJECT MARKER, TYPE 2 EACH 38 38

A1040 63402-0300 MILE 4.014 0.486 4.500

A1060 63501-0000 TEMPORARY TRAFFIC CONTROL LPSM All ALL

A1100 64620-0400 REMOVE AND RESET MAILBOX EACH 3 3

SUMMARY OF QUANTITIES - Schedule A

A

M

E

N

Line

Item

Pay Item Number

Pay Item Description Unit

Estimated Quantities

Remarks and/or Determination of Estimated Quantity

STATE PROJECT

B2

FTFS 121(1)

TRICKEL PARK ROAD

CO

SHEET

B14 B15-B17

Option X Miscellaneous

Quantities

Option X Signing and

Striping Summaries

Allowances Bid

Schedule

X0020 15101-0000 MOBILIZATION LPSM ALL

X0040 20301-2400 REMOVAL OF SIGN EACH 5 5

X0060 63301-0000 SIGN SYSTEM EACH 26 26

X0080 63308-2000 OBJECT MARKER, TYPE 2 EACH 6 6

X0100 63308-3000 OBJECT MARKER, TYPE 3 EACH 1 1

X0120 63402-0300 PAVEMENT MARKINGS, TYPE B, SOLID MILE 8.334 0.666 9.000

SUMMARY OF QUANTITIES - Schedule X

A M E N D

Line Item No.

Pay Item Number

Pay Item Description Unit

Estimated Quantities

Remarks and/or Determination of Estimated Quantity

STATE PROJECT

B3

FTFS 121(1)

TRICKEL PARK ROADCO

SHEET

Option

4. Existing geogrid may be encountered during subexcavation;

remove and dispose of geogrid from subexcavation limits.

Overlap existing geogrid per CO with the separation-stabilization geotextile prior to backfilling subexcavation area with roadway aggregate.

FTFS 121(1)

TRICKEL PARK ROADCO T1

TRICKEL PARK ROADCO T2

TRICKEL PARK ROADCO T3

TRICKEL PARK ROADCO T4

TRICKEL PARK ROADCO T5

TRICKEL PARK ROADCO T6

TRICKEL PARK ROADCO T16

TRICKEL PARK ROAD

8. Signs, channeling devices, traffic control supervisor hours, pilot car hours, and flagger hours paid for under 63501-0000 Temporary Traffic Control.

CO T17

TRICKEL PARK ROADCO T18