Trickel Park Road Asphalt Grand Mesa, Uncompahgre, and Gunnison National Forest, Colorado
Solicitation number
1240LT26Q0156
Issued by

About this file

This is a Forest Service Supplemental Specifications (FSSS) document attachment for a road construction project. The document establishes the technical and contractual specifications for the Trickel Park Road Asphalt project located on the Grand Mesa, Uncompahgre, and Gunnison National Forest in Colorado. The project encompasses road rehabilitation work including asphalt concrete pavement placement, subgrade improvement, and culvert installations along Trickel Park Road.

The solicitation (1240LT26Q0156) is issued as a Request for Quotation (RFQ) for commercial items under FAR Part 12 and is set-aside exclusively for small business concerns with a size standard of $45 million. The Department of Agriculture Forest Service is the contracting agency. Contractors must submit a bid bond/offer guarantee at 20% of the total offer price (not to exceed $3 million) on Standard Form 24, along with 100% Performance and Payment Bonds on Standard Forms 25 and 25A respectively. A site visit is mandatory, and quotations will be evaluated based on the technical requirements outlined in the engineering plans, FP-14 specifications, and the FSSS document. The applicable NAICS code is 237310 (Highway, Street, and Bridge Construction). All responsible sources may submit quotations, though preference is given to small business concerns meeting the acquisition set-aside requirements.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Supplemental Specifications

The following Supplemental Specifications amend and supplement the Standard Specifications for Construction of Roads and Bridges, on Federal Highway Projects (FP-14), U.S. Department of Transportation, Federal Highway Administration.

Preface Preface_wo_07_11_2023

Delete all but the first paragraph and add the following:

The Forest Service, US Department of Agriculture has adopted FP-14 for construction of National Forest System Roads.

Section 101. – TERMS, FORMAT, AND DEFINITIONS

101.01 Meaning of Terms.

Add the following paragraph top Subsection 101.01:

Delete all references to the TAR (Transportation Acquisition Regulations) in the specifications.

101.03 Abbreviations.

(a) Acronyms. Add the following:

AGAR — Agriculture Acquisition Regulations AFPA — American Forest and Paper Association FSAR — Forest Service Acquisition Regulations MSHA — Mine Safety and Health Administration NESC — National Electrical Safety Code WCLIB — West Coast Lumber Inspection Bureau GSA – General Services Administration

(b) US Customary abbreviations and symbols. Delete the text and substitute the following:

ºF
—degrees Fahrenheit
temperature
A
—ampere
electric current
ac.
—acre
area
BTU
—British Thermal Unit
energy
cu. in. or in3
—cubic inches
volume
cu. ft., cf, ft3 or CUFT
—cubic feet
volume
cu. yd., cy, yd3 or CUYD
—cubic yards
volume
D
—day
time
deg. or º
—degree
plane angle
Fc
—foot-candles
luminous intensity
fl. oz.
—fluid ounces
volume
ft. or '
—foot or feet
length
gal. or GAL
—gallon
volume
H
—Henry
inductance
hr. or HR
—hour
time
Hz
—hertz (s-1)
frequency
in. or "
inch or inches
length
K
—kelvin
temperature
lb or LB, lbs
—pound, pounds
mass
Lbf
—pound-force
force
lnft or LNFT
linear foot
length
mi.
—miles
length
min. or m
—minute
time
min. or '
—minute
plane angle
oz.
—ounces
mass
Psi
—pounds/square inch
pressure
Q
—cubic feet/second
flow rate
sec. or s
—second
time
sec. or "
—second
plane angle
sq. in. or in2
—square inches
area
sq. ft., sf, ft2 or SQFT
—square feet
area
sq. yd., sy, yd2 or SQYD
—square yards
area
T
—short ton (2000 lbs)
mass
V
—volt (W/A)
electric potential
W
—watt (J/s)
power
yd or YD
—yard or yards
length
Ω
—ohm V/A
electric resistance

(c) Metric unit abbreviations and symbols. Delete the text and substitute the following:

A
—ampere
electric current
Cd
—candella
luminous intensity
oC
—degree Celsius
temperature
D
—day
time
deg. or º
—degree
plane angle
g or gram
—gram
mass
H
—Henry
inductance
Ha
—hectare
area
hr. or HR
—hour
time
Hz
—hertz (s-1)
frequency
J
—Joule (N.m)
energy
K
—kelvin
temperature
Kg
—kilogram
mass
L
—liter
volume
Lx
—lux
illuminance
M
—meter
length
mm
—millimeter
length
m2 m3
· meter squared

· cubic meter area volume

min. or m
—minute
time
min. or '
—minute
plane angle
N
—Newton (kg.m/s2)
force
Pa
—Pascal (N/m2)
pressure
sec. or s
—second
time
sec. or "
—second
plane angle
T
—metric ton
Mass
V
—volt (W/A)
electric potential
W
—watt (J/s)
Power
Ω
—ohm V/A
electric resistance

(f) Miscellaneous unit abbreviations.

MPmilepostlocation
ppmparts per millionvolumes
STAstationlocation

101.04 Definitions.

Delete these definitions and replace the following:

Bid Schedule — The Schedule of Items.

Bridge — A structure, including supports, erected over a depression or an obstruction such as water along a road, a trail, or a railway and having a deck for carrying traffic or other loads.

Contractor — The individual or legal entity contracting with the Government for performance of prescribed work. In a timber sale contract, the contractor is the “Purchaser”.

Culvert — Any structure with a bottom, regardless of fill depth, depth of invert burial, or presence of horizontal driving surface, or any bottomless (natural channel) structure with footings that will not have wheel loads in direct contact with the top of the structure.

Drawings — (Public Works Contracts) Design sheets or fabrication, erection, or construction details submitted to the CO by the Contractor according to FAR Clause 52.236-21 Specifications and Drawings for Construction. Also refers to submissions and submittals.

Notice to Proceed — (Public Works Contracts) Written notice to the Contractor to begin the contract work.

Right-of-Way — A general term denoting (1) the privilege to pass over land in some particular line (including easement, lease, permit, or license to occupy, use, or traverse public or private lands), or (2) Real property necessary for the project, including roadway, buffer areas, access, and drainage areas.

Solicitation— (Public Works Contracts) The complete assembly of documents (whether attached or incorporated by reference) furnished to prospective bidders.

Add the following definitions:

Adjustment in Contract Price — “Equitable adjustment,” as used in the Federal Acquisition Regulations, or “construction cost adjustment,” as used in the Timber Sale Contract, as applicable.

Change — “Change” means “change order” as used in the Federal Acquisition Regulations, or “design change” as used in the Timber Sale Contract.

Forest Service — The United States of America, acting through the Forest Service, U.S. Department of Agriculture.

Neat Line — A line defining the proposed or specified limits of an excavation or structure.

Pioneer Road — Temporary construction access built along the route of the project.

Purchaser — The individual, partnership, joint venture, or corporation contracting with the Government under the terms of a Timber Sale Contract and acting independently or through agents, employees, or subcontractors.

Protected Streamcourse — A drainage shown on the plans or timber sale area map that requires designated mitigation measures.

Road Order — An order affecting and controlling traffic on roads under Forest Service jurisdiction. Road Orders are issued by a designated Forest Officer under the authorities of 36 CFR, part 260.

Roadway Prism Delete the text and substitute the following:

Roadway Prism – The area between the original terrain cross-section and the final design cross- section.

Subcontractor Delete the text and substitute the following:

Subcontractor – An individual or legal entity with which the Contractor sublets part of the work. This includes subcontractors and material suppliers at any tier.

Utilization Standards — The minimum size and percent soundness of trees described in Public Works contract specifications or Timber Sale and IRTC contract provisions to determine merchantable timber.

Add Figure 101-1—Illustration of road structure terms:

Figure 101-1—Illustration of road structure terms.

Section 102. — BID, AWARD, AND EXECUTION OF CONTRACT

Delete Section 102.

Section 103. — SCOPE OF WORK

Delete all of Section 103 except Subsection 103.01 Intent of Contract.

Delete Subsections 103.02, 103.03, 103.04, 103.05.

Section 104 – CONTROL OF WORK

Delete Subsections 104.01, 104.02, and 104.04.

Delete Subsections 104.01, 104.02, 104.04.

Add the following to Subsection 104.06:

104.06 Use of Roads by Contractor.

The Contractor is authorized to use roads under the jurisdiction of the Forest Service for all activities necessary to complete this contract, subject to the limitations and authorizations designated in the Road Order(s) or described in the contract, when such use will not damage the roads or national forest resources, and when traffic can be accommodated safely.

Section 105. — CONTROL OF MATERIAL

105.01 Source of Supply and Quality Requirements.

Add the following:

Certify, according to Subsection 107.10 (d)(2), that sources of rock, sand, gravel, earth, subsoil, or other natural material imported into the project construction limits are noxious weed free.

105.04 Storing and Handling Material.

Add the following after the third sentence of the second paragraph:

For Contractor-located, non-commercial staging, storing, and material handling areas, secure environmental clearances according to Subsection 107.10.

Add the following:

The Contractor may use the pullout that branches off north of FS 123 just after the Trickel Park Road and FS 123 intersection for a staging area.

Use all products according to the manufacturer’s recommendations for handling, storage, and disposal. Follow the requirements of FAR Clause 52.236-10 Operations and Storage Areas and FAR Clause 52.236-12 Cleaning Up. Maintain the staging and storage areas in a clean, neat, and orderly condition satisfactory to the CO.

Store construction materials within the limits indicated on the contract drawings. Properly store materials according to the applicable permit and the requirements in Section 107, 157, 203, 204, 624, and 625. Check the storage areas weekly and according to the applicable permit.

Store construction, building and waste materials, and containers in designated areas indoors or protect with a suitable covering.

Submit a site map showing the material storage and stockpile locations at least 14 calendar days prior to the start of construction activities.

Keep the manufacturer’s SDS, an inventory of the material, and emergency numbers near the storage area. Take appropriate measures to ensure that incompatible chemicals are not stored next to each other.

Restore the staging area to pre-construction conditions and to satisfaction of CO.

105.05 Use of Material Found in the Work.

Delete 105.05 (a) and (b) and the last sentence of the second paragraph and substitute the following:

Materials produced or processed from Government lands more than the quantities required for performance of this contract are the property of the Government. Place excess material safely at government-approved location, at no additional cost to government.

Section 106. — ACCEPTANCE OF WORK

Delete Subsection 106.01 and replace with the following:

106.01 Conformity with Contract Requirements.

Follow the requirements of FAR Clause 52.246-12 Inspection of Construction.

References to standard test methods of AASHTO, ASTM, GSA, and other recognized standard authorities refer to the methods in effect on the date of solicitation for bids.

Perform all work to the lines, grades, cross-sections, dimensions, and processes or material requirements shown on the plans or specified in the contract.

Incorporate manufactured materials into the work according to the manufacturer’s recommendations or to these specifications, whichever is stricter.

Plan dimensions and contract specification values are the values to be strived for and complied with as the design values from which any deviations are allowed. Perform work and provide material that is uniform in character and reasonably close to the prescribed value or within the specified tolerance range. The purpose of a tolerance range is to accommodate occasional minor variations from the median zone that are unavoidable for practical reasons.

When standard manufactured items are specified (such as fence, wire, plates, rolled shapes, pipe conduits, etc., that are identified by gauge, unit mass, section dimensions, etc.), the identification will be nominal masses or dimensions. Unless specific contract tolerances are noted, established manufacturing tolerances will be accepted.

The Government may inspect, sample, or test all work at any time before final acceptance of the project. When the Government tests work, copies of test reports are furnished to the Contractor upon request. Government tests may or may not be performed at the work site. If Contractor testing and inspection is verified by the Government, the Contractor’s results may be used by the Government to evaluate work for acceptance. Do not rely on the availability of Government test results for process control.

Acceptable work conforming to the contract will be paid for at the contract unit bid price. Four methods of determining conformity and accepting work are described in Subsections 106.02 to 106.05 inclusive. The primary method of acceptance is specified in each Section of work. However, work may be rejected at any time it is found by any of the methods not to comply with the contract.

Remove, repair, or replace work that does not conform to the contract, or to prevailing industry standards where no specific contract requirements are noted. Removing, repairing, or replacing work; providing temporary traffic control; and any other related work to accomplish conformity will be at no cost to the Government.

(a) Disputing Government test results. If the accuracy of Government test results is disputed, promptly inform the CO. If the dispute is unresolved after reasonable steps are taken to resolve the dispute, further evaluation may be obtained by written request. Include a narrative describing the dispute and a proposed resolution protocol that addresses the following:

1. Sampling method.

2. Number of samples.

3. Sample transport.

4. Test procedures.

5. Testing laboratories.

6. Reporting.

7. Estimated time and costs; and

8. Validation process.

If the evaluation requires additional sampling or testing be performed, mutually agree with the Government on witnessing procedures and on sampling and testing by a third-party laboratory. Use a third-party laboratory accredited by the AASHTO accreditation program. Provide proof of the laboratory’s accreditation for the test procedures to be used. Do not use the same laboratory that produced the disputed Government test results or that produced the test results used as a basis for the dispute.

The CO will review the proposed resolution protocol and may modify it before final approval and execution.

The Government will use the approved resolution protocol test results to determine the validity of the disputed testing. If the Government test results are validated, the Contractor will be responsible for all costs associated with developing and performing the resolution protocol. If the Government test results are not validated, the Government will be responsible for all costs associated with developing and performing the resolution protocol. If the validity of the Government test results cannot be determined, the Contractor and Government will equally share all costs associated with developing and carrying out the resolution protocol.

(b) Alternatives to removing and replacing non-conforming work. As an alternative to removal and replacement, the Contractor may submit a written request to:

1. Have the work accepted at a reduced price; or

2. Be given permission to perform corrective measures to bring the work into conformity.

The request must contain supporting rationale and documentation. Include references or data justifying the proposal based on an evaluation of test results, effect on service life, value of material or work, quality, aesthetics, and other tangible engineering basis. The CO will determine disposition of the nonconforming work.

Add the following to 106.01(b):

The number of significant figures used in the calculations will be according to ASTM E 29, absolute method.

Where sample/testing procedures refer to AASHTO, ASTM, or other standards (designated as FLH T), the procedure as modified in the Materials Manual governs. Where the specifications refer to AASHTO Test T11, “Procedure B - Washing Using a Wetting Agent” will be the procedure followed.

Where the specifications refer to AASHTO Test T310, “Direct Transmission Method of In-Place Nuclear Density and Moisture Content” will be the procedure followed.

Delete Subsection 106.02 and replace with the following:

106.02 Visual Inspection.

Acceptance is based on visual inspection of the work for compliance with the specific contract requirements. Use prevailing industry standards in the absence of specific contract requirements or tolerances.

Add the following to Subsection 106.03 Certification, after the second paragraph:

See Table 106-3 for schedule for acceptance by material certification. Submit certification and sample of material for testing as required.

Delete the third paragraph in 106.03 and replace with the following:

Check certifications before incorporating the material into the work to ensure that the requirements of the contract have been met. Mark the certifications with the following information:

· Project number and name.

· Pay item number and description.

· Contractor signed certification stating, “to the best of our knowledge the materials certified by the attached certification represent the materials incorporated into the work of this contract”.

· Date.

Add Table 106-3 following Table 106-2.

Table 106-3 Schedule For Full or Partial Acceptance by Materials Certification

Section
Description
Material
Material Property or Specification
Frequency
Certification
Sample
302
Minor Crushed Aggregate
Crushed Aggregate
Source, Quality and Gradation
1 per source
1 per source

Dust Palliative Calcium Chloride Magnesium Chloride, Lignosulfonate, As specified

1 per shipment

First shipment

Asphalt Concrete

Aggregate Asphalt Mix Source quality, Gradation, Stability, and Grade

1 per mix

1 per source

634 and

Permanent Pavement Markings,
634.02 as

applicable, 635 as applicable

As specified

1 per source

Section
Description
Material
Material Property Or Specification
Frequency
Certification
Sample

Temporary Traffic Control

Hydraulic Cement

Portland Cement, Blended Hydraulic Cement, Masonry and Mortar Cement
AASHTO M 85, M 240,

ASTM C 91 and ASTM C1392 as applicable

1 per 100 tons

702.01

Asphalt Material

Asphalt Cement

AASHTO M 226

or M 320, as applicable

1 per shipment

702.02

Emulsified Asphalt

AASHTO M 140

or M 208 as applicable

702.03

Asphalt Materials used for Damproofing and Waterproofing Concrete and Masonry Surfaces

As specified for each type of asphalt material

702.05
Antistrip
As specified
As applicable
1 per shipment
-----
706
Concrete and Plastic Pipe
As specified
As applicable
1 per shipment
-----
707
Metal Pipe
As specified
As applicable
1 per shipment
-----
708
Plastic Pipe
As specified
As applicable
1 per shipment
-----

Reinforcing and Prestressing Steel

As specified

As applicable

For 709.01 submit 3, 1- yard (1-meter) bars of each size and grade of bar furnished.

709.02 submit one 6-foot (2- meter) length for each size furnished

710
Fence and Guardrail
As specified
As applicable
1 per shipment
-----

Concrete Curing Material and Admixtures

As specified

As applicable 1 per material source per material type

712
Joint Material (all)
As specified
As applicable
1 per shipment
-----

Roadside Improvement Materials (all)

As specified

As applicable

1 per shipment

714
Geosynthetic Material (all)
As specified
As applicable
1 per shipment
1 per project per type
Section
Description
Material
Material Property Or Specification
Frequency
Certification
Sample
715
Piling
As specified
As applicable
1 per shipment
-----
716
Material for Timber Structures
Timber and Hardware
As applicable
1 per shipment
-----

Structural Metal

As specified

As applicable

717.01(e) minimum 6 per shipment for each size used.

717.10 1 per project

718
Traffic Signing and Marking

Material (all)

As specified
As applicable
1 per shipment
-----

Paint

As specified

As applicable

1 per batch\lot 1 sample for quantities > 25 gallons (100L)

Structural Wall and Stabilized Embankment Material (all)

As specified

As applicable 1 per shipment per material type

Electrical and Illumination Material (all)

As specified

As applicable 1 per shipment per material type

Anchor Material

As specified

As applicable 1 per shipment per material type

Miscellaneous materials

As specified

As applicable 1 per shipment per material type

Section 107. LEGAL RELATIONS AND RESPONSIBILITY TO THE PUBLIC

Add the following to the end of section 107.01:

Section 401 and 404 of the Clean Water Act.

Comply with the terms and conditions of any permits that authorize the discharge of dredged or fill material in waters of the U.S., including Section 404 permits and Section 401 water quality certifications. See the appendix for permits.

National Pollutant Discharge Elimination System (NPDES) Comply with the requirements of EPA Construction General Permit (CGP); https://www.epa.gov/system/files/documents/2022-01/2022-cgp-final-permit.pdf This permit is scheduled to expire on 02/16/2027. Amend the SWPPP and site plan when a new permit goes into effect to meet new permit conditions.

Allow 30 days from submittal of NOI to issuance of permit.

(a) General. Designate a qualified Erosion Control Supervisor according to Subsection 157.03.

Obtain a separate NPDES permit associated with industrial activity for any mobile asphalt and concrete plants that provide material for the project. Provide a copy of the permit and acknowledgement letter to the CO for their records.

(b) Notice of Intent (NOI). File a NOI as a primary operator after the Government has approved the SWPPP and filed its NOI. The Government will provide a copy of its NOI for the contractor NOI. Provide a copy of the NOI and confirmation letter to the CO. Do not mobilize to the work area until an acknowledgement letter is received from the regulatory agency and the CO has authorized on-site work to proceed.

Post all project authorization numbers near the entrance to the site and on the bulletin board.

(d) Notice of Termination (NOT). File a NOT if the conditions listed in the CGP have been met or transfer the NOI to the maintaining agency or government when project has reached final acceptance.

Add the following at the end of Subsection 107.02:

The locations of the utilities shown in the plans have been certified to a Quality Level C, with spot locations certified to a Quality Level C according to the CFLHD Utility Data Quality Certification requirements:

http://flh.fhwa.dot.gov/resources/row/cfl/documents/UtilityDataQualityLevelCertification.doc

Table 107-1 Status of Utilities

Company
Utility Type
Contact Name
Phone Number
Status 1, 2, 3, or
1
Delta-Montrose Electric Association
Power
Rosemary Rodriguez
(877) 687-3632
4

Status 1: The utilities conflict with the project and require relocation by others during construction.

Status 2: The utilities conflict with the project and require relocation by the Contractor during construction.

Status 3: The utilities conflict with the project and require relocation by others before construction.

Status 4: The utilities are located within the project rights of way but require no relocation.

Delete Subsection 107.05:

Delete subsection 107.05.

Add the following to Subsection 107.10, (a):

(4) Do not ford flowing streams with construction equipment. Obtain approval from the CO to use temporary bridges or other structures whenever crossings are necessary.

(5) Immediately clear ephemeral drainages, intermittent and perennial streams, lakes and reservoirs of all work items, debris or other obstructions placed by or resulting from construction operations.

(6) Locate machinery servicing and refueling areas away from streambeds and washes to reduce the possibility and minimize the impacts of accidental spills or discharges.

Add the following to Subsection 107.10, (b), end of the third paragraph:

Sand or soils are not approved absorbent materials.

Add the following to Subsection 107.10 , end of paragraph (b) :

Report the spill to the appropriate federal, state, and local authorities as required by the SPCC plan or hazardous spill plan.

Add the following to Subsection 107.10, end of paragraph (c):

All vehicles and equipment entering the project area must be clean of noxious weeds and free from oil leaks and are subject to inspection. Wash all construction equipment to thoroughly remove all dirt, plant, and other foreign material prior to entering the project. Particular attention must be shown to the under carriage and any surface where soil containing exotic seeds may exist. Allow the CO to inspect each piece of equipment before entering the project. Provide the cleaning and inspection records to the CO. Equipment found operating on the project that has not been inspected or has oil leaks will be shut down and subject to citation.

Add the following to Subsection 107.10, (d), end of first subparagraph:

Use rock, sand, gravel, earth, subsoil, or other natural materials from a Contractor-selected non-commercial materials source that has been certified free of noxious weeds. Materials imported into the project limits which do not include a noxious weed free certification may be rejected and ordered by the CO to be removed from the project limits. The CO has the discretion of requesting inspection of certified materials by a third party and rejecting the use of the source if noxious weeds or seeds thereof are found to be present.

All heavy equipment (loaders, excavators, dump trucks, etc.) shall be cleaned of weeds and their seeds and thoroughly inspected prior to mobilization and each entrance onto the National Forest lands. Cleaning shall consist of the removal of all dirt, grease, debris, and materials that may harbor noxious weeds and their seeds. Special care shall be taken to assure removal of the following noxious weeds and their seeds. This may require the use of a pressure hose.

Equipment shall be made available for visual inspection by the Forest Service prior to entering Forest Service lands. At least 3 business days prior to mobilization of any piece of equipment, the contractor shall advise of a proposed date, time, and location for mobilization and provide the opportunity for the government to inspect the equipment. Inspections will take place at mutually agreeable en route locations in advance of entry onto National Forest lands.

The contractor shall inspect all equipment prior to mobilization to the National Forest Lands and document that inspection on the “Equipment Cleaning Inspection/Verification Form”. The contractor shall attach photographic documentation of the cleaned equipment with the Equipment Inspection Form and include that with the daily report for the day.

If either the contractor or the Forest Service finds that the equipment is not sufficiently clean, then the equipment shall be recleaned and reinspected prior to use on the project site. All cleaning shall occur off of National Forest lands.

Once on site, all equipment shall be inspected daily and all visible oil, grease, and hydraulic fluid will be removed; this inspection shall be documented in the daily dairy. Needed repairs will be implemented immediately before resuming work.

All equipment shall be in good repair, and capable of accomplishing assigned tasks in a safe and environmentally acceptable manner.

Add the following to Subsection 107.10, add the following after end of paragraph (d):

(e) Project-specific commitments.

(1) Schedule the clearing and grubbing meeting before December 1 or after August 31. Retain a qualified biologist, approved by USFS, 2 weeks prior to clearing and grubbing activities if they are scheduled between December 1 and August

31. The qualified biologist will conduct a nesting bird survey. Provide a survey report to the USFS within 2 weeks of completing the survey.

(2) Install and maintain appropriate screen material on any water drafting device. Use a ¼ inch mesh on water intakes.

The USFS will coordinate on any other appropriate protection measures to be implemented if local source water will be used for dust control.

(3) Develop an agreement with the maintaining agency that provides proof of rights to water before sourcing from any body of water. Submit a copy of the agreement to the CO.

Add the following to end of section 107.11:

The fire prevention plan involving emergency curtailment of operations is included in the Appendix and is in effect on this project. The CO will order the suspension of operations when conditions are unsafe as determined by the CO and the land management agency.

Section 108. — PROSECUTION AND PROGRESS

Add the following to Subsection 108.01:

Limit operations according to Subsection 107.10(e) and Section 156.

Limit operations as follows:

(a) Limit operations according to Subsection 107.10(e) and Section 156.

Perform no work except to maintain traffic control devices, erosion control devices, the roadway driving surface, and to control dust during the listed Federal holidays and surrounding days as shown in Table 108-2.

Table 108-2 Federal Holidays and Surrounding Days

Federal Holiday
Time
Remarks
Memorial Day
12:00 Noon Friday to 6:00 am Tuesday
-

Juneteenth National Independence Day

12:00 Noon June 18 to 6:00 am June 20

Independence Day
12:00 Noon July 3 to

6:00 am July 5 If July 4 falls on a weekend, Friday, or Monday, do not work the weekend.

Labor Day
12:00 Noon Friday to 6:00 am Tuesday
-
Columbus Day
12:00 Noon Friday to 6:00 am Tuesday
-
Veterans Day
12:00 Noon November 10

to 6:00 am November 12

Thanksgiving
12:00 Noon Wednesday to 6:00 am Monday
-

Schedule at least 2 non-workdays out of every 14 calendar days. The selected non-workdays do not need to be consecutive, but they must be scheduled. Notify the CO at least 2 weeks before changing the scheduled days off.

The CO may grant written approval for exemptions to scheduled days off for specific project operations and for periods of limited duration.

Delete subsections 108.02, 108.03, 108.04, and 108.05:

Delete subsections 108.02, 108.03, 108.04, and 108.05:

Section 109. — MEASUREMENT AND PAYMENT

Delete Subsections 109.06, 109.07, 109.08, and 109.09:

Delete Subsections 109.06, 109.07, 109.08, 109.09.

Delete the third paragraph and Table 109-1 of Subsection 109.01 and replace with the following:

109.01 Measurement of Work.

Take measurements as described in Subsection 109.02 unless otherwise modified by the Measurement Subsection of the section controlling the work being performed. Table 109-1 indicates the accuracy required for quantities of the various pay units used in the Schedule of Items. Use this guide to determine the decimal placement in the final payment.

Table 109-1 Decimal Accuracy of Quantities for Final Payment

Pay Item
Level of Precision
Linear Foot
1
Exception--Timber, Steel, and concrete Piles
0.1
Station
0.1
Mile
0.01
Square Foot
0.1
Square Yard
0.1
Each
1
Acre
0.01
Gallon
1
M-Gals.
0.1
Cubic Yard
1

Exception--Structure Excavation; Sheathing Materials: Bedding, Bed Course, and Backfill 0.1

Materials; Gabions;

Exception--Concrete; Masonry
0.01
Pound
1
Ton
0.1

Exception--Calcium Chloride. Sodium Chloride; Hydrated Lime. Bituminous Materials; Pavements.

Bed Course Materials 0.01

Hour
0.1
MFBM
0.01
Station Yard
1
Cubic Yard Mile
1
Ton Mile
1

Add the following sentence to Subsection 109.02(b):

109.02 Measurement Terms and Definitions.

(b) Contract quantity.

Contract quantities will be adjusted only when there are errors in the original design of 15% or more.

152 - Construction Survey and Staking

Add the following to Subsection 152.04(c):

152.04 – General

(c) Material.

Use required stake dimensions and materials. Pre-paint the top 2 inches of all stakes and lath or mark them with plastic flagging. Use designated colors for paint or flagging. Mark all stakes with a stake pencil that leaves a legible imprint, or with waterproof ink.

Do not use aerosol spray paints.

Use moisture-resistant paper for survey notes. Keep notes in books with covers that will protect the contents and retain the pages in numerical sequence.

Make the following changes to Subsection 152.05:

Delete Subsection 152.05(d)(2) and replace with the following:

(d) Slope and reference stakes.

(2) Conventional survey methods. When required, locate slope stakes on designated portions of the road. Locate the slope stake catch points and use them to establish clearing limits and slope stake references.

Mark slope stakes with the station, the amount of cut or fill, the horizontal distance to centerline, and the slope ratios.

Place slope reference stakes at least 10 feet outside the clearing limit and mark with the offset distance to the slope stake. Place sight stakes when required.

Prior to clearing and grubbing operations, move the slope stake outside the clearing limit to the slope reference stake. After clearing and grubbing and before excavation, reset the slope stakes in their original position.

Use the designated method to establish the slope stake catchpoint.

Method I—Computed Method. Use the template information shown in the plans or other Government-provided data to calculate the actual location of the catchpoint. The slope stake “catchpoint distance” provided may be used as a trial location to initiate slope staking. Recatch slope stakes on any section that does not match the staking report within the tolerances established in Table 152-2.

Method II—Catchpoint Measurement Method. Determine the location of slope stake catchpoints by measuring the catchpoint distances shown in the plans or other Government-provided data.

Add the following to subsection 152.05(e):

(e) Clearing and grubbing limits.

Mark the clearing limits with flagging or tags on trees to be left standing, or on lath. Make markings intervisible, and no more than 90 feet apart.

After establishing clearing limits, move the location line stake outside the clearing limits for station identification purposes, and mark it with horizontal distance to location line.

Section 152.05(f) Grade-finishing Stakes:

Delete subparagraph (1) AMG Method.

Delete 152.05(g) and replace it with the following:

(g) Culverts Verify and set culvert locations at the inlet, outlet, and inlet basin points according to the plans. Plot the centerline of the proposed culvert at a 1:20 scale. Show the natural ground, the flow line, the roadway section, and the culvert including end treatments and other appurtenances. Provide the elevations, grade, culvert length, degree of elbow, catch points, and hinge points on the plot.

Perform the following if the culvert design shown in the plans does not fit field conditions, when the CO requires adjustment to a culvert location, or when a culvert design isn’t provided for a new culvert, culvert replacement, or culvert extension:

(1) Recommend a revised culvert location and alignment if needed.

(2) Survey and record the ground profile along the culvert centerline.

(3) Determine the slope catch points at the inlet and outlet.

(4) Set reference points and record information necessary to determine culvert length and end treatments.

(5) Plot to scale the profile along the culvert centerline. Show the natural ground, the flow line, the roadway section, and the culvert including end treatments and other appurtenances. Show elevations, grade, culvert length, and degree of elbow.

(a) For single skewed culverts, submit a plotted field-design cross-section normal to roadway centerline and at each end section. Plot the offset and elevation of natural ground at the end section and at proposed template break points between centerline and the end section. Ensure the template design embankment slope is not exceeded.

(b) For multiple skewed culverts, submit a plotted field design cross-section normal to roadway centerline and at the end sections (left and right) nearest to the shoulder. Plot the offset and elevation of natural ground at the end section and at proposed template break points between centerline and the end section. Ensure the template design embankment slope is not exceeded.

(c) Submit the plotted field-design cross-section for approval of final culvert length and alignment. Plot at a clear and readable scale.

Replace Table 152-1 with the following:

Table 152-1 Construction Survey and Staking Tolerances (1)

Staking Phase
Horizontal
Vertical
Control points set from existing. Government control points- Tolerance Class A
±0.03 feet

(±10 millimeters) ±0.01 feet × N (±3 millimeters × N )(2)

Mapping, topography, and cross-section Points- Tolerance Class A
±0.16 feet

(±50 millimeters) ±0.16 feet (±50 millimeters)

Centerline points (3) including (PC), (PT), (POT),(POC), and references- Tolerance Class A
±0.06 feet

(±20 millimeters) ±0.06 feet (±20 millimeters)

Slope-stake and slope-stake references- Tolerance Class A (4)
±0.16 feet

(±50 millimeters) ±0.16 feet ±50 millimeters)

Culverts, ditches, and minor drainage structures stakes- Tolerance Class A
±0.16 feet

(±50 millimeters) ±0.06 feet (±20 millimeters)

Retaining walls stakes
±0.06 feet

(±20 millimeters) ±0.03 feet (±10 millimeters)

Curb and gutter stakes
±0.06 feet

(±20 millimeters) ±0.03 feet (±10 millimeters)

Bridge substructures stakes
±0.03 feet

(±10 millimeters) (5) ±0.03 feet (±10 millimeters)

Bridge superstructures stakes
±0.03 feet

(±10 millimeters) (5) ±0.03 feet (±10 millimeters)

Clearing and grubbing limit stakes- Tolerance Class A
±1.00 feet

(±300 millimeters)

Roadway subgrade finish stakes- Tolerance Class A (6)
±0.16 feet

(±50 millimeters) ±0.03 feet (±10 millimeters)

Roadway finish grade stakes (6)
±0.16 feet

(±50 millimeters) ±0.03 feet (±10 millimeters)

1. At statistical 95 percent confidence level. Tolerances are relative to existing Government control points.

2. N is the number of instrument setups.

3. Centerline points: PC - point of curve, PT - point of tangent, POT - point on tangent, POC - point on curve. Take the cross-sections normal to the centerline ±1 degree.

4. Bridge control is established as a local network and the tolerances are relative to that network.

5. Includes paved ditches.

6. Tolerance Class B for Very Low Volume Roads with an aggregate or native finished surface.

Section 153. — CONTRACTOR QUALITY CONTROL

Description Construction Requirements

153.01 Qualifications.

(a) Quality control manager (QCM) Delete the first sentence and substitute the following:

Provide a QCM according to paragraph (2) below.

Add the following to 153.03, after (c):

(d) Subcontractors and suppliers. Include the work of all subcontractors. If a subcontractor is to perform work under this Section, explain how the subcontractor’s inspection plan will interface with the Prime Contractor first tier subcontractors and lower tier subcontractors and organizations, and the CO. Include the work of major suppliers and suppliers of structural and geotechnical services and materials.

153.04 Prosecution of Work.

Add the following to 153.04 after subparagraph paragraph (c):

(d) Construction progress meeting.

(1) Schedule and facilitate a weekly construction progress meeting. Invite the CO, project superintendent, QCM, and any other personnel directly supervising or managing the project. At a minimum, discuss the Working Schedule according to Subsection 155.06(f).

Section 155. — SCHEDULES FOR CONSTRUCTION CONTRACTS

Construction Requirements Comment by Davilman, Lacie - FS: FS typically deletes entire section. I propose we Delete the entire spec and replace w a simplified requirement for critical path method Gantt chart schedule Add the following to 155.06 Baseline Schedule Updates, after subparagraph (g):

(f) Working Schedule. At each construction progress meeting, provide the CO with a written summary detailing the work completed in the previous week and the proposed work activities for the following two weeks. Provide detail of proposed operations that will affect traffic flow, residents, and businesses adjacent to the project. Provide the CO with a schedule revision if the written summary significantly differs from the baseline construction schedule or the latest construction schedule revision.

Section 156. — PUBLIC TRAFFIC

Add the following to 156.02:

Permanent Traffic Control
633
Traffic Signing and Marking Material
718
Concrete Barriers and Precast Guard walls
618
Temporary plastic fence
710.11

Construction Requirements

156.04 Accommodating Traffic During Work.

Delete the first paragraph and substitute the following:

Accommodate traffic according to the MUTCD, contract traffic control drawings, Section 635, and this Section. Submit a traffic control plan for approval according to Subsection 104.03.

Submit a traffic control plan at least 30 days before intended use.

156.05 Maintaining Roadways During Work.

Add the following to end of subparagraph (a):

Do not construct diversions outside of the clearing limits or use alternate route detours without the approval of the CO.

156.07 Limitations on Construction Operations.

Delete the first sentence of subparagraph (c) and replace with the following:

For alternate one-way traffic control, provide a minimum lane width of 9 feet (3 meters). For two-way traffic, provide a minimum roadway width of 18 feet (6.7 meters).

Add the following to end of paragraph (j):

(j) Tie into residential approaches during mainline construction to maintain access to adjacent properties. Limit residential approach construction operations to 3-hour cumulative closure. Coordinate with the property owner and provide proof of coordination to the CO.

Add the following after paragraph (j):

(k) Sequence construction operations in a manner that minimizes construction caused closures and delays to public traffic. Do not delay public traffic when not necessary for roadway construction operation.

(l) Immediately open the road to emergency vehicles and all other vehicles under evacuation.

(m) Close National Forest Service Road (NFSR) 121 - Trickel Park, as needed, from Latitude 39.044872 and Longitude: -107.946735° to the intersection with NFSR 123 Old Grand Mesa at Latitude 39.03994 and Longitude -107.94992 except to local traffic between the two intersections. Coordinate with landowners 2 weeks prior to planned closure and maintain open communication throughout closure. The closure must not exceed 10 cumulative days total. The road will not be closed until all detour signs are installed and all associated culvert materials needed throughout the closed area are on site and approved by the CO.

(n) Weekend work will not be allowed.

156.09 Traffic Control Supervisor.

Delete the second sentence and replace the following:

The superintendent may serve as the traffic control supervisor provided the requirements of Subsection 156.03 are met.

Add the following Subsection:

156.09A Public Information. This project will require regular direct communication to the USFS regarding schedule, and possible delays or other restrictions. Provide a Public Information Program Coordinator who will be responsible for coordinating project construction information such as operational changes, delays, etc. with the project team, CO, and the USFS Public Affairs. The coordinator must be knowledgeable of construction operations and possess good written and verbal communication skills. The coordinator will be responsible for the following:

(a) Provide notification to the CO who will coordinate with the USFS on all aspects of this project, including roadway operations, schedule, road closures, and restrictions to public traffic.

(b) Organize, schedule, and conduct weekly coordination, planning, and reporting meetings

(c) Provide information to the USFS Public Affairs for news releases on construction activities prior to and during construction, to inform the public of construction activities, schedules, closures, width or height restrictions to traffic, and traffic detour routes. The news release information on construction activities must be updated on a timely basis; and

(d) Refer the news media to the USFS Public Affairs for release of any items of interest to the press. Do not provide news media with any direct interviews.

03/22/2022

Section 157. — SOIL EROSION AND SEDIMENT CONTROL

Delete subparagraph 157.04 and replace with the following:

157.04 General.

Thirty (30) days prior to the start of construction, submit a written plan according to subsection 104.03 with all necessary permits that provides permanent and temporary erosion control measures to minimize erosion and sedimentation during and after construction. Do not begin work until the necessary controls for that particular phase of work have been implemented. Do not modify the type, size, or location of any control without approval.

When erosion control measures are not functioning as intended, take corrective action to eliminate or minimize pollutants in storm water discharges from the project.

Section 203. — REMOVAL OF STRUCTURES AND OBSTRUCTIONS

203.04 Removing Material.

Add the following to the end of section 203.04:

Coordinate with the USFS for removal of signs.

Section 204. — EXCAVATION AND EMBANKMENT

Materials 204.03.

Add the following to 204.03:

Crushed aggregate703.06
Geotextile714.01(a)
Asphalt concrete403, Type II

Construction Requirements

204.06 Roadway Excavation

Delete section 204.06 and replace with the following:

204.06 Roadway Excavation. Excavate as follows:

(a) Rock cuts. Blast rock according to Section 205. Excavate rock cuts to 6 inches (150 millimeters) below subgrade within the roadbed limits. Backfill to subgrade with topping or other suitable material. Compact the material according to Subsection 204.11.

(b) Earth cuts. Scarify earth cuts to 6 inches (150 millimeters) below subgrade within the roadbed limits. Compact the scarified material according to Subsection 204.11.

(c) Pioneer Roads. Conduct excavation and placement operations so material to be treated under Section 201 will not be incorporated into the roadway unless specified in the slash treatment method. Maintain drainage during pioneering operations.

Remove snow and ice in advance of the work and deposit beyond the roadway limits in a manner that will not waste material or generate sediment. Do not incorporate snow and ice into embankments. Place snow or ice in a manner to prevent resource damage.

(d) Drainage Feature. Drainage feature includes construction of all ditches, minor channel changes, drainage dips, catch basins, surface water deflectors, and other minor drainage structures. Compact the material according to Subsection 204.11. Excavate on a uniform grade between control points.

Do not disturb material and vegetation outside the construction limits. Retrieve material deposited outside the construction limits. Dispose of unsuitable or excess excavation material according to Subsection 204.14. Replace shortage of suitable material caused by premature disposal of roadway excavation.

Shape to drain and compact the work area to a uniform cross-section at the end of each day's operations.

204.07 Subexcavation.

Delete the subsection and replace with the following:

204.07 Subexcavation.

Use separation-stabilization geotextile, class 1, type C.

Notify the CO of type and source of backfill material anticipated for subexcavation work at the preparatory phase meeting according to Subsection 153.04(a). Excavate unsuitable materials to the limits designated in the plans, or as directed by the CO. Notify the CO of any additional locations requiring subexcavation, or which require a change in surface dimension or depth. Advise the CO of any adverse conditions such as active subsurface water or unstable soil conditions prior to backfilling. Dispose of unsuitable material according to Subsection 204.14. Do not subexcavate during periods of inclement weather.

Submit a neat line drawing of the excavated volume for each subexcavation prior to backfilling. Place geotextile according to Section 207 prior to placing soil or aggregate backfill materials in the subexcavation. Place and compact aggregate backfill according to Section 204.11, Prevent backfill materials from becoming contaminated with unsuitable materials. Replace the excavated structural section with the structural section shown in the typical section of the plans. Adjust the subgrade elevation to accommodate the replacement structural section.

Delete subsection 204.11 and replace with the following;

204.11 Compaction. Compact the embankment using one of the following methods as specified.

(a) Placement Method 1. Use AASHTO T 27 to determine the quantity of material retained on a No. 4 (4.75-millimeter) sieve. Compact as follows:

(1) More than 80 percent retained on a No. 4 (4.75-millimeter) sieve. Adjust the moisture content to a level suitable for compaction. Fill the interstices around rock with earth or other fine material as practical. Use compression-type rollers at speeds less than 6 feet (1.8 meters) per second and vibratory rollers at speeds less than 3 feet (1 meter) per second. Compact each layer of material full width with one of the following and until there is no visible evidence of further consolidation:

(a) Four roller passes of a vibratory roller having a minimum dynamic force of 40,000 pounds (180 kilonewtons) impact per vibration and a minimum frequency of 1000 vibrations per minute;

(b) Eight roller passes of a 20-ton (20-metric ton) compression-type roller; or

(c) Eight roller passes of a vibratory roller having a minimum dynamic force of 30,000 pounds (130 kilonewtons) impact per vibration and a minimum frequency of 1000 vibrations per minute.

Increase the compactive effort for layers deeper than 12 inches (300 millimeters) as follows:

• For each additional 6 inches (150 millimeters) or fraction thereof, increase the number of roller passes in Subsection 204.11(a)(1)(a), by four passes; or

• For each additional 6 inches (150 millimeters) or fraction thereof, increase the number of roller passes in Subsection 204.11(a)(1)(b) and (c), by eight passes.

(2) 50 to 80 percent retained on a No. 4 (4.75-millimeter) sieve. Classify the material according to AASHTO M 145. Adjust the moisture content of material classified A-1 through A-5 to a moisture content suitable for compaction. Adjust the moisture content of material classified A-6 and A-7 to within 2 percent of the optimum moisture content. Use AASHTO T 99 to determine the optimum moisture content of the portion of the material passing a No. 4 (4.75-millimeter) sieve. Multiply this number by the percentage of material passing a No. 4 (4.75-millimeter) sieve, and add 2 percent to determine the optimum moisture content of the material.

Use nonvibratory rollers at speeds less than 6 feet (1.8 meters) per second and vibratory rollers at speeds less than 3 feet(1 meter) per second. Compact each layer of material full width according to Subsection 204.11(a)(1).

(3) Less than 50 percent retained on a No. 4 (4.75-millimeter) sieve. Classify the material according to AASHTO M 145. For material classified A-1 or A-2-4, determine the maximum density according to AASHTO T 99, Method C.

Adjust the moisture content of material classified A-1 through A-5 to a moisture content suitable for compaction. Adjust the moisture content of material classified A 6 and A-7 to within 2 percent of the optimum moisture content.

Use compression-type or vibratory rollers. Compact each layer of material full width to at least 95 percent of the maximum density. Determine the in-place density and moisture content according to AASHTO T 310 or other approved test procedures. When required, use AASHTO T 224 to correct for coarse particles.