ATT_B_S1.10.pdf

PDF 2 MB Posted

Attached to
OCYCF Med/Dental Remodel
Solicitation number
S-DASOBO-00001190
Issued by
Lake County, Albany City, Oregon

About this file

The provided document is a set of structural observation requirements for the OCYCF Med/Dental Remodel Project in Albany, Oregon, overseen by the Oregon Youth Authority. The document outlines the responsibilities of the Owner, Contractor, and Structural Engineering Observer, including requirements for inspection of concrete, steel, and reinforcing elements at various stages of construction. Key items to be observed include footing reinforcement, floor and roof framing, welding and bolting, concrete placement and curing, and post-installed anchors. The Contractor is required to notify the Owner and Observer at least 48 hours prior to scheduled observations. At the conclusion of the structural work, the Observer must submit a written statement identifying any unresolved deficiencies.

The related state and local contract opportunity is for the OCYCF Med/Dental Remodel Project, located in the jurisdictions of Linn County and the City of Albany, Oregon. The purpose is to establish a contract for this remodel project for the benefit of the Oregon Youth Authority. No other pricing, funding, or award details are provided in the given information.

View the file

Other files

File Type Posted
A5.01-INTERIOR_ELEVATIONS~1.pdf PDF
ATT A_Specs.pdf PDF
ATT_B_M0.00.pdf PDF
Pre_Bid_Conference_Attendance.pdf PDF
_EO21-29_Form.pdf PDF
Notice of Intent to Award~4.pdf PDF
E0.02-ELECTRICAL_LIGHTING_SCHEDULES.pdf PDF
S-DASOBO-00001190 Addendum 1.pdf PDF
ATT_B_P0.00.pdf PDF
ATT_B_G0.01.pdf PDF
ATT_B_E0.00.pdf PDF
Exhibit_7 Oregon Youth Authority Facility Access agreements.pdf PDF
S-DASOBO-00001190_OCYCF MedDental Remodel.pdf PDF
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STRUCTURAL OBSERVATIONS:

STRUCTURAL OBSERVATIONS

ITEM SER

FOOTING REINFORCING AND FORM WORK PRIOR TO

CONCRETE PLACEMENT

FLOOR FRAMING AND HARDWARE PLACEMENT

ROOF FRAMING AND HARDWARE PLACEMENT

COMPLETION OF ALL STRUCTURAL ELEMENTS CONTAINED

HEREIN

AS REQUIRED TO ADDRESS STRUCTURAL ISSUES X

1. THE OWNER SHALL EMPLOY THE ENGINEER OF RECORD (SER) TO PERFORM STRUCTURAL

OBSERVATIONS IN ACCORDANCE WITH THE INTERNATIONAL BUILDING CODE (IBC) SECTION 1704.5.

STRUCTURAL OBSERVATIONS ARE THE VISUAL OBSERVATIONS OF THE STRUCTURAL SYSTEM BY A

REGISTERED DESIGN PROFESSIONAL FOR THE GENERAL CONFORMANCE TO THE APPROVED

CONSTRUCTION DOCUMENTS. STRUCTURAL OBSERVATION DOES NOT INCLUDE OR WAIVE THE

RESPONSIBILITY FOR THE REQUIRED INSPECTIONS AS NOTED IN SECTIONS 110, 1705 OR OTHER

SECTIONS OF THE IBC.

2. THE OWNER AND THE BUILDING OFFICIAL SHALL REPORT ANY DEFICIENCIES IN WRITING. THE

STRUCTURAL OBSERVER SHALL SUBMIT TO THE BUILDING OFFICIAL AND THE OWNER, AT THE

CONCLUSION OF THE STRUCTURAL WORK CONTAINED WITHIN THE PERMIT, A WRITTEN STATEMENT THAT THE SITE VISITS HAVE BEEN MADE. IN ADDITION, THAT THEY HAVE IDENTIFIED ANY REPORTED

DEFICIENCIES WHICH, TO THE BEST OF THE STRUCTURAL OBSERVER'S KNOWLEDGE, HAVE NOT

BEEN RESOLVED.

3. THE CONTRACTOR SHALL CONTRACTOR SHALL NOTIFY THE OWNER AND THE STRUCTURAL

OBSERVER A MINIMUM OF 48 HOURS PRIOR TO THE TIME AT WHICH THE SPECIFIED STRUCTURAL

OBSERVATIONS MAY BE PERFORMED. CONSTRUCTION PROGRESS SHALL ALSO BE UPDATED TO

THE STRUCTURAL OBSERVER BY THE CONTRACTOR.

4. THE FOLLOWING AREAS OF WORK SHALL BE PERFORMED FOR STRUCTURAL OBSERVATIONS:

X

X

X

Inspection of reinforcing steel and placement.

Inspection of reinforcing steel welding in accordance with required verification and inspection of steel construction.

Inspect bolts to be installed in concrete prior to and during placement of concrete where noted on drawings.

Verifying use of required design mix.

At the time fresh concrete is sampled to fabricate specimens for strength tests, perform slump and air content tests, and determine the temperature of the concrete.

Inspection of concrete and shotcrete placement for proper application techniques.

Inspection for maintenance of specified curing temperature and techniques.

1)

2)

3)

5)

6)

7)

8)

REQUIRED VERIFICATION AND INSPECTION OF CONCRETE CONSTRUCTION

CONTINUOUSVERIFICATION AND INSPECTION

- X

PERIODIC

ACI 318: 3.5, 7.1-7.7

REFERENCED

STANDARD

IBC REFERENCE

- X

- X

- X

X -

X -

- X

AWS D1.4

ACE 318: 3.5.2

ACI 318: 8.1.3, 21.1.8

ACI 318: Ch. 4, 5.2-5.4

ASTM C 172

ASTM C 31

ACI 318: 5.6, 5.8

ACI 318: 5.9, 5.10

ACI 318: 5.11-5.13

1910.4

1908.5, 1909.1

1904.2, 1910.2, 1910.10

1910.6, 1910.7, 1910.9

1910.3

1910.8

Identification markings to conform to ASTM standards specified in the approved construction documents.

Snug-tight joints

Pretensioned and slip-critical joints using

For structural steel, Identification markings to conform to AISC 360

Identification markings to conform to AWS specification in the approved construction documents.

Structural steel and cold-formed steel deck:

Complete and partial penetration groove welds.

Multipass fillet welds.

Single-pass fillet welds > 5/16" Plug and slot welds.

Floor and roof deck welds.

Reinforcing steel:

Verification of weldability of reinforcing steel other than ASTM A706

Details such as bracing and stiffening.

Member location.

Application of joint details at each connection.

a.

a.

b.

a.

a.

a.

b.

a.

b.

c.

1.

2.

3.

5.

6.

7.

1)

1)

6)

4) 3) 2)

X

X X X

CONTINUOUS PERIODIC

X X X

X

X

X

X

X

VERIFY

X

X and applicable ASTM material standards.

AISC 360, Section A3.3

AISC 360, Section M2.5

AISC 360, Section M5.5

AISC 360, Section A3.5 and applicable AWS A5

AWS D1.1

AWS D1.3

VERIFICATION AND INSPECTION REFERENCED

STANDARD

REQUIRED VERIFICATION AND INSPECTION OF STEEL CONSTRUCTION

Inspection of anchors post-installed in hardened concrete members.

4) - X ACI 318: 8.1.3, 21.1.8 1908.5, 1909.1

Inspection of prestressed concrete:

a. Application of prestressing forces.

9)

N/A - ACI 318: 18.20

b. Grouting of bonded prestressing tendons in the seismic force-resisting system.

Erection of precast concrete members.10) - N/A ACI 318: Ch. 16

N/A - ACI 318: 18.18.4

Verification of in-situ concrete strength, prior to stressing of tendons in post-tensioned concrete and prior to removal of shores and forms from

11) - N/A ACI 318: 6.2

beams and structural slabs.

Inspect formwork for shape, locations, and dimensions of the concrete member being formed.

12) - N/A ACI 318: 6.1.1 1910.6, 1910.7,

1910.8

Manufacturer's certificate of compliance requiredb. - X turn-of-nut with matchmarking, twist-off bolt or direct tension indicator methods of installation

Pretensioned and slip-critical joints usingc. X - -turn-of-nut without matchmarking or calibrated wrench methods of installation

For other steel, Identification markings to conform to ASTM standards specified in the

b. - X - Applicable ASTM approved construction documents.

material standards

Manufacturer's certified test reportsc. - X - -

4. - X -Manufacturer's certified test reportsa. -documents.

Manufacturer's certificate of compliance required.b. - - X

Single-pass fillet welds < 5/16"5

- - X

Reinforcing steel resisting flexural and axial forces in intermediate and special moment

2) X - -frames, and boundary elements of special structural walls of concrete and shear reinforcement.

Shear reinforcement3) X - - Other reinforcing steel4) - X -

AWS D1.4,

ACI 318: Section 3.5.2

Material verification of high-strength bolts, nuts and washers:

Inspection of high-strength bolting:

Material verification of structural steel:

Material verification of cold-formed steel deck:

Material verification of weld filler materials:

Inspection of welding:

Inspection of steel frame joint details for compliance:

PROJECT NO.:

ISSUE DATE:

REVISIONS:

CL

AR

K

KJ

OS

A

RC

HI

TE

CT

S, LL

C C

OP

YR

IG

HT

1 S

W A lde r S t., Su ite

Po rtla nd

, O R

Ph on e:

3/2

-4

9/

/2

9:

:3

AM

04.02.2021

CO

NS

TR

UC

TI

ON

D

OC

UM

EN

TS

20018

O A

K C

R

EE

K E

XP

A

N

SI

O N

L O

C H

N

ER

R D

S E, A

LB

AN

Y, O R

O R

EG

O

N Y

O U

TH

A

U

TH

O R

IT

Y

LA

NOI

SSEF

ORPDERETSIGER

R

EENIGN

E

LARUTCURTS

O R E G O N

15,099

EXPIRES 12-31-2022

STRUCTURAL

NOTES

S1.10

DocuSign Envelope ID: 7974D412-E6C0-4C79-8211-DE0C02D5CD6A

2 3

B

A

C

18A

PROJECT NO.:

ISSUE DATE:

REVISIONS:

CL

AR

K

KJ

OS

A

RC

HI

TE

CT

S, LL

C C

OP

YR

IG

HT

1 S

W A lde r S t., Su ite

Po rtla nd

, O R

Ph on e:

3/2

-4

9/

/2

9:

:3

AM

04.02.2021

CO

NS

TR

UC

TI

ON

D

OC

UM

EN

TS

20018

O A

K C

R

EE

K E

XP

A

N

SI

O N

L O

C H

N

ER

R D

S E, A

LB

AN

Y, O R

O R

EG

O

N Y

O U

TH

A

U

TH

O R

IT

Y

LA

NOI

SSEF

ORPDERETSIGER

R

EENIGN

E

LARUTCURTS

O R E G O N

15,099

EXPIRES 12-31-2022

FDN. PLAN - LEVEL 1

S1.01

PROJECT NO.:

ISSUE DATE:

REVISIONS:

CL

AR

K

KJ

OS

A

RC

HI

TE

CT

S, LL

C C

OP

YR

IG

HT

1 S

W A lde r S t., Su ite

Po rtla nd

, O R

Ph on e:

3/2

-4

9/

/2

9:

:3

AM

04.02.2021

CO

NS

TR

UC

TI

ON

D

OC

UM

EN

TS

20018

O A

K C

R

EE

K E

XP

A

N

SI

O N

L O

C H

N

ER

R D

S E, A

LB

AN

Y, O R

O R

EG

O

N Y

O U

TH

A

U

TH

O R

IT

Y

LA

NOI

SSEF

ORPDERETSIGER

R

EENIGN

E

LARUTCURTS

O R E G O N

15,099

EXPIRES 12-31-2022

FOUNDATION

DETAILS

S1.11

2 3

B

A

C

18A

X

PROJECT NO.:

ISSUE DATE:

REVISIONS:

CL

AR

K

KJ

OS

A

RC

HI

TE

CT

S, LL

C C

OP

YR

IG

HT

1 S

W A lde r S t., Su ite

Po rtla nd

, O R

Ph on e:

3/2

-4

9/

/2

9:

:3

AM

04.02.2021

CO

NS

TR

UC

TI

ON

D

OC

UM

EN

TS

20018

O A

K C

R

EE

K E

XP

A

N

SI

O N

L O

C H

N

ER

R D

S E, A

LB

AN

Y, O R

O R

EG

O

N Y

O U

TH

A

U

TH

O R

IT

Y

LA

NOI

SSEF

ORPDERETSIGER

R

EENIGN

E

LARUTCURTS

O R E G O N

15,099

EXPIRES 12-31-2022

ROOF FRMG. PLAN -

LEVEL 1

S2.01

PROJECT NO.:

ISSUE DATE:

REVISIONS:

CL

AR

K

KJ

OS

A

RC

HI

TE

CT

S, LL

C C

OP

YR

IG

HT

1 S

W A lde r S t., Su ite

Po rtla nd

, O R

Ph on e:

3/2

-4

9/

/2

9:

:3

AM

04.02.2021

CO

NS

TR

UC

TI

ON

D

OC

UM

EN

TS

20018

O A

K C

R

EE

K E

XP

A

N

SI

O N

L O

C H

N

ER

R D

S E, A

LB

AN

Y, O R

O R

EG

O

N Y

O U

TH

A

U

TH

O R

IT

Y

LA

NOI

SSEF

ORPDERETSIGER

R

EENIGN

E

LARUTCURTS

O R E G O N

15,099

EXPIRES 12-31-2022

ROOF FRAMING

DETAILS

S2.11

20115 DETAILS-S1.10
Sheets and Views
S1.10
20115 PLANS-S1.01
Sheets and Views
S1.01
20115 DETAILS-S1.11
Sheets and Views
S1.11
20115 PLANS-S2.01
Sheets and Views
S2.01
20115 DETAILS-S2.11
Sheets and Views
S2.11
2021-04-02T14:03:09-0700
Digitally verifiable PDF exported from www.docusign.com

File details come from the government source that posted it. Updated .