ATT_B_P0.00.pdf

PDF 1 MB Posted

Attached to
OCYCF Med/Dental Remodel
Solicitation number
S-DASOBO-00001190
Issued by
Lake County, Albany City, Oregon

About this file

This document contains the general notes, abbreviations, and sheet index for a plumbing scope of work as part of the OCYCF Med/Dental Remodel Project for the benefit of the Oregon Youth Authority. The project includes work such as compliance with local codes, plumbing system requirements, coordination with other trades, seismic restraint, submittals, and project closeout. The plumbing work entails demolition of the existing plumbing system, installation of new underground plumbing, waste and vent system, domestic water system, and associated plumbing details. The project is located in Albany, Oregon, which is within Linn County.

The document provides plumbing equipment and fixture schedules, water service calculations, and a domestic hot water recirculation schematic. Pricing terms, set asides, incumbents, funding requirements, and other salient commercial information are not included in this technical document.

View the file

Other files

File Type Posted
ATT_B_M0.00.pdf PDF
Exhibit_7 Oregon Youth Authority Facility Access agreements.pdf PDF
ATT_B_G0.01.pdf PDF
ATT_B_E0.00.pdf PDF
_EO21-29_Form.pdf PDF
A5.01-INTERIOR_ELEVATIONS~1.pdf PDF
Notice of Intent to Award~4.pdf PDF
ATT A_Specs.pdf PDF
S-DASOBO-00001190_OCYCF MedDental Remodel.pdf PDF
Pre_Bid_Conference_Attendance.pdf PDF
E0.02-ELECTRICAL_LIGHTING_SCHEDULES.pdf PDF
S-DASOBO-00001190 Addendum 1.pdf PDF
ATT_B_S1.10.pdf PDF
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. MATERIALS, METHODS, AND INSTALLATION SHALL COMPLY WITH THE PROVISIONS OF THE LATEST EDITION OF

THE FOLLOWING CODES AS ADOPTED BY THE AUTHORITY HAVING JURISDICTION.

OREGON STRUCTURAL SPECIALTY CODE (OSSC)

OREGON MECHANICAL SPECIALTY CODE

OREGON PLUMBING SPECIALTY CODE

OREGON FIRE CODE

OREGON STATE ENERGY CODE WITH LOCAL AMENDMENTS

2. THE SCOPE OF THE PLUMBING WORK CONSISTS OF WORK SHOWN ON THE PLANS AND AS DESCRIBED IN THE SPECIFICATIONS. IN CASE OF CONFLICT, THE SPECIFICATIONS SHALL GOVERN. PROVIDE A COMPLETE &

FUNCTIONAL SYSTEM.

3. PERFORM ALL WORK IN ACCORDANCE WITH LOCAL CODES AND ORDINANCES. OBTAIN AND PAY FOR ALL REQUIRED PERMITS AND PAY FOR ALL FEES REQUIRED BY AUTHORITIES HAVING JURISDICTION. PAY ALL ROYALTIES OR FEES REQUIRED IN CONNECTION WITH THE USE OF PATENTED DEVICES AND SYSTEMS.

4. REFER TO ARCHITECTURAL AND STRUCTURAL DRAWINGS FOR GENERAL CONSTRUCTION INCLUDING CONCRETE EQUIPMENT PADS, FLASHING DETAILS, ETC. REFER TO ARCHITECTURAL DRAWINGS FOR ROOM ELEVATIONS, LOCATE PLUMBING DEVICES SO THAT THEY DO NOT CONFLICT WITH GENERAL CONSTRUCTION (WAINSCOT, DOOR HARDWARE, ETC.) NOR WITH ELECTRICAL SYSTEM (LIGHT SWITCHES, SPEAKERS, OUTLETS, ETC.).

5. COORDINATE WITH OTHER TRADES:

A. REFER TO ELECTRICAL DRAWINGS AND CONFIRM ELECTRICAL CHARACTERISTICS SHOWN FOR PLUMBING

EQUIPMENT (VOLTAGE, PHASE, HZ, ETC). MATCHES THAT OF THE PLUMBING EQUIPMENT PROVIDED.

B. PROVIDE ADEQUATE CLEARANCE OF PLUMBING WORK FROM ELECTRICAL EQUIPMENT. MAINTAIN

MINIMUM ACCESS OF 6-INCHES ABOVE CABLE TRAYS AND 18-INCHES TO THE SIDE OF CABLE TRAYS.

CLEARANCE ABOVE CABLE TRAY SHOULD BE 1/2 THE WIDTH AND NOT LESS THAN 6-INCHES WHEN RUNNING PARALLEL WITH CABLE TRAY. AND NOT LESS THAN 6-INCHES WHEN RUNNING PERPENDICULAR

TO THE CABLE TRAY.

6. ARRANGE EQUIPMENT SO THAT ACCESS CLEARANCES INDICATED BY DRAWINGS, REQUIRED BY CODES, OR

RECOMMENDED BY MANUFACTURER ARE PROVIDED.

7. INSTALL MATERIALS AND SYSTEMS IN ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS AND ACCEPTED SUBMITTALS. INSTALL MATERIAL IN PROPER RELATION TO ADJACENT CONSTRUCTION AND WITH UNIFORM

APPEARANCE FOR EXPOSED WORK.

8. THOROUGHLY EXAMINE ALL AREAS WHERE EQUIPMENT, AND PIPING WILL BE INSTALLED AND REPORT ANY

CONDITION THAT PREVENTS THE PROPER INSTALLATION OF THE PLUMBING WORK.

9. THE COMMISSIONING SPECIFICATION, INCLUDING ALL FUNCTIONAL TEST PROCEDURES, SHALL BE PROVIDED

AND ENFORCED BY THE CONTRACTOR.

10. PROVIDE SEISMIC RESTRAINT IN ACCORDANCE WITH IBC AND ASCE STANDARD 7. SUBMIT CALCULATIONS BY LICENSED STRUCTURAL ENGINEER. PRODUCTS MAY CONFORM TO SMACNA SEISMIC RESTRAINT GUIDELINES.

11. PROVIDE A SINGLE SUBMITTAL OF ALL PLUMBING EQUIPMENT AS SPECIFIED. AS A MINIMUM, SUBMIT PRODUCT DATA FOR ALL EQUIPMENT AND FIXTURES LISTED IN ACCOMPANYING SCHEDULES FOR APPROVAL.

12. USE EXPERIENCED INSTALLERS. DELIVER, HANDLE, AND STORE MATERIALS IN ACCORDANCE WITH

MANUFACTURER'S INSTRUCTIONS.

13. ARRANGEMENT OF SYSTEMS INDICATED ON THE DRAWINGS IS DIAGRAMMATIC, AND INDICATES THE MINIMUM REQUIREMENTS FOR PLUMBING WORK. SITE CONDITIONS SHALL DETERMINE THE ACTUAL ARRANGEMENT OF THE WORK. TAKE FIELD MEASUREMENTS BEFORE PREPARING SHOP DRAWINGS, OBTAIN APPROVAL OF SHOP DRAWINGS BEFORE BEGINNING FABRICATION. BE RESPONSIBLE FOR ACCURACY OF DIMENSIONS AND

LAYOUT. OVERHEAD PIPING SHALL BE ARRANGED TO OBTAIN MAXIMUM HEAD ROOM.

14. CLEAN AND PROTECT WORK FROM DAMAGE. RESTORE DAMAGED FINISHES. COVER ENDS OF PIPING NOT

ACTIVELY BEING WORKED ON.

15. MODIFY AND EXTEND EXISTING SERVICE TO ACCOMMODATE NEW WORK. RELOCATE EXISTING COMPONENTS

AS REQUIRED FOR NEW SYSTEM. COORDINATE WITH BUILDING MANAGEMENT.

16. PROVIDE PRODUCTS OF ACCEPTABLE MANUFACTURERS, WHICH HAVE BEEN IN SATISFACTORY USE IN SIMILAR

SERVICE FOR THREE YEARS. DELIVER, HANDLE, AND STORE MATERIALS IN ACCORDANCE WITH

MANUFACTURER'S INSTRUCTIONS.

17. DO NOT CUT STRUCTURAL ELEMENTS WITHOUT PRIOR WRITTEN APPROVAL OF STRUCTURAL ENGINEER.

18. CONCEAL PIPING TO THE GREATEST EXTENT POSSIBLE.

19. INSTRUCT OWNER IN PROPER OPERATION OF SYSTEMS.

20. DRAWINGS DO NOT SHOW ALL OFFSETS WHICH MAY BE REQUIRED. MAKE OFFSETS WITH FITTINGS USING THE LEAST ANGLE OF OFFSET POSSIBLE. PIPING SHALL BE ROUTED TO AVOID ALL STRUCTURAL SUPPORTS, AND

COORDINATED WITH WORK OF OTHER TRADES.

GENERAL NOTES:

1. DEMOLITION: WORK REQUIRED IS NOTED ON PLANS. VERIFY WITH ON SITE CONDITION AND OWNER. SALVAGE

EQUIPMENT FOR OWNER'S USE AS NOTED.

2. COORDINATE INTERRUPTIONS OF SERVICES PASSING THROUGH WORK AREA TO MINIMIZE DISRUPTION IN

ADJACENT SPACES. COORDINATE WITH BUILDING OWNER.

3. INSTALL NEW WORK GENERALLY AS SHOWN. ADEQUATE SPACE HAS BEEN VERIFIED TO THE DEGREE POSSIBLE, BUT MAY REQUIRE MINOR RELOCATION OF SMALL CONDUIT AND CEILING WIRE. COORDINATE

EXTENT OF RELOCATION WITH GENERAL CONSTRUCTION WORK.

4. COORDINATE WORK WITH GENERAL CONSTRUCTION TO MINIMIZE DUST & DUST MIGRATION.

REMODEL CONSTRUCTION NOTES:

1. SANITARY, WASTE, AND VENT PIPING (PLASTIC NOT ALLOWED) SHALL BE NO-HUB CAST IRON OR DWV COPPER.

2. HOT AND COLD WATER PIPING SHALL BE HARD DRAWN COPPER TUBING: TYPE L, ASSEMBLED WITH WROT

COPPER FITTINGS AND LEAD-AND ANTIMONY-FREE SOLDER.

3. INSULATE ALL HOT AND COLD WATER PIPING WITH GLASS FIBER INSULATION WITH ALL SERVICE JACKET. USE

HEAT BONDING TAPE TO CLOSE INSULATION; STAPLES AND PRESSURE TAPE ARE PROHIBITED.

4. PROVIDE ALL REQUIRED ACCESSORIES INCLUDING SHUT-OFFS AND CLEAN-OUTS. PROVIDE COMPONENTS WHICH PREVENT BACK-SIPHONAGE OR CROSS-CONNECTIONS. PROVIDE ISOLATION DEVICES TO REDUCE

SOUND TRANSMISSION.

5. PROVIDE STOPS FOR EACH WATER CONNECTION TO EACH FIXTURE OR ITEM OF EQUIPMENT.

6. DISINFECT WATER DISTRIBUTION SYSTEM. FLUSH AND TEST ALL SYSTEMS FOR PROPER OPERATION. ADJUST

SYSTEM TO PREVENT WATER HAMMER.

7. REFER TO PIPING DIAGRAMS AND DETAILS FOR REQUIRED FITTINGS, VALVES, ETC. FLOOR PLANS AND

SECTIONS INDICATE EQUIPMENT LOCATIONS AND GENERAL PIPE ROUTING ONLY.

8. REFER TO CIVIL DRAWINGS FOR UTILITY WORK 5'-0" BEYOND THE BUILDING LINE.

PIPING NOTES:

A AIR

AFF ABOVE FINISHED FLOOR

ARRGT ARRANGEMENT

ATM ATMOSPHERE

BFF BELOW FINISHED FLOOR

BFP BACKFLOW PREVENTER

BHP BRAKE HORSEPOWER

BLDG BUILDING

BOB BOTTOM OF BEAM

BOS BOTTOM OF STEEL

BTUH BRITISH THERMAL UNITS PER HOUR

CAP CAPACITY

CFM CUBIC FEET PER MINUTE

CI CAST IRON

CLG CEILING, COOLING

CNTFGL CENTRIFUGAL

CO CLEANOUT

CONC CONCRETE

COND CONDENSATE

CONT CONTINUE, CONTROL

COMP COMPRESSOR

CP CIRCULATING PUMP

CTG CLEANOUT TO GRADE

CU FT CUBIC FEET

CV CONSTANT VOLUME

CW COLD WATER

dB DECIBELS

DCVA DOUBLE CHECK VALVE ASSEMBLY

DEG DEGREE

DF DRINKING FOUNTAIN

DI DE-IONIZED

DIA DIAMETER

DN DOWN

DS DOWNSPOUT

E EXISTING

EER ENERGY EFFICIENCY RATING

EFF EFFICIENCY

EL ELEVATION

EQUIP EQUIPMENT

ESP EXTERNAL STATIC PRESSURE

EWT ENTERING WATER TEMPERATURE

EXH EXHAUST

EWC ELECTRIC WATER COOLER

EXIST EXISTING

EXP EXPANSION

EXT EXTERIOR, EXTERNAL

F FAHRENHEIT, FIRE LINE

FD FIRE DAMPER, FLOOR DRAIN

FDC FIRE DEPARTMENT CONNECTION

FLA FULL LOAD AMPS

FLR FLOOR

FLTR FILTER

FM FLOW METER

FPM FEET PER MINUTE

FPS FEET PER SECOND

FT FEET

FV FACE VELOCITY

GA GAGE

GAL GALLONS

GALV GALVANIZED

GPM GALLONS PER MINUTE

H HEIGHT

HB HOSE BIBB

HC HEATING COIL

HD HEAD

HEX HEAT EXCHANGE

HOA HAND-OFF-AUTOMATIC

HP HORSEPOWER, HEAT PUMP

HPS HIGH PRESSURE STEAM

HW HOT WATER

HWC HOT WATER CIRCULATING

HWP HOT WATER PUMP

HWR HEATING WATER RETURN

HWS HEATING WATER SUPPLY

HZ HERTZ

ABBREVIATIONS

IDE DIAMETER, INDIRECT DRAIN

IE INVERT ELEVATION

IN INCH

INIT INITIAL

INT INTERIOR

IPLV INTEGRATED PART LOAD VALUE

KW KILOWATT

KWH KILOWATT HOURS

L LENGTH

LAT LEAVING AIR TEMPERATURE

LB POUND, LINEAR BAR

LBS POUNDS

LWT LEAVING WATER TEMPERATURE

MAX MAXIMUM

MBH THOUSAND BTU PER HOUR

MCA MINIMUM CIRCUIT AMPACITY

MD MANUAL DAMPER

MECH MECHANICAL

MFR MANUFACTURER

MIN MINIMUM

MTR MOTOR

NC NORMALLY CLOSED

NEG NEGATIVE

NIC NOT IN CONTRACT

NO NUMBER, NORMALLY OPEN

NTS NOT TO SCALE

OC ON CENTER

OD OUTSIDE DIAMETER

OPNG OPENING

ORD OVERFLOW ROOF DRAIN

ORL OVERFLOW RAIN LEADER

P PUMP, PLUMBING

PD PRESSURE DROP

PH PHASE

POC POINT OF CONNECTION

POS POSITIVE

P/T PRESSURE/TEMPERATURE

PVC POLYVINYL CHLORIDE

QTY QUANTITY

RD ROOF DRAIN

REF REFERENCE

REQD REQUIRED

RL RAIN LEADER

RPBFP REDUCED PRESSURE BACKFLOW PREVENTER

RPM REVOLUTIONS PER MINUTE

S SOIL

SD STORM DRAIN, SMOKE DAMPER

SPR SPRINKLER

SS STAINLESS STEEL, SANITARY SEWER

STP STANDPIPE

TEMP TEMPERATURE

TOT TOTAL

TP TRAP PRIMER, TOTAL PRESSURE

TYP TYPICAL

UON UNLESS OTHERWISE NOTED

V VENT, VOLT

VA VALVE

VEL VELOCITY

VFD VARIABLE FREQUENCY DRIVE

VTR VENT THROUGH ROOF

W WASTE, WATER, WATT, WIDTH

WG WATER GAGE

WH WATER HEATER, WALL HYDRANT

WTR WATER

SYMBOLS LEGEND - GENERAL

DESCRIPTIONSYMBOL

X-XX

X

XX.XX

X

XX.XX

X

XX.XX

N

DRAWING CONSTRUCTION ("FLAG") NOTE

EQUIPMENT IDENTIFIER

MATCHLINE

REVISION CLOUD (ENCIRCLES DRAWING CHANGES MADE SINCE THE

PREVIOUS RELEASE)

REVISION REFERENCE

EXISTING TO BE REMOVED (HATCH)

HEAVY LINEWEIGHT INDICATES NEW WORK

LIGHT LINEWEIGHT INDICATES EXISTING INFORMATION

POINT OF CONNECTION

DETAIL REFERENCE

DETAIL IDENTIFICATION NUMBER

SHEET WHERE DETAIL IS DRAWN

ELEVATION REFERENCE

ELEVATION IDENTIFICATION

NUMBER SHEET WHERE ELEVATION IS DRAWN

SECTION REFERENCE SECTION

IDENTIFICATION NUMBER

SHEET WHERE SECTION IS DRAWN

NORTH REFERENCE

SYMBOLS LEGEND - PIPING

DESCRIPTIONSYMBOL

MAV AAV

SOIL OR WASTE

VENT

RAIN LEADER

OVERFLOW RAIN LEADER

INDIRECT DRAIN

COLD WATER

HOT WATER

HOT WATER CIRCULATING

140° POTABLE HOT WATER

120° POTABLE HOT WATER

FIRE

SPRINKLER

STANDPIPE

HIGH PRESSURE STEAM

REDUCER, CONCENTRIC

WYE STRAINER WITH CAPPED HOSE END BLOWDOWN VALVE

ANGLE VALVE

AUTOMATIC CONTROL VALVE - TWO WAY (PNEUMATIC OPERATOR

SHOWN)

AUTOMATIC CONTROL VALVE - THREE WAY (ELECTRIC OPERATOR

SHOWN)

BUTTERFLY VALVE

FLEXIBLE CONNECTION IN PIPING

MANUAL AIR VENT (MAV), AUTOMATIC AIR VENT (AAV)

PRESSURE GAUGE

THERMOMETER

THERMOMETER WELL

SIGHT GLASS

HOSE BIB

V

RD

OD

ID

140º HW

120º HW

F

SPR

STP

HPS

M

SYMBOLS LEGEND - PIPING

DESCRIPTIONSYMBOL

A

PS

P/T

PIPE ANCHOR

PIPE ALIGNMENT GUIDE

CONTROL VALVE STATION

PIPE SUPPORT

PRESSURE/TEMPERATURE TEST PORT

CAP

UNION

WYE STRAINER

GATE VALVE

GLOBE VALVE

BALL VALVE

BALANCING OR PLUG VALVE

PRESSURE REDUCING VALVE

BALANCING/MEASURING VALVE

RELIEF VALVE

CHECK VALVE

PIPE TURNING DOWN / AWAY

PIPE TURNING UP / TOWARDS

PIPE DOWN TEE

PIPE DOWN TEE / AWAY

PIPE UP TEE / TOWARDS

PLUG

SYMBOLS LEGEND - PIPING & AIRFLOW DIAGRAMS

DESCRIPTIONSYMBOL

M

M

PUMP

CENTRIFUGAL FAN

ELECTRIC MOTOR/STARTER ASSEMBLY

ELECTRIC MOTOR OPERATOR (VALVES AND DAMPERS)

FLOOR DRAIN

FUNNEL DRAIN

FLOW DIRECTION

FLOOR SINK (SQUARE AND ROUND)

PROJECT NO.:

ISSUE DATE:

REVISIONS:

C

LA

R K

K

JO

S A

R C

H

IT

E C

T S

LL

C

O

P Y

R

IG

H T

S W

A ld er S t., S ui te

P or tla nd

, O R

P h on e:

3/

4-

111 SW Fifth Ave, Ste 2120 Portland, Oregon 97204

Tel 503.416.2400 Fax 206.267.1701

SAZAN# 257-20047

/2

/2

:3

:3

A M

GENERAL NOTES,

ABBREVIATIONS AND

SHEET INDEX

04.02.21

P0.00

IS

S

U E

D F

O R

P E

R M

IT

20018

O A

K C

R E

E K

E X

P A

N S

IO

N

L O

C H

N E

R R

D S

E A

L B

A N

Y

O R

O R

E G

O N

Y O

U T

H A

U T

H O

R

IT

Y

PLUMBING SHEET INDEX

P0.00 GENERAL NOTES, ABBREVIATIONS AND SHEET INDEX

P0.01 PLUMBING SCHEDULES

PD1.01 PLUMBING DEMOLITION - FLOOR PLAN

P2.00 PLUMBING UNDERGROUND PLAN

P2.01 PLUMBING WASTE & VENT, ROOF DRAIN - FLOOR PLAN

P3.01 PLUMBING DOMESTIC WATER - FLOOR PLAN

P4.00 PLUMBING DETAILS

Expires: 06/30/22

PROJECT NO.:

ISSUE DATE:

REVISIONS:

C

LA

R K

K

JO

S A

R C

H

IT

E C

T S

P Y

R

IG

H T

S W

A ld e r

S t., S u ite

P or tla nd

, O R

P h on e:

3/

4-

111 SW Fifth Ave, Ste 2120 Portland, Oregon 97204

Tel 503.416.2400 Fax 206.267.1701

SAZAN# 257-20047

/2

/2

:3

:3

A M

PLUMBING SCHEDULES

04.02.21

P0.01

IS

S

U E

D F

O R

P E

R M

IT

20018

O A

K C

R E

E K

E X

P A

N S

IO

N

L O

C H

N E

R R

D S

E A

L B

A N

Y

O R

O R

E G

O N

Y O

U T

H A

U T

H O

R

IT

Y

1. COORDINATE MOUNTING HEIGHTS WITH ARCHITECTURAL DRAWINGS.

REMARKS:

WC-2

WATER CLOSET, FLOOR MOUNTED,

FLUSH VALVE

4 2 1 -- -- --

ACORN PENAL-WARE SIPHON JET FLOOR OUTLET TOILET 1695-W-3-1.28GPF-FVBO-SPS-EG WHITE, WITH STAINLESS STEEL ACCESS PANEL FOR FLUSH VALVE ACCESS. SLOAN ROYAL CONCEALED MANUAL HYDRAULIC FLUSHOMETER, 940-1.28-2-10-3/4-LDIM WITH NY-108-1

PENAL WARE METAL PUSH BUTTON.

WC-1

WATER CLOSET, FLOOR MOUNTED,

FLUSH VALVE

4 2 1 -- -- --

AMERICAN STANDARD 3351.101, AFWALL, VITREOUS CHINA, 1.1 - 1.6 GPF, WALL MOUNTED, ELONGATED BOWL, FULLY GLAZED TRAPWAY, SIPHON JET, 1 1/2" TOP INLET SPUD, ADA COMPLIANT. FLUSH VALVE: SLOAN ROYAL 111 DFSM-1.6/1.1, DUAL FLUSH - 1.6 GPF/1.1 GPF.

SEAT: CHURCH MODEL 9500C, OPEN FRONT, WHITE.

TPV-1 TRAP PRIMER -- -- 1/2 -- -- -- PRECISION PLUMBING PRODUCT MODEL PR-500. PRIME DRAINS USING DU-4/DU-U DISTRIBUTION SYSTEM.

TMV-1 THERMOSTATIC MIXING VALVE -- -- 1/2 1/2 1/2 -- WATTS HYDROGUARD SERIES LFLM495-2, SWEAT UNION CONNECTIONS, INTEGRAL CHECKS AND SCREENS.

S-1 SINK 2 2 1/2 1/2 -- --

ELKAY LRAD191855 (19"X17"X5 1/2"), 8-INCH CENTER-CENTER HOLES FOR FAUCET. FAUCET: CHICAGO FAUCETS 786-GN2BVBCP, 6" GOOSENECK SPOUT WITH ATMOSPHERIC VACUUM BREAKER WITH PRESSURE COMPENSATING NON AERATING LAMINAR SPRAY.

MCGUIRE STOPS, SUPPLIES, TRAP. PROVIDE ADA WRAP FOR STOPS, SUPPIES, TRAP. PROVIDE WITH TMV-1

L-2 LIGATURE RESISTANT LAVATORY 2 2 1/2 1/2 -- --

ACORN DURA-WARE 1953-9-H1-GT-TE ADA COMPLIANT, 18" 16 GA STAINLESS STEEL LAVATORY WITH SINGLE HOLE PUNCHING, AND TRAP ENCLOSURE. CHICAGO FAUCETS ELR-E12A-42ABCP. MCGUIRE STOPS, SUPPLIES, TRAP. PROVIDE VANDAL RESISTANT BOLTS WHEN

MOUNTING SINK AND TRAP/ANGLE STOPS COVER. PROVIDE ONE COMMANDER UNIT.

L-1 LAVATORY 2 2 1/2 1/2 -- --

AMERICAN STANDARD LUCERN WALL HUNG LAVATORY, 0356.521, 8" C-C FAUCET HOLES, WALL HANGER COMPLIANT. PROVIDE IN-WALL FLOOR MOUNTED SUPPORT. CHICAGO FAUCETS 786-GN2BVBCP FAUCET WITH PRESSURE COMPENSATING NON-AERATING LAMINAR SPRAY. MCGUIRE STOPS, SUPPLIES, TRAP. PROVIDE ADA WRAP FOR STOPS, SUPPLIES, TRAP,TMV. PROVIDE WITH TMV-1.

RPBP-1

REDUCED PRESSURE BACKFLOW

PREVENTER

-- -- 3/4 -- -- -- WATTS 009 WITH FACTORY DRAIN FITTING. PIPE DRAIN FITTING TO ADJACENT FS-1.

HB-2 EXTERIOR HOSE BIBB - - 3/4 - - -

WOODFORD MODEL RB65, ROUND AUTOMATIC DRAINING WITH ANTI-SIPHON VACUUM BREAKER, CHROME PLATED, LOOSE KEY LOCK

COVER.

HB-1 HOSE BIBB - - 3/4 - - -

WOODFORD MODEL 21, MILD CLIMATE, NO VACUUM BREAKER. MOUNT DOWNSTREAM OF RPBP-1. MOUNT 48 INCHES ABOVE FINISHED

FLOOR.

FS-1 FLOOR SINK 3 2 -- -- -- --

JR SMITH 3150Y-12 12"X12"X8" DEEP WITH NICKEL BRONZE GRATE AND FRAME, WHITE ACID RESISTING EPOXY COATED INTERIOR AND TOP, ANCHOR FLANGE, 1/2 GRATE, TRAP PRIMER CONNECTION, WHITE ARC ANTI-SPLASH INTERIOR BOTTOM DOME STRAINER. PRIME.

FD-2 LIGATURE RESISTANT FLOOR DRAIN 3 2 WILLOUGHBY INDUSTRIES LRFD-6RD-3-NH, 6" COVER, 3" OUTLET, NO HUB OUTLET.

FD-1 FLOOR DRAIN 2 2 -- -- -- --

ZURN MODEL #Z415B, CAST IRON BODY, 5" DIAMETER ADJUSTABLE NICKEL BRONZE STRAINER. PROVIDE WITH 1/2" TRAP PRIMER

CONNECTION.

EEW-1 EMERGENCY EYE WASH -- -- 1/2 1/2 1/2 GUARDIAN G1750P, WALL MOUNTED. DRAIN TO ADJACENT FLOOR SINK. PROVIDE G3600LF TEMPERING VALVE.

DN-1 DOWNSPOUT NOZZLE 4 -- -- -- -- -- J R SMITH 1770, THREADED OR NO HUB OUTLET AT CONTRACTOR'S OPTION

W V CW HW TW GAS

MARK DESCRIPTION

ROUGH-IN CONNECTION (IN)

REMARKS

PLUMBING FIXTURE SCHEDULE

watercalc...

HOT WATER TO BUILDING, WH-3 1 1/2"

HOT WATER TO BUILDING, WH-1, WH-2 2"

COLD WATER MAIN 2 1/2"

TOTAL GPM/BUILDING 100.00 65.00

TOTAL 389.50 207.75

42 WATER CLOSET 2.50 105.00 0.00

10 WB-1 (CLOTHESWASHER) 4.00 40.00 30.00

8 SHOWER 2.00 16.00 12.00

1 MOP SINK 3.00 3.00 2.25

42 LAVATORY 1.00 42.00 31.50

1 LAUNDRY TRAY 2.00 2.00 1.50

29 KITCHEN SINK 2.00 58.00 43.50

5 HOSE BIBB 1.00 5.00 0.00

1 HOSE BIBB 2.50 2.50 0.00

29 BATHTUB/SHOWER 4 116.00 87.00

DOMESTIC DEMAND

ITEM DESCRIPTION

PUBLIC

GENERAL

USE

TOTAL

UNITS

(.75)

HOT

WATER

ONE BUILDING

WATER SERVICE CALCULATION

1. INSTALL PER MANUFACTURER'S RECOMMENDATIONS. PROVIDE OPTIONAL DIGITAL TIMER. SUSPEND PUMP INDEPENDENT OF PIPING.

REMARKS:

RCP-1 HOT WATER RECIRC GENERAL BUILDING GRUNDFOS 15-35SUC INLINE 3 120/1/60 SEE NOTE 1

FLA EACH V/PH/HZ

EQUIP. NO LOCATION SERVICE

BASIS OF DESIGN

MANUFACTURER

BASIS OF DESIGN

MODEL NUMBER

DESCRIPTION GPM

ELECTRICAL

REMARKS

EQUIPMENT SCHEDULE

B

A

C

(E) L-1

(E) L-2

(E) SH-1

(E) WC-2

(E) S-2

(E) S-2

(E) L-2(E) WC-1

(E) HB-1

OFFICE

(E)

ENGINEERING

(E)

EMERGENCY

GENERATOR

(E)

(E)2 1/2" CW

(E)1 1/4" HW

(E)3/4" HWC

(E)2" NG

2 1/2" CW

(E)3/4" HWC

(E )1

/2

C

W (E

)3 /4

H

W

(E )2

V

(E )2

V

(E )3

/4

H W

(E )3

/4

C W

(E)1 1/2" CW

(E)3/4" HW

(E) 4" RD UP

(E) 4" OD UP

(E)3/4" CW

(E)3" V

1 1

(E)6" W

(E)4" W

(E)4" W

(E)4" W

(E)4" W

(E)6" W

(E)6" W

IE=-7.59'

(E) FD-1

(E) FD-1

(E) FD-1

(E)1 1/4" HW

PROJECT NO.:

ISSUE DATE:

REVISIONS:

C

LA

R K

K

JO

S A

R C

H

IT

E C

T S

P Y

R

IG

H T

S W

A ld e r

S t., S u ite

P or tla nd

, O R

P h on e:

3/

4-

111 SW Fifth Ave, Ste 2120 Portland, Oregon 97204

Tel 503.416.2400 Fax 206.267.1701

SAZAN# 257-20047

/2

/2

:3

:4

A M

PLUMBING DEMOLITION

- FLOOR PLAN

04.02.21

PD1.01

IS

S

U E

D F

O R

P E

R M

IT

20018

O A

K C

R E

E K

E X

P A

N S

IO

N

L O

C H

N E

R R

D S

E A

L B

A N

Y

O R

O R

E G

O N

Y O

U T

H A

U T

H O

R

IT

Y

1/4" = 1'-0"PD1.01

1 PLUMBING DEMOLITION - FIRST FLOOR PLAN

SHEET NOTE

A. ENTIRE HOT WATER SYSTEM WILL BE REPLACED.

FLAG NOTES

1. DEMOLISH EXISTING FIXTURE. CAP WASTE PIPING BELOW FLOOR IN A PERMANENT

MANNER. CAP VENT LINE ABOVE CEILING. REMOVE COLD WATER PIPING AND CAP AT

MAIN. DEMO HOT WATER PIPING.

2. DEMOLISH EXISTING FIXTURE. CAP WASTE LINE BELOW FLOOR FOR FUTURE

CONNECTION. CAP VENT LINE FOR FIXTURE CONNECTION. CAP COLD WATER ABOVE

CEILING FOR FUTURE CONNECTION. DEMO HOT WATER PIPING.

3. DEMO OD DROP IN WALL AND PREPARE FOR FUTURE CONNECTION. EXCAVATE

UNDERGROUND ROOF DRAIN PIPING TO A POINT 6 FEET OUT FROM EXISTING

BUILDING. IF PIPING TYPE IS APPROVED FOR USE WITHIN BUILDING PER OSPC TABLE

101.2 IT MAY REMAIN IN PLACE. IF NOT REPLACE WITH APPROVED PIPING.

4. DEMO HOSE BIBB AND PIPING. CAP FOR THE FUTURE CONNECTION.

B

A

C

(E )4

W

(E)4" W(E)4" W(E)4" W(E)4" W

(E )6

W

(E )6

W

1" MV

(E)6" W

IE=-7.59'

(E )4

W

4" W

(E )4

W

1/2" CA 2

3" W UP

2" W UP

4" W UP

2" W UP

4" W UP

2" W UP

4" W UP

4" W TO FD-2

4" W UP TO FD-1

1" MV

1/2" CA

4" RD

PROJECT NO.:

ISSUE DATE:

REVISIONS:

C

LA

R K

K

JO

S A

R C

H

IT

E C

T S

P Y

R

IG

H T

S W

A ld er S t., S ui te

P or tla nd

, O R

P h on e:

3/

4-

111 SW Fifth Ave, Ste 2120 Portland, Oregon 97204

Tel 503.416.2400 Fax 206.267.1701

SAZAN# 257-20047

/2

/2

:0

:4

P

M

PLUMBING

UNDERGROUND PLAN

04.02.21

P2.00

IS

S

U E

D F

O R

P E

R M

IT

20018

O A

K C

R E

E K

E X

P A

N S

IO

N

L O

C H

N E

R R

D S

E A

L B

A N

Y

O R

O R

E G

O N

Y O

U T

H A

U T

H O

R

IT

Y

1/4" = 1'-0"P2.00

1 PLUMBING UNDERGROUND PLAN

FLAG NOTES

1. DRAIN FOR MEDICAL EQUIPMENT.

2. CONNECTION LOCATED IN FLOOR BOX AT FOOT OF CHAIR.

3. 1/2" CA AND 1" DENTAL VACUUM UP. COOERDINATE LOCATION WITH DENTAL

EQUIPMENT.

4. POINT OF CONNECTION TO EXISTING 4-INCH ROOF DRAIN PIPING.

5. SEPARATELY SLEEVE MV AND CA PIPING. SLEEVING SHALL BE 2-INCH ELECTRIC

CONDUIT USING MIN. 24" RADIUS ELBOWS.

1 Addendum 1 06-01-21

B

A

C

57 SF

STAFF TLT

63 SF

FILE STORAGE

142 SF

MED EXAM

71 SF

DENTAL UTILITY

59 SF

OFFICE

87 SF

PSYCH OFFICE

107 SF

PSYCH OFFICE

108 SF

DENTAL EXAM

58 SF

MED UTILITY

45 SF

PAT TLT

45 SF

SOILED HOLDING/

POCT

144 SF

NURSE STATION

291 SF

HALLWAY

67 SF

WAITING

S-1

WC-2

WC-1

L-2

S-1 S-1

L-1

S-1

S-1

FD-1

(E)4" RD (E)4" OD

(E )2

V (E

)2

V

DN-1

2" V

2" V

2" V

3" FS-1

(E)3" V

2" V

4" WCO

FD-2

EEW-1

EMERGENCY

GENERATOR

(E)

ELECTRICAL

ENGINEERING

(E)

OFFICE

(E)

2" V

PROJECT NO.:

ISSUE DATE:

REVISIONS:

C

LA

R K

K

JO

S A

R C

H

IT

E C

T S

P Y

R

IG

H T

S W

A ld e r

S t., S u ite

P or tla nd

, O R

P h on e:

3/

4-

111 SW Fifth Ave, Ste 2120 Portland, Oregon 97204

Tel 503.416.2400 Fax 206.267.1701

SAZAN# 257-20047

/2

/2

:3

:3

A M

PLUMBING WASTE &

VENT, ROOF DRAIN -

FLOOR PLAN

04.02.21

P2.01

IS

S

U E

D F

O R

P E

R M

IT

20018

O A

K C

R E

E K

E X

P A

N S

IO

N

L O

C H

N E

R R

D S

E A

L B

A N

Y

O R

O R

E G

O N

Y O

U T

H A

U T

H O

R

IT

Y

1/4" = 1'-0"P2.01

1 PLUMBING WASTE & VENT, ROOF DRAIN FOOR PLAN

FLAG NOTES

1. DROP 4" RD IN WALL. SEE P2.00.

2. CONNECT DENTAL AIR AND DENTAL VACUUM TO OWNER FURNISHED EQUIPMENT.

PROVIDE SHUT OFF VALVES RATED FOR SERVICE. USE ONLY TAPE JOINT SEALANT

FOR THESE SERVICES. PIPE JOINT COMPOUND (DOPE) IS PROHIBITED.

9A

B

A

C

7A

8A

57 SF

STAFF TLT

63 SF

FILE STORAGE

142 SF

MED EXAM

71 SF

DENTAL UTILITY

59 SF

OFFICE

87 SF

PSYCH OFFICE

107 SF

PSYCH OFFICE

108 SF

DENTAL EXAM

58 SF

MED UTILITY

45 SF

PAT TLT

45 SF

SOILED HOLDING/

POCT

144 SF

NURSE STATION

291 SF

HALLWAY

67 SF

WAITING

S-1

WC-2

WC-1

L-2

S-1 S-1

L-1

S-1

S-1

2 1/2" CW

(E)3/4" HWC

(E)2 1/2" CW

(E )1

/2

C

W

HB-2

1 1/4" HW

1 1/2" CW

1/2" CW

1/2" CW

1 1/2" CW TO WC-2

RPBP-11

3/4" CW

HB-1

EEW-1

(E)2" NG

3/4" HWC

1 1/4" 140º HW

3/4" HWC

1" HW

3/4" HW

3/4" HW

DOMESTIC HOT

WATER AND

SPRINKLER RISER

(E)

ELECTRICAL

(E)

ENGINEERING / SHOP

(E)

ELECTRICAL

EMERGENCY

GENERATOR

(E)

ENGINEERING

(E)

OFFICE

(E)

RCP-1

140º HW

P4.00

TPV-1

1/2" CW

1/2" HW

PROJECT NO.:

ISSUE DATE:

REVISIONS:

C

LA

R K

K

JO

S A

R C

H

IT

E C

T S

P Y

R

IG

H T

S W

A ld e r

S t., S u ite

P or tla nd

, O R

P h on e:

3/

4-

111 SW Fifth Ave, Ste 2120 Portland, Oregon 97204

Tel 503.416.2400 Fax 206.267.1701

SAZAN# 257-20047

/2

/2

:3

:3

A M

PLUMBING DOMESTIC

WATER - FLOOR PLAN

04.02.21

P3.01

IS

S

U E

D F

O R

P E

R M

IT

20018

O A

K C

R E

E K

E X

P A

N S

IO

N

L O

C H

N E

R R

D S

E A

L B

A N

Y

O R

O R

E G

O N

Y O

U T

H A

U T

H O

R

IT

Y

1/4" = 1'-0"P3.01

1 PLUMBING DOMESTIC WATER - FIRST FLOOR PLAN

SHEET NOTE:

A. HOT WATER IS CIRCULATED TO THE ANGLE STOP AT EACH FIXTURE.

B. DOUBLE CHECK VALVE BACKFLOW PREVENTER ON ALL DOMESTIC WATER SERVING

THE CLINIC.

FLAG NOTES:

1. 3/4" REDUCED PRESSURE BACKFLOW PREVENTER.

2. FIELD ROUTE 1 1/4" HW AND 3/4" HWR TO EXISTING HOT WATER HEATER. PROVIDE

NEW HOT WATER RECIRC PUMP, RCP-1.

3. THERMOSTATIC MIXING VALVE TO BE LOCATED AT EACH SINK. SEE DETAIL 3 / P4.00.

4. WATER HEATERS ARE EXISTING.

5. PROVIDE SOV ON DROP.

CLEANOUT BOXFLOOR COVER

CLEANOUT PLUG

UNDERGROUND DRAIN PIPING

C.I. NO-HUB CPLG.

SPEEDY SEAL OR

FERNCO CPLG.

COORDINATE SETTING

OF GRATE FLUSH WITH

FLOOR

STRUCTURAL SLAB

TY-SEAL

ATTACHMENT

WATER-PROOF

MEMBRANE

CONCRETE FILL

CEMENT BED

TILE FLOOR

M

CH

TEMPERING VALVE

TEMPERING VALVE

M

C

H

(N) 1" HWC

(E) HWC

RCP-1

CONNECT TO EXISTING COLD

WATER SUPPLY TO EXISTING

WATER HEATERS DOWNSTREAM

OF SHUT OFF AND CHECK VALVES

PROVIDE NEW BALANCING,

CHECK AND SHUT OFF VALVES

ON EXISTING HWC PIPING

PROJECT NO.:

ISSUE DATE:

REVISIONS:

C

LA

R K

K

JO

S A

R C

H

IT

E C

T S

P Y

R

IG

H T

S W

A ld er S t., S ui te

P or tla nd

, O R

P h on e:

3/

4-

111 SW Fifth Ave, Ste 2120 Portland, Oregon 97204

Tel 503.416.2400 Fax 206.267.1701

SAZAN# 257-20047

/2

/2

:0

:5

P

M

PLUMBING DETAILS

04.02.21

P4.00

IS

S

U E

D F

O R

P E

R M

IT

20018

O A

K C

R E

E K

E X

P A

N S

IO

N

L O

C H

N E

R R

D S

E A

L B

A N

Y

O R

O R

E G

O N

Y O

U T

H A

U T

H O

R

IT

Y

12" = 1'-0"

FLOOR CLEANOUT DETAIL

12" = 1'-0"

FLOOR DRAIN DETAIL

1 Addendum 1 06-01-21

12" = 1'-0"

THERMOSTATIC MIXING VALVE DETAIL

12" = 1'-0"

HWC SCHEMATIC

Sheets
P0.00 - GENERAL NOTES, ABBREVIATIONS AND SHEET INDEX
P0.01 - PLUMBING SCHEDULES
PD1.01 - PLUMBING DEMOLITION - FLOOR PLAN
P2.00 - PLUMBING UNDERGROUND PLAN
P2.01 - PLUMBING WASTE & VENT, ROOF DRAIN - FLOOR PLAN
P3.01 - PLUMBING DOMESTIC WATER - FLOOR PLAN
P4.00 - PLUMBING DETAILS

File details come from the government source that posted it. Updated .