This document is a Pre-Construction Checklist for a VA (Veterans Affairs) construction project that outlines critical administrative and operational requirements for contractors. The checklist covers key areas including contract authority, progress schedules, payment procedures, project management, safety protocols, change order processes, and administrative requirements. Significant provisions include: submitting a cost schedule within 10 calendar days of Notice to Proceed, monthly payments based on completed work, mandatory daily logs tracking workforce, specific procedures for proposing contract changes, requirements for subcontractor submissions, and labor standards provisions such as posting wage rates and apprenticeship certifications. The document emphasizes that only the Contracting Officer can authorize contract changes, and provides detailed guidelines for correspondence, contract modifications, and project documentation.

View the file

Other files

File Type Posted
S05 Pre-Bid RFIs 12.18.25.xlsx XLSX spreadsheet
S05 Pre-Bid RFIs 11.25.25.xlsx XLSX spreadsheet
ATT - 15th Floor Legend.png PNG image
ATT - Loading Dock Area.png PNG image
ATT - Service Elevators.png PNG image
ATT - 238200.pdf PDF
36C25225B0026 0003.docx DOCX document
ATT - Contractor Village.png PNG image
S05 Pre-Bid RFIs 10.30.25.xlsx XLSX spreadsheet
36C25225B0026 0002.docx DOCX document
36C25225B0026 0001.docx DOCX document
079200 JOINT SEALANTS.pdf PDF
S05 Pre-Bid RFIs 10.2.25.xlsx XLSX spreadsheet
078400 FIRESTOPPING.pdf PDF
ATT - 23 578-23-013 Task Locations.pdf PDF
ATT - 20c VHA ICRA-1.3 Task 3.pdf PDF
ATT - 20a VHA ICRA-1.3 Task 1.pdf PDF
ATT - 19 Interim Life Safety Measures.pdf PDF
ATT - 18g VHA PCRA 2024_1.1_Task 7.pdf PDF
ATT - 18f VHA PCRA 2024_1.1_Task 6.pdf PDF
ATT - 10 Fire Protection Code Reviews.pdf PDF
ATT - 7 Infection Control Barrier Sample.pdf PDF
ATT - 3 Parking Designations 08042025.pdf PDF
ATT - 2 HINES VA SITE PLAN 5-1-2025.pdf PDF
ATT - 22 578-23-013 Asbestos Quantity Estimates.pdf PDF
ATT - 21 Specifications 578-23-013.pdf PDF
ATT - 20g VHA ICRA-1.3 Task 7.pdf PDF
ATT - 20b VHA ICRA-1.3 Task 2.pdf PDF
ATT - 1 Hines Underground Utility Plan.pdf PDF
36C25225B0026_1.docx DOCX document
ATT - 20e VHA ICRA-1.3 Task 5.pdf PDF
ATT - 20d VHA ICRA-1.3 Task 4.pdf PDF
ATT - 18d VHA PCRA 2024_1.1_Task 4.pdf PDF
ATT - 18c VHA PCRA 2024_1.1_Task 3.pdf PDF
ATT - 18a VHA PCRA 2024_1.1_Task 1.pdf PDF
ATT - 15 Hines COVID-19 Guidelines.pdf PDF
ATT - 12 Cutting Welding and Other Hot Work.pdf PDF
ATT - 11 No Smoking Policy 10-1-19.pdf PDF
ATT - 8 Dig Permit SOP Form.pdf PDF
ATT - 4 Contractor Badging - Fingerprint Request Form.pdf PDF
P07 Wage Determination.pdf PDF
ATT - 20f VHA ICRA-1.3 Task 6.pdf PDF
ATT - 18e VHA PCRA 2024_1.1_Task 5.pdf PDF
ATT - 18b VHA PCRA 2024_1.1_Task 2.pdf PDF
ATT - 17 Emergency Contact List - Template.pdf PDF
ATT - 16 VHA Supplemental Contract Requirements for Ensuring Adequate COVID-19 Safety Protocols for Federal Contractors rev2.pdf PDF
ATT - 14 OIT Horizontal Cable Requirements.pdf PDF
ATT - 13 Asbestos Survey Glossary.pdf PDF
ATT - 9 Above Ceiling Permits.pdf PDF
ATT - 5 Safety and Health During Construction Activities.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PRE-CONSTRUCTION CHECKLIST

PROJECT: __________________________________________________

DATE: ____________________ CONTRACT: _____________________

1. AUTHORITY OF GOVERNMENT PERSONNEL.

☐ a. The Contracting Officer is the only person authorized to bind the U.S.

Government, and then only to the extent of the authority invested in him/her by the appointment.

☐ b. The VA Project Manager is designated as the Contracting Officer's representative for the purpose of technical supervision and acceptance. The VA Project Manager is responsible for the inspection of the work called for in the contract schedules, including related specifications and contract terms regarding on-site work requirements. Pursuant to the delegation of authority (attached), the Project Manager does not have the authority to make changes to the contract in amount or time.

☐ c. The VA Project Manager for this project is _________________

☐ d. No other office or individual has the authority to act in any manner on behalf of the U.S. Government in the performance of this contract. The VA Project Manager will refer any changes or questions regarding this contract to the Contracting Officer.

2. CONTRACT PROGRESS SCHEDULES AND REPORTS:

☐ a. The Contractor shall submit a schedule of cost to the Contracting Officer within 10 calendar days after date of receipt of the Notice to Proceed.

The approved cost schedule will be one of the bases for determining progress payments for work completed. In accordance with FAR 52.236-1, Performance of Work by the Contractor, the schedule must indicate what portion(s) of the work the contractor intends to perform with his/her own workforce to meet the 15% requirement.

☐ b. The Contractor shall submit a progress chart, with in l O calendar days after issuance of a Notice to Proceed, which indicates the anticipated installation of work versus the elapsed contract time, which shall be represented in the form of a bar graph. The starting date of the schedule shall be the date of the Notice to Proceed and the ending date shall be the original contract completion date.

☐ c. Submittals, samples, and shop drawings. Project Engineer will explain distribution procedures

3. PAYMENT REQUESTS:

☐ a. Payments shall be made monthly by the VA according to the value of completed work from the Contractor's approved Schedule of Costs. All invoices should be submitted to Austin Texas as outlined in the contract. In accordance with the Prompt Payment Act, the fourteen (14) day timeframe for payment shall commence on the date a proper invoice is received by the CO. Included with the pay request shall be the payroll sheets for the Contractor and Subcontractors.

4. PROTECTION OF SURROUNDING AREA:

☐ a. In performing this contract, the Contractor shall provide for protecting the lives and health of employees and other persons, preventing damage to property, materials, supplies, equipment and avoiding work interruptions.

☐ b. Any damage caused by the Contractor or his personnel will be restored and repaired at the expense of the Contractor.

5. DAILY LOGS:

☐ a. The Contractor shall provide the VA Project Manager with daily logs.

Project Engineer will explain frequency. The daily log shall identify the number of laborers, supervisors and each branch of work and will be used to verify payrolls submitted.

6. SAFETY:

☐ a. The VA Safety Officer has the authority to stop work if a serious safety violation is being committed.

7. CHANGES:

☐ a. The Contracting Officer (CO), from information furnished by the COTR may, by a written order, make changes to the drawings and/or specifications that are within the general scope of the contract. No other person is authorized to make revisions, changes, or deletions from the contract.

☐ b. Proposals for changes in work shall be submitted to the Contracting Officer according to the requirements contained in Clauses 52.243-4 and 852.236-88 of the General Conditions. Proposals more than $1,000 must include:

1. Itemized breakdown of labor and material costs.

2. List of subcontractors performing the work.

3. Overhead & Profit percentages.

☐ c. Change Orders (Proceed Orders): There may be some instances (as described in Clause 52.343-4 of the General Conditions) where the need to proceed with a change in work is necessary. In these cases, written authorization will be issued by the Contracting Officer (CO) to proceed with the work. An equitable adjustment will be negotiated within 30 calendar days.

8. SUBCONTRACTORS:

☐ a. The Contractor shall submit a list of subcontractors which will include names and addresses and the nature of work involved (SF 1413). The Contracting Officer reserves the right to disapprove any proposed Subcontractor who has had prior record of unsatisfactory work at this site, or any Federal or non-Federal Agency.

9. LABOR STANDARDS PROVISONS AND PAYROLLS:

☐ a. A copy of the rates and wages shall be posted by the Contractor in a prominent place at the work site.

☐ b. Apprentices will be permitted to work only under a Bona Fide apprenticeship program. Concurrent with or prior to the first payroll listing, certificates of apprenticeship from a recognized council shall be submitted to the Contracting Officer.

10. CORRESPONDENCE:

a. All correspondence from the Contractor shall bear:

☐ (1) Contract Number

☐ (2) Project Title

☐ (3) Project Name

11. OTHER TOPICS SPECIFIC TO THIS PROJECT:

{Signature of Contracting Officer, (CO) Date

Signature of Project Manager, (COR) Date

Signature of Contractor Date:

PROJECT:
DATE:
CONTRACT:
c The VA Project Manager for this project is:
11 OTHER TOPICS SPECIFIC TO THIS PROJECT 1:
11 OTHER TOPICS SPECIFIC TO THIS PROJECT 2:
11 OTHER TOPICS SPECIFIC TO THIS PROJECT 3:
11 OTHER TOPICS SPECIFIC TO THIS PROJECT 4:
11 OTHER TOPICS SPECIFIC TO THIS PROJECT 5:
11 OTHER TOPICS SPECIFIC TO THIS PROJECT 6:
11 OTHER TOPICS SPECIFIC TO THIS PROJECT 7:
11 OTHER TOPICS SPECIFIC TO THIS PROJECT 8:
11 OTHER TOPICS SPECIFIC TO THIS PROJECT 9:
11 OTHER TOPICS SPECIFIC TO THIS PROJECT 10:
11 OTHER TOPICS SPECIFIC TO THIS PROJECT 11:
11 OTHER TOPICS SPECIFIC TO THIS PROJECT 12:
11 OTHER TOPICS SPECIFIC TO THIS PROJECT 13:
11 OTHER TOPICS SPECIFIC TO THIS PROJECT 14:
Check Box1: Off
Check Box2: Off
Check Box3: Off
Check Box4: Off
Check Box5: Off
Check Box6: Off
Check Box7: Off
Check Box8: Off
Check Box9: Off
Check Box10: Off
Check Box11: Off
Check Box12: Off
Check Box13: Off
Check Box14: Off
Check Box15: Off
Check Box16: Off
Check Box17: Off
Check Box18: Off
Check Box19: Off
Check Box20: Off
Check Box21: Off

File details come from the government source that posted it. Updated .