This document appears to be a series of demolition and renovation project plans for multiple rooms and floors across Building 200 and Building 1, detailing seven distinct tasks with specific timelines and areas of focus. Each task involves a full or partial demolition of specific spaces, with calendar days ranging from 15-120, and including additional abatement and monitoring days. The tasks include:
Task 1: Full gut demolition of Floor 15 in Building 200, spanning 120 calendar days with specific fire safety requirements to maintain stairwell and mechanical room partitions. Tasks 2-7 involve various rooms in Building 1 (F350, C307, C130, B209/B313, D239, A306), with calendar days ranging from 15-20, and 2-4 abatement days and 4-6 monitoring days per task. The project involves medical research spaces, engineering mechanical rooms, common corridors, and vertical chase areas, suggesting a comprehensive renovation of research and administrative facilities with careful attention to structural and safety considerations.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Task 1:
Bldg. 200, Floor 15 Full Gut Demolition of Entire Floor
Calendar Days = 120 Abatement Days = 0 Monitoring Days = 0
Floor 15, Building 200 Fire Drawing
Ensure all wall partitions enclosing stairwells, and mechanical rooms remain intact. Ensure that the Smoke and Fire rated structures retain their existing Smoke or Fire rating in accordance with VA specification 078400 Firestopping.
Building 200 – Floor 15
Building 200 – Floor 15
Task 2:
Building 1 – F350
Calendar Days = 15 Abatement Days =2 Monitoring Days = 4
Building 1 – F350
Task 3:
Building 1 – C307
Calendar Days = 20 Abatement Days = 2
Building 1 – C307
Task 4: Building 1 – C130
Calendar days = 20 Abatement days = 4 Monitoring Days = 6
Building 1 – C130
Task 5: Building 1 – B209 & B313
Calendar Days = 20 Abatement Days = 4 Monitoring Days = 6
Building 1 – B209 & B313 B209
B313
Task 6: Building 1 – D239
Calendar Days = 15
Building 1 – D239
Task 7: Building 1 – A306
Calendar Days = 20
Building 1 – A306
| Slide Number 1 |
| Floor 15, Building 200 Fire Drawing |
| Building 200 – Floor 15 |
| Building 200 – Floor 15 |
| Slide Number 5 |
| Building 1 – F350 |
| Slide Number 7 |
| Building 1 – C307 |
| Slide Number 9 |
| Building 1 – C130 |
| Slide Number 11 |
| Building 1 – B209 & B313 |
| Slide Number 13 |
| Building 1 – D239 |
| Slide Number 15 |
| Building 1 – A306 |
File details come from the government source that posted it. Updated .