This document appears to be a series of demolition and renovation project plans for multiple rooms and floors across Building 200 and Building 1, detailing seven distinct tasks with specific timelines and areas of focus. Each task involves a full or partial demolition of specific spaces, with calendar days ranging from 15-120, and including additional abatement and monitoring days. The tasks include:

Task 1: Full gut demolition of Floor 15 in Building 200, spanning 120 calendar days with specific fire safety requirements to maintain stairwell and mechanical room partitions. Tasks 2-7 involve various rooms in Building 1 (F350, C307, C130, B209/B313, D239, A306), with calendar days ranging from 15-20, and 2-4 abatement days and 4-6 monitoring days per task. The project involves medical research spaces, engineering mechanical rooms, common corridors, and vertical chase areas, suggesting a comprehensive renovation of research and administrative facilities with careful attention to structural and safety considerations.

View the file

Other files

File Type Posted
S05 Pre-Bid RFIs 12.18.25.xlsx XLSX spreadsheet
S05 Pre-Bid RFIs 11.25.25.xlsx XLSX spreadsheet
ATT - Contractor Village.png PNG image
S05 Pre-Bid RFIs 10.30.25.xlsx XLSX spreadsheet
ATT - 15th Floor Legend.png PNG image
ATT - Loading Dock Area.png PNG image
ATT - Service Elevators.png PNG image
ATT - 238200.pdf PDF
36C25225B0026 0003.docx DOCX document
36C25225B0026 0002.docx DOCX document
079200 JOINT SEALANTS.pdf PDF
S05 Pre-Bid RFIs 10.2.25.xlsx XLSX spreadsheet
078400 FIRESTOPPING.pdf PDF
36C25225B0026 0001.docx DOCX document
ATT - 22 578-23-013 Asbestos Quantity Estimates.pdf PDF
ATT - 21 Specifications 578-23-013.pdf PDF
ATT - 20g VHA ICRA-1.3 Task 7.pdf PDF
ATT - 20b VHA ICRA-1.3 Task 2.pdf PDF
ATT - 1 Hines Underground Utility Plan.pdf PDF
36C25225B0026_1.docx DOCX document
ATT - 20e VHA ICRA-1.3 Task 5.pdf PDF
ATT - 20d VHA ICRA-1.3 Task 4.pdf PDF
ATT - 18d VHA PCRA 2024_1.1_Task 4.pdf PDF
ATT - 18c VHA PCRA 2024_1.1_Task 3.pdf PDF
ATT - 18a VHA PCRA 2024_1.1_Task 1.pdf PDF
ATT - 15 Hines COVID-19 Guidelines.pdf PDF
ATT - 12 Cutting Welding and Other Hot Work.pdf PDF
ATT - 11 No Smoking Policy 10-1-19.pdf PDF
ATT - 8 Dig Permit SOP Form.pdf PDF
ATT - 4 Contractor Badging - Fingerprint Request Form.pdf PDF
ATT - 20c VHA ICRA-1.3 Task 3.pdf PDF
ATT - 20a VHA ICRA-1.3 Task 1.pdf PDF
ATT - 19 Interim Life Safety Measures.pdf PDF
ATT - 18g VHA PCRA 2024_1.1_Task 7.pdf PDF
ATT - 18f VHA PCRA 2024_1.1_Task 6.pdf PDF
ATT - 10 Fire Protection Code Reviews.pdf PDF
ATT - 7 Infection Control Barrier Sample.pdf PDF
ATT - 3 Parking Designations 08042025.pdf PDF
ATT - 2 HINES VA SITE PLAN 5-1-2025.pdf PDF
P07 Wage Determination.pdf PDF
ATT - 20f VHA ICRA-1.3 Task 6.pdf PDF
ATT - 18e VHA PCRA 2024_1.1_Task 5.pdf PDF
ATT - 18b VHA PCRA 2024_1.1_Task 2.pdf PDF
ATT - 17 Emergency Contact List - Template.pdf PDF
ATT - 16 VHA Supplemental Contract Requirements for Ensuring Adequate COVID-19 Safety Protocols for Federal Contractors rev2.pdf PDF
ATT - 14 OIT Horizontal Cable Requirements.pdf PDF
ATT - 13 Asbestos Survey Glossary.pdf PDF
ATT - 9 Above Ceiling Permits.pdf PDF
ATT - 6 Pre-Construction Checklist Rev 07.27.2021.pdf PDF
ATT - 5 Safety and Health During Construction Activities.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Task 1:

Bldg. 200, Floor 15 Full Gut Demolition of Entire Floor

Calendar Days = 120 Abatement Days = 0 Monitoring Days = 0

Floor 15, Building 200 Fire Drawing

Ensure all wall partitions enclosing stairwells, and mechanical rooms remain intact. Ensure that the Smoke and Fire rated structures retain their existing Smoke or Fire rating in accordance with VA specification 078400 Firestopping.

Building 200 – Floor 15

Building 200 – Floor 15

Task 2:

Building 1 – F350

Calendar Days = 15 Abatement Days =2 Monitoring Days = 4

Building 1 – F350

Task 3:

Building 1 – C307

Calendar Days = 20 Abatement Days = 2

Building 1 – C307

Task 4: Building 1 – C130

Calendar days = 20 Abatement days = 4 Monitoring Days = 6

Building 1 – C130

Task 5: Building 1 – B209 & B313

Calendar Days = 20 Abatement Days = 4 Monitoring Days = 6

Building 1 – B209 & B313 B209

B313

Task 6: Building 1 – D239

Calendar Days = 15

Building 1 – D239

Task 7: Building 1 – A306

Calendar Days = 20

Building 1 – A306

Slide Number 1
Floor 15, Building 200 Fire Drawing
Building 200 – Floor 15
Building 200 – Floor 15
Slide Number 5
Building 1 – F350
Slide Number 7
Building 1 – C307
Slide Number 9
Building 1 – C130
Slide Number 11
Building 1 – B209 & B313
Slide Number 13
Building 1 – D239
Slide Number 15
Building 1 – A306