ATT - 238200.pdf

PDF 79 KB Posted

Attached to
Z1DA--578-23-013 Abatement Task Order D
Solicitation number
36C25225B0026
Issued by

About this file

This is a technical specification document for Convection Heating and Cooling Units (Section 23 82 00), specifically focusing on finned-tube radiation units for HVAC systems. The document details product requirements for radiation units with two primary heating element configurations: hydronic and electric. Hydronic heating elements consist of steel pipe or nonferrous tubing with mechanically bonded fins, designed for silent horizontal expansion and contraction. Electric heating elements are Cal-rod resistance type units installed inside aluminum tubes, with automatic thermal cutout protection and UL approval.

The specification includes detailed requirements for enclosures, which must be 1.6 mm steel with a sloping top, designed for wall mounting and finished in baked enamel. Installation guidelines mandate rigorous support to prevent distortion, with cross-bracing as needed. Additional requirements include installing fiberglass blanket insulation with a minimum R-value of 8 above hydronic radiant panels. The document also specifies that a manufacturer's technical representative must provide 4 hours of training to VA personnel on system operation and maintenance, and that all units must be tested to prove compliance with design specifications.

View the file

Other files

File Type Posted
S05 Pre-Bid RFIs 12.18.25.xlsx XLSX spreadsheet
S05 Pre-Bid RFIs 11.25.25.xlsx XLSX spreadsheet
ATT - Contractor Village.png PNG image
S05 Pre-Bid RFIs 10.30.25.xlsx XLSX spreadsheet
ATT - 15th Floor Legend.png PNG image
ATT - Loading Dock Area.png PNG image
ATT - Service Elevators.png PNG image
36C25225B0026 0003.docx DOCX document
36C25225B0026 0002.docx DOCX document
079200 JOINT SEALANTS.pdf PDF
S05 Pre-Bid RFIs 10.2.25.xlsx XLSX spreadsheet
36C25225B0026 0001.docx DOCX document
078400 FIRESTOPPING.pdf PDF
ATT - 22 578-23-013 Asbestos Quantity Estimates.pdf PDF
ATT - 21 Specifications 578-23-013.pdf PDF
ATT - 20g VHA ICRA-1.3 Task 7.pdf PDF
ATT - 20b VHA ICRA-1.3 Task 2.pdf PDF
ATT - 1 Hines Underground Utility Plan.pdf PDF
36C25225B0026_1.docx DOCX document
ATT - 23 578-23-013 Task Locations.pdf PDF
ATT - 20c VHA ICRA-1.3 Task 3.pdf PDF
ATT - 20a VHA ICRA-1.3 Task 1.pdf PDF
ATT - 19 Interim Life Safety Measures.pdf PDF
ATT - 18g VHA PCRA 2024_1.1_Task 7.pdf PDF
ATT - 18f VHA PCRA 2024_1.1_Task 6.pdf PDF
ATT - 10 Fire Protection Code Reviews.pdf PDF
ATT - 7 Infection Control Barrier Sample.pdf PDF
ATT - 3 Parking Designations 08042025.pdf PDF
ATT - 2 HINES VA SITE PLAN 5-1-2025.pdf PDF
ATT - 20e VHA ICRA-1.3 Task 5.pdf PDF
ATT - 20d VHA ICRA-1.3 Task 4.pdf PDF
ATT - 18d VHA PCRA 2024_1.1_Task 4.pdf PDF
ATT - 18c VHA PCRA 2024_1.1_Task 3.pdf PDF
ATT - 18a VHA PCRA 2024_1.1_Task 1.pdf PDF
ATT - 15 Hines COVID-19 Guidelines.pdf PDF
ATT - 12 Cutting Welding and Other Hot Work.pdf PDF
ATT - 11 No Smoking Policy 10-1-19.pdf PDF
ATT - 8 Dig Permit SOP Form.pdf PDF
ATT - 4 Contractor Badging - Fingerprint Request Form.pdf PDF
P07 Wage Determination.pdf PDF
ATT - 20f VHA ICRA-1.3 Task 6.pdf PDF
ATT - 18e VHA PCRA 2024_1.1_Task 5.pdf PDF
ATT - 18b VHA PCRA 2024_1.1_Task 2.pdf PDF
ATT - 17 Emergency Contact List - Template.pdf PDF
ATT - 16 VHA Supplemental Contract Requirements for Ensuring Adequate COVID-19 Safety Protocols for Federal Contractors rev2.pdf PDF
ATT - 14 OIT Horizontal Cable Requirements.pdf PDF
ATT - 13 Asbestos Survey Glossary.pdf PDF
ATT - 9 Above Ceiling Permits.pdf PDF
ATT - 6 Pre-Construction Checklist Rev 07.27.2021.pdf PDF
ATT - 5 Safety and Health During Construction Activities.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

03-01-23

23 82 00 - 1

SECTION 23 82 00

CONVECTION HEATING AND COOLING UNITS

PART 1 - GENERAL

1.1 DESCRIPTION

A. A complete listing of common acronyms and abbreviations are included in

Section 23 05 11, COMMON WORK RESULTS FOR HVAC.

B. This section specifies finned-tube radiation.

1.2 RELATED WORK

A. Section 01 00 00, GENERAL REQUIREMENTS.

B. Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES.

C. Section 01 81 13, SUSTAINABLE CONSTRUCTION REQUIREMENTS.

D. //Section 01 91 00, GENERAL COMMISSIONING REQUIREMENTS.//

F. Section 23 05 11, COMMON WORK RESULTS FOR HVAC.

G. Section 23 05 41, NOISE and VIBRATION CONTROL FOR HVAC PIPING and

EQUIPMENT.

H. Section 23 05 93, TESTING, ADJUSTING, and BALANCING FOR HVAC.

J. Section 23 09 23, DIRECT-DIGITAL CONTROL SYSTEM FOR HVAC.

K. Section 23 21 13, HYDRONIC PIPING.

L. Section 23 31 00, HVAC DUCTS and CASINGS.

M. Section 23 82 16, AIR COILS.

1.3 APPLICABLE PUBLICATIONS

A. The publications listed below form a part of this specification to the extent referenced. The publications are referenced in the text by the basic designation only. Where conflicts occur these specifications and the VHA standards will govern.

B. Air-Conditioning, Heating, and Refrigeration Institute (ANSI/AHRI):

440-2019................Performance Rating of Fan-Coil Units

C. National Fire Protection Association (NFPA):

70-2020.................National Electrical Code

90A-2021................Standard for the Installation of

Air-Conditioning and Ventilating Systems

D. Underwriters Laboratories, Inc. (UL):

181-2013(R2017).........Standard for Factory-Made Air Ducts and Air

Connectors

1995-2015(R2018)........Heating and Cooling Equipment

23 82 00 - 2

1.4 SUBMITTALS

A. Submittals, including number of required copies, shall be submitted in accordance with Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND

SAMPLES.

B. Information and material submitted under this section shall be marked

“SUBMITTED UNDER SECTION 23 XX XX, SECTION TITLE”, with applicable paragraph identification.

C. Manufacturer's Literature and Data Including: Full item description and optional features and accessories. Include dimensions, weights, materials, applications, standard compliance, model numbers, size, and capacity.

1. Finned-tube radiation.

D. Certificates:

1. Compliance with paragraph QUALITY ASSURANCE.

2. Compliance with specified standards.

E. Complete operating and maintenance manuals including wiring diagrams, technical data sheets, information for ordering replaceable parts, and troubleshooting guide:

1. Include complete list indicating all components of the systems.

2. Include complete diagrams of the internal wiring for each item of equipment.

3. Diagrams shall have their terminals identified to facilitate installation, operation, and maintenance.

1.5 QUALITY ASSURANCE

A. Refer to paragraph QUALITY ASSURANCE of Section 23 05 11, COMMON WORK

RESULTS FOR HVAC. Provide guarantee in accordance with FAR clause

52.246-21.

B. Bio-Based Materials: For products designated by the USDA’s

Bio-Preferred Program, provide products that meet or exceed USDA recommendations for bio-based content, so long as products meet all performance requirements in this specifications section. For more information regarding the product categories covered by the

Bio-Preferred Program, visit http://www.biopreferred.gov.

C. Refer to Section 01 81 13, SUSTAINABLE CONSTRUCTION REQUIREMENTS for additional sustainable design requirements.

1.6 AS-BUILT DOCUMENTATION

A. Comply with requirements in paragraph AS-BUILT DOCUMENTATION of Section

23 05 11, COMMON WORK RESULTS FOR HVAC.

http://www.biopreferred.gov/

23 82 00 - 3

PART 2 - PRODUCTS

2.1 FINNED-TUBE RADIATION UNITS

A. Ratings: Certified under the I=B=R program of the Gas Appliance

Manufacturer’s Association.

B. Enclosures: 1.6 mm (l6 gauge) steel, sloping top, designed for wall mounting. Provide baked enamel finish in standard manufacturer’s colors as selected by the Architect. End plates and corner pieces shall be die-formed with round edges and fit flush with enclosure surface. Where continuous wall-to-wall installations are shown in the contract documents provide all fillers, corner fittings, sleeves, end caps and other accessories, which shall have the same profile as the basic unit.

Provide access panels or extensions where required for access to valves, or traps shown in the contract documents.

C. Hydronic Heating Elements: Steel pipe or nonferrous tubing with fins mechanically bonded by mechanical expansion of the tube. Elements shall be positively positioned front-to-back with provisions for silent horizontal expansion and contraction.

D. Electric Heating Elements: Cal-rod electric resistance type inside aluminum tubes, mechanically expanded into fins and suspended between junction boxes. Provide capillary type automatic reset thermal cutout for immediate overheat protection. Front panel temperature shall not exceed 54 degrees C (l30 degrees F). Units shall be UL approved.

PART 3 - EXECUTION

3.1 INSTALLATION

A. If an installation is unsatisfactory to the COR, the contractor shall correct the installation at no additional cost or time to the

Government.

B. Work shall be installed as shown and according to the manufacturer’s diagrams and recommendations.

C. Handle and install units in accordance with manufacturer's written instructions.

D. Support units rigidly so they always remain stationary. Cross-bracing or other means of stiffening shall be provided as necessary. Method of support shall be such that distortion and malfunction of units cannot occur.

23 82 00 - 4

E. Install fiberglass blanket insulation with a minimum R value of 8 above hydronic radiant panels.

3.2 STARTUP AND TESTING

A. Perform tests as recommended by product manufacturer and listed standards and under actual or simulated operating conditions and prove full compliance with design and specified requirements. Tests of the various items of equipment shall be performed simultaneously with the system of which each item is an integral part.

B. When any defects are detected, correct defects and repeat test at no additional cost or time to the Government.

3.3 DEMONSTRATION AND TRAINING

A. Provide services of manufacturer’s technical representative for //4//

// // hour//s// to instruct each VA personnel responsible in operation and maintenance of the system.

- - - E N D - - -

SECTION 23 82 00
CONVECTION HEATING AND COOLING UNITS
PART 1 - GENERAL
1.1 DESCRIPTION
1.2 RELATED WORK
1.3 APPLICABLE PUBLICATIONS
1.4 SUBMITTALS
1.5 QUALITY ASSURANCE
1.6 AS-BUILT DOCUMENTATION
PART 2 - PRODUCTS
2.1 FINNED-TUBE RADIATION UNITS
PART 3 - EXECUTION
3.1 INSTALLATION
3.2 STARTUP AND TESTING
3.3 DEMONSTRATION AND TRAINING

File details come from the government source that posted it. Updated .