This is a Revised Bid Schedule for Solicitation 36C25225B0026, Project 578-23-013, an abatement task order for the Edward Hines Jr. VA Hospital in Hines, IL. The contract requires a contractor to perform comprehensive interior demolition, abatement, and restoration across seven specific tasks in Buildings 1 and 200, involving removal of lead paint, mold, asbestos-containing materials (ACM), vinyl composite floor tiles, carpeting, and pipe insulation. The project scope includes selective interior demolition, removing interior finishes, and restoring spaces, with all work to be completed within 290 calendar days after receiving the Notice to Proceed.

The solicitation includes critical bidding requirements such as a bid guarantee of 20% of the bid price (not exceeding $1,000,000), mandatory Payment and Performance Bonds, and the requirement for an approved cost-loaded Critical Path Method (CPM) construction schedule before commencing work. Award will be made to the responsible bidder submitting the lowest responsive bid, with all bid documents available electronically on SAM.gov. Bidders must provide per-square-foot pricing for abatement and demolition, and submit detailed pricing for seven specific task areas involving different rooms and floors across the VA hospital facility.

View the file

Other files

File Type Posted
S05 Pre-Bid RFIs 12.18.25.xlsx XLSX spreadsheet
S05 Pre-Bid RFIs 11.25.25.xlsx XLSX spreadsheet
ATT - Contractor Village.png PNG image
S05 Pre-Bid RFIs 10.30.25.xlsx XLSX spreadsheet
ATT - 15th Floor Legend.png PNG image
ATT - Loading Dock Area.png PNG image
ATT - Service Elevators.png PNG image
ATT - 238200.pdf PDF
36C25225B0026 0003.docx DOCX document
36C25225B0026 0002.docx DOCX document
079200 JOINT SEALANTS.pdf PDF
S05 Pre-Bid RFIs 10.2.25.xlsx XLSX spreadsheet
36C25225B0026 0001.docx DOCX document
078400 FIRESTOPPING.pdf PDF
ATT - 22 578-23-013 Asbestos Quantity Estimates.pdf PDF
ATT - 21 Specifications 578-23-013.pdf PDF
ATT - 20g VHA ICRA-1.3 Task 7.pdf PDF
ATT - 20b VHA ICRA-1.3 Task 2.pdf PDF
ATT - 1 Hines Underground Utility Plan.pdf PDF
36C25225B0026_1.docx DOCX document
ATT - 23 578-23-013 Task Locations.pdf PDF
ATT - 20c VHA ICRA-1.3 Task 3.pdf PDF
ATT - 20a VHA ICRA-1.3 Task 1.pdf PDF
ATT - 19 Interim Life Safety Measures.pdf PDF
ATT - 18g VHA PCRA 2024_1.1_Task 7.pdf PDF
ATT - 18f VHA PCRA 2024_1.1_Task 6.pdf PDF
ATT - 10 Fire Protection Code Reviews.pdf PDF
ATT - 7 Infection Control Barrier Sample.pdf PDF
ATT - 3 Parking Designations 08042025.pdf PDF
ATT - 2 HINES VA SITE PLAN 5-1-2025.pdf PDF
ATT - 20e VHA ICRA-1.3 Task 5.pdf PDF
ATT - 20d VHA ICRA-1.3 Task 4.pdf PDF
ATT - 18d VHA PCRA 2024_1.1_Task 4.pdf PDF
ATT - 18c VHA PCRA 2024_1.1_Task 3.pdf PDF
ATT - 18a VHA PCRA 2024_1.1_Task 1.pdf PDF
ATT - 15 Hines COVID-19 Guidelines.pdf PDF
ATT - 12 Cutting Welding and Other Hot Work.pdf PDF
ATT - 11 No Smoking Policy 10-1-19.pdf PDF
ATT - 8 Dig Permit SOP Form.pdf PDF
ATT - 4 Contractor Badging - Fingerprint Request Form.pdf PDF
P07 Wage Determination.pdf PDF
ATT - 20f VHA ICRA-1.3 Task 6.pdf PDF
ATT - 18e VHA PCRA 2024_1.1_Task 5.pdf PDF
ATT - 18b VHA PCRA 2024_1.1_Task 2.pdf PDF
ATT - 17 Emergency Contact List - Template.pdf PDF
ATT - 16 VHA Supplemental Contract Requirements for Ensuring Adequate COVID-19 Safety Protocols for Federal Contractors rev2.pdf PDF
ATT - 14 OIT Horizontal Cable Requirements.pdf PDF
ATT - 13 Asbestos Survey Glossary.pdf PDF
ATT - 9 Above Ceiling Permits.pdf PDF
ATT - 6 Pre-Construction Checklist Rev 07.27.2021.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Revised Bid Schedule

SOLICITATION: 36C25225B0026

PROJECT: 578-23-013 (CON) Abatement Task Order D

The contractor shall provide for and furnish all labor, supervision, materials, tools, equipment, licenses, certification, insurance, safety, and temporary protection to complete selective interior demolition, removing all remaining interior finishes, and restoration of spaces as identified within this project’s Scope of Work.

In addition, the contractor shall abate all lead paint, all mold, and all asbestos containing materials (ACM) from spaces identified within this SOW. Included in the scope will be removal and disposal of all suspect vinyl composite floor tile (VCT) and mastic throughout the project area. Removal and disposal of all carpeting, padding and underlayment materials as indicated;

removal and disposal of all (ACM) pipe insulation, abatement of all lead paint, and remediation of all molds from within project area.

Provide work in accordance with federal, state, and local authorities as detailed in the attached project scope of work, specifications and drawings at the Edward Hines Jr. VA Hospital in Hines, IL. All work shall be completed within 290 calendar days after receipt of the Notice to Proceed.

Task 1 – Bldg. 200, 15th Floor Full Gut entire floor: $ ___________________

Task 2 – Bldg. 1, 3rd Floor Rm F350: $_______________________________

Task 3 – Bldg. 1, 3rd Floor Rm C307: $_______________________________

Task 4 – Bldg. 1, 1st Floor Rm C130: $_______________________________

Task 5 – Bldg. 1, 2nd Floor & 3rd Rms. B209, B313: $____________________

Task 6 – Bldg. 1, 2nd Floor Rm D239: $_______________________________

Task 7 – Bldg. 1, 3rd Floor Rm A306: $_______________________________

Abatement Price Per Square Foot: $_______________________________

Demolition Price Per Square Foot: $_______________________________

NOTICE TO BIDDERS: Award will be made to the responsible bidder who submitted the lowest responsive bid.

NOTICE TO BIDDERS: Work shall not commence until all required submittals are approved by the Contracting Officer or the Contracting Officer’s Representative (COR). An approved cost-loaded, Critical Path Method (CPM) construction schedule is required prior to commencement of construction. See specifications for details. CPM schedule shall be approved by the Contracting Officer or the Contracting Officer’s Representative. See specifications for details.

(a) This solicitation & all associated bid documents are available to interested parties in electronic file format from www.sam.gov. No hard copy documents will be provided by the government.

(b) A bid guarantee is required in an amount not less than 20 percent of the bid price but shall not exceed $1,000,000. Failure to furnish the required bid guarantee in the proper form and amount, by the time set for opening of bids, will result in rejection of the bid in all cases except those listed in FAR 28.101-4, and may be cause for rejection even then.

(c) The bidder to whom a contract is awarded will be required to furnish a Payment Bond, on form SF 25A, and a Performance Bond, on form SF 25. Each bond shall be issued for a penal sum equal to the value of the awarded contract. Copies of forms SF 25 and 25A may be obtained from the Contracting Officer upon request.

(End of Clause)

PROJECT: 578-23-013 (CON) Abatement Task Order D http://www.sam.gov/

BID SCHEDULE

File details come from the government source that posted it. Updated .