ATT 6- 635-21-700 Bid Breakdown.docx
DOCX document 23 KB Posted
- Attached to
- 635-21-700 - Construct EHRM Infrastructure Upgrades - OKC-OK Federal contract opportunity
- Solicitation number
- 36C77625R0044_
About this file
The document is a Bid Breakdown template for a Department of Veterans Affairs infrastructure upgrade project (Solicitation Number: 36C77625R0044_) located in Oklahoma City. The project involves comprehensive infrastructure improvements for Electronic Health Record Modernization (EHRM) across multiple buildings, including Buildings 1, 5, 19, 21, Lawton, and Friendship House. Specific infrastructure upgrades encompass electrical systems (panel upgrades, normal and emergency power), building management system interfaces, HVAC assessments, space reconfiguration and renovation, communication infrastructure upgrades (new data outlets, Cat 6A cabling), physical upgrades, and campus-wide fiber infrastructure improvements.
The bid breakdown template provides a detailed divisional breakdown for cost estimation, covering 28 construction divisions from general requirements to electronic safety and security. While most line items are currently blank, the template is structured to capture labor, material, and total costs for each division, with additional sections for bonds, insurance, contractor overhead, profit, and a final lump sum total amount. The project appears to be a comprehensive modernization effort focused on preparing VA facilities for enhanced technological infrastructure to support the electronic health record system.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| S04- Site Visit Instructions - 635-21-700 - Construction EHRM Infrastructure Upgrades.docx | DOCX document | |
| S06- 0001 amendment - Site visit date change and Site visit instructions.pdf | ||
| 36C77625R0044.pdf | ||
| ATT 7- Spec 01 31 00.01 Project Management and Coordination.pdf | ||
| ATT 4 - PPQ.docx | DOCX document | |
| ATT 2- 635-21-700 - 100CD Drawings.pdf | ||
| ATT 1- 635-21-700 -10 CD Specs.pdf | ||
| ATT 5 - Limitations on Subcontracting.docx | DOCX document | |
| ATT 3- Wages Determination- OKC OK.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BASE BID – GENERAL CONSTRUCTION:
This project includes but not limited to the following infrastructure improvements: Electrical (electrical panel upgrade, power (normal and emergency)), Bonding, UPS, Building Management System interfaces, assess for new and upgrades to existing HVAC, reconfiguration, expansion and renovation of existing space (demo, new construction, finishes), communication infrastructure (new Data outlets, patch panels, upgrade to Cat 6A cable) in buildings as necessary, physical upgrades, assess and upgrade fiber infrastructure backbone campus wide within buildings and between buildings, hazardous material abatement. Project Buildings locations include Buildings 1,5,19,21, site, Lawton and Friendship House.
| DIVISION |
| LABOR |
| MATERIAL |
| TOTAL |
| DIVISION 1 – GENERAL REQUIREMENTS |
| $ |
| $ |
| $ |
| DIVISION 2 – EXISTING CONDITIONS |
| $ |
| $ |
| $ |
| DIVISION 3 – CONCRETE |
| $ |
| $ |
| $ |
| DIVISION 4 – MASONRY |
| $ |
| $ |
| $ |
| DIVISION 5 – METALS |
| $ |
| $ |
| $ |
| DIVISION 6 – WOOD AND PLASTIC |
| $ |
| $ |
| $ |
| DIVISION 7 – THERMAL AND MOISTURE |
| $ |
| $ |
| $ |
| DIVISION 8 – DOORS AND WINDOWS (OPENINGS) |
| $ |
| $ |
| $ |
| DIVISION 9 – FINISHES |
| $ |
| $ |
| $ |
| DIVISION 10 – SPECIALTIES |
| $ |
| $ |
| $ |
| DIVISION 11 – EQUIPMENT – N/A |
| $ |
| $ |
| $ |
| DIVISION 12 – FURNISHINGS – N/A |
| $ |
| $ |
| $ |
| DIVISION 13 – SPECIAL CONSTRUCTION |
| $ |
| $ |
| $ |
| DIVISION 14 – CONVEYING EQUIPMENT |
| $ |
| $ |
| $ |
| DIVISION 21 – FIRE SUPPRESSION |
| $ |
| $ |
| $ |
| DIVISION 22 – PLUMBING |
| $ |
| $ |
| $ |
| DIVISION 23 – HEATING, VENTILATING, AND AIR CONDITIONING |
| $ |
| $ |
| $ |
| DIVISION 25 – INTEGRATED AUTOMATION – N/A |
| $ |
| $ |
| $ |
| DIVISION 26 – ELECTRICAL |
| $ |
| $ |
| $ |
| DIVISION 27 – COMMUNICATIONS |
| $ |
| $ |
| $ |
| DIVISION 28 – ELECTRONIC SAFETY AND SECURITY |
| $ |
| $ |
| $ |
| DIVISION 31 – EARTHWORK – N/A |
| $ |
| $ |
| $ |
| DIVISION 32 – EXTERIOR – N/A |
| $ |
| $ |
| $ |
| DIVISION 33 – UTILITIES – N/A |
| $ |
| $ |
| $ |
| DIVISION 34 – TRANSPORTATION – N/A |
| $ |
| $ |
| $ |
| SUM OF ALL DIVISION TOTALS |
| $ |
| BONDS & INSURANCE |
| $ |
| CONTRACTOR OVERHEAD |
| $ |
| CONTRACTOR PROFIT |
| $ |
| OTHER: _________________________________ |
| $ |
| OTHER: _________________________________ |
| $ |
| LUMP SUM TOTAL AMOUNT: |
| $ |
File details come from the government source that posted it. Updated .