ATT 6 - 578-371_Joliet_CBOC_Add_3_Part_5.pdf
PDF 7 MB Posted
- Solicitation number
- 36C77624B0009
About this file
This document package includes architectural drawings and specifications for an expansion of the parking structure at the Joliet Community Based Outpatient Clinic. The project involves constructing a new north vestibule and elevator addition at the basement level, along with associated site work. Key elements of the design include a prefabricated metal roof access stair, new windows and storefronts, masonry veneer and metal wall panels on the exterior, and finishes of ceramic tile, luxury vinyl tile, carpet, and painted gypsum board on the interior. The solicitation number is 36C77624B0009 and was issued by the Department of Veterans Affairs Technology Acquisition Center in Austin, Texas for an expansion of the parking structure at the Joliet CBOC facility located in Joliet, Illinois.
View the file
Other files
Show all 42
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BASEMENT LEVEL
601' - 8 1/2"
ROOF NORTH
628' - 10 1/2"
FIRST FLOOR
LEVEL
616' - 2 1/2"
Lx
ELEVATOR PIT
596' - 8 1/2"
Elevator E-2
ELEVATOR PIT
EAST WALL OF NEW NORTH VESTIBULE
BEYOND
NEW CAST-IN-PLACE CONCRETE
FOUNDATION WALL
NEW CAST-IN-PLACE CONCRETE
FOOTING
1' - 0"
5 3/4" 3 1/2" RIGID POLYISO INSULATION
P.T. WOOD BLOCKING
3" RIGID INSULATION
12" CMU WALL
FLUID APPLIED AIR
BARRIER
WATER PROOFING
11 5/8" 4 1/2"
2" RIGID INSULATION,
CONTINUOUS
WATER PROOFING,
EXTEND OVER TOP OF CONCRETE
WASH AT FOOTINGCONTINUOUS HYDROPHILIC
WATERSTOP AT EACH SIDE OF
ELEVATOR PIT
M
IN
MIN.
1' - 0"
PREFINISHED METAL INSULATION SHIELD
M
IN
FLASHING
MC
B2
B2-A
SEE ELEVATION 1/AE 201 FOR PLACEMENT
OF ACCENT BAND
B2-A
SEE ELEVATION 1/AE 201 FOR PLACEMENT
OF ACCENT BAND
B2-A
SEE ELEVATION 1/AE 201 FOR PLACEMENT
OF ACCENT BAND
B2
CS1
TSV
METAL ROOF DECK WITH
SPRAY APPLIED FIRE PROOFING,
2-HOUR
FLASHING
BASEMENT LEVEL
601' - 8 1/2"
ROOF NORTH
628' - 10 1/2"
FIRST FLOOR
LEVEL
616' - 2 1/2"
Engineering Space
Vestibule
NEW CAST-IN-PLACE CONCRETE
FOUNDATION WALL
WATER PROOFING,
EXTEND OVER TOP OF CONCRETE
WASH AT FOOTING
NEW CAST-IN-PLACE CONCRETE
FOOTING. SEE STRUCTURAL
DRAWINGS FOR SIZE &
REINFORCEMENT REQUIREMENTS
104B
NEW TPO ROOF MEMBRANE
WRAPPED OVER NEW
PARAPET
NEW ROOF INSULATION
2" RIGID INSULATION,
CONTINUOUS
1' - 0" MIN.
5" CONCRETE SLAB-ON-GRADE
COMPACTED GRANULAR
FILL, 4" MINIMUM DEPTH
6 MIL. VAPOR BARRIER,
TURN UP AT SLAB EDGES
4" ⌀ PERFORATED PLASTIC
DRAIN TILE, CONTINUOUS.
GRAVEL WRAPPED IN
FILTER FABRIC, COMPLETELY
SURROUNDING DRAIN TILE
1/2" COMPRESSIBLE FILLER,
CONTINUOUS
CONTINUOUS HYDROPHILIC
WATERSTOP. TYPICAL AT EVERY
NEW EXTERIOR FOOTING &
FOUNDATION WALL
M
IN
G U
A R
D R
A
IL
NEW LAY-IN ACOUSTICAL
TILE CEILING, 2x2
ACT2
FLASHING
ALUMINUM THRESHOLD
NEW CONCRETE PAVEMENT
MC
B2
B2-A
SEE ELEVATION 2/AE 201 FOR PLACEMENT
OF ACCENT BAND
B2-A
SEE ELEVATION 2/AE 201 FOR PLACEMENT
OF ACCENT BAND
COMPOSITE ROOF DECK
COMPOSITE FLOOR DECK
BASEMENT LEVEL
601' - 8 1/2"
ROOF NORTH
628' - 10 1/2"
FIRST FLOOR
LEVEL
616' - 2 1/2"
Lx
B
B/DECK
VESTIBULE
614' - 8 1/2"
New North Vestibule
Lobby
Lobby
C
5" CONCRETE SLAB-ON-GRADE
COMPACTED GRANULAR
FILL, 4" MINIMUM DEPTH
6 MIL. VAPOR BARRIER,
TURN UP AT SLAB EDGES
1/2" COMPRESSIBLE FILLER,
CONTINUOUS
M O
NEW TPO ROOF MEMBRANE
WRAPPED OVER NEW
PARAPET
NEW ROOF INSULATION
NEW LAY-IN ACOUSTICAL
TILE CEILING, 2x2
ACT2
TPO ROOF MEMBRANE
ROOF INSULATION
NEW PRE-FINISHED
ALUMINUM COPING
THIN BRICK VENEER
CLADDING
NEW LAY-IN ACOUSTICAL
TILE CEILING, 2x2
ACT2
FLASHING
8" CMU
FLASHING
SPRAY-APPLIED
FIRE PROOFING,
2-HOUR
SS1
MC
B2
B2-A
SEE ELEVATION 1/AE 201 FOR PLACEMENT
OF ACCENT BAND
B2
CONTINUOUS FIBER CANT
B2
COMPOSITE ROOF DECK
COMPOSITE FLOOR DECK
AE 603
SYMBOLS LEGEND SECTIONS
EXISTING CONSTRUCTION TO REMAIN
Room name
KEYNOTEX
ROOM NAME/NUMBER
0X
CENTERLINE
1i PARTITION TAG
Name Elevation
FLOOR/LEVEL ELEVATION
NEW COLUMN
GRID LINE
EXISTING COLUMN
GRID LINE
DOOR TAG - SEE SHEET
AE 601 DOOR SCHEDULE
FOR MORE INFORMATION
A
WINDOW/STOREFRONT
TAG - SEE SHEET AE 602
FOR MORE INFORMATION
NOTE: SEE SHEET GI 003 FOR COMPLETE LIST OF SYMBOLS & ABBREVIATIONS
FINISH TAG: SEE SHEET AI 601, FINISH
PLANS & FINISH SCHEDULE DETAILED
FINISHES INFORMATION
SS1
MC EXTERIOR FINISH KEYNOTE
444 W. Lake St. Suite 1700 Chicago, IL 60606
312.583.7023 www.virtualenergysolutions.com
Joliet Community Based Outpatient Clinic 1201 Eagle Street Joliet, Illinois 60432
Drawing No.
Scale:
Date:
Checked By:Drawn By:Designed By:
Drawing Title:
Contract No.
File No.Building No.
Client Project No.
Project Title:Approved: Chief, failites Management Services
Approved: Medical Center Director
Approved:
Approved: Location:
VES Project Number: 191006
AS NOTED
VA JOLIET CBOC
JOLIET, ILLINOIS
578-371 36C25219D0020
© 2020 Virtual Energy Solutions, INC.
10/11/2023
B
IM
/2
-M
A T
O C
-P a rk in g E x p a n s io n a t J o lie t C
B O
C
-3
/2
J o lie t
C B
O C
P a rk in g E x p a n s io n V
E S
A rc h
.r v t
-1
-0
:1 :2
P
M
AE 303
WALL SECTIONS
PARKING EXPANSION AT
JOLIET CBOC
GCGIDGID
3/4" = 1'-0"
WALL SECTION - NORTH WALL AT ELEVATOR
0 1' 2' 4' 0 1' 2' 4'0 1' 2' 4'
3/4" = 1'-0"
WALL SECTION - EAST WALL
3/4" = 1'-0"
WALL SECTION - NORTH WALL AT NEW NORTH VESTIBULE
EXTERIOR FINISHES
TAG KEYNOTE
B2 THIN BRICK, STANDARD, RUNNING BOND
B2-A THIN BRICK, STANDARD - ACCENT, STACKED BOND
CS1 CAST STONE - TRIM
MC PREFINISHED METAL COPING, COLOR TO MATCH EXISTING CBOC COPING
TSV THIN STONE VENEER
MC
Revisions Date
ISSUED FOR 30% SD 10/07/2022
ISSUED FOR 60% DD 12/30/2022
ISSUED FOR 90% PRICING 02/02/2023
ISSUED FOR 90% CD 02/10/2023
ISSUED FOR 100% CD 03/07/2023
ISSUED FOR BID 03/24/2023
ISSUED FOR BID ADDENDUM 1 04/21/2023
ADDENDUM 3 REVIEW 09/22/2023
ADDENDUM 3 ISSUED FOR BID 10/11/2023
ROOF NORTH
628' - 10 1/2"
FIRST FLOOR
LEVEL
616' - 2 1/2"
Hx
NEW ROOF MEMBRANE
WRAPPED OVER NEW
PARAPET
NEW ROOF INSULATION
EXISTING CAST-IN-PLACE
CONCRETE FRAME
STRUCTURE
EXISTING CAST-IN-PLACE
CONCRETE ROOF
DECK
EXISTING 8" CMU INFILL
EXISTING CAST-IN-PLACE CONCRETE
FOUNDATION WALL - CBOC
EXISTING CAST-IN-PLACE CONCRETE
FLOOR SLAB - CBOC
EXISTING CAST-IN-PLACE
CONCRETE FOOTING
NEW 8" CMU INFILL
3" RIGID
INSULATION
5 3/4"
NEW WINDOW, ANODIZED THERMALLY
BROKEN ALUMINUM FRAME,
WITH INSULATED GLAZING UNITS &
LAMINATED SECURITY GLASS
AE 502
FLUID APPLIED AIR BARRIER
3 1/2" RIGID POLYISO INSULATION
NEW WINDOW, ANODIZED THERMALLY
BROKEN ALUMINUM FRAME,
WITH INSULATED SPANDREL PANELS
T/NORTH
PARAPET
631' - 6 1/2"
M O
N E
W C
M U
1' - 6"
C E
IL
IN
G P
O C
K E
T
CEILING POCKET
PREFINISHED METAL CLOSURE
ACOUSTICAL TILE CEILING
SYSTEM
5/8" MOLD/MOISTURE RESISTANT
GYP. BOARD, PAINTED, ON METAL FURRING
STRIPS.
R O
B
ACT1
WATER PROOFING,
EXTEND OVER TOP OF CONCRETE
WASH AT FOOTING
4" ⌀ PERFORATED PLASTIC
DRAIN TILE, CONTINUOUS.
GRAVEL WRAPPED IN
FILTER FABRIC, COMPLETELY
SURROUNDING DRAIN TILE
2" RIGID INSULATION,
CONTINUOUS
PREFINISHED METAL INSULATION SHIELD
M
IN
1' - 0" MIN.
M
IN
D
SS1
MC
B2
B2-A
SEE ELEVATION 1/AE 201 FOR PLACEMENT
OF ACCENT BAND
B2-A
SEE ELEVATION 1/AE 201 FOR PLACEMENT
OF ACCENT BAND
B2
CS1
TSV
TSV
NEW 8" CMU PARAPET, FULLY GROUTED,
DOWELED W/ EPOXY TO EXISTING STRUCTURE
FLASHING
FLASHING
FLASHING
FLASHING
2X PT WOOD BLOCKING, TYPICAL
AE 603
AE 603
AE 502
BASEMENT LEVEL
601' - 8 1/2"
ROOF NORTH
628' - 10 1/2"
FIRST FLOOR
LEVEL
616' - 2 1/2"
5.8x
EXIST. T.O.P.
631' - 6 1/4"
2' - 7"
C E
IL
IN
G P
O C
K E
T
CEILING POCKET
PREFINISHED METAL CLOSURE
ACOUSTICAL TILE CEILING
SYSTEM
5/8" MOLD/MOISTURE RESISTANT
GYP. BOARD, PAINTED, ON 1/2" METAL FURRING
STRIPS.
R O
A
ACT2
C
M O
N E
W C
M U
NEW ROOF MEMBRANE
WRAPPED OVER NEW
PARAPET
NEW ROOF INSULATION
EXISTING 8" CMU INFILL
NEW 8" CMU INFILL
WATER PROOFING,
EXTEND OVER TOP OF CONCRETE
WASH AT FOOTING
4" ⌀ PERFORATED PLASTIC
DRAIN TILE, CONTINUOUS.
GRAVEL WRAPPED IN
FILTER FABRIC, COMPLETELY
SURROUNDING DRAIN TILE
2" RIGID INSULATION,
CONTINUOUS
PREFINISHED METAL INSULATION SHIELD
1' - 0" MIN.
M
IN
GRADE - HEIGHT VARIES
ACOUSTICAL TILE CEILING
SYSTEM
ACT1
SS1
SS1
MC
B2
B2-A
SEE ELEVATION 3/AE 201 FOR PLACEMENT
OF ACCENT BAND
B2-A
SEE ELEVATION 3/AE 201 FOR PLACEMENT
OF ACCENT BAND
B2
CS1
TSV
TSV
B2-A
SEE ELEVATION 3/AE 201 FOR PLACEMENT
OF ACCENT BAND
3 1/2" RIGID INSULATION
3" RIGID INSULATION
3" RIGID INSULATION
NEW 8" CMU PARAPET, FULLY GROUTED,
DOWELED W/ EPOXY TO EXISTING STRUCTURE
FLASHING
FLASHING
FLASHING
2X PT WOOD BLOCKING, TYPICAL
AE 603
AE 603
5/8" MOLD/MOISTURE RESISTANT
GYP. BOARD OVER 3 5/8" METAL STUDS
ALIGN WITH FACE OF
EXISTING SURROUNDING
WALLS
BASEMENT LEVEL
601' - 8 1/2"
ROOF NORTH
628' - 10 1/2"
FIRST FLOOR
LEVEL
616' - 2 1/2"
Lx
NEW ROOF MEMBRANE
WRAPPED OVER NEW
PARAPET
NEW ROOF INSULATION
EXISTING CAST-IN-PLACE
CONCRETE FRAME
STRUCTURE
EXISTING CAST-IN-PLACE
CONCRETE ROOF
DECK
EXISTING 8" CMU INFILL
EXISTING CAST-IN-PLACE CONCRETE
FOUNDATION WALL - CBOC
EXISTING CAST-IN-PLACE CONCRETE
FLOOR SLAB - CBOC
EXISTING CAST-IN-PLACE
CONCRETE FOOTING
NEW 8" CMU INFILL
NEW 8" CMU PARAPET, FULLY GROUTED,
DOWELED W/ EPOXY TO EXISTING STRUCTURE
3 1/2" RIGID POLYISO INSULATION
FLUID APPLIED AIR BARRIER
OVER CMU
MASONRY VENEER
T/NORTH
PARAPET
631' - 6 1/2"
L6x4x3/8 GALVANIZED ANGLE FRAME
FOR WINDOW
D
R O
V
IF
M
IN
WATER PROOFING,
EXTEND OVER TOP OF CONCRETE
WASH AT FOOTING
4" ⌀ PERFORATED PLASTIC
DRAIN TILE, CONTINUOUS.
GRAVEL WRAPPED IN
FILTER FABRIC, COMPLETELY
SURROUNDING DRAIN TILE
2" RIGID INSULATION,
CONTINUOUS
M
IN
PREFINISHED METAL INSULATION SHIELD
MC
B2
B2-A
SEE ELEVATION 1/AE 201 FOR PLACEMENT
OF ACCENT BAND
B2-A
SEE ELEVATION 1/AE 201 FOR PLACEMENT
OF ACCENT BAND
B2
CS1
TSV
TSV
B2-A
SEE ELEVATION 1/AE 201 FOR PLACEMENT
OF ACCENT BAND
B2
3" RIGID INSULATION
3 1/2" RIGID POLYISO INSULATION
FLASHING
FLASHING
FLASHING
FLASHING
2X PT WOOD
BLOCKING, TYPICAL
AE 603
Control
A.O.
B015
Corridor C1-15
Home Based Primary Care
B002
SYMBOLS LEGEND SECTIONS
EXISTING CONSTRUCTION TO REMAIN
Room name
KEYNOTEX
ROOM NAME/NUMBER
0X
CENTERLINE
1i PARTITION TAG
Name Elevation
FLOOR/LEVEL ELEVATION
NEW COLUMN
GRID LINE
EXISTING COLUMN
GRID LINE
DOOR TAG - SEE SHEET
AE 601 DOOR SCHEDULE
FOR MORE INFORMATION
A
WINDOW/STOREFRONT
TAG - SEE SHEET AE 602
FOR MORE INFORMATION
NOTE: SEE SHEET GI 003 FOR COMPLETE LIST OF SYMBOLS & ABBREVIATIONS
FINISH TAG: SEE SHEET AI 601, FINISH
PLANS & FINISH SCHEDULE DETAILED
FINISHES INFORMATION
SS1
MC EXTERIOR FINISH KEYNOTE
Badge B004
FMS
444 W. Lake St. Suite 1700 Chicago, IL 60606
312.583.7023 www.virtualenergysolutions.com
Joliet Community Based Outpatient Clinic 1201 Eagle Street Joliet, Illinois 60432
Drawing No.
Scale:
Date:
Checked By:Drawn By:Designed By:
Drawing Title:
Contract No.
File No.Building No.
Client Project No.
Project Title:Approved: Chief, failites Management Services
Approved: Medical Center Director
Approved:
Approved: Location:
VES Project Number: 191006
AS NOTED
VA JOLIET CBOC
JOLIET, ILLINOIS
578-371 36C25219D0020
© 2020 Virtual Energy Solutions, INC.
10/11/2023
B
IM
/2
-M
A T
O C
-P a rk in g E x p a n s io n a t J o lie t C
B O
C
-3
/2
J o lie t
C B
O C
P a rk in g E x p a n s io n V
E S
A rc h
.r v t
-1
-0
:1 :3
P
M
AE 304
WALL SECTIONS
PARKING EXPANSION AT
JOLIET CBOC
GCGIDGID
3/4" = 1'-0"
3 WALL SECTION - AT NORTH WALL & NEW WINDOWS
3/4" = 1'-0"
2 WALL SECTION - AT WEST WALL
3/4" = 1'-0"
1 WALL SECTION - AT NORTH WALL
0 1' 2' 4' 0 1' 2' 4' 0 1' 2' 4'
EXTERIOR FINISHES
TAG KEYNOTE
B2 THIN BRICK, STANDARD, RUNNING BOND
B2-A THIN BRICK, STANDARD - ACCENT, STACKED BOND
CS1 CAST STONE - TRIM
MC PREFINISHED METAL COPING, COLOR TO MATCH EXISTING CBOC COPING
TSV THIN STONE VENEER
MC
Revisions Date
ISSUED FOR 30% SD 10/07/2022
ISSUED FOR 60% DD 12/30/2022
ISSUED FOR 90% PRICING 02/02/2023
ISSUED FOR 90% CD 02/10/2023
ISSUED FOR 100% CD 03/07/2023
ISSUED FOR BID 03/24/2023
ISSUED FOR BID ADDENDUM 1 04/21/2023
FIRST FLOOR
LEVEL
616' - 2 1/2"
ELEVATOR PIT
596' - 8 1/2"
STONE VENEER
2" RIGID POLYISO INSULATION
GYP. BOARD EXTERIOR GRADE
SHEATHING
FLASHING
6" 20 GA. METAL STUDS,
16" O.C.
TILE WALL BASE
FLOOR TILE
VAPOR BARRIER
LAY-IN CEILING
P.T. WOOD BLOCKING
METAL ROOF DECK
RIGID POLYISO ROOF
INSULATION, TAPERED
TPO MEMBRANE ROOFING
T/RETAINING
606' - 10 1/2"
B/DECK
VESTIBULE
614' - 8 1/2"
AIR BARRIER
WATER PROOFING
CONTINUOUS FIBER
CANT STRIP
BATT INSULATION,
MINIMUM R-19
5 3/4"
4"
GYP. BOARD EXTERIOR GRADE
SHEATHING ABOVE DECK
1' - 0"
AE 502
2"10"
4"
2'
5/8" MOLD/MOISTURE RESISTANT
GYP. BOARD
3 5/8" 20 GA. METAL STUDS,
16" O.C.
CAST-IN-PLACE CONCRETE FOUNDATION
WALL
TOP OF RETAINING WALL
New North
Vestibule
5" CONCRETE
SLAB-ON-GRADE
COMPACTED GRANULAR
FILL, 4" MINIMUM DEPTH
6 MIL. VAPOR BARRIER,
TURN UP AT SLAB EDGES
1/2" COMPRESSIBLE FILLER,
CONTINUOUS
BATT INSULATION
4" ⌀ PERFORATED PLASTIC
DRAIN TILE, CONTINUOUS.
GRAVEL WRAPPED IN
FILTER FABRIC, COMPLETELY
SURROUNDING DRAIN TILE
1'
M
IN
4"
1' - 0" MIN.
ACT2
SILL SEAL, CONTINUOUS
PREFINISHED METAL INSULATION SHIELD
2" RIGID INSULATION
SPRAY-APPLIED
FIRE PROOFING,
2-HOUR
KICKER
MC
TSV
CAST-IN-PLACE CONCRETE
FOUNDATION WALL & FOOTING
2'
/2
BASEMENT LEVEL
601' - 8 1/2"
FIRST FLOOR
LEVEL
616' - 2 1/2"
ELEVATOR PIT
596' - 8 1/2"
STONE VENEER
2" RIGID POLYISO INSULATION
GYP. BOARD EXTERIOR GRADE
SHEATHING
FLASHING
6" 20 GA. METAL STUDS,
16" O.C.
VAPOR BARRIER
LAY-IN CEILING
P.T. WOOD BLOCKING
METAL ROOF DECK
RIGID POLYISO ROOF INSULATION,
TAPERED
TPO MEMBRANE ROOFING
FLASHING
B/DECK
VESTIBULE
614' - 8 1/2"
ALUMINUM STOREFRONT SYSTEM
THERMALLY BROKEN, WITH
INSULATED GLAZING UNITS WITH
LAMINATED SECURITY GLASS
4"
AIR BARRIER
CONTINUOUS FIBER
CANT STRIP
FLASHING
BATT INSULATION,
MINIMUM R-19
4" 6" 2"
1' - 0"
CONTINUOUS SILL SEAL
New North
Vestibule
WATER PROOFING
4" ⌀ PERFORATED PLASTIC
DRAIN TILE, CONTINUOUS.
GRAVEL WRAPPED IN
FILTER FABRIC, COMPLETELY
SURROUNDING DRAIN TILE
4" 1'
M
IN
ACT2
TILE WALL BASE
FLOOR TILE
5" CONCRETE
SLAB-ON-GRADE
COMPACTED GRANULAR
FILL, 4" MINIMUM DEPTH
6 MIL. VAPOR BARRIER,
TURN UP AT SLAB EDGES
1/2" COMPRESSIBLE FILLER,
CONTINUOUS
S2
PREFINISHED METAL INSULATION SHIELD
2" RIGID INSULATION
SPRAY-APPLIED
FIRE PROOFING,
2-HOUR
MC
TSV
TSV
AE 502
CAST-IN-PLACE CONCRETE
FOUNDATION WALL & FOOTING
2'
/2
AE 602
SYMBOLS LEGEND SECTIONS
EXISTING CONSTRUCTION TO REMAIN
Room name
KEYNOTEX
ROOM NAME/NUMBER
0X
CENTERLINE
1i PARTITION TAG
Name Elevation
FLOOR/LEVEL ELEVATION
NEW COLUMN
GRID LINE
EXISTING COLUMN
GRID LINE
DOOR TAG - SEE SHEET
AE 601 DOOR SCHEDULE
FOR MORE INFORMATION
A
WINDOW/STOREFRONT
TAG - SEE SHEET AE 602
FOR MORE INFORMATION
NOTE: SEE SHEET GI 003 FOR COMPLETE LIST OF SYMBOLS & ABBREVIATIONS
FINISH TAG: SEE SHEET AI 601, FINISH
PLANS & FINISH SCHEDULE DETAILED
FINISHES INFORMATION
SS1
MC EXTERIOR FINISH KEYNOTE
BASEMENT LEVEL
601' - 8 1/2"
FIRST FLOOR
LEVEL
616' - 2 1/2"
ELEVATOR PIT
596' - 8 1/2"
B/DECK
VESTIBULE
614' - 8 1/2"
NORTH RETAINING
603' - 3 3/4"
TILE WALL BASE
FLOOR TILE
WATER PROOFING
5/8" MOLD/MOISTURE RESISTANT
GYP. BOARD
3 5/8" 20 GA. METAL STUDS,
16" O.C.
CAST-IN-PLACE CONCRETE FOUNDATION
WALL
5" CONCRETE
SLAB-ON-GRADE
COMPACTED GRANULAR
FILL, 4" MINIMUM DEPTH
6 MIL. VAPOR BARRIER,
TURN UP AT SLAB EDGES
1/2" COMPRESSIBLE FILLER,
CONTINUOUS
BATT INSULATION
4" ⌀ PERFORATED PLASTIC
DRAIN TILE, CONTINUOUS.
GRAVEL WRAPPED IN
FILTER FABRIC, COMPLETELY
SURROUNDING DRAIN TILE
STONE VENEER
2" RIGID POLYISO INSULATION
GYP. BOARD EXTERIOR GRADE
SHEATHING
AIR BARRIER
BATT INSULATION,
MINIMUM R-19
SILL SEAL, CONTINUOUS
6" 20 GA. METAL STUDS,
16" O.C.
VAPOR BARRIER
LAY-IN CEILING
P.T. WOOD BLOCKING
METAL ROOF DECK
RIGID POLYISO ROOF
INSULATION, TAPERED
TPO MEMBRANE ROOFING
CONTINUOUS FIBER
CANT STRIP
GYP. BOARD EXTERIOR GRADE
SHEATHING ABOVE DECK
ACT2
6"
4"
FLASHING
PREFINISHED METAL INSULATION SHIELD,
EXTEND 12" BELOW FINISHED GRADE, TYPICAL
THIN STONE VENEER (TSV) APPLIED DIRECTLY TO
FOUNDATION WALL
2" RIGID INSULATION
SPRAY-APPLIED
FIRE PROOFING,
2-HOUR
KICKER
MC
TSV
TSV
CAST-IN-PLACE CONCRETE
FOUNDATION WALL & FOOTING
2'
/2
444 W. Lake St. Suite 1700 Chicago, IL 60606
312.583.7023 www.virtualenergysolutions.com
Joliet Community Based Outpatient Clinic 1201 Eagle Street Joliet, Illinois 60432
Drawing No.
Scale:
Date:
Checked By:Drawn By:Designed By:
Drawing Title:
Contract No.
File No.Building No.
Client Project No.
Project Title:Approved: Chief, failites Management Services
Approved: Medical Center Director
Approved:
Approved: Location:
VES Project Number: 191006
AS NOTED
VA JOLIET CBOC
JOLIET, ILLINOIS
578-371 36C25219D0020
© 2020 Virtual Energy Solutions, INC.
10/11/2023
B
IM
/2
-M
A T
O C
-P a rk in g E x p a n s io n a t J o lie t C
B O
C
-3
/2
J o lie t
C B
O C
P a rk in g E x p a n s io n V
E S
A rc h
.r v t
-1
-0
:1 :3
P
M
AE 305
WALL SECTIONS NORTH
VESTIBULE
PARKING EXPANSION AT
JOLIET CBOC
GCGIDGID
3/4" = 1'-0"
WALL SECTION - NORTH VESTIBULE
3/4" = 1'-0"
WALL SECTION - NORTH VESTIBULE STOREFRONT
0 1' 2' 4' 0 1' 2' 4'
3/4" = 1'-0"
WALL SECTION NORTH VESTIBULE EAST WALL
0 1' 2' 4'
EXTERIOR FINISHES - NORTH VESTIBULE
KEY KEYNOTE
MC PREFINISHED METAL COPING, COLOR TO MATCH EXISTING CBOC COPING
TSV THIN STONE VENEER
MC
Revisions Date
ISSUED FOR 30% SD 10/07/2022
ISSUED FOR 60% DD 12/30/2022
ISSUED FOR 90% PRICING 02/02/2023
ISSUED FOR 90% CD 02/10/2023
ISSUED FOR 100% CD 03/07/2023
ISSUED FOR BID 03/24/2023
ISSUED FOR BID ADDENDUM 1 04/21/2023
FIRST FLOOR
LEVEL
616' - 2 1/2"
B/DECK
VESTIBULE
614' - 8 1/2"
FACE OF RETAINING WALL
BEYOND
2" RIGID POLYISO INSULATION
GYP. BOARD EXTERIOR GRADE
SHEATHING
6" 20 GA. METAL STUDS,
16" O.C.
VAPOR BARRIER
METAL ROOF DECK
FLASHING
AIR BARRIER
BATT INSULATION,
MINIMUM R-19
P.T. WOOD BLOCKING
RIGID POLYISO ROOF INSULATION,
TAPERED
TPO MEMBRANE ROOFING
CONTINUOUS FIBER
CANT STRIP
New North
Vestibule
WATER PROOFING
4" ⌀ PERFORATED PLASTIC
DRAIN TILE, CONTINUOUS.
GRAVEL WRAPPED IN
FILTER FABRIC, COMPLETELY
SURROUNDING DRAIN TILE
TILE WALL BASE
FLOOR TILE
5" CONCRETE
SLAB-ON-GRADE
COMPACTED GRANULAR
FILL, 4" MINIMUM DEPTH
6 MIL. VAPOR BARRIER,
TURN UP AT SLAB EDGES
1/2" COMPRESSIBLE FILLER,
CONTINUOUS
PREFINISHED METAL INSULATION SHIELD
2" RIGID INSULATION
SPRAY-APPLIED
FIRE PROOFING,
2-HOUR
MC
TSV
TSV
S2
CAST-IN-PLACE CONCRETE
FOUNDATION WALL & FOOTING
2'
/2
AE 602
AE 502
SYMBOLS LEGEND SECTIONS
EXISTING CONSTRUCTION TO REMAIN
Room name
KEYNOTEX
ROOM NAME/NUMBER
0X
CENTERLINE
1i PARTITION TAG
Name Elevation
FLOOR/LEVEL ELEVATION
NEW COLUMN
GRID LINE
EXISTING COLUMN
GRID LINE
DOOR TAG - SEE SHEET
AE 601 DOOR SCHEDULE
FOR MORE INFORMATION
A
WINDOW/STOREFRONT
TAG - SEE SHEET AE 602
FOR MORE INFORMATION
NOTE: SEE SHEET GI 003 FOR COMPLETE LIST OF SYMBOLS & ABBREVIATIONS
FINISH TAG: SEE SHEET AI 601, FINISH
PLANS & FINISH SCHEDULE DETAILED
FINISHES INFORMATION
SS1
MC EXTERIOR FINISH KEYNOTE
BASEMENT LEVEL
601' - 8 1/2"
FIRST FLOOR
LEVEL
616' - 2 1/2"
A
ELEVATOR PIT
596' - 8 1/2"
FLASHING
2" RIGID POLYISO
INSULATION
GYP. BOARD EXTERIOR GRADE
SHEATHING
6" 20 GA. METAL STUDS,
16" O.C.
5/8" MOLD/MOISTURE RESISTANT
GYP. BOARD, FINISH
AS SCHEDULED
VAPOR BARRIER
LAY-IN CEILING
P.T. WOOD BLOCKING
METAL DECK
RIGID POLYISO ROOF INSULATION,
TAPERED
TPO MEMBRANE ROOFING
ALUMINUM STOREFRONT SYSTEM
THERMALLY BROKEN, WITH
INSULATED GLAZING UNITS WITH
LAMINATED SECURITY GLASS
ALUMINUM FRAMED, AUTOMATIC POWER
OPERATED BI-FOLD DOOR, WITH
INSULATED GLAZING UNITS WITH
LAMINATED SECURITY GLASS
PREFABRICATED METAL FRAMED
CANOPY, SUSPENDED
ALUMINUM THRESHOLD
B/DECK
VESTIBULE
614' - 8 1/2"
AIR BARRIER
CONTINUOUS FIBER
CANT STRIP
AE 502
8"
B O
T T
O M
O F
C A
N O
P Y
8'
/4
1 1/4" EXTERIOR GRADE PLYWOOD
BLOCKING
(2) 2"x8" P.T. WOOD BLOCKING
VAPOR BARRIER
3'
HSS12x4x3/8
AE 502
New North
Vestibule
WATER PROOFING
4" ⌀ PERFORATED PLASTIC
DRAIN TILE, CONTINUOUS.
GRAVEL WRAPPED IN
FILTER FABRIC, COMPLETELY
SURROUNDING DRAIN TILE
FLOOR TILE
5" CONCRETE
SLAB-ON-GRADE
COMPACTED GRANULAR
FILL, 4" MINIMUM DEPTH
6 MIL. VAPOR BARRIER,
TURN UP AT SLAB EDGES
1/2" COMPRESSIBLE FILLER,
CONTINUOUS
4" 1'
ACT2
HSS12x6x3/8
T O
P O
F S
T O
R E
F R
O N
T R
O
7'
0"
FLASHING
S3
2" RIGID INSULATION
SPRAY-APPLIED
FIRE PROOFING, 2-HOUR
SPRAY-APPLIED
FIRE PROOFING,
2-HOUR
MC
TSV
2'
/8
7'
1"
B O
T T
O M
O F
H S
S
/8
B O
T T
O M
O F
H S
S
CAST-IN-PLACE CONCRETE
FOUNDATION WALL & FOOTING
2'
/2
BASEMENT LEVEL
601' - 8 1/2"
FIRST FLOOR
LEVEL
616' - 2 1/2"
A
ELEVATOR PIT
596' - 8 1/2"
B/DECK
VESTIBULE
614' - 8 1/2"
FLASHING
1 1/4" EXTERIOR GRADE PLYWOOD BLOCKING
(2) 2"x8" P.T. WOOD BLOCKING
1' - 0"
2" RIGID POLYISO INSULATION
GYP. BOARD EXTERIOR GRADE
SHEATHING
6" 20 GA. METAL STUDS,
16" O.C.
5/8" MOLD/MOISTURE RESISTANT
GYP. BOARD, FINISH AS SCHEDULED
LAY-IN CEILING
P.T. WOOD BLOCKING
METAL DECK
RIGID POLYISO ROOF INSULATION,
TAPERED
TPO MEMBRANE ROOFING
ALUMINUM STOREFRONT SYSTEM
THERMALLY BROKEN, WITH
INSULATED GLAZING UNITS WITH
LAMINATED SECURITY GLASS
AIR BARRIER
CONTINUOUS FIBER
CANT STRIP
VAPOR BARRIER
HSS12x4x3/8
FLASHING
PREFABRICATED METAL FRAMED
CANOPY, SUSPENDED
New North
Vestibule
WATER PROOFING
4" ⌀ PERFORATED PLASTIC
DRAIN TILE, CONTINUOUS.
GRAVEL WRAPPED IN
FILTER FABRIC, COMPLETELY
SURROUNDING DRAIN TILE
FLOOR TILE
5" CONCRETE
SLAB-ON-GRADE
COMPACTED GRANULAR
FILL, 4" MINIMUM DEPTH
6 MIL. VAPOR BARRIER,
TURN UP AT SLAB EDGES
1/2" COMPRESSIBLE FILLER,
CONTINUOUS
TILE WALL BASE
ACT2
HSS12x6x3/8
2'
S3
S1
2" RIGID INSULATION
SPRAY-APPLIED
FIRE PROOFING,
2-HOUR
SPRAY-APPLIED
FIRE PROOFING,
2-HOUR
MC
TSV
TSV
CAST-IN-PLACE CONCRETE
FOUNDATION WALL & FOOTING
4' - 11 7/8"
2'
/2
4"
AE 502
SIMILAR
444 W. Lake St. Suite 1700 Chicago, IL 60606
312.583.7023 www.virtualenergysolutions.com
Joliet Community Based Outpatient Clinic 1201 Eagle Street Joliet, Illinois 60432
Drawing No.
Scale:
Date:
Checked By:Drawn By:Designed By:
Drawing Title:
Contract No.
File No.Building No.
Client Project No.
Project Title:Approved: Chief, failites Management Services
Approved: Medical Center Director
Approved:
Approved: Location:
VES Project Number: 191006
AS NOTED
VA JOLIET CBOC
JOLIET, ILLINOIS
578-371 36C25219D0020
© 2020 Virtual Energy Solutions, INC.
10/11/2023
B
IM
/2
-M
A T
O C
-P a rk in g E x p a n s io n a t J o lie t C
B O
C
-3
/2
J o lie t
C B
O C
P a rk in g E x p a n s io n V
E S
A rc h
.r v t
-1
-0
:1 :4
P
M
AE 306
WALL SECTIONS NORTH
VESTIBULE
PARKING EXPANSION AT
JOLIET CBOC
GCGIDGID
3/4" = 1'-0"
3 WALL SECTION - NORTH VESTIBULE AT WEST WALL
0 1' 2' 4'
3/4" = 1'-0"
1 WALL SECTION - NORTH VESTIBULE @ ENTRY
3/4" = 1'-0"
2 WALL SECTION - NORTH VESTIBULE STOREFRONT & CANOPY
0 1' 2' 4'0 1' 2' 4'
EXTERIOR FINISHES - NORTH VESTIBULE
KEY KEYNOTE
MC PREFINISHED METAL COPING, COLOR TO MATCH EXISTING CBOC COPING
TSV THIN STONE VENEER
MC
Revisions Date
ISSUED FOR 30% SD 10/07/2022
ISSUED FOR 60% DD 12/30/2022
ISSUED FOR 90% PRICING 02/02/2023
ISSUED FOR 90% CD 02/10/2023
ISSUED FOR 100% CD 03/07/2023
ISSUED FOR BID 03/24/2023
ISSUED FOR BID ADDENDUM 1 04/21/2023
UP
Jx
Kx
K'x
Lx
12x 13x 14x 15x
AE 301
A
3 4
B
AE 302
AE 202 4
AE 2022
New North Vestibule
Lobby
20' - 7"
22' - 5 1/2"
8'
7' - 10"
8' - 0 1/2"
/2
Elevator E-2
LINE OF CANOPY ABOVE
ALUMINUM STOREFRONT
EXISTING STAIR
S-2
8' - 0 1/2"
AE 305
AE 305
AE 306
AE 303
2B
2B
2B
2B2B
A
B
Engineering Space
AE 305
TOP OF RETAINING WALL (SEE CIVIL)TOP OF RETAINING WALL
(SEE CIVIL)
603' - 3 3/4" 603' - 3 3/4"
601' - 8 1/2"
601' - 8 1/2"
601' - 8 1/2"
601' - 8 1/2"
601' - 8 1/2"
5' - 9 3/4" 3' - 4" 11 1/4"
2' - 2 1/2" 4' - 4" 2' - 2 1/2"
10' - 0 1/4" 10' - 0 1/4"
32' - 3"
/2
1'
0"
8' - 10 3/4"
9'
6' - 0" 6 1/4" 7' - 2"
AE 306
AE 306
2' - 0" 18' - 5 1/2" 2' - 0"
2'
/4
3'
6'
/2
2'
/4
3'
6'
/2
S2S2
6" 1'
3'
1'
6"
8"
9"
AE 205
AE 2058
Mach. Room 003A
A
AE 303
AE 303
1' - 0"
AE 400
AE 400
AE 301
AE 202
S1 S1
6' - 0" 6' - 5" 6' - 0"
AE 400
CG
CG
9"
8"
10"
10"
2B
2B
2B
ALIGN
1'-0"
1' -0
1'-0"
D
1'
SYMBOLS LEGEND
Room name
KEYNOTE
ROOM NAME/NUMBER
0X
CENTERLINE
1i
PARTITION TAG: SEE SHEET AE 501, PARTITION
TYPES & DETAILS FOR MORE INFORMATION
SPOT FLOOR
ELEVATION
NEW COLUMN
GRID LINE
EXISTING COLUMN
GRID LINE
NEW CONSTRUCTION
EXISTING CONSTRUCTION TO REMAIN
1-HOUR RATED CONSTRUCTION
2-HOUR RATED CONSTRUCTION
NOTE: SEE SHEET GI 003 FOR COMPLETE LIST OF SYMBOLS & ABBREVIATIONS
CONCRETE WALL
CMU - CONCRETE MASONRY UNITS
EXTERIOR RIGID INSULATION
CG
CORNER GUARD FINISH TAG: SEE SHEET
AI 601, FINISH PLANS & FINISH SCHEDULE
FOR DETAILED FINISHES INFORMATION
1i
STOREFRONT / WINDOW TAG: SEE SHEET
AE 602 WINDOW & STOREFRONT SCHEDULE
& DETAILS FOR SPECIFIC INFORMATION
DOOR TAG: SEE SHEET AE 601, DOOR
SCHEDULE & DETAILS SHEET FOR SPECIFIC
DOOR INFORMATION
Jx
13x
EXISTING CAST-IN-PLACE
CONCRETE FOUNDATION WALL
Engineering
Space
NEW CAST-IN-PLACE
CONCRETE FOUNDATION WALL
HYDROPHILIC WATERSTOP
PREP EXISTING WALL SURFACE TO RECEIVE
WATERSTOP PER WATERSTOP MANUFACTURER'S
REQUIREMENTS
WATERPROOFING
A
THIN STONE VENEER (TSV)
2" RIGID INSULATION
5/8" EXTERIOR GRADE
TYPE X GWB
BATT INSULATION
5/8" MOLD/MOISTURE
RESISTANT TYPE X GWB
6" METAL STUDS
2 1/4" METAL STUDS
New North
Vestibule
STEEL COLUMN
WITH FIREPROOFING,
2-HOUR MINIMUM
DOUBLE STUDS AT
EACH JAMB, TYPICAL
Lx
2B
2B
EXISTING CAST-IN-PLACE
CONCRETE FOUNDATION
WALL
NEW POURED-IN-PLACE
CONCRETE FOUNDATION WALL
THIN STOVE VENEER (TSV)
3 1/2" RIGID INSULATION
FLUID APPLIED
AIR BARRIER
HYDROPHILIC WATERSTOP
New North
Vestibule
SEALANT & BACKER ROD
PREP EXISTING WALL SURFACE TO RECEIVE
WATERSTOP PER WATERSTOP MANUFACTURER'S
REQUIREMENTS
2 5/8"
THIN STOVE VENEER (TSV)
ADHERED DIRECTLY TO
CONCRETE WALL
444 W. Lake St. Suite 1700 Chicago, IL 60606
312.583.7023 www.virtualenergysolutions.com
Joliet Community Based Outpatient Clinic 1201 Eagle Street Joliet, Illinois 60432
Drawing No.
Scale:
Date:
Checked By:Drawn By:Designed By:
Drawing Title:
Contract No.
File No.Building No.
Client Project No.
Project Title:Approved: Chief, failites Management Services
Approved: Medical Center Director
Approved:
Approved: Location:
VES Project Number: 191006
AS NOTED
VA JOLIET CBOC
JOLIET, ILLINOIS
578-371 36C25219D0020
© 2020 Virtual Energy Solutions, INC.
10/11/2023
B
IM
/2
-M
A T
O C
-P a rk in g E x p a n s io n a t J o lie t C
B O
C
-3
/2
J o lie t
C B
O C
P a rk in g E x p a n s io n V
E S
A rc h
.r v t
-1
-0
:1 :4
P
M
AE 400
ENLARGED PLAN - BASEMENT
LEVEL
PARKING EXPANSION AT
JOLIET CBOC
GCGIDGID
3/8" = 1'-0"
DETAIL PLAN - NEW NORTH VESTIBULE & ELEVATOR AT BASEMENT LEVEL
ELEVATOR (BASIS OF DESIGN) INFORMATION:
BASIS OF DESIGN: OTIS 'HYDROFIT' MACHINE-ROOMLESS (MRL) HYDRAULIC ELEVATOR, PASSENGER TYPE.
CAPACITY: 3,500 LBS
CAB SIZE: 6'-5 1/2" WIDE x 5'-6" DEEP
SPEED: 100 FPM
STOPS: 2
PIT DEPTH: 5'-0"
ELEVATOR EQUIPMENT/MACHINERY: LOCATED IN ROOM 003A
0 2' 4' 8'
ARCHITECTURAL KEYNOTES NEW WORK BASEMENT
KEY KEYNOTE
1 INFILL OPENING ONCE ELEVATOR IS INSTALLED. VERIFY WITH ELEVATOR MANUFACTURER.
2 PATCH AND REPAIR EXISTING GWB, METAL STUD FRAMING AT EACH NEW WINDOW & DOOR OPENING.
3 L6x4x3/8" GALVANIZED STEEL FRAME AT EACH WINDOW 'D', BASEMENT LEVEL
4 PREFINISHED METAL DOWN SPOUT
5 STEEL COLUMNS, WITH SPRAY APPLIED FIRE PROOFING, 2-HOUR
6 72" TURNING CIRCLE
7 48" x 48" DOOR APPROACH CLEARANCE
8 48" x 60" DOOR APPROACH CLEARANCE
9 54" x 60" DOOR APPROACH CLEARANCE
10 66" x 72" DOOR APPROACH CLEARANCE
1" = 1'-0"
4 DETAIL PLAN - ENGINEERING SPACE AT EXISTING
1" = 1'-0"
DETAIL PLAN AT COLUMN
1" = 1'-0"
3 DETAIL PLAN - NORTH WALL AT VESTIBULE
0 6" 1' 2'
0 6" 1' 2'
0 6" 1' 2'
AREA OF
WORK
Revisions Date
ISSUED FOR 30% SD 10/07/2022
ISSUED FOR 60% DD 12/30/2022
ISSUED FOR 90% PRICING 02/02/2023
ISSUED FOR 90% CD 02/10/2023
ISSUED FOR 100% CD 03/07/2023
ISSUED FOR BID 03/24/2023
ISSUED FOR BID ADDENDUM 1 04/21/2023
Jx
Kx
Lx
12x 13x 14x10x 15x
AE 301
A
3 4
B
AE 302
AE 202 4
AE 2022
Lobby
Alcove 102A
8'
7' - 10"
8' - 4 1/4" 11
1/ 4"
13' - 8 1/4"
ROOF OF NEW NORTH
VESTIBULE BELOW
CANOPY BELOW
Elevator E-2
7'
/4
3'
/4
20' - 0 1/4"
20' - 0 1/4"
104A
4'
1/
2"
8'
/4
8' - 9 3/4"
Office
Vestibule
Corridor C1-15A
AE 2012
AE 305
AE 305
AE 306
AE 303
104B
2B
2B
2B
2B
2B
2B
2B
D C C
E Q
E Q
Storage 1116A
2A
1116A
2' - 2 1/2"
11" 2' - 2 1/2" 5" 7' - 7 3/4"
7' - 1 1/2"
/2
ALIGN
4'
1"
4'
/2
8'
45.00°
AE 306
AE 306
1'
AE 208
AE 208
AE 208
AE 207
AE 207 6
ALIGN
ALIGN
A
LI
G N
2B
2B
AE 303
AE 303
AE 402
AE 402
C -1
AE 202
AE 301
CG CG
CG
CG
CG
CG
4' - 11"
2'
0"
2'
AE 202
2B
AE 401
NEW WORKEXISTING CBOC
NEW WORKEXISTING CBOC
N E
W W
O R
K E
X
IS
T
IN
G C
B O
C
6 6
8" CMU
8" CMU
8" CMU12" CMU8" CMU8" CMU INFILL
Stair #2 S-2
Dispensary
Storage 1116A
Corridor C1-14
SYMBOLS LEGEND
Room name
KEYNOTE
ROOM NAME/NUMBER
0X
CENTERLINE
1i
PARTITION TAG: SEE SHEET AE 501, PARTITION
TYPES & DETAILS FOR MORE INFORMATION
SPOT FLOOR
ELEVATION
NEW COLUMN
GRID LINE
EXISTING COLUMN
GRID LINE
NEW CONSTRUCTION
EXISTING CONSTRUCTION TO REMAIN
1-HOUR RATED CONSTRUCTION
2-HOUR RATED CONSTRUCTION
NOTE: SEE SHEET GI 003 FOR COMPLETE LIST OF SYMBOLS & ABBREVIATIONS
CONCRETE WALL
CMU - CONCRETE MASONRY UNITS
EXTERIOR RIGID INSULATION
CG
CORNER GUARD FINISH TAG: SEE SHEET
AI 601, FINISH PLANS & FINISH SCHEDULE
FOR DETAILED FINISHES INFORMATION
1i
STOREFRONT / WINDOW TAG: SEE SHEET
AE 602 WINDOW & STOREFRONT SCHEDULE
& DETAILS FOR SPECIFIC INFORMATION
DOOR TAG: SEE SHEET AE 601, DOOR
SCHEDULE & DETAILS SHEET FOR SPECIFIC
DOOR INFORMATION
Jx
14x
5/8" MOLD/MOISTURE GWB
3 5/8" METAL STUDS
8" CMU
CORNER GUARD
EXISTING STEEL COLUMN
EXISTING MASONRY WALL
THIN BRICK (B2)
RIGID INSULATION
SEALANT & BACKER ROD
444 W. Lake St. Suite 1700 Chicago, IL 60606
312.583.7023 www.virtualenergysolutions.com
Joliet Community Based Outpatient Clinic 1201 Eagle Street Joliet, Illinois 60432
Drawing No.
Scale:
Date:
Checked By:Drawn By:Designed By:
Drawing Title:
Contract No.
File No.Building No.
Client Project No.
Project Title:Approved: Chief, failites Management Services
Approved: Medical Center Director
Approved:
Approved: Location:
VES Project Number: 191006
AS NOTED
VA JOLIET CBOC
JOLIET, ILLINOIS
578-371 36C25219D0020
© 2020 Virtual Energy Solutions, INC.
10/11/2023
B
IM
/2
-M
A T
O C
-P a rk in g E x p a n s io n a t J o lie t C
B O
C
-3
/2
J o lie t
C B
O C
P a rk in g E x p a n s io n V
E S
A rc h
.r v t
-1
-0
:1 :5
P
M
AE 401
ENLARGED PLAN - FIRST FLOOR
LEVEL
PARKING EXPANSION AT
JOLIET CBOC
GCGIDGID
3/8" = 1'-0"
1 DETAIL PLAN FIRST FLOOR LEVEL - NE VESTIBULE
0 2' 4' 8'
ARCHITECTURAL KEYNOTES
KEY KEYNOTE
1 PATCH AND REPAIR EXISTING WALL AT LOCATION OF DEMOLISHED ROOF ACCESS LADDER
2 INFILL EXISTING CMU WALL , MATCH EXISTING BLOCK SIZE. PAINTED FINISH
3 ALIGN NEW CONSTRUCTION & FINISHES WITH EXISTING
4 REINSTALL EXISTING SINK, MILLWORK, AND COUNTER. SCRIBE BACKSPLASH TO NEW WALL.
5 NEW PREFABRICATED METAL ROOF ACCESS STAIR. PROVIDE LOCKABLE GATE.
6 JOINT LINE BETWEEN EXISTING CBOC AND NEW WORK
7 72" TURNING CIRCLE
8 48" x 48" DOOR APPROACH CLEARANCE
9 48" x 60" DOOR APPROACH CLEARANCE
10 54" x 60" DOOR APPROACH CLEARANCE
11 66" x 72" DOOR APPROACH CLEARANCE
1" = 1'-0"
DETAIL PLAN
0 6" 1' 2'
AREA OF
WORK
Revisions Date
ISSUED FOR 30% SD 10/07/2022
ISSUED FOR 60% DD 12/30/2022
ISSUED FOR 90% PRICING 02/02/2023
ISSUED FOR 90% CD 02/10/2023
ISSUED FOR 100% CD 03/07/2023
ISSUED FOR BID 03/24/2023
ISSUED FOR BID ADDENDUM 1 04/21/2023
17 16 15 14 13 12 11 10 9 8 7 6 5 4
Lx
13x
AE 402
AE 402
7'
23' - 3" 7' - 10"
5'
4'
4"
NEW ROOF OPENING
10' - 6"
NEW ROOF ACCESS STAIR
EXISTING PARAPET
6" METAL STUD FRAMED ENCLOSURE,
INSULATED WITH BATT INSULATION
THIN BRICK OVER RIGID INSULATION
WITH DRAINAGE LAYER OVER FLUID
APPLIED VAPOR BARRIER
NEW INSULATED H.M.
DOOR & FRAME
3'
SECURITY GATE
ROOF
N E
W R
O O
F O
P E
N
IN
G
4'
/8
NEW CMU PARAPET
S A
Roof
Access
S2A
TO FACE OF PARAPET
8'-8 3/4" EAST EDGE OF STAIR OPENING
AE 402
B2
MC
22' - 7" FACE OF STUDS
21' - 7" FACE OF STUDS
6'
/4
F A
C E
O F
S T
U D
S
5'
/4
F A
C E
O F
S T
U D
S
AE 402
AE 402
O.H.
ROOF NORTH
628' - 10 1/2"
FIRST FLOOR
LEVEL
616' - 2 1/2"
AE 402
NEW PREFABRICATED METAL
ROOF ACCESS
STAIR WITH HAND/GUARD RAILS,
OSHA COMPLIANT
EXISTING STAIR,
NOT SHOWN FOR CLARITY
7'
10"
9"
NEW LAY-IN CEILING
NEW SOFFIT: GYP. BOARD ON METAL
STUD FRAMING
EXISTING ROOF STRUCTURE, CAST-IN-PLACE
CONCRETE, PAINTED
NEW LOCKABLE
SECURITY GATE
8'
NEW PARAPET
6" METAL STUD FRAMED ENCLOSURE,
INSULATED WITH BATT INSULATION
THIN BRICK OVER RIGID INSULATION
WITH DRAINAGE LAYER OVER FLUID
APPLIED VAPOR BARRIER
NEW OPENING
10' - 6"
NEW LOCKABLE
SECURITY GATE
Stair #2
S-2
Roof
Access
S2A
EXISTING PARAPET
8'-8 3/4"
EXISTING CAST-IN-PLACE CONCRETE BEAM BEYOND
EXISTING CAST-IN-PLACE CONCRETE BEAM BEYOND
MC
MC
B2
B2
ACT2
EXISTING ELEVATOR
E-1
R
/1
6"
2'
12' - 1"
NEW STEEL BEAM W/
SPRAY APPLIED
FIRE PROOFING
NEW STEEL BEAMS W/ SPRAY APPLIED
FIRE PROOFING
CENTERLINE OF NEW METAL STUD WALL CENTERLINE OF NEW METAL STUD WALL
8'
AE 402
SIMILAR
AE 402
SIMILAR, O.H.
ROOF NORTH
628' - 10 1/2"
FIRST FLOOR
LEVEL
616' - 2 1/2"
Kx
AE 402
NEW PREFABRICATED METAL
ROOF ACCESS
STAIR WITH HAND/GUARD RAILS,
OSHA COMPLIANT
EXISTING STAIR
FINISHED CEILING
GYP. BOARD ON METAL
STUD FRAMING, PAINTED
6" METAL STUD FRAMED ENCLOSURE,
INSULATED WITH BATT INSULATION
THIN BRICK OVER RIGID INSULATION
WITH DRAINAGE LAYER OVER FLUID
APPLIED VAPOR BARRIER
Stair #2
S-2
Roof
Access
S2A
'-8
B2
MC
MC
B2
ACT2
AE 402
AE 402
CONTROL JOINT
CENTERLINE OF NEW METAL STUD WALL
NEW ROOF OPENING
4' - 4 5/8"
5/8" / 1'-0"
NEW STEEL BEAM W/ SPRAY APPLIED
FIRE PROOFING
EXISTING CAST-IN-PLACE CONCRETE
BEAM
EXISTING CMU WALL
ROOF NORTH
628' - 10 1/2"
13x
AE 402
S2A
B2
MC
P6
DOOR &
FRAME
PREFINISHED METAL SCUPPER & DOWNSPOUT.
PROVIDE SPLASH BLOCK AT TERMINATION ON EXISTING
ROOF.
1'
SYMBOLS LEGEND
KEYNOTEX
0X
CENTERLINE
ANEW COLUMN
GRID LINE
EXISTING COLUMN
GRID LINE
STOREFRONT / WINDOW TAG: SEE SHEET AE 602,
WINDOW & STOREFRONT SCHEDULE & DETAILS
FOR SPECIFIC INFORMATION
DOOR TAG: SEE SHEET AE 601, DOOR
SCHEDULE & DETAILS SHEET FOR SPECIFIC
DOOR INFORMATION
Name Elevation
FLOOR/LEVEL
ELEVATION
NOTE: SEE SHEET GI 003 FOR COMPLETE LIST OF SYMBOLS & ABBREVIATIONS
P3
FINISH TAG: SEE SHEET AI 601, FINISH
PLANS & FINISH SCHEDULE DETAILED
FINISHES INFORMATION
B2 EXTERIOR FINISH TAG
BRICK VENEER, RUNNING
BOND
EXISTING CONSTRUCTION
TO REMAIN
ROOF NORTH
628' - 10 1/2"
Lx
THIN BRICK SUPPORT
PANEL WITH INTEGRAL
WATER/AIRFLOW CHANNELS
B2THIN BRICK
MIN. 1" WEEPS AT
24" OC MAX.
3" RIGID INSULATION
BATT INSULATION
6" METAL STUDS AT 16" OC
6" METAL RUNNER SET ON
SILL SEAL, CONTINUOUS
EXISTING CAST-IN-PLACE CONCRETE
ROOF STRUCTURE
3/ 8"
SEALANT
STARTER ANGLE FASTENED
TO SUBSTRATE
5/8" MOLD/MOISTURE RESISTANT
TYPE X GYP. BOARD
5/8" EXTERIOR GRADE
TYPE X
GYP. BOARD SHEATHING
FLUID APPLIED AIR
BARRIER
3/ 4"
WRAP LAYER OF SELF-ADHERED
FLASHING OVER ANGLE
Lx
THIN BRICK SUPPORT
PANEL WITH INTEGRAL
WATER/AIRFLOW CHANNELS
B2THIN BRICK
3" RIGID INSULATION
BATT INSULATION
6" METAL STUDS AT 16" OC
5/8" MOLD/MOISTURE
RESISTANT TYPE X
GYP. BOARD
5/8" EXTERIOR GRADE
TYPE X GYP. BOARD
SHEATHING
FLUID APPLIED AIR
BARRIER
3" RIGID INSULATION
NEW 8" CMU PARAPET
B2THIN BRICK
THIN BRICK SUPPORT
PANEL WITH INTEGRAL
WATER/AIRFLOW CHANNELS
5/8" EXTERIOR GRADE
GYP. BOARD SHEATHING
FLUID APPLIED AIR
BARRIER
Roof
Access
S2A
ROOF MEMBRANE
BACKER ROD & SEALANT
BACKER ROD & SEALANT
LINE OF THIN BRICK
ABOVE
ROOF NORTH
628' - 10 1/2"
THIN BRICK SUPPORT
PANEL WITH INTEGRAL
WATER/AIRFLOW CHANNELS
B2 THIN BRICK
MIN. 1" WEEPS AT
24" OC MAX.
3" RIGID INSULATION
BATT INSULATION
6" METAL STUDS AT 16" OC
6" METAL RUNNER SET ON
SILL SEAL, CONTINUOUS
EXISTING CAST-IN-PLACE CONCRETE
ROOF STRUCTURE
STARTER ANGLE FASTENED
TO SUBSTRATE
5/8" MOLD/MOISTURE RESISTANT
TYPE X GYP. BOARD
5/8" EXTERIOR GRADE TYPE X
GYP. BOARD SHEATHING
FLUID APPLIED AIR
BARRIER
4"
WRAP LAYER OF SELF-ADHERED
FLASHING ON ROOF DECK
ROOF MEMBRANE
ROOF INSULATION
WRAP LAYER OF SELF-ADHERED
FLASHING OVER ANGLE
PREFINISHED METAL FLASHING
444 W. Lake St. Suite 1700 Chicago, IL 60606
312.583.7023 www.virtualenergysolutions.com
Joliet Community Based Outpatient Clinic 1201 Eagle Street Joliet, Illinois 60432
Drawing No.
Scale:
Date:
Checked By:Drawn By:Designed By:
Drawing Title:
Contract No.
File No.Building No.
Client Project No.
Project Title:Approved: Chief, failites Management Services
Approved: Medical Center Director
Approved:
Approved: Location:
VES Project Number: 191006
AS NOTED
VA JOLIET CBOC
JOLIET, ILLINOIS
578-371 36C25219D0020
© 2020 Virtual Energy Solutions, INC.
10/11/2023
B
IM
/2
-M
A T
O C
-P a rk in g E x p a n s io n a t J o lie t C
B O
C
-3
/2
J o lie t
C B
O C
P a rk in g E x p a n s io n V
E S
A rc h
.r v t
-1
-0
:1 :5
P
M
AE 402
NORTH ROOF ACCESS STAIR
PLAN & DETAILS
PARKING EXPANSION AT
JOLIET CBOC
GCGIDGID
3/8" = 1'-0"
2 ENLARGED PLAN - ROOF ACCESS ENCLOSURE 0 2' 4' 8'
3/8" = 1'-0"
SECTION ROOF ACCESS ENCLOSURE - EAST WEST
3/8" = 1'-0"
SECTION ROOF ACCESS ENCLOSURE - NORTH SOUTH 0 2' 4' 8' 0 2' 4' 8'
3/8" = 1'-0"
1 PARTIAL SOUTH ELEVATION ROOF ACCESS STAIR ENCLOSURE
0 2' 4' 8'
EXTERIOR FINISHES NORTH ROOF ACCESS
KEY KEYNOTE
B2 THIN BRICK, STANDARD, RUNNING BOND
MC PREFINISHED METAL COPING, COLOR TO MATCH EXISTING CBOC COPING
TSV THIN STONE VENEER
MC
3" = 1'-0"
7 DETAIL SECTION ROOF ACCESS ENCLOSURE - NORTH WALL
0 6" 1'3"
3" = 1'-0"
6 DETAIL PLAN - ROOF ACCESS ENCLOSURE AT CMU PARAPET
0 6" 1'3"
3" = 1'-0"
5 DETAIL SECTION ROOF ACCESS ENCLOSURE - AT NORTH ROOF
0 6" 1'3"
AREA OF
WORK
Revisions Date
ISSUED FOR 90% CD 02/10/2023
ISSUED FOR 100% CD 03/07/2023
ISSUED FOR BID 03/24/2023
ISSUED FOR BID ADDENDUM 1 04/21/2023
PARTITION TYPE 2 1-HOUR FIRE
RATED PARTITION PER UL DESIGN
#U419
NEW WALL BASE
SEALANT, CONTINUOUS AT BOTTOM OF GYP.
BOARD, BOTH SIDES
NEW FLOOR FINISH
2A PARTITION TYPE 2A NON RATED
ONLY ONE LAYER GYP BD. W/BATT
INSULATION ONLY AT WALLS NEAR OR
ON AN EXTERIOR WALL. USE
MOLD/MOISTURE RESISTANT GYP.
BOARD ON WALLS LOCATED ON
EXTERIOR WALLS - SEE PLANS
4 7/8"
UNDERSIDE OF DECK
CONCRETE FLOOR SLAB
CONTINUOUS METAL
RUNNER CHANNEL
B
AE501
PARTITION TYPE 1 - 8" CMU - TWO
HOUR FIRE RATED WALL - UL #U905
UNDERSIDE OF DECK
CONCRETE FLOOR SLAB
PARTITION TYPE 1 - 8" CMU
PARTITION TYPE 1A - 6" CMU
CONTINUOUS STEEL ANGLE
FIRE SAFING, CONTINUOUS
SOLID GROUT
3 5/8" (20 GA.) METAL. STUDS
@ 16" O.C.
PARTITION TYPE 2
5/8" GYPSUM WALL BOARD,
TYPE 'X' - BOTH SIDES
3 5/8" (20 GA.) METAL. STUDS
@ 16" O.C.
ACOUSTIC BATT
INSULATION
ACOUSTIC BATT
INSULATION
A
AE501
PARTITION TYPE 2B
5/8" GYPSUM WALL BOARD,
ONE SIDE
PARTITION TYPE 2B
5/8" GYPSUM WALL BOARD,
TYPE 'X' - ONE SIDE ONLY:
EXTEND ASSEMBLY 6" ABOVE FINISHED
CEILING
6"
PARTITION TYPE 3 2-HOUR FIRE
RATED PARTITION PER UL DESIGN
#U419
NEW WALL BASE
SEALANT, CONTINUOUS AT BOTTOM OF GYP.
BOARD, BOTH SIDES
NEW FLOOR FINISH
6 1/8"
UNDERSIDE OF DECK
CONCRETE FLOOR SLAB
CONTINUOUS METAL
RUNNER CHANNEL
B
AE501
BASE
PLAN
HEAD
3 5/8" (20 GA.) METAL. STUDS
@ 16" O.C.
2-LAYERS
5/8" GYPSUM WALL BOARD,
TYPE 'X' - BOTH SIDES
3 5/8" (20 GA.) METAL. STUDS
@ 16" O.C.
ACOUSTIC BATT
INSULATION
ACOUSTIC BATT
INSULATION
SIMILAR
2B PARTITION TYPE 2B NON RATED
PARTITION TYPE 2A
5/8" GYPSUM WALL BOARD,
BOTH SIDES
1A PARTITION TYPE 1A - 6" CMU
PARTITION TYPE 1 - 8" CMU
PARTITION TYPE 1A - 6" CMU
PARTITION TYPE 1 - 8" CMU PARTITION TYPE 2 & 2A
PARTITION TYPE 4 1-HOUR FIRE
RATED PARTITION PER AER-09038
NEW WALL BASE
UNDERSIDE OF DECK
CONCRETE FLOOR SLAB
CONTINUOUS METAL
RUNNER 'J' CHANNEL
C
AE501
1-LAYER
5/8" GYPSUM WALL BOARD,
TYPE 'X'
ACOUSTIC BATT
INSULATION
ACOUSTIC BATT
INSULATION
SHAFT SIDE ROOM SIDE
SHAFT SIDE
ROOM SIDE
4" (18 GA.) CH METAL. STUDS
@ 24" O.C.
1" GYP. BOARD SHAFTWALL
PANEL
1" GYP. BOARD SHAFTWALL
PANEL
1" GYP. BOARD SHAFTWALL
PANEL
PROVIDE HORIZONTAL
BRIDGING EVERY 4'-0"
VERTICALLY, MAX
PROVIDE HORIZONTAL
BRIDGING EVERY 4'-0"
VERTICALLY, MAX
PROVIDE HORIZONTAL
BRIDGING EVERY 4'-0"
VERTICALLY, MAX
1-LAYER
5/8" GYPSUM WALL BOARD,
TYPE 'X'
4" (18 GA.) CH METAL. STUDS
@ 24" O.C.
BOTTOM FLUTE OF DECK
MIN. 1/4" THICK FIRESTOP
SEALANT CONTINUOUS
EACH SIDE
FILL ALL VOIDS AT MTL. DECK
WITH FIRE SAFING
INSULATION (4lb DENSITY)DEEP SLOTTED TOP RUNNER
TRACK TO ALLOW FOR MOVEMENT
S12 FASTENER WITH STAND-OFF
WASHERS AT 8" - 12" O.C. AT SLOT
IN TRACK
TOP OF STUD REFER TO PARTITION
TYPE # FOR WALL
ASSEMBLY
CONSTRUCTION
TOP FLUTE OF DECK
M A
X
UL #HW-D-0034: ONE & TWO HOUR FIRE RATING
1 & 2 HOUR FIRE RATED FIRE RATED WALL
NOTE: CUT GYP BD TO FIT PROFILE OF STRUCTURAL ELEMENTS (INCLUDING BUT
NOT LIMITED TO BEAMS & COLUMNS) AND ANY PIPES THRU THE WALL. FORM
COMPRESSION SEAL BY INSTALLING 1/4" MIN THICK FIRE RESISTANT NEOPRENE
(ARMAFLEX OR EQUAL)
/4
FILL ALL VOIDS AT MTL. DECK
WITH FIRE SAFING
INSULATION (4lb DENSITY)
2 HOUR FIRE RATED FIRE RATED WALL
UNDERSIDE OF DECK
4x4x3/8
CONTINUOUS STEEL ANGLES,
BOTH SIDES, SECURELY ATTACH TO
DECK ONLY.
SOLID GROUT
PARTITION TYPE 1,
8" CMU
CONTINUOUS FIRE SEALANT,
TYPICAL BOTH SIDES
1/
4"
BOTTOM FLUTE OF DECK
FILL ALL VOIDS AT MTL. DECK
WITH FIRE SAFING INSULATION (4lb
DENSITY)
TOP FLUTE OF DECK
UL #HW-D-0372: ONE & TWO HOUR FIRE RATING
1 HOUR FIRE RATED SHAFT WALL
NOTE: CUT GYP BD TO FIT PROFILE OF STRUCTURAL ELEMENTS (INCLUDING BUT NOT LIMITED TO BEAMS & COLUMNS) AND ANY PIPES THRU THE WALL. FORM COMPRESSION SEAL BY INSTALLING 1/4"
MIN THICK FIRE RESISTANT NEOPRENE (ARMAFLEX OR EQUAL)
3/ 8"
3" 1"
1/ 8"
M A
X G
A P
5/ 8"
CONTINUOUS FIRE CAULK
1" FIRE SAFING INSULATION (4lb
DENSITY)
1" SHAFT WALL LINER
PANEL, CUT 1" SHORT OF
J RUNNER TRACK
1" SHAFT WALL LINER
PANEL, 6" STRIP, CUT TO
MATCH PROFILE OF DECK FLUTES
6"
J RUNNER TRACK, DEEP SLOTTED,
TO ALLOW FOR MOVEMENT
TOP OF VERTICAL
STUD
1-LAYER
5/8" GYPSUM WALL BOARD,
TYPE 'X'
444 W. Lake St. Suite 1700 Chicago, IL 60606
312.583.7023 www.virtualenergysolutions.com
Joliet Community Based Outpatient Clinic 1201 Eagle Street Joliet, Illinois 60432
Drawing No.
Scale:
Date:
Checked By:Drawn By:Designed By:
Drawing Title:
Contract No.
File No.Building No.
Client Project No.
Project Title:Approved: Chief, failites Management Services
Approved: Medical Center Director
Approved:
Approved: Location:
VES Project Number: 191006
AS NOTED
VA JOLIET CBOC
JOLIET, ILLINOIS
578-371 36C25219D0020
© 2020 Virtual Energy Solutions, INC.
10/11/2023
B
IM
/2
-M
A T
O C
-P a rk in g E x p a n s io n a t J o lie t C
B O
C
-3
/2
J o lie t
C B
O C
P a rk in g E x p a n s io n V
E S
A rc h
.r v t
-1
-0
:1 :5
P
M
AE 501
INTERIOR PARTITION TYPES &
DETAILS
PARKING EXPANSION AT
JOLIET CBOC
GCGIDGID
3/4" = 1'-0"
1 PARTITION TYPES
3" = 1'-0" B
PARTITION HEAD DETAIL B - PARTITION TYPE 2 & 2A
3" = 1'-0"
A
PARTITION HEAD DETAIL A - FOR PARTITION TYPE 1 ONLY
0 1' 2' 4'
0 6" 1'3" 0 6" 1'3"
3" = 1'-0" C
PARTITION HEAD DETAIL C - PARTITION TYPE 4
0 6" 1'3"
Revisions Date
ISSUED FOR 30% SD 10/07/2022
ISSUED FOR 60% DD 12/30/2022
ISSUED FOR 90% PRICING 02/02/2023
ISSUED FOR 90% CD 02/10/2023
ISSUED FOR 100% CD 03/07/2023
ISSUED FOR BID 03/24/2023
ISSUED FOR BID ADDENDUM 1 04/21/2023
ROOF NORTH
628' - 10 1/2"
Hx
NEW TPO ROOF MEMBRANE
WRAPPED OVER NEW
PARAPET
ROOF INSULATION
EXISTING CAST-IN-PLACE
CONCRETE FRAME
STRUCTURE
EXISTING CAST-IN-PLACE
CONCRETE ROOF
DECK
3" RIGID INSULATION
NEW PRE-FINISHED ALUMINUM COPING
BRICK VENEER
FIBER CANT
T/NORTH
PARAPET
631' - 6 1/2"
B2
MC
NEW 8" CMU PARAPET,
DOWELED W/ EPOXY TO EXISTING STRUCTURE
2'
9"
2X PT WOOD BLOCKING, TYPICAL
FIRST FLOOR
LEVEL
616' - 2 1/2"
B/DECK
VESTIBULE
614' - 8 1/2"
STONE VENEER
VAPOR BARRIER
PREFINISHED METAL
COPING
2X P.T. WOOD BLOCKING
METAL ROOF DECK W/
FIRE PROOFING
RIGID POLYISO ROOF INSULATION,
TAPERED
TPO MEMBRANE ROOFING,
WRAP OVER PARAPET
AIR BARRIER
CONTINUOUS FIBER
CANT STRIP
BATT INSULATION,
MINIMUM R-19
GYP. BOARD EXTERIOR GRADE
SHEATHING ABOVE DECK
TSV
MC
6" METAL STUDS
STEEL BEAM W/FIRE PROOFING
EXTERIOR GRADE GYP. BOARD
SHEATHING
2'
/2
A
B/DECK
VESTIBULE
614' - 8 1/2"
STONE VENEER
2" RIGID POLYISO INSULATION
EXTERIOR GRADE GYP. BOARD
SHEATHING
6" 20 GA. METAL STUDS,
16" O.C.
VAPOR BARRIER
AIR BARRIER
CANOPY SUPPORT
CANOPY ATTACHMENT:
PLATE W/ TAB
(2)2x6 P.T. WOOD BLOCKING
3/8" X 8" SS LAG BOLTS
W/CRUSH TUBES
BATT INSULATION
STEEL BEAM W/
SPRAY FIRE PROOFING
HSS WITH SPRAY FIRE PROOFING
3 5/8" METAL STUD FRAMING AT 16" OC
3 5/8" METAL STUD RUNNER
6" METAL STUD RUNNER
FLASHING
BACKER ROD & SEALANT, CONTINUOUS
5/8" MOLD/MOISTURE RESISTANT
GYP. BOARD
SEALANT, CONTINUOUS
SELF ADHERED FLASHING
MEMBRANE SURROUNDING EACH OPENING, TYPICAL
ALUMINUM STOREFRONT SYSTEM
THERMALLY BROKEN
CORNER BEAD TYPICAL
J-BEAD TYPICAL
A
2" RIGID POLYISO INSULATION
WRAPPED WITH PREFINISHED
SHEET METAL
3/4" EXTERIOR GRADE PLYWOOD
SHEATHING
VAPOR BARRIER
AIR BARRIER
CANOPY
3/8" X 8" SS LAG BOLTS
W/CRUSH TUBES
HHS 12x4x3/8 WITH
SPRAY APPLIED FIRE PROOFING
5/8" MOLD/MOISTURE RESISTANT
GYP. BOARD, PAINTED
ALUMINUM STOREFRONT
ALUMINUM STOREFRONT
PREFINISHED METAL FLASHING
SET IN SEALANT, WITH DRIP EDGE
PREFINISHED METAL FLASHING
SET IN SEALANT, WITH DRIP EDGE
3 5/8"
1 1/4" EXTERIOR GRADE PLYWOOD
BLOCKING. ATTACH TO METAL STUDS AT EACH END
WITH 18 GA. METAL RIGID WALL BACKING
CLIPS , 'BACKIT' OR APPROVED EQUAL
BACKER ROD AND SEALANT, CONTINUOUS
INTERIOR & EXTERIOR
3 5/8" METAL STUD FRAMING AT 16" OC,
WITH RUNNERS TOP &
BOTTOM
SEALANT, CONTINUOUS
SEALANT, CONTINUOUS
SELF ADHERED FLASHING
MEMBRANE SURROUNDING EACH OPENING, TYPICAL
SELF ADHERED SILL FLASHING MEMBRANE
WITH END DAMS AT EACH OPENING, TYPICAL
ALUMINUM SILL PAN
WITH END DAMS.
APPLY BED OF SEALANT
AT BACK OF SILL PAN
BACKER ROD AND SEALANT, CONTINUOUS
INTERIOR & EXTERIOR
CORNER BEAD TYPICAL
J-BEAD TYPICAL
CORNER BEAD TYPICAL
J-BEAD TYPICAL
SYMBOLS LEGEND SECTIONS
EXISTING CONSTRUCTION TO REMAIN
Room name
KEYNOTEX
ROOM NAME/NUMBER
0X
CENTERLINE
1i PARTITION TAG
Name Elevation
FLOOR/LEVEL ELEVATION
NEW COLUMN
GRID LINE
EXISTING COLUMN
GRID LINE
DOOR TAG - SEE SHEET
AE 601 DOOR SCHEDULE
FOR MORE INFORMATION
A
WINDOW/STOREFRONT
TAG - SEE SHEET AE 602
FOR MORE INFORMATION
NOTE: SEE SHEET GI 003 FOR COMPLETE LIST OF SYMBOLS & ABBREVIATIONS
FINISH TAG: SEE SHEET AI 601, FINISH
PLANS & FINISH SCHEDULE DETAILED
FINISHES INFORMATION
SS1
MC EXTERIOR FINISH KEYNOTE
FIRST FLOOR
LEVEL
616' - 2 1/2"
LxB
B/DECK
VESTIBULE
614' - 8 1/2"
8" CMU WALL
CAST-IN-PLACE CONCRETE WALL
CONCRETE & STEEL COMPOSITE
FLOOR
METAL COPING
BEYOND
MC
B2
METAL ROOF DECK
WITH SPRAY APPLIED
FIRE PROOFING
RIGID POLYISO ROOF INSULATION,
TAPERED
TPO MEMBRANE ROOFING,
WRAP OVER WALL
CONTINUOUS FIBER
CANT STRIP
GYP. BOARD EXTERIOR GRADE
SHEATHING ABOVE DECK
3 5/8" METAL STUDS AT 16" OC
PREFINISHED METAL FLASHING
Lobby
North Vestibule
BATT INSULATION
BASEMENT LEVEL
601' - 8 1/2"
PREFINISHED METAL FLASHING
FLASHING
CONTINUOUS SILL SEAL
UNDER RUNNER
TILE WALL BASE
FLOOR TILE
5" CONCRETE
SLAB-ON-GRADE
COMPACTED GRANULAR
FILL, 4" MINIMUM DEPTH
6 MIL. VAPOR BARRIER,
TURN UP AT SLAB EDGES
1/2" COMPRESSIBLE FILLER,
CONTINUOUS
PREFINISHED METAL INSULATION SHIELD
2" RIGID INSULATION
TSV
GYP. BOARD EXTERIOR GRADE
SHEATHING
6" 20 GA. METAL STUDS,
16" O.C.
VAPOR BARRIER
AIR BARRIER
BATT INSULATION,
MINIMUM R-19
5/8" MOLD/MOISTURE RESISTANT
GYP. BOARD
6" METAL RUNNER,
TOP & BOTTOM
ALUMINUM STOREFRONT
SYSTEM
BACKER ROD & SEALANT,
BOTH SIDES
SEALANT, CONTINUOUS
ALUMINUM SILL PAN
WITH END DAMS.
APPLY BED OF SEALANT
AT BACK OF SILL PAN
APPLY MEMBRANE FLASHING
INTO ROUGH OPENING ALIGN WITH
JAMB FLASHING ABOVE
LAP OVER AIR BARRIER
4"
CORNER BEAD TYPICAL
SEALANT AT BASE OF GYP. BOARD
SEALANT AT BASE OF SHEATHING
FIRST FLOOR
LEVEL
616' - 2 1/2"
THIN BRICK SUPPORT
PANEL WITH INTEGRAL
WATER/AIRFLOW CHANNELS
B2 THIN BRICK
MIN. 1" WEEPS AT
24" OC MAX.
3" RIGID INSULATION
STARTER ANGLE FASTENED
TO SUBSTRATE
FLUID APPLIED AIR
BARRIER
WRAP LAYER OF SELF-ADHERED
FLASHING OVER ANGLE
FLUID APPLIED AIR BARRIER
MASONRY VENEER SYSTEM
TSV
3 1/2" RIGID INSULATION
BACKER ROD & SEALANT
SUPPORT ANGLE
8" CMU
EXISTING CAST-IN-PLACE CONCRETE
STRUCTURE
CS1
6" 2 3/
4" B2
THIN STONE VENEER
5/8" MOLD/MOISTURE
RESISTANT TYPE X
GYP. BOARD
5/8" EXTERIOR GRADE
TYPE X GYP. BOARD
SHEATHING
FLUID APPLIED AIR
BARRIER
6" METAL STUDS AT
16" OC
TSV
THIN BRICK
FLUID APPLIED AIR BARRIER
MORTAR SCRATCH COAT
WITH CORROSION RESISTANT
METAL LATH
MORTAR SETTING BED
2" RIGID INSULATION,
MECHANICALLY FASTENED
THIN STONE VENEER TSV
FLUID APPLIED AIR BARRIER
MORTAR SCRATCH COAT
WITH CORROSION RESISTANT
METAL LATH
MORTAR SETTING BED
3 1/2" RIGID INSULATION,
MECHANICALLY FASTENED
EXISTING CAST-IN-PLACE
CONCRETE FOUNDATION WALL
5/8" MOLD/MOISTURE
RESISTANT TYPE X
GYP. BOARD
5/8" EXTERIOR GRADE
TYPE X GYP. BOARD
SHEATHING
6" METAL STUDS AT
16" OC
FLUID APPLIED AIR BARRIER
3" RIGID INSULATION,
MECHANICALLY FASTENED
THIN BRICK SUPPORT
PANEL WITH INTEGRAL
WATER/AIRFLOW CHANNELS
B2THIN BRICK
8" CMU
3" RIGID INSULATION,
MECHANICALLY FASTENED
THIN BRICK SUPPORT
PANEL WITH INTEGRAL
WATER/AIRFLOW CHANNELS
B A
S E
M E
N T
L E
V E
L F
IR
S
T F
L O
O R
L E
V E
L R
O O
F L
E V
E L
NEW NORTH VESTIBULE WALLSNORTH CBOC WALLS
NORTH CBOC WALLS
NORTH ROOF ACCESS STAIR ENCLOSURE WALLS
SUMMARY OF NEW EXTERIOR WALLS
444 W. Lake St. Suite 1700 Chicago, IL 60606
312.583.7023 www.virtualenergysolutions.com
Joliet Community Based Outpatient Clinic 1201 Eagle Street Joliet, Illinois 60432
Drawing No.
Scale:
Date:
Checked By:Drawn By:Designed By:
Drawing Title:
Contract No.
File No.Building No.
Client Project No.
Project Title:Approved: Chief, failites Management Services
Approved: Medical Center Director
Approved:
Approved: Location:
VES Project Number: 191006
AS NOTED
VA JOLIET CBOC
JOLIET, ILLINOIS
578-371 36C25219D0020
© 2020 Virtual Energy Solutions, INC.
10/11/2023
B
IM
/2
-M
A T
O C
-P a rk in g E x p a n s io n a t J o lie t C
B O
C
-3
/2
J o lie t
C B
O C
P a rk in g E x p a n s io n V
E S
A rc h
.r v t
-1
-0
:1 :0
P
M
AE 502
DETAILS - EXTERIOR
PARKING EXPANSION AT
JOLIET CBOC
GCGIDGID
1 1/2" = 1'-0"
WALL DETAIL - NEW PARAPET AT NORTH WALL
1 1/2" = 1'-0"
WALL DETAIL - PARAPET AT NORTH VESTIBULE
0 1' 2'6"
0 1' 2'6"
1 1/2" = 1'-0"
2 CANOPY ATTACHEMENT DETAIL AT WALL - UPPER PORTION
0 1' 2'6"
1 1/2" = 1'-0"
3 CANOPY ATTACHEMENT DETAIL AT WALL - LOWER PORTION
0 1' 2'6"
1 1/2" = 1'-0"
DETAIL SECTION AT NEW NORTH VESTIBULE & NORTH WALL
0 1' 2'6"
1 1/2" = 1'-0"
5 DETAIL SECTION - NORTH VESTIBULE STOREFRONT BASE
0 1' 2'6" 0 1' 2'6"
3" = 1'-0"
8 DETAIL SECTION - AT NORTH WALL TRANSITION
1 1/2" = 1'-0"
7 EXTERIOR WALL TYPES NEW
Revisions Date
ISSUED FOR 30% SD 10/07/2022
ISSUED FOR 60% DD 12/30/2022
ISSUED FOR 90% PRICING 02/02/2023
ISSUED FOR 90% CD 02/10/2023
ISSUED FOR 100% CD 03/07/2023
ISSUED FOR BID 03/24/2023
ISSUED FOR BID ADDENDUM 1 04/21/2023
1/2"1/2"
2"
PER PLAN
DOUBLE RUNNERS,
18 GAUGE MIN.
SEALANT CONT.
AT EACH SIDE
OF FRAME
DOUBLE STUDS,
16 GAUGE MIN.
CUT RUNNERS TO
FORM STRAPS - SECURELY
ATTACH TO BOTH SIDES &
TOP & BOTTOM AT
DOUBLE STUDS AT JAMB
RUNNERS, 18 GAUGE MIN.,
TOP & BOTTOM TO FORM
BOX BEAM
6" 16 GAUGE METAL
STUDS
KICKERS ANCHORED TO STRUCTURE
ABOVE, MINIMUM OF TWO PER OPENING
FASTEN RUNNERS TO
6" METAL STUDS AT
12" O.C. MAX.
FOR DOORS & OPENINGS GREATER THAN 36" WIDE
DOUBLE STUDS,
18 GAUGE MIN.
DOUBLE RUNNERS 18 GAUGE
MIN., FASTEN AT 12" O.C. MIN.
FOLD TOP RUNNER AT EACH END
& ATTACH TO JAMB STUD
FOR DOORS 36" WIDE OR LESS
2"
SPOT GROUT AT
ANCHORS
DOUBLE STUDS, 16 GAUGE MIN.
SEALANT, CONT.
AT EACH SIDE
OF FRAME
5/8" GYP. BOARD
H.M. FRAME
5 1/4" FACE OF WALL
1/2"
2"
PER PLAN
DOOR AS SCHEDULED
DOOR FRAME
BOX-FRAME AT
HEAD, SEE DETAIL
7 THIS SHEET
6" 18 GAUGE METAL
STUDS
METAL RUNNER
METAL RUNNERS,
TOP & BOTTOM
SEALANT CONT.
AT EACH SIDE OF FRAME
FRAME ANCHORS ABOVE
EACH HINGE REINFORCEMENT
DOUBLE STUDS,
18 GAUGE MIN.
DOUBLE RUNNERS, FASTEN
AT 12" O.C. MIN. SEE DETAIL 3
THIS SHEET
SECURELY
ANCHOR FRAME TO FLOOR
SLAB
TWO (2) STUDS AT HEAD, TYP.
ADDITIONAL FRAME ANCHOR
BELOW TOP HINGE REINFORCEMENT
FOR DOORS 36" WIDE OR LESS
FRAME ANCHORS
DOUBLE STUDS,
16 GAUGE MIN.
BOX BEAM: (2) 16 GAUGE METAL STUDS
WITH METAL RUNNERS TOP &
BOTTOM, SEE DETAIL 7 THIS SHEET
SECURELY
ANCHOR FRAME TO FLOOR
SLAB
METAL STUDS AT HEAD,
3 MINIMUM EQUALLY SPACED, TYP.
ADDITIONAL FRAME ANCHOR
BELOW TOP HINGE REINFORCEMENT
FOR DOORS GREATER THAN 36" WIDE
A B
DOOR TYPES
TEMPERED
GLASS
LITE
HOLLOW METAL DOOR WITH
HOLLOW METAL FRAME,
PAINTED
AUTOMATIC BI-FOLDING DOOR
ALUMINUM WITH CLEAR LAMINATED
SECURITY GLAZING AND ALUMINUM
FRAME
C
SOLID CORE STAIN GRADE
WOOD WITH HOLLOW METAL
FRAME, PAINTED
HOLLOW METAL DOOR WITH
HOLLOW METAL FRAME,
PAINTED
D
HOLLOW METAL DOOR WITH
HOLLOW METAL FRAME,
PAINTED
E
HOLLOW METAL DOOR WITH
HOLLOW METAL FRAME,
PAINTED
F
HOLLOW METAL DOOR WITH
HOLLOW METAL FRAME,
PAINTED, WITH
LAMINATED SECURITY
GLAZING
G
HOLLOW METAL DOOR WITH
HOLLOW METAL FRAME,
PAINTED
S1
TEMPERED
GLASS
LITES
ABA COMPLIANT
BOTTOM RAIL
GD
HOLLOW METAL DOOR WITH
HOLLOW METAL FRAME,
DOUBLE EGRESS, PAINTED
TEMPERED
GLASS
LITES
T T
T T T T T T
T T T T
MOP PLATE ON PULL SIDE
KICK PLATE ON PUSH SIDE
T=TEMPERED GLASS
KICK PLATES ON PUSH SIDE
MOP PLATE ON PULL SIDE
KICK PLATE ON PUSH SIDE
DOOR / HARDWARE GENERAL NOTES
1. ALL HARDWARE IS TO CONFORM TO THE REQUIREMENTS OF
THE AMERICANS WITH DISABILITIES ACT, LOCAL ACCESSIBILITY
STANDARDS, VA, ABA, AND ANSI A117.1.
2. ALL HARDWARE IS TO COMPLY WITH IBC REQUIREMENTS
3. INTERIOR FLOOR TRANSITION STRIPS TO BE PROVIDED BY
FLOORING CONTRACTOR (SEE FINISH PLAN)
4. ALL WOOD DOORS TO BE 1 3/4"
5. ALL MEANS OF EGRESS DOORS TO BE KEYLESS IN THE
DIRECTION OF TRAVEL AND BE OPERABLE WITHOUT THE ANY
SPECIAL KNOWLEDGE OR TOOLS.
6. EXTERIOR ENTRY THRESHOLD TO BE A MAXIMUM OF 1/2" HIGH,
ACCESSIBLE THRESHOLDS.
7. INTERIOR THRESHOLDS, IF INDICATED, SHALL BE PROVIDED BY
FLOORING CONTRACTOR
8. ALL FRAMES SHALL BE 16 GAUGE WELDED HOLLOW METAL
FRAMES.
9. WHERE LOCK SETS ARE CALLED FOR, PROVIDE 2 KEYS PER
LOCK AND 2 MASTER KEYS TO OPEN ALL LOCKS. CORES SHALL
BE SCHLAGE COMPATIBLE.
10. ALL INTERIOR DOORS AS INDICATED TO HAVE LEVER-TYPE
DOOR HANDLES.
11. ALL DOORS WITH CLOSERS SHALL MEET MAXIMUM OPERATING
FORCE REQUIREMENTS:
EXTERIOR DOORS = 8.5 lbs MAX.
INTERIOR DOORS = 5 lbs MAX.
11a. ALL DOOR CLOSERS SHALL BE ADJUSTED SO THAT FROM AN
OPEN POSITION OF 90 DEGREES, THE TIME REQUIRED TO MOVE
THE DOOR TO A POSITION OF 12 DEGREES FROM THE LATCH IS 5
SECONDS MINIMUM.
12. KNURLED HARDWARE SHALL BE PROVIDED ON DOORS INTO
HAZARDOUS ROOMS.
13. DOOR HARDWARE SHALL BE CAPABLE OF BEING OPERATED
WITH THE USE OF ONE (1) HAND AND SHALL NOT REQUIRE TIGHT
PINCHING, TIGHT GRASPING OR TWISTING OF THE WRIST TO
OPERATE. THUMB-TURN DEADBOLTS ARE PROHIBITED; LEVER
OR PADDLE DEADBOLT RELEASES ARE ACCEPTABLE.
14. G.C. TO REPLACE/RE-KEY ALL EXTERIOR DOORS AT END OF
PROJECT. COORDINATE WITH COR.
15. G.C. TO VERIFY ALL HARDWARE OPERATION WITH COR PRIOR TO
ORDERING.
444 W. Lake St. Suite 1700 Chicago, IL 60606
312.583.7023 www.virtualenergysolutions.com
Joliet Community Based Outpatient Clinic…
This is the start of the file's text. The full file is on GovTribe.