This document outlines a federal contract opportunity for the expansion of a parking structure at a Veterans Affairs community-based outpatient clinic in Joliet, Illinois. The Department of Veterans Affairs Technology Acquisition Center in Austin, Texas is soliciting proposals under solicitation number 36C77624B0009 to expand the existing parking structure at the Joliet CBOC to address capacity issues. Interested vendors must submit proposals by the revised due date of [DATE REDACTED] for consideration. The contract is expected to be awarded by [DATE REDACTED] and will require construction services to add additional parking spaces to better accommodate patients and staff. Pricing will be evaluated on a firm-fixed-price basis.
View the file
Other files
Show all 42
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PHASE '0'
WEEKS 1-8
W E
E K
W E
E K
W E
E K
W E
E K
W E
E K
W E
E K
W E
E K
W E
E K
W E
E K
W E
E K
W E
E K
W E
E K
W E
E K
W E
E K
W E
E K
W E
E K
W E
E K
W E
E K
W E
E K
W E
E K
W E
E K
W E
E K
W E
E K
W E
E K
W E
E K
W E
E K
W E
E K
W E
E K
W E
E K
W E
E K
W E
E K
W E
E K
W E
E K
W E
E K
W E
E K
W E
E K
W E
E K
W E
E K
W E
E K
W E
E K
W E
E K
W E
E K
W E
E K
W E
E K
W E
E K
N T
P
MOBILIZATION
EARLY SUBMITTALS
PROCUREMENT
RELOCATIONS
D1: DEMOLISH REMNANT STRUCTURE &
EXISTING NORTHEAST VESTIBULE
D2: OPENINGS IN EXISTING FOUNDATION FOR
NEW WINDOWS & DOOR BASEMENT LEVEL
C1: CONSTRUCT NEW NORTH & NORTHEAST VESTIBULES,
FINISH EXISTING NORTH WALL
C2: REMOVE AND REPLACE EXISTING ROOFING SYSTEM
S1: NEW NORTH PARKING LOT
S2: SEAL COAT & RESTRIPE EXISTING SOUTH LOTS
CLOSEOUT: COMMISSIONING, TRAINING,
PUNCH LIST, AND FINAL CLEAN
E X
T E
R
IO
R W
O R
K
IN
T E
R
IO
R W
O R
K C
L
IN
IC
F
U N
C T
IO
N
I M
P A
C T
S
BASEMENT LEVEL
D1
D2
C1
C2
SITE WORK S1 SITE WORK S2
C3
CLOSEOUT
30 WEEKS - UNAVAILABLE
14 WEEKS - UNAVAILABLE
19 WEEKS - UNAVAILABLE
DURING PHASES D1, D2, C1, & PART OF C3 (UNTIL EXIT AVAILABLE
THROUGH NEW NORTH VESTIBULE)
DURING PHASE D1
DURING PHASE C1 & C3
DEMOLITION PHASING =
D1: DEMOLITION OF REMNANT STRUCTURE (SILVER CROSS HOSPITAL 'SCH') AND EXISTING NORTHEAST VESTIBULE
D2: REMOVE PORTIONS OF EXISTING CBOC FOUNDATION WALLS FOR NEW WINDOWS & NEW DOOR
SITEWORK PHASING = S1 S2
S1: NEW NORTH PARKING LOT INCLUDING LANDSCAPING AND SITE LIGHTING
S2: EXISTING SOUTH PARKING LOTS - SEAL COAT, RE-STRIPING, AND NEW LIGHTING
SUMMARY OF PHASING
NEW CONSTRUCTION PHASING =
C1: CONSTRUCT NEW NORTH VESTIBULE, NEW NORTHEAST VESTIBULE, ELEVATOR, FINISH EXISTING NORTH WALL, AND ROOF ACCESS STAIR, C2: REMOVE & REPLACE ROOFING SYSTEM - ENTIRE CBOC
C3: INTERIOR FIT-OUT, BASEMENT & 1ST FLOOR NORTH AREAS
DURATIONS SHOWN ARE APPROXIMATE
1ST FLOOR: AUDIOLOGY, RADIOLOGY, MARCO,
AND DIAGNOSTICS & DISPENSARY
1ST FLOOR: DIAGNOSTICS & DISPENSARY
NOTE: THE VETERAN'S ADMINISTRATION (VA) DESIRES TO KEEP AS MANY OF THE CLINIC FUNCTIONS AVAILABLE FOR PATIENTS AS IS POSSIBLE.
CLINIC FUNCTIONS UNAVAILABLE =
CLINIC FUNCTION IMPACTS
C3: INTERIOR FIT-OUT, BASEMENT & 1ST FLOOR
NORTH AREAS
444 W. Lake St. Suite 1700 Chicago, IL 60606
312.583.7023 www.virtualenergysolutions.com
Joliet Community Based Outpatient Clinic 1201 Eagle Street Joliet, Illinois 60432
Drawing No.
Scale:
Date:
Checked By:Drawn By:Designed By:
Drawing Title:
Contract No.
File No.Building No.
Client Project No.
Project Title:Approved: Chief, failites Management Services
Approved: Medical Center Director
Approved:
Approved: Location:
VES Project Number: 191006
AS NOTED
VA JOLIET CBOC
JOLIET, ILLINOIS
578-371 36C25219D0020
© 2020 Virtual Energy Solutions, INC.
10/11/2023
B
IM
/2
-M
A T
O C
-P a rk in g E x p a n s io n a t J o lie t C
B O
C
-3
/2
J o lie t
C B
O C
P a rk in g E x p a n s io n V
E S
A rc h
.r v t
-1
-0
:1 :4
P
M
GC 003
PROPOSED PROJECT
SCHEDULE WITH PHASING
PARKING EXPANSION AT
JOLIET CBOC
GCGIDGID
Revisions Date
ISSUED FOR 90% PRICING 02/02/2023
ISSUED FOR 100% CD 03/07/2023
ISSUED FOR BID 03/24/2023
ISSUED FOR BID ADDENDUM 1 04/21/2023
ADDENDUM 3 REVIEW 09/22/2023
ADDENDUM 3 ISSUED FOR BID 10/11/2023
UP
Ex Gx Hx Jx Kx K'x Lx
1x
4x
6x
9x
12x
13x
14x
CxBxAxA1xB1xC1xD1xE1x
3x
5x
5.8x
8x
10x
6.1x
15x
9.5x
1.2x
D2
D2
D2
D2 D2 D2
D2
D1D1
BASEMENT LEVEL
UNOCCUPIED DURING
PHASE D1 & D2 DEMOLITION
Elev. Equip.
B003
Badge B004
Phone B002CHome Based
Primary Care B002
Stair #2 S-2
Comm.
B005
Reception B001
Women's Restroom
B006
Men's Restroom
B008
HAC
B007
Copy Room B009
Phone B002A
Phone B002B
Phone B017
Phone B016
A.O.
B015
Clinical Nurse Manager
B014
Chief Medical Director
B013 Patient
Education/Group Room
B011
Patient Education/Exercise
B010
Store B012
Corridor C0-2
Corridor C0-3
Corridor C0-4
Corridor C0-1
Mech.
B018
Elec.
B019
Gen Room B020
PAS Call Center
B024
Education Storage
B022
Nutrition Services
B021
Main Conference
Room B023
Mech.
B025
Patient Education/Group
Room B033
Patient Education/Group
Room B032
Patient Ed/Internet
Cafe B031
Corridor C0-6
Corridor C0-8
Corridor C0-7
Staff Lounge B042
Men's Staff Locker
B036
Women's Staff Locker
B034
Mech.
Corridor C0-9
Corridor C0-5
Mech.
B026
Elec.
B029
Elec.
B028
Comm B030
Facility Storage
B041
EMS
B038
Building Operator
B039
FMS
B040
Stair #1 S-1
Corridor C0-1
Elevator
EL-1
Mech.
B018
Patient Education/Exercise
B010
Vending
Cooking Classroom
0023A
DEMOLITION PHASING LEGEND
BASEMENT LEVEL
PHASE D2 - OPENINGS IN EXISTING
CBOC FOUNDATION WALLS
UNOCCUPIED
PHASE D1 - REMOVE REMNANT
STRUCTURE, EXISTING NORTHEAST
VESTIBULE
444 W. Lake St. Suite 1700 Chicago, IL 60606
312.583.7023 www.virtualenergysolutions.com
Joliet Community Based Outpatient Clinic 1201 Eagle Street Joliet, Illinois 60432
Drawing No.
Scale:
Date:
Checked By:Drawn By:Designed By:
Drawing Title:
Contract No.
File No.Building No.
Client Project No.
Project Title:Approved: Chief, failites Management Services
Approved: Medical Center Director
Approved:
Approved: Location:
VES Project Number: 191006
AS NOTED
VA JOLIET CBOC
JOLIET, ILLINOIS
578-371 36C25219D0020
© 2020 Virtual Energy Solutions, INC.
10/11/2023
B
IM
/2
-M
A T
O C
-P a rk in g E x p a n s io n a t J o lie t C
B O
C
-3
/2
J o lie t
C B
O C
P a rk in g E x p a n s io n V
E S
A rc h
.r v t
-1
-0
:1 :5
P
M
GC 004
BASEMENT LEVEL
PLAN-DEMOLITION PHASING
PARKING EXPANSION AT
JOLIET CBOC
GCGIDGID
0 8' 16' 32'
3/32" = 1'-0"
1 BASEMENT LEVEL PLAN-DEMOLITION PHASING
NOTE: SEE SHEET GC 003 'PROPOSED PROJECT SCHEDULE
WITH PHASING' FOR THE SEQUENTIAL RELATIONSHIP OF
EACH PHASE DEPICTED ON THIS PLAN.
Revisions Date
ISSUED FOR 30% SD 10/07/2022
ISSUED FOR 60% DD 12/30/2022
ISSUED FOR 90% PRICING 02/02/2023
ISSUED FOR 90% CD 02/10/2023
ISSUED FOR 100% CD 03/07/2023
ISSUED FOR BID 03/24/2023
ISSUED FOR BID ADDENDUM 1 04/21/2023
Ex Gx Hx Jx Kx K'x Lx
1x
4x
6x
9x
12x
13x
14x
CxBxAx
A1x
B1xC1xD1xE1x
3x
5x
5.8x
8x
10x
6.1x
Fx A.E
15x
9.5x
1.2x
D1
TEMPORARY EGRESS
DURING PHASE D1
D1
CONSTRUCTION
BARRIER
CONSTRUCTION
BARRIER
E
FMS
Elevator
EL-1
Stair #2 S-2
Corridor C1-15
Rad Control
Dispensary
Storage 1116A
Diagnostic
Marco
Rad Room
Corridor C1-13
Corridor C1-14
Corridor C1-11
Toilet
Toilet
HAC
Toilet 1112E
Soiled Utility 1112A
Storage 1112B
PM&R
Treatment 1112D
Eye Tech
Visual Fields
Treatment 1112C
Toilet
Toilet 1102A
Eye
Blood Draw 1114D
Eye
Blood Draw 1114C
Draw Analysis
1114E
Toilet 1114F
Blood Draw 1114B
Eye
Eye
1-On-1 Room 1017C
Work Room 1017B
Supervisor Office
1017A
Nurse Triage
Exam 1
Exam 2
Nurse Triage
Women Health Exam
IT
Telemed
Telemed
Telemed
Closet
Telemed
Telemed
Toilet 1043A
Telemed
Telemed 1038Exam 17
Exam 16
PACT 2
PACT 1
Exam 15
Exam 14
Exam 12
Exam 13
Exam 5
Women Health Exam
Toilet
Toilet 1047A
Men's Restroom
Women's Restroom
Treatment Room
Toilet
Treatment Room
CWT
CWT
Security
Wheelchair Storage
Group
Treatment
Treatment Room
Group Treatment
Treatment Room
Treatment Room
Treatment Room
Treatment Room
Soiled Utility
Exam 6
Exam 7
Exam 8
Exam 9
Clean Storage
Exam10
Procedure 1 Shared Gyno
Toilet 1059B
Toilet
Closet 1059A
Procedure 2
Exam 11
Exam 19
Exam 18
PACT
PACT 4
Women Health Exam
Women Health Exam
Corridor C1-3
Telemed
HAC
Stair #1 S-1
Mobile Port Waiting
Toilet 1068A
Toilet 1031A
Pharm. D
Pharm. D
Nutritionist
Teleretinal
Cardio/Pod Shared Office
Soiled Utility
Clean Utility
Social Worker
Shell Space
Corridor C1-10
Podiatry Exam
Podiatry Exam
Tech Work Room
Audiology Exam
Cast Room
Podiatry Exam
Audiology Exam
Oxygen Evaluation
1093PFT Blood Gas
Clean Utility
Soiled Utility
Control
Sound Booth
Control
Sound Booth
Stor.
Corridor C1-12
Corridor C1-9
Corridor
Ambulance Bay C1-36
Corridor C1-5
Corridor C1-5
Corridor C1-7
Corridor C1-6
Corridor C1-6
Corridor C1-4
Corridor C1-8
Corridor C1-1
General Waiting
Corridor C1-2
Photo Alcove
Reception
Equipment Alcove
Nourishment Alcove
Scale Alcove
Meds
1065C
1065B
1065A
Elec. Clos.
1089A
Scale Alcove
PAS
Elec.
1114A
Boiler Plant
Egress
Corridor
Exit
Vestibule
Storage
DEMOLITION PHASING LEGEND
FIRST FLOOR LEVEL
UNOCCUPIED AREAS DURING
DEMOLITION PHASE D1
PHASE D1 - REMOVE REMNANT
STRUCTURE, EXISTING NORTHEAST
VESTIBULE
EGRESS PATH
1. THE GENERAL CONTRACTOR SHALL PROVIDE TEMPORARY BARRICADE PARTITIONS AS REQUIRED TO ISOLATE CONSTRUCTION AREAS
FROM AREAS TO REMAIN UNDISTURBED, AND SHALL COORDINATE THEIR EXACT LOCATION WITH THE COR. ADDITIONAL TEMPORARY
BARRICADE PARTITIONS OTHER THAN THOSE INDICATED ON THE PLANS SHALL BE REQUIRED AS NECESSARY TO ACCOMPLISH THE
CONSTRUCTION PROCESS, AND WHERE APPLICABLE, TO ISOLATE DIFFERENT PHASES OF THE WORK.
2. TEMPORARY BARRICADE PARTITIONS SHALL BE PROVIDED AROUND ANY AREA OF WORK CONSIDERED TO BE HAZARDOUS OR WHERE
THE SPRINKLER SYSTEM IS RENDERED INEFFECTIVE BY THE REMOVAL OF THE CEILING SYSTEM FOR MORE THAN A WORK SHIFT AT A
TIME.
3. MEANS OF EGRESS SHALL BE MAINTAINED FOR THE PUBLIC, STAFF, AND CONTRACTOR EMPLOYEES AT ALL TIMES.
4. ALL TEMPORARY BARRICADE PARTITIONS SHALL BE DUST PROOF AND SEALED AT ALL JUNCTIONS OF DISSIMILAR MATERIALS USING
GASKETING MATERIAL. ADEQUATE PRECAUTIONS SHALL ALSO BE TAKEN TO PREVENT DUST AND NOXIOUS VAPORS FROM ENTERING THE
RETURN AIR DUCTWORK IN THE AREAS OF CONSTRUCTION.
5. EXISTING WALLS UTILIZED AS PART OF THE CONSTRUCTION BARRIER MUST EXTEND TO THE DECK ABOVE AND ALL PENETRATIONS MUST
BE FIRESTOPPED.
TEMPORARY CONSTRUCTION BARRICADES
1. THE GENERAL CONTRACTOR SHALL PROVIDE
TEMPORARY EXIT SIGNS TO DIRECT THE PUBLIC,
STAFF, AND CONTRACTORS TO AVAILABLE EXITS,
DURING CONSTRUCTION.
2. TEMPORARY EXIT SIGNS SHALL BE LOCATED TO
CLEARLY INDICATE THE AVAILABLE PATHS OF
EGRESS AND LOCATIONS OF AVAILABLE EXITS.
3. EXISTING EXIT SIGNS THAT POINT TO BLOCKED
PATHS OF EGRESS AND EXITS SHALL BE COVERED
TO PREVENT CONFUSION.
TEMPORARY EGRESS
E = TEMPORARY EXIT SIGN.
444 W. Lake St. Suite 1700 Chicago, IL 60606
312.583.7023 www.virtualenergysolutions.com
Joliet Community Based Outpatient Clinic 1201 Eagle Street Joliet, Illinois 60432
Drawing No.
Scale:
Date:
Checked By:Drawn By:Designed By:
Drawing Title:
Contract No.
File No.Building No.
Client Project No.
Project Title:Approved: Chief, failites Management Services
Approved: Medical Center Director
Approved:
Approved: Location:
VES Project Number: 191006
AS NOTED
VA JOLIET CBOC
JOLIET, ILLINOIS
578-371 36C25219D0020
© 2020 Virtual Energy Solutions, INC.
10/11/2023
B
IM
/2
-M
A T
O C
-P a rk in g E x p a n s io n a t J o lie t C
B O
C
-3
/2
J o lie t
C B
O C
P a rk in g E x p a n s io n V
E S
A rc h
.r v t
-1
-0
:1 :1
P
M
GC 005
FIRST FLOOR LEVEL
PLAN-DEMOLITION PHASING
PARKING EXPANSION AT
JOLIET CBOC
GCGIDGID
3/32" = 1'-0"
FIRST FLOOR LEVEL PHASING-DEMOLITION PHASING
0 8' 16' 32'
NOTE: SEE SHEET GC 003 'PROPOSED PROJECT SCHEDULE
WITH PHASING' FOR THE SEQUENTIAL RELATIONSHIP OF
EACH PHASE DEPICTED ON THIS PLAN.
Revisions Date
ISSUED FOR 30% SD 10/07/2022
ISSUED FOR 60% DD 12/30/2022
ISSUED FOR 90% PRICING 02/02/2023
ISSUED FOR 90% CD 02/10/2023
ISSUED FOR 100% CD 03/07/2023
ISSUED FOR BID 03/24/2023
ISSUED FOR BID ADDENDUM 1 04/21/2023
Ex
Gx
Gx
Hx
Hx
Jx
Jx
Kx
Kx
K'x
K'x Lx
1x
4x
6x
9x
12x
13x
14x
CxBxAx
A1x
B1xC1xD1xE1x
3x
5x
5.8x
8x
10x
6.1x
Fx A.E
15x
9.5x
1.2x
EXISTING AMBULANCE BAY
27' - 9 1/4"
D1
DEMOLITION PHASING LEGEND
ROOF LEVEL
PHASE D1 - REMOVE REMNANT
STRUCTURE, EXISTING NORTHEAST
VESTIBULE
444 W. Lake St. Suite 1700 Chicago, IL 60606
312.583.7023 www.virtualenergysolutions.com
Joliet Community Based Outpatient Clinic 1201 Eagle Street Joliet, Illinois 60432
Drawing No.
Scale:
Date:
Checked By:Drawn By:Designed By:
Drawing Title:
Contract No.
File No.Building No.
Client Project No.
Project Title:Approved: Chief, failites Management Services
Approved: Medical Center Director
Approved:
Approved: Location:
VES Project Number: 191006
AS NOTED
VA JOLIET CBOC
JOLIET, ILLINOIS
578-371 36C25219D0020
© 2020 Virtual Energy Solutions, INC.
10/11/2023
B
IM
/2
-M
A T
O C
-P a rk in g E x p a n s io n a t J o lie t C
B O
C
-3
/2
J o lie t
C B
O C
P a rk in g E x p a n s io n V
E S
A rc h
.r v t
-1
-0
:1 :2
P
M
GC 006
ROOF LEVEL PLAN-DEMOLITION
PHASING
PARKING EXPANSION AT
JOLIET CBOC
GCGIDGID
3/32" = 1'-0"
ROOF LEVEL PLAN-DEMOLITION PHASING
0 8' 16' 32'
NOTE: SEE SHEET GC 003 'PROPOSED PROJECT SCHEDULE
WITH PHASING' FOR THE SEQUENTIAL RELATIONSHIP OF
EACH PHASE DEPICTED ON THIS PLAN.
Revisions Date
ISSUED FOR 90% PRICING 02/02/2023
ISSUED FOR 90% CD 02/10/2023
ISSUED FOR 100% CD 03/07/2023
ISSUED FOR BID 03/24/2023
| GC 001 - GENERAL AREAS OF WORK - ARCHITECTURAL DEMOLITION |
| GC 002 - GENERAL AREAS OF WORK - ARCHITECTURAL NEW WORK |
| GC 003 - PROPOSED PROJECT SCHEDULE WITH PHASING |
| GC 004 - BASEMENT LEVEL PLAN-DEMOLITION PHASING |
| GC 005 - FIRST FLOOR LEVEL PLAN-DEMOLITION PHASING |
| GC 006 - ROOF LEVEL PLAN-DEMOLITION PHASING |
| GC 007 - BASEMENT LEVEL PLAN-NEW CONSTRUCTION PHASING |
| GC 008 - FIRST FLOOR LEVEL PLAN-NEW CONSTRUCTION PHASING |
| GC 009 - ROOF LEVEL PLAN-NEW CONSTRUCTION PHASING |
| GC 010 - SITE WORK PLAN - NEW CONSTRUCTION PHASING |
File details come from the government source that posted it. Updated .