ATT 3 - 578-371_Joliet_CBOC_Add_3_Part_2.pdf

PDF 13 MB Posted

Attached to
578-371 Expansion of Parking Structure at Joliet CBOC Revised
Solicitation number
36C77624B0009
Issued by

About this file

This document outlines a federal contract opportunity for the expansion of a parking structure at a Veterans Affairs community-based outpatient clinic in Joliet, Illinois. The Department of Veterans Affairs Technology Acquisition Center in Austin, Texas is soliciting proposals under solicitation number 36C77624B0009 to expand the existing parking structure at the Joliet CBOC to address capacity issues. Interested vendors must submit proposals by the revised due date of [DATE REDACTED] for consideration. The contract is expected to be awarded by [DATE REDACTED] and will require construction services to add additional parking spaces to better accommodate patients and staff. Pricing will be evaluated on a firm-fixed-price basis.

View the file

Other files

File Type Posted
36C77624B0009 0011 signed.pdf PDF
Joliet CBOC Parking Expansion - Bid Opening Attendance.pdf PDF
S07 - Abstract of Bids OF 1419 Joliet -S.pdf PDF
Amend 0010 ATT 1 - 578-371 Joliet CBOC Addendum 3 PM R 240502.pdf PDF
36C77624B0009 0010 signed.pdf PDF
36C77624B0009 0009.pdf PDF
Joliet CBOC Technical Questions 1-41 VA Responses Final.pdf PDF
36C77624B0009 0008.pdf PDF
36C77624B0009 0007.pdf PDF
S05 - Joliet CBOC - Technical Questions - Updated 041524.pdf PDF
13974 - Joliet Geotechnical Report.pdf PDF
S05 - Joliet CBOC - Technical Questions 1-41 VA Responses.pdf PDF
26 24 13 Distribution Switchboards.pdf PDF
36C77624B0009 0006.pdf PDF
26 05 73 Overcurrent Protective Device Coordination Study.pdf PDF
26 22 00 Low Voltage Transformers.pdf PDF
13974 - Proposed Parking Addition REV01.pdf PDF
26 24 16 Panelboard.pdf PDF
Pre-bid Site Visit 2 Sign-in Sheet.pdf PDF
36C77624B0009 0005.pdf PDF
36C77624B0009 0004.pdf PDF
36C77624B0009 0003.pdf PDF
Updated - Wage Rates - Will County 2.23.24.pdf PDF
Site Visit 2 Details.pdf PDF
578-371 Pre-bid Site Visit 031824.pdf PDF
36C77624B0009 0002.pdf PDF
Att - 4 -578-371_Joliet_CBOC_Add_3_Part_3_R1.pdf PDF
36C77624B0009 0001.pdf PDF
ATT 10 - 578-371_Joliet_CBOC_Add_3_Parts_Index.pdf PDF
ATT 9 - 578-371_Joliet_CBOC_Add_3_Part_8.pdf PDF
ATT 8 - 578-371_Joliet_CBOC_Add_3_Part_7.pdf PDF
ATT 12 - Limitations on Subcontracting.pdf PDF
ATT 7 - 578-371_Joliet_CBOC_Add_3_Part_6.pdf PDF
ATT 13 - Wage Rates - Will County 2.23.24.pdf PDF
S02 - 36C77624B0009 - Solicitation - Joliet Parking Expansion.pdf PDF
ATT 1 - Specifications Book.pdf PDF
ATT 5 - 578-371_Joliet_CBOC_Add_3_Part_4.pdf PDF
ATT 6 - 578-371_Joliet_CBOC_Add_3_Part_5.pdf PDF
ATT 11 - 578-371 Construction SOW Final.pdf PDF
ATT 4 - 578-371_Joliet_CBOC_Add_3_Part_3.pdf PDF
ATT 2 - 578-371_Joliet_CBOC_Add_3_Part_1.pdf PDF
ATT 14 - Site Visit Instructions.pdf PDF
Show all 42

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PHASE '0'

WEEKS 1-8

W E

E K

W E

E K

W E

E K

W E

E K

W E

E K

W E

E K

W E

E K

W E

E K

W E

E K

W E

E K

W E

E K

W E

E K

W E

E K

W E

E K

W E

E K

W E

E K

W E

E K

W E

E K

W E

E K

W E

E K

W E

E K

W E

E K

W E

E K

W E

E K

W E

E K

W E

E K

W E

E K

W E

E K

W E

E K

W E

E K

W E

E K

W E

E K

W E

E K

W E

E K

W E

E K

W E

E K

W E

E K

W E

E K

W E

E K

W E

E K

W E

E K

W E

E K

W E

E K

W E

E K

W E

E K

N T

P

MOBILIZATION

EARLY SUBMITTALS

PROCUREMENT

RELOCATIONS

D1: DEMOLISH REMNANT STRUCTURE &

EXISTING NORTHEAST VESTIBULE

D2: OPENINGS IN EXISTING FOUNDATION FOR

NEW WINDOWS & DOOR BASEMENT LEVEL

C1: CONSTRUCT NEW NORTH & NORTHEAST VESTIBULES,

FINISH EXISTING NORTH WALL

C2: REMOVE AND REPLACE EXISTING ROOFING SYSTEM

S1: NEW NORTH PARKING LOT

S2: SEAL COAT & RESTRIPE EXISTING SOUTH LOTS

CLOSEOUT: COMMISSIONING, TRAINING,

PUNCH LIST, AND FINAL CLEAN

E X

T E

R

IO

R W

O R

K

IN

T E

R

IO

R W

O R

K C

L

IN

IC

F

U N

C T

IO

N

I M

P A

C T

S

BASEMENT LEVEL

D1

D2

C1

C2

SITE WORK S1 SITE WORK S2

C3

CLOSEOUT

30 WEEKS - UNAVAILABLE

14 WEEKS - UNAVAILABLE

19 WEEKS - UNAVAILABLE

DURING PHASES D1, D2, C1, & PART OF C3 (UNTIL EXIT AVAILABLE

THROUGH NEW NORTH VESTIBULE)

DURING PHASE D1

DURING PHASE C1 & C3

DEMOLITION PHASING =

D1: DEMOLITION OF REMNANT STRUCTURE (SILVER CROSS HOSPITAL 'SCH') AND EXISTING NORTHEAST VESTIBULE

D2: REMOVE PORTIONS OF EXISTING CBOC FOUNDATION WALLS FOR NEW WINDOWS & NEW DOOR

SITEWORK PHASING = S1 S2

S1: NEW NORTH PARKING LOT INCLUDING LANDSCAPING AND SITE LIGHTING

S2: EXISTING SOUTH PARKING LOTS - SEAL COAT, RE-STRIPING, AND NEW LIGHTING

SUMMARY OF PHASING

NEW CONSTRUCTION PHASING =

C1: CONSTRUCT NEW NORTH VESTIBULE, NEW NORTHEAST VESTIBULE, ELEVATOR, FINISH EXISTING NORTH WALL, AND ROOF ACCESS STAIR, C2: REMOVE & REPLACE ROOFING SYSTEM - ENTIRE CBOC

C3: INTERIOR FIT-OUT, BASEMENT & 1ST FLOOR NORTH AREAS

DURATIONS SHOWN ARE APPROXIMATE

1ST FLOOR: AUDIOLOGY, RADIOLOGY, MARCO,

AND DIAGNOSTICS & DISPENSARY

1ST FLOOR: DIAGNOSTICS & DISPENSARY

NOTE: THE VETERAN'S ADMINISTRATION (VA) DESIRES TO KEEP AS MANY OF THE CLINIC FUNCTIONS AVAILABLE FOR PATIENTS AS IS POSSIBLE.

CLINIC FUNCTIONS UNAVAILABLE =

CLINIC FUNCTION IMPACTS

C3: INTERIOR FIT-OUT, BASEMENT & 1ST FLOOR

NORTH AREAS

444 W. Lake St. Suite 1700 Chicago, IL 60606

312.583.7023 www.virtualenergysolutions.com

Joliet Community Based Outpatient Clinic 1201 Eagle Street Joliet, Illinois 60432

Drawing No.

Scale:

Date:

Checked By:Drawn By:Designed By:

Drawing Title:

Contract No.

File No.Building No.

Client Project No.

Project Title:Approved: Chief, failites Management Services

Approved: Medical Center Director

Approved:

Approved: Location:

VES Project Number: 191006

AS NOTED

VA JOLIET CBOC

JOLIET, ILLINOIS

578-371 36C25219D0020

© 2020 Virtual Energy Solutions, INC.

10/11/2023

B

IM

/2

-M

A T

O C

-P a rk in g E x p a n s io n a t J o lie t C

B O

C

-3

/2

J o lie t

C B

O C

P a rk in g E x p a n s io n V

E S

A rc h

.r v t

-1

-0

:1 :4

P

M

GC 003

PROPOSED PROJECT

SCHEDULE WITH PHASING

PARKING EXPANSION AT

JOLIET CBOC

GCGIDGID

Revisions Date

ISSUED FOR 90% PRICING 02/02/2023

ISSUED FOR 100% CD 03/07/2023

ISSUED FOR BID 03/24/2023

ISSUED FOR BID ADDENDUM 1 04/21/2023

ADDENDUM 3 REVIEW 09/22/2023

ADDENDUM 3 ISSUED FOR BID 10/11/2023

UP

Ex Gx Hx Jx Kx K'x Lx

1x

4x

6x

9x

12x

13x

14x

CxBxAxA1xB1xC1xD1xE1x

3x

5x

5.8x

8x

10x

6.1x

15x

9.5x

1.2x

D2

D2

D2

D2 D2 D2

D2

D1D1

BASEMENT LEVEL

UNOCCUPIED DURING

PHASE D1 & D2 DEMOLITION

Elev. Equip.

B003

Badge B004

Phone B002CHome Based

Primary Care B002

Stair #2 S-2

Comm.

B005

Reception B001

Women's Restroom

B006

Men's Restroom

B008

HAC

B007

Copy Room B009

Phone B002A

Phone B002B

Phone B017

Phone B016

A.O.

B015

Clinical Nurse Manager

B014

Chief Medical Director

B013 Patient

Education/Group Room

B011

Patient Education/Exercise

B010

Store B012

Corridor C0-2

Corridor C0-3

Corridor C0-4

Corridor C0-1

Mech.

B018

Elec.

B019

Gen Room B020

PAS Call Center

B024

Education Storage

B022

Nutrition Services

B021

Main Conference

Room B023

Mech.

B025

Patient Education/Group

Room B033

Patient Education/Group

Room B032

Patient Ed/Internet

Cafe B031

Corridor C0-6

Corridor C0-8

Corridor C0-7

Staff Lounge B042

Men's Staff Locker

B036

Women's Staff Locker

B034

Mech.

Corridor C0-9

Corridor C0-5

Mech.

B026

Elec.

B029

Elec.

B028

Comm B030

Facility Storage

B041

EMS

B038

Building Operator

B039

FMS

B040

Stair #1 S-1

Corridor C0-1

Elevator

EL-1

Mech.

B018

Patient Education/Exercise

B010

Vending

Cooking Classroom

0023A

DEMOLITION PHASING LEGEND

BASEMENT LEVEL

PHASE D2 - OPENINGS IN EXISTING

CBOC FOUNDATION WALLS

UNOCCUPIED

PHASE D1 - REMOVE REMNANT

STRUCTURE, EXISTING NORTHEAST

VESTIBULE

444 W. Lake St. Suite 1700 Chicago, IL 60606

312.583.7023 www.virtualenergysolutions.com

Joliet Community Based Outpatient Clinic 1201 Eagle Street Joliet, Illinois 60432

Drawing No.

Scale:

Date:

Checked By:Drawn By:Designed By:

Drawing Title:

Contract No.

File No.Building No.

Client Project No.

Project Title:Approved: Chief, failites Management Services

Approved: Medical Center Director

Approved:

Approved: Location:

VES Project Number: 191006

AS NOTED

VA JOLIET CBOC

JOLIET, ILLINOIS

578-371 36C25219D0020

© 2020 Virtual Energy Solutions, INC.

10/11/2023

B

IM

/2

-M

A T

O C

-P a rk in g E x p a n s io n a t J o lie t C

B O

C

-3

/2

J o lie t

C B

O C

P a rk in g E x p a n s io n V

E S

A rc h

.r v t

-1

-0

:1 :5

P

M

GC 004

BASEMENT LEVEL

PLAN-DEMOLITION PHASING

PARKING EXPANSION AT

JOLIET CBOC

GCGIDGID

0 8' 16' 32'

3/32" = 1'-0"

1 BASEMENT LEVEL PLAN-DEMOLITION PHASING

NOTE: SEE SHEET GC 003 'PROPOSED PROJECT SCHEDULE

WITH PHASING' FOR THE SEQUENTIAL RELATIONSHIP OF

EACH PHASE DEPICTED ON THIS PLAN.

Revisions Date

ISSUED FOR 30% SD 10/07/2022

ISSUED FOR 60% DD 12/30/2022

ISSUED FOR 90% PRICING 02/02/2023

ISSUED FOR 90% CD 02/10/2023

ISSUED FOR 100% CD 03/07/2023

ISSUED FOR BID 03/24/2023

ISSUED FOR BID ADDENDUM 1 04/21/2023

Ex Gx Hx Jx Kx K'x Lx

1x

4x

6x

9x

12x

13x

14x

CxBxAx

A1x

B1xC1xD1xE1x

3x

5x

5.8x

8x

10x

6.1x

Fx A.E

15x

9.5x

1.2x

D1

TEMPORARY EGRESS

DURING PHASE D1

D1

CONSTRUCTION

BARRIER

CONSTRUCTION

BARRIER

E

FMS

Elevator

EL-1

Stair #2 S-2

Corridor C1-15

Rad Control

Dispensary

Storage 1116A

Diagnostic

Marco

Rad Room

Corridor C1-13

Corridor C1-14

Corridor C1-11

Toilet

Toilet

HAC

Toilet 1112E

Soiled Utility 1112A

Storage 1112B

PM&R

Treatment 1112D

Eye Tech

Visual Fields

Treatment 1112C

Toilet

Toilet 1102A

Eye

Blood Draw 1114D

Eye

Blood Draw 1114C

Draw Analysis

1114E

Toilet 1114F

Blood Draw 1114B

Eye

Eye

1-On-1 Room 1017C

Work Room 1017B

Supervisor Office

1017A

Nurse Triage

Exam 1

Exam 2

Nurse Triage

Women Health Exam

IT

Telemed

Telemed

Telemed

Closet

Telemed

Telemed

Toilet 1043A

Telemed

Telemed 1038Exam 17

Exam 16

PACT 2

PACT 1

Exam 15

Exam 14

Exam 12

Exam 13

Exam 5

Women Health Exam

Toilet

Toilet 1047A

Men's Restroom

Women's Restroom

Treatment Room

Toilet

Treatment Room

CWT

CWT

Security

Wheelchair Storage

Group

Treatment

Treatment Room

Group Treatment

Treatment Room

Treatment Room

Treatment Room

Treatment Room

Soiled Utility

Exam 6

Exam 7

Exam 8

Exam 9

Clean Storage

Exam10

Procedure 1 Shared Gyno

Toilet 1059B

Toilet

Closet 1059A

Procedure 2

Exam 11

Exam 19

Exam 18

PACT

PACT 4

Women Health Exam

Women Health Exam

Corridor C1-3

Telemed

HAC

Stair #1 S-1

Mobile Port Waiting

Toilet 1068A

Toilet 1031A

Pharm. D

Pharm. D

Nutritionist

Teleretinal

Cardio/Pod Shared Office

Soiled Utility

Clean Utility

Social Worker

Shell Space

Corridor C1-10

Podiatry Exam

Podiatry Exam

Tech Work Room

Audiology Exam

Cast Room

Podiatry Exam

Audiology Exam

Oxygen Evaluation

1093PFT Blood Gas

Clean Utility

Soiled Utility

Control

Sound Booth

Control

Sound Booth

Stor.

Corridor C1-12

Corridor C1-9

Corridor

Ambulance Bay C1-36

Corridor C1-5

Corridor C1-5

Corridor C1-7

Corridor C1-6

Corridor C1-6

Corridor C1-4

Corridor C1-8

Corridor C1-1

General Waiting

Corridor C1-2

Photo Alcove

Reception

Equipment Alcove

Nourishment Alcove

Scale Alcove

Meds

1065C

1065B

1065A

Elec. Clos.

1089A

Scale Alcove

PAS

Elec.

1114A

Boiler Plant

Egress

Corridor

Exit

Vestibule

Storage

DEMOLITION PHASING LEGEND

FIRST FLOOR LEVEL

UNOCCUPIED AREAS DURING

DEMOLITION PHASE D1

PHASE D1 - REMOVE REMNANT

STRUCTURE, EXISTING NORTHEAST

VESTIBULE

EGRESS PATH

1. THE GENERAL CONTRACTOR SHALL PROVIDE TEMPORARY BARRICADE PARTITIONS AS REQUIRED TO ISOLATE CONSTRUCTION AREAS

FROM AREAS TO REMAIN UNDISTURBED, AND SHALL COORDINATE THEIR EXACT LOCATION WITH THE COR. ADDITIONAL TEMPORARY

BARRICADE PARTITIONS OTHER THAN THOSE INDICATED ON THE PLANS SHALL BE REQUIRED AS NECESSARY TO ACCOMPLISH THE

CONSTRUCTION PROCESS, AND WHERE APPLICABLE, TO ISOLATE DIFFERENT PHASES OF THE WORK.

2. TEMPORARY BARRICADE PARTITIONS SHALL BE PROVIDED AROUND ANY AREA OF WORK CONSIDERED TO BE HAZARDOUS OR WHERE

THE SPRINKLER SYSTEM IS RENDERED INEFFECTIVE BY THE REMOVAL OF THE CEILING SYSTEM FOR MORE THAN A WORK SHIFT AT A

TIME.

3. MEANS OF EGRESS SHALL BE MAINTAINED FOR THE PUBLIC, STAFF, AND CONTRACTOR EMPLOYEES AT ALL TIMES.

4. ALL TEMPORARY BARRICADE PARTITIONS SHALL BE DUST PROOF AND SEALED AT ALL JUNCTIONS OF DISSIMILAR MATERIALS USING

GASKETING MATERIAL. ADEQUATE PRECAUTIONS SHALL ALSO BE TAKEN TO PREVENT DUST AND NOXIOUS VAPORS FROM ENTERING THE

RETURN AIR DUCTWORK IN THE AREAS OF CONSTRUCTION.

5. EXISTING WALLS UTILIZED AS PART OF THE CONSTRUCTION BARRIER MUST EXTEND TO THE DECK ABOVE AND ALL PENETRATIONS MUST

BE FIRESTOPPED.

TEMPORARY CONSTRUCTION BARRICADES

1. THE GENERAL CONTRACTOR SHALL PROVIDE

TEMPORARY EXIT SIGNS TO DIRECT THE PUBLIC,

STAFF, AND CONTRACTORS TO AVAILABLE EXITS,

DURING CONSTRUCTION.

2. TEMPORARY EXIT SIGNS SHALL BE LOCATED TO

CLEARLY INDICATE THE AVAILABLE PATHS OF

EGRESS AND LOCATIONS OF AVAILABLE EXITS.

3. EXISTING EXIT SIGNS THAT POINT TO BLOCKED

PATHS OF EGRESS AND EXITS SHALL BE COVERED

TO PREVENT CONFUSION.

TEMPORARY EGRESS

E = TEMPORARY EXIT SIGN.

444 W. Lake St. Suite 1700 Chicago, IL 60606

312.583.7023 www.virtualenergysolutions.com

Joliet Community Based Outpatient Clinic 1201 Eagle Street Joliet, Illinois 60432

Drawing No.

Scale:

Date:

Checked By:Drawn By:Designed By:

Drawing Title:

Contract No.

File No.Building No.

Client Project No.

Project Title:Approved: Chief, failites Management Services

Approved: Medical Center Director

Approved:

Approved: Location:

VES Project Number: 191006

AS NOTED

VA JOLIET CBOC

JOLIET, ILLINOIS

578-371 36C25219D0020

© 2020 Virtual Energy Solutions, INC.

10/11/2023

B

IM

/2

-M

A T

O C

-P a rk in g E x p a n s io n a t J o lie t C

B O

C

-3

/2

J o lie t

C B

O C

P a rk in g E x p a n s io n V

E S

A rc h

.r v t

-1

-0

:1 :1

P

M

GC 005

FIRST FLOOR LEVEL

PLAN-DEMOLITION PHASING

PARKING EXPANSION AT

JOLIET CBOC

GCGIDGID

3/32" = 1'-0"

FIRST FLOOR LEVEL PHASING-DEMOLITION PHASING

0 8' 16' 32'

NOTE: SEE SHEET GC 003 'PROPOSED PROJECT SCHEDULE

WITH PHASING' FOR THE SEQUENTIAL RELATIONSHIP OF

EACH PHASE DEPICTED ON THIS PLAN.

Revisions Date

ISSUED FOR 30% SD 10/07/2022

ISSUED FOR 60% DD 12/30/2022

ISSUED FOR 90% PRICING 02/02/2023

ISSUED FOR 90% CD 02/10/2023

ISSUED FOR 100% CD 03/07/2023

ISSUED FOR BID 03/24/2023

ISSUED FOR BID ADDENDUM 1 04/21/2023

Ex

Gx

Gx

Hx

Hx

Jx

Jx

Kx

Kx

K'x

K'x Lx

1x

4x

6x

9x

12x

13x

14x

CxBxAx

A1x

B1xC1xD1xE1x

3x

5x

5.8x

8x

10x

6.1x

Fx A.E

15x

9.5x

1.2x

EXISTING AMBULANCE BAY

27' - 9 1/4"

D1

DEMOLITION PHASING LEGEND

ROOF LEVEL

PHASE D1 - REMOVE REMNANT

STRUCTURE, EXISTING NORTHEAST

VESTIBULE

444 W. Lake St. Suite 1700 Chicago, IL 60606

312.583.7023 www.virtualenergysolutions.com

Joliet Community Based Outpatient Clinic 1201 Eagle Street Joliet, Illinois 60432

Drawing No.

Scale:

Date:

Checked By:Drawn By:Designed By:

Drawing Title:

Contract No.

File No.Building No.

Client Project No.

Project Title:Approved: Chief, failites Management Services

Approved: Medical Center Director

Approved:

Approved: Location:

VES Project Number: 191006

AS NOTED

VA JOLIET CBOC

JOLIET, ILLINOIS

578-371 36C25219D0020

© 2020 Virtual Energy Solutions, INC.

10/11/2023

B

IM

/2

-M

A T

O C

-P a rk in g E x p a n s io n a t J o lie t C

B O

C

-3

/2

J o lie t

C B

O C

P a rk in g E x p a n s io n V

E S

A rc h

.r v t

-1

-0

:1 :2

P

M

GC 006

ROOF LEVEL PLAN-DEMOLITION

PHASING

PARKING EXPANSION AT

JOLIET CBOC

GCGIDGID

3/32" = 1'-0"

ROOF LEVEL PLAN-DEMOLITION PHASING

0 8' 16' 32'

NOTE: SEE SHEET GC 003 'PROPOSED PROJECT SCHEDULE

WITH PHASING' FOR THE SEQUENTIAL RELATIONSHIP OF

EACH PHASE DEPICTED ON THIS PLAN.

Revisions Date

ISSUED FOR 90% PRICING 02/02/2023

ISSUED FOR 90% CD 02/10/2023

ISSUED FOR 100% CD 03/07/2023

ISSUED FOR BID 03/24/2023

GC 001 - GENERAL AREAS OF WORK - ARCHITECTURAL DEMOLITION
GC 002 - GENERAL AREAS OF WORK - ARCHITECTURAL NEW WORK
GC 003 - PROPOSED PROJECT SCHEDULE WITH PHASING
GC 004 - BASEMENT LEVEL PLAN-DEMOLITION PHASING
GC 005 - FIRST FLOOR LEVEL PLAN-DEMOLITION PHASING
GC 006 - ROOF LEVEL PLAN-DEMOLITION PHASING
GC 007 - BASEMENT LEVEL PLAN-NEW CONSTRUCTION PHASING
GC 008 - FIRST FLOOR LEVEL PLAN-NEW CONSTRUCTION PHASING
GC 009 - ROOF LEVEL PLAN-NEW CONSTRUCTION PHASING
GC 010 - SITE WORK PLAN - NEW CONSTRUCTION PHASING