ATT 2 - 578-371_Joliet_CBOC_Add_3_Part_1.pdf

PDF 8 MB Posted

Attached to
578-371 Expansion of Parking Structure at Joliet CBOC Revised
Solicitation number
36C77624B0009
Issued by

About this file

This is a solicitation for a federal contract to expand the parking structure at the Joliet Community Based Outpatient Clinic located in Joliet, Illinois. The solicitation number is 36C77624B0009 and was issued by the Department of Veterans Affairs Technology Acquisition Center in Austin, Texas. The scope of work includes demolishing an existing remnant structure, renovating portions of the existing clinic building, and expanding the parking area. The contract drawings provide plans for demolition, new construction, life safety, and details related to architectural, structural, mechanical, electrical, plumbing and civil work. Relevant details are included regarding codes and standards, project description, construction type, fire ratings, occupancy classification, finishes, and life safety requirements.

View the file

Other files

File Type Posted
36C77624B0009 0011 signed.pdf PDF
Joliet CBOC Parking Expansion - Bid Opening Attendance.pdf PDF
S07 - Abstract of Bids OF 1419 Joliet -S.pdf PDF
Amend 0010 ATT 1 - 578-371 Joliet CBOC Addendum 3 PM R 240502.pdf PDF
36C77624B0009 0010 signed.pdf PDF
36C77624B0009 0009.pdf PDF
Joliet CBOC Technical Questions 1-41 VA Responses Final.pdf PDF
36C77624B0009 0008.pdf PDF
36C77624B0009 0007.pdf PDF
S05 - Joliet CBOC - Technical Questions - Updated 041524.pdf PDF
13974 - Joliet Geotechnical Report.pdf PDF
S05 - Joliet CBOC - Technical Questions 1-41 VA Responses.pdf PDF
26 24 13 Distribution Switchboards.pdf PDF
36C77624B0009 0006.pdf PDF
26 05 73 Overcurrent Protective Device Coordination Study.pdf PDF
26 22 00 Low Voltage Transformers.pdf PDF
13974 - Proposed Parking Addition REV01.pdf PDF
26 24 16 Panelboard.pdf PDF
Pre-bid Site Visit 2 Sign-in Sheet.pdf PDF
36C77624B0009 0005.pdf PDF
36C77624B0009 0004.pdf PDF
36C77624B0009 0003.pdf PDF
Updated - Wage Rates - Will County 2.23.24.pdf PDF
Site Visit 2 Details.pdf PDF
578-371 Pre-bid Site Visit 031824.pdf PDF
36C77624B0009 0002.pdf PDF
Att - 4 -578-371_Joliet_CBOC_Add_3_Part_3_R1.pdf PDF
36C77624B0009 0001.pdf PDF
ATT 10 - 578-371_Joliet_CBOC_Add_3_Parts_Index.pdf PDF
ATT 9 - 578-371_Joliet_CBOC_Add_3_Part_8.pdf PDF
ATT 8 - 578-371_Joliet_CBOC_Add_3_Part_7.pdf PDF
ATT 12 - Limitations on Subcontracting.pdf PDF
ATT 7 - 578-371_Joliet_CBOC_Add_3_Part_6.pdf PDF
ATT 13 - Wage Rates - Will County 2.23.24.pdf PDF
S02 - 36C77624B0009 - Solicitation - Joliet Parking Expansion.pdf PDF
ATT 1 - Specifications Book.pdf PDF
ATT 5 - 578-371_Joliet_CBOC_Add_3_Part_4.pdf PDF
ATT 3 - 578-371_Joliet_CBOC_Add_3_Part_2.pdf PDF
ATT 6 - 578-371_Joliet_CBOC_Add_3_Part_5.pdf PDF
ATT 11 - 578-371 Construction SOW Final.pdf PDF
ATT 4 - 578-371_Joliet_CBOC_Add_3_Part_3.pdf PDF
ATT 14 - Site Visit Instructions.pdf PDF
Show all 42

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SITE

444 W. Lake St. Suite 1700 Chicago, IL 60606

312.583.7023 www.virtualenergysolutions.com

Joliet Community Based Outpatient Clinic 1201 Eagle Street Joliet, Illinois 60432

Drawing No.

Scale:

Date:

Checked By:Drawn By:Designed By:

Drawing Title:

Contract No.

File No.Building No.

Client Project No.

Project Title:Approved: Chief, failites Management Services

Approved: Medical Center Director

Approved:

Approved: Location:

VES Project Number: 191006

AS NOTED

VA JOLIET CBOC

JOLIET, ILLINOIS

578-371 36C25219D0020

© 2020 Virtual Energy Solutions, INC.

N

10/11/2023

B

IM

/2

-M

A T

O C

-P a rk in g E x p a n s io n a t J o lie t C

B O

C

-3

/2

J o lie t

C B

O C

P a rk in g E x p a n s io n V

E S

A rc h

.r v t

-1

-0

:0 :3

P

M

GI 001

COVER SHEET

PARKING EXPANSION AT

JOLIET CBOC

GCGIDGID

6" = 1'-0"

LOCATION MAP - VA JOLIET CBOC

PARKING EXPANSION AT JOLIET CBOC

1201 EAGLE STREET

JOLIET, ILLINOIS 60432

PROJECT NUMBER 578-371

AREA OF WORK

SILVER CROSS

HOSPITAL (SCH) REMNANT

STRUCTURE TO BE

REMOVED

CBOC

AREA OF NEW

NORTH PARKING LOT

ARCHITECTURAL SHEET INDEX

Sheet Number Sheet Name

Revision

Number Issue Date Issued For

GI 001 COVER SHEET 19 10/11/2023 ADDENDUM 3 ISSUED FOR BID

GI 002 CODE ANALYSIS, ACCESSIBILITY, & GENERAL NOTES 19 10/11/2023 ADDENDUM 3 ISSUED FOR BID

GI 003 ARCHITECTURAL SYMBOLS & ABBREVIATIONS 19 10/11/2023 ADDENDUM 3 ISSUED FOR BID

GI 004 LIFE SAFETY PLANS 19 10/11/2023 ADDENDUM 3 ISSUED FOR BID

GC 001 GENERAL AREAS OF WORK - ARCHITECTURAL DEMOLITION 19 10/11/2023 ADDENDUM 3 ISSUED FOR BID

GC 002 GENERAL AREAS OF WORK - ARCHITECTURAL NEW WORK 19 10/11/2023 ADDENDUM 3 ISSUED FOR BID

GC 003 PROPOSED PROJECT SCHEDULE WITH PHASING 19 10/11/2023 ADDENDUM 3 ISSUED FOR BID

GC 004 BASEMENT LEVEL PLAN-DEMOLITION PHASING 19 10/11/2023 ADDENDUM 3 ISSUED FOR BID

GC 005 FIRST FLOOR LEVEL PLAN-DEMOLITION PHASING 19 10/11/2023 ADDENDUM 3 ISSUED FOR BID

GC 006 ROOF LEVEL PLAN-DEMOLITION PHASING 19 10/11/2023 ADDENDUM 3 ISSUED FOR BID

GC 007 BASEMENT LEVEL PLAN-NEW CONSTRUCTION PHASING 19 10/11/2023 ADDENDUM 3 ISSUED FOR BID

GC 008 FIRST FLOOR LEVEL PLAN-NEW CONSTRUCTION PHASING 19 10/11/2023 ADDENDUM 3 ISSUED FOR BID

GC 009 ROOF LEVEL PLAN-NEW CONSTRUCTION PHASING 19 10/11/2023 ADDENDUM 3 ISSUED FOR BID

GC 010 SITE WORK PLAN - NEW CONSTRUCTION PHASING 19 10/11/2023 ADDENDUM 3 ISSUED FOR BID

AD 100 BASEMENT DEMOLITION PLAN REMNANT STRUCTURE & N.E. VESTIBULE 19 10/11/2023 ADDENDUM 3 ISSUED FOR BID

AD 101 FIRST FLOOR DEMOLITION PLAN REMNANT STRUCTURE & N.E. VESTIBULE 19 10/11/2023 ADDENDUM 3 ISSUED FOR BID

AD 102 ROOF DEMOLITION PARTIAL PLAN REMNANT STRUCTURE & N.E. VESTIBULE 19 10/11/2023 ADDENDUM 3 ISSUED FOR BID

AD 110 DEMOLITION REFLECTED CEILING PLAN-BASEMENT 19 10/11/2023 ADDENDUM 3 ISSUED FOR BID

AD 111 DEMOLITION REFLECTED CEILING PLAN-1ST FLOOR 19 10/11/2023 ADDENDUM 3 ISSUED FOR BID

AD 301 DEMOLITION WALL SECTION & DETAILS AT REMNANT STRUCTURE 19 10/11/2023 ADDENDUM 3 ISSUED FOR BID

AE 100F EXISTING FOUNDATIONS, PARTIAL PLAN 19 10/11/2023 ADDENDUM 3 ISSUED FOR BID

AE 100 BASEMENT LEVEL PLAN NORTH 19 10/11/2023 ADDENDUM 3 ISSUED FOR BID

AE 101 FIRST FLOOR PLAN NORTH 19 10/11/2023 ADDENDUM 3 ISSUED FOR BID

AE 102N ROOF PLAN - NORTH PORTION 19 10/11/2023 ADDENDUM 3 ISSUED FOR BID

AE 102S ROOF PLAN - SOUTH PORTION 19 10/11/2023 ADDENDUM 3 ISSUED FOR BID

AC 100 REFLECTED CEILING ENLARGED PLANS-BASEMENT LEVEL 19 10/11/2023 ADDENDUM 3 ISSUED FOR BID

AC 101 REFLECTED CEILING ENLARGED PLAN FIRST FLOOR LEVEL 19 10/11/2023 ADDENDUM 3 ISSUED FOR BID

AE 201 ELEVATIONS 19 10/11/2023 ADDENDUM 3 ISSUED FOR BID

AE 202 ELEVATIONS 19 10/11/2023 ADDENDUM 3 ISSUED FOR BID

AE 205 INTERIOR ELEVATIONS - BASEMENT LEVEL 19 10/11/2023 ADDENDUM 3 ISSUED FOR BID

AE 206 INTERIOR ELEVATIONS - BASEMENT LEVEL 19 10/11/2023 ADDENDUM 3 ISSUED FOR BID

AE 207 INTERIOR ELEVATIONS - FIRST FLOOR LEVEL 19 10/11/2023 ADDENDUM 3 ISSUED FOR BID

AE 208 INTERIOR ELEVATIONS - FIRST FLOOR LEVEL 19 10/11/2023 ADDENDUM 3 ISSUED FOR BID

AE 301 BUILDING SECTIONS 19 10/11/2023 ADDENDUM 3 ISSUED FOR BID

AE 302 BUILDING SECTIONS 19 10/11/2023 ADDENDUM 3 ISSUED FOR BID

AE 303 WALL SECTIONS 19 10/11/2023 ADDENDUM 3 ISSUED FOR BID

AE 304 WALL SECTIONS 19 10/11/2023 ADDENDUM 3 ISSUED FOR BID

AE 305 WALL SECTIONS NORTH VESTIBULE 19 10/11/2023 ADDENDUM 3 ISSUED FOR BID

AE 306 WALL SECTIONS NORTH VESTIBULE 19 10/11/2023 ADDENDUM 3 ISSUED FOR BID

AE 400 ENLARGED PLAN - BASEMENT LEVEL 19 10/11/2023 ADDENDUM 3 ISSUED FOR BID

AE 401 ENLARGED PLAN - FIRST FLOOR LEVEL 19 10/11/2023 ADDENDUM 3 ISSUED FOR BID

AE 402 NORTH ROOF ACCESS STAIR PLAN & DETAILS 19 10/11/2023 ADDENDUM 3 ISSUED FOR BID

AE 501 INTERIOR PARTITION TYPES & DETAILS 19 10/11/2023 ADDENDUM 3 ISSUED FOR BID

AE 502 DETAILS - EXTERIOR 19 10/11/2023 ADDENDUM 3 ISSUED FOR BID

AE 601 DOOR SCHEDULE & DETAILS 19 10/11/2023 ADDENDUM 3 ISSUED FOR BID

AE 602 WINDOW & STOREFRONT SCHEDULE, ELEVATIONS & DETAILS 19 10/11/2023 ADDENDUM 3 ISSUED FOR BID

AE 603 WINDOW DETAILS 19 10/11/2023 ADDENDUM 3 ISSUED FOR BID

AI 601 FINISH PLANS & FINISH SCHEDULE 19 10/11/2023 ADDENDUM 3 ISSUED FOR BID

Grand total: 48

3" = 1'-0"

SITE MAP

PROJECT NORTH

TRUE NORTH

PROJECT NORTH

TRUE NORTH

MECHANICAL SHEET INDEX

Sheet Number Sheet Name

Revision

Number Issue Date Issued For

M001 MECHANICAL SYMBOLS AND ABBREVIATIONS 7 10/11/2023 ISSUED FOR BID ADDENDUM 3

MH100-N BASEMENT LEVEL - MECHANICAL VENTILATION PLAN - NORTH 7 10/11/2023 ISSUED FOR BID ADDENDUM 3

MH101-N FIRST FLOOR - MECHANICAL VENTILATION PLAN - NORTH 7 10/11/2023 ISSUED FOR BID ADDENDUM 3

M501 MECHANICAL DETAILS 7 10/11/2023 ISSUED FOR BID ADDENDUM 3

M502 MECHANICAL DETAILS 7 10/11/2023 ISSUED FOR BID ADDENDUM 3

M601 MECHANICAL SCHEDULES 4 03/24/2023 ISSUED FOR BID

Grand total: 6

ELECTRICAL SHEET INDEX

Sheet Number Sheet Name

Revision

Number Issue Date Issued For

E001 ELECTRICAL SYMBOLS AND ABBREVIATIONS 7 10/11/2023 ISSUED FOR BID ADDENDUM 3

ED100-N BASEMENT LEVEL - ELECTRICAL DEMOLITION PLAN - NORTH 7 10/11/2023 ISSUED FOR BID ADDENDUM 3

ED101-N FIRST FLOOR - ELECTRICAL DEMOLITION PLAN - NORTH 7 10/11/2023 ISSUED FOR BID ADDENDUM 3

EL100-N BASEMENT LEVEL - ELECTRICAL LIGHTING PLAN - NORTH 7 10/11/2023 ISSUED FOR BID ADDENDUM 3

EL101-N FIRST FLOOR - ELECTRICAL LIGHTING PLAN - NORTH 7 10/11/2023 ISSUED FOR BID ADDENDUM 3

EP100-N BASEMENT LEVEL - ELECTRICAL POWER PLAN - NORTH 7 10/11/2023 ISSUED FOR BID ADDENDUM 3

EP100-S BASEMENT LEVEL - ELECTRICAL POWER PLAN - SOUTH 7 10/11/2023 ISSUED FOR BID ADDENDUM 3

EP101-N FIRST FLOOR - ELECTRICAL POWER PLAN - NORTH 7 10/11/2023 ISSUED FOR BID ADDENDUM 3

EP101-S FIRST FLOOR - ELECTRICAL POWER PLAN - SOUTH 7 10/11/2023 ISSUED FOR BID ADDENDUM 3

ES101 ELECTRICAL SITE PLAN 7 10/11/2023 ISSUED FOR BID ADDENDUM 3

ESD101 ELECTRICAL DEMOLITION SITE PLAN 7 10/11/2023 ISSUED FOR BID ADDENDUM 3

E501 ELECTRICAL DETAILS 7 10/11/2023 ISSUED FOR BID ADDENDUM 3

E502 ELECTRICAL DETAILS 7 10/11/2023 ISSUED FOR BID ADDENDUM 3

E503 ELECTRICAL DETAILS 7 10/11/2023 ISSUED FOR BID ADDENDUM 3

E504 ELECTRICAL DETAILS 7 10/11/2023 ISSUED FOR BID ADDENDUM 3

E505 ELECTRICAL DETAILS 7 10/11/2023 ISSUED FOR BID ADDENDUM 3

E506 CARD READER - REFERENCE DETAILS 7 10/11/2023 ISSUED FOR BID ADDENDUM 3

E603 LIGHITNG CONTROLS & RISER 7 10/11/2023 ISSUED FOR BID ADDENDUM 3

E604 ELECTRICAL SCHEDULES 7 10/11/2023 ISSUED FOR BID ADDENDUM 3

Grand total: 19

PLUMBING & FIRE PROTECTION SHEET INDEX

Sheet Number Sheet Name

Revision

Number Issue Date Issued For

P001 PLUMBING SYMBOLS, ABBREVIATIONS & SCHEDULES 7 10/11/2023 ISSUED FOR BID ADDENDUM 3

PD101-N FIRST FLOOR - PLUMBING DEMOLITION PLAN - NORTH 7 10/11/2023 ISSUED FOR BID ADDENDUM 3

PD101-S FIRST FLOOR - PLUMBING DEMOLITION PLAN - SOUTH 7 10/11/2023 ISSUED FOR BID ADDENDUM 3

PD102-N ROOF - PLUMBING DEMOLITION PLAN - NORTH 7 10/11/2023 ISSUED FOR BID ADDENDUM 3

P100-N BASEMENT LEVEL - PLUMBING WASTE & VENT PLAN - NORTH 7 10/11/2023 ISSUED FOR BID ADDENDUM 3

P101-N FIRST FLOOR - PLUMBING PLAN - NORTH 7 10/11/2023 ISSUED FOR BID ADDENDUM 3

P101-S FIRST FLOOR - PLUMBING PLAN - SOUTH 7 10/11/2023 ISSUED FOR BID ADDENDUM 3

P102-N ROOF - PLUMBING PLAN-NORTH 7 10/11/2023 ISSUED FOR BID ADDENDUM 3

FP001 FIRE PROTECTION SYMBOLS AND ABBREVIATIONS 7 10/11/2023 ISSUED FOR BID ADDENDUM 3

FP100-N BASEMENT LEVEL - FIRE PROTECTION PLAN - NORTH 7 10/11/2023 ISSUED FOR BID ADDENDUM 3

FP101-N FIRST FLOOR - FIRE PROTECTION PLAN - NORTH 7 10/11/2023 ISSUED FOR BID ADDENDUM 3

FP501 FIRE PROTECTION DETAILS 6 04/21/2023 ISSUED FOR BID ADDENDUM 1

Grand total: 12

STRUCTURAL SHEET INDEX - NORTH VESTIBULE

Sheet Number Sheet Name

Revision

Number Issue Date Issued For

S 001 GENERAL NOTES

S 002 GENERAL NOTES

S 010 TYPICAL DETAILS

S 011 TYPICAL DETAILS

S 012 TYPICAL DETAILS

S 100 ENLARGED STRUCTURAL PLANS

S 102 ENLARGED STRUCTURAL PLANS

S 103 PARKING EXPANSION RETAINING WALL PLAN

S 200 CONCRETE SCHEDULES AND DETAILS

S 201 CONCRETE SECTIONS AND DETAILS

S 300 STEEL SECTIONS AND DETAILS

Grand total: 11

CIVIL SHEET INDEX

Sheet Number Sheet Name

Revision

Number Issue Date Issued For

C1.0 GENERAL NOTES 19 10/11/2023 ADDENDUM 3 ISSUED FOR BID

C1.1 TOPOGRAPHIC SURVEY 19 10/11/2023 ADDENDUM 3 ISSUED FOR BID

C2.0 DEMOLITION PLAN 19 10/11/2023 ADDENDUM 3 ISSUED FOR BID

C3.0 SITE PLAN 19 10/11/2023 ADDENDUM 3 ISSUED FOR BID

C4.0 GRADING PLAN 19 10/11/2023 ADDENDUM 3 ISSUED FOR BID

C4.1 DRIVEWAY GRADING PLAN & STORMWATER EXCAVATION 19 10/11/2023 ADDENDUM 3 ISSUED FOR BID

C5.0 UTILITY PLAN 19 10/11/2023 ADDENDUM 3 ISSUED FOR BID

C5.1 STORMTRAP DETAILS 19 10/11/2023 ADDENDUM 3 ISSUED FOR BID

C5.2 STORMTRAP DETAILS 19 10/11/2023 ADDENDUM 3 ISSUED FOR BID

C5.3 STORMTRAP DETAILS 19 10/11/2023 ADDENDUM 3 ISSUED FOR BID

C6.0 EROSION CONTROL/SWPPP PLAN 19 10/11/2023 ADDENDUM 3 ISSUED FOR BID

C6.1 EROSION CONTROL/SWPPP DETAILS 19 10/11/2023 ADDENDUM 3 ISSUED FOR BID

C6.2 EROSION CONTROL/SWPPP NOTES 19 10/11/2023 ADDENDUM 3 ISSUED FOR BID

C6.3 EROSION CONTROL/SWPPP NOTES 19 10/11/2023 ADDENDUM 3 ISSUED FOR BID

C7.0 DETAILS 19 10/11/2023 ADDENDUM 3 ISSUED FOR BID

C7.1 DETAILS 19 10/11/2023 ADDENDUM 3 ISSUED FOR BID

C7.2 DETAILS 19 10/11/2023 ADDENDUM 3 ISSUED FOR BID

C8.0 TRAFFIC CONTROL DETAILS 19 10/11/2023 ADDENDUM 3 ISSUED FOR BID

Grand total: 18

LANDSCAPE SHEET INDEX

Sheet Number Sheet Name

Revision

Number Issue Date Issued For

AS 102 PARKING LOT STRIPING PLAN 19 10/11/2023 ADDENDUM 3 ISSUED FOR BID

LS 101 LANDSCAPE & PLANTING PLAN 19 10/11/2023 ADDENDUM 3 ISSUED FOR BID

LS-102 LANDSCAPE AND PLANTING DETAILS 19 10/11/2023 ADDENDUM 3 ISSUED FOR BID

LS-103 LANDSCAPE AND PLANTING DETAILS 19 10/11/2023 ADDENDUM 3 ISSUED FOR BID

Grand total: 4

CIVIL & STRUCTURAL ENGINEERING

STRUCTURAL ENGINEERING

LANDSCAPE

ARCHITECTURE

COST ESTIMATOR

MECHANICAL SYSTEMS CONSULTANT

ARCHITECTURE & MECHANICAL,

ELECTRICAL, PLUMBING, &

FIRE PROTECTION ENGINEERING

10/11/2023 ISSUED FOR BID ADDENDUM 3

STRUCTURAL SHEET INDEX - BASEMENT & ROOF ACCESS

Sheet Number Sheet Name

Revision

Number Issue Date Issued For

S001 STRUCTURAL GENERAL NOTES 19 10/11/2023 ADDENDUM 3 ISSUED FOR BID

S002 STRUCTURAL GENERAL NOTES 19 10/11/2023 ADDENDUM 3 ISSUED FOR BID

S010 STRUCTURAL SCHEDULES 19 10/11/2023 ADDENDUM 3 ISSUED FOR BID

SF 101N EXISTING BASEMENT PLAN - NORTH 19 10/11/2023 ADDENDUM 3 ISSUED FOR BID

SF 103N ROOF ACCESS ENCLOSURE PLANS - NORTH 19 10/11/2023 ADDENDUM 3 ISSUED FOR BID

S504 FRAMING DETAILS AND SECTIONS 19 10/11/2023 ADDENDUM 3 ISSUED FOR BID

Grand total: 6

10/11/2023 ISSUED FOR BID ADDENDUM 3

10/11/2023 ISSUED FOR BID ADDENDUM 3

10/11/2023 ISSUED FOR BID ADDENDUM 3

10/11/2023 ISSUED FOR BID ADDENDUM 3

10/11/2023 ISSUED FOR BID ADDENDUM 3

10/11/2023 ISSUED FOR BID ADDENDUM 3

10/11/2023 ISSUED FOR BID ADDENDUM 3

10/11/2023 ISSUED FOR BID ADDENDUM 3

10/11/2023 ISSUED FOR BID ADDENDUM 3

10/11/2023 ISSUED FOR BID ADDENDUM 3

Revisions Date

ISSUED FOR 60% DD 12/30/2022

ISSUED FOR 90% PRICING 02/02/2023

ISSUED FOR 90% CD 02/10/2023

ISSUED FOR 100% CD 03/07/2023

ISSUED FOR BID 03/24/2023

ISSUED FOR BID ADDENDUM 1 04/21/2023

ADDENDUM 3 REVIEW 09/22/2023

ADDENDUM 3 ISSUED FOR BID 10/11/2023

N N

Toe Clearance T his Drawing Produced by the U.S. A ccess Board

17-25

6 max m in

(a) elevation

(b) plan

Knee Clearance T his Drawing Produc ed by the U.S. Acc ess Board

11 min m in

8 min

9 min

(a) elevation

(b) plan m in

25 max

LC

Figure 703.4.2 Location of Tactile Signs at Doors

T his Dr aw in g P ro du ce d by th e U. S. Ac ce ss B oa rd

18 min

18 min

45° centered on tactile characters

Vertical Change in Level

T his Drawing Produced by the U.S. Access Board

¼ max

Beveled Change in Level

T his Drawing Produced by the U.S. Access Board

¼

¼

½

CL

S

IG

N A

G E

O R

P L A

Q U

E W

T

A C

T

IL

E C

H A

R A

C T

E R

B L D

G E

N T

R A

N C

E S

Y M

B O

L O

F A

C C

E S

S I B

IL

IT

Y

IN

T

E R

IO

R

W A

L L M

T D

R O

O M

S

IG

N A

G E to c e n te rl in e o f s ig n CL

S A

F E

T Y

S W

IT

C

H

M O

T O

R S

T A

R T

E R

S

F

IR

E A

L A

R M

P U

L L S

T A

T

IO

N

W A

L L

A N

D A

L L

E M

E R

G E

N C

Y P

H O

N E

S

E L E

C T

R

IC

O

U T

L E

T T

E L E

P H

O N

E O

R C

A B

L E

J A

C K

S W

IT

C

H O

R W

A L L O

U T

L E

T A

B O

V E

C O

U N

T E

R

P U

S H

B U

T T

O N to c e n te rl in e o f s ig n

CL

CL

CL

Circular Turning Space Circular Turning Space Bariatric

Figure 308.2.1 Unobstructed

Forward Reach

T his Drawing Pro duced by the U. S. Access Board

Figure 308.2.2 Obstructed High Forward Reach

T his Drawing Produced by the U.S. Access Board

Maneuvering Clearance at Manual Swinging Doors and Gates

T his Dr aw in g P ro du ce d by th e U. S. Ac ce ss B oa rd

Maneuvering Clearance at Manual Swinging Doors and Gates

T his Dr aw in g P ro du ce d by th e U. S. Ac ce ss B oa rd

T-Shaped Turning Space T his Drawing Produced by the U.S. A ccess Board

Clear Floor or Ground Space

T his Drawing Produced by the U.S. A ccess Board

66 min 72" min m in m a x m a x m a x

>20-25 max 510-635

20 max

(a) (b) m in

18 min

(a) front approach, pull side m in12 min

(c) front approach, push side, door provided with both closer and latch m in

24 min m in

36 min

12 min 12 min

60 min base a rm a rm

52 min m in m in

9"

GENERAL NOTES

1. THE TERM "WORK" AS USED IN THESE NOTES SHALL INCLUDE ALL REVISIONS AS DRAWN OR SPECIFIED IN THESE DOCUMENTS AS WELL AS ALL OTHER PROVISIONS SPECIFICALLY INCLUDED BY

THE COR IN THE FORM OF DRAWINGS, SPECIFICATIONS, AND WRITTEN INSTRUCTIONS.

2. IT IS HIGHLY RECOMMENDED THAT GC, CM AND SUBCONTRACTORS SHALL VISIT JOB SITE AND BECOME FAMILIAR WITH EXISTING CONDITIONS BEFORE SUBMITTING BIDS. ANY DISCREPANCIES WITHIN THESE DRAWINGS AND/OR BETWEEN THESE DRAWINGS AND EXISTING CONDITIONS SHALL BE BROUGHT TO THE IMMEDIATE ATTENTION OF THE COR & ARCHITECT PRIOR TO SUBMITTING BIDS AND

THE START OF ANY WORK.

3. IT IS RECOMMENDED THAT GC & SUBCONTRACTORS FIELD VERIFY ALL DIMENSIONS PRIOR TO

CONSTRUCTION. IF THE CONTRACT DRAWINGS APPEAR TO BE UNCLEAR, AMBIGUOUS, OR

CONTRADICTORY, THE GC AND SUBCONTRACTORS MUST REQUEST CLARIFICATION FROM THE

ARCHITECT IN WRITING BEFORE SUBMITTING BIDS AND PROCEEDING WITH THAT PART OF THE WORK.

IN CASE OF ANY APPARENT DISCREPANCIES OR CONFLICTS, GC MUST NOTIFY COR & ARCHITECT

IMMEDIATELY BEFORE SUBMITTING BIDS AND PROCEEDING WITH ANY WORK.

4. GENERAL CONTRACTOR SHALL BECOME FAMILIAR WITH THE COR & VA REQUIREMENTS PRIOR TO

BIDDING AND SHALL BE RESPONSIBLE FOR COMPLIANCE WITH THESE REQUIREMENTS.

5. ALL WORK SHALL BE PERFORMED AS TO COMPLY WITH ALL GOVERNING STATUTES,

ORDINANCES, GOVERNMENTAL AND JURISDICTIONAL PERMITS AND APPROVALS AS

OBTAINED. CONTRACTORS SHALL NOT SUBMIT A BID FOR THIS WORK UNLESS THEY ARE FULLY

QUALIFIED AND LICENSED BY THE JURISDICTION IN WHICH THE WORK IS TO BE PERFORMED.

6. ALL WORK SHALL BE PERFORMED IN A PROFESSIONAL MANNER AND SHALL BE IN GOOD AND USABLE

CONDITION AT THE DATE OF COMPLETION THEREOF.

7. GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR REVIEWING APPROVED

PLANS AS APPROVED AND FOR ALL REVISIONS AND OTHER CHANGES. NO WORK SHALL BEGIN

PRIOR TO RECEIPT OF COR APPROVAL.

8. DIMENSIONS ARE BASED ON THE FOLLOWING CRITERIA:

A. GRID DIMENSIONS ARE TO CENTERLINE OF STRUCTURAL GRID LINE UNLESS

OTHERWISE NOTED.

B. DIMENSIONS ARE TO FACE OF FINISHED WALL.

C. DO NOT SCALE DRAWINGS. IF DIMENSIONS ARE NOT SHOWN AND CANNOT BE

DETERMINED, CONTACT THE ARCHITECT FOR CLARIFICATION.

D. DIMENSIONING LAYOUT BEGINS WHERE THE START POINT IS INDICATED ON THE

DRAWINGS

E. WHERE A DIMENSION IS NOTED AS "HOLD" THIS DIMENSION SHALL INDICATE

CLEARANCES AT COMPLETED CONDITIONS, TAKING FINISH MATERIALS INTO

ACCOUNT.

F. DIMENSIONS ARE BASED UPON SPECIFIED MATERIALS AND EQUIPMENT.

SUBSTITUTIONS MAY AFFECT DIMENSIONS. SUBSTITUTION REQUESTS SHALL

INDICATE THE IMPACT OF THE SUBSTITUTIONS UPON DIMENSIONS AND

CLEARANCES.

9. PROVIDE BACKING AND BLOCKING FOR WALL MOUNTED ELEMENTS AS REQUIRED FOR

ATTACHMENT AND BRACING OF NON-STRUCTURAL ELEMENTS.

10. IF MATERIALS SUSPECTED OF CONTAINING HAZARDOUS MATERIALS ARE ENCOUNTERED, DO NOT DISTURB; IMMEDIATELY NOTIFY ARCHITECT AND COR. HAZARDOUS MATERIALS WILL BE REMOVED BY

VA UNDER A SEPARATE CONTRACT.

11. THE CONTRACTOR SHALL, UPON RECEIPT, CAREFULLY REVIEW ALL OF THE CONTRACT

DOCUMENTS AND SHALL IMMEDIATELY NOTIFY THE ARCHITECT REGARDING ANY APPARENT ERRORS, INCONSISTENCIES, OR OMISSIONS DISCOVERED.

12. THE CONTRACT DOCUMENTS ARE CONSIDERED A WHOLE AND AS SUCH, THE GENERAL CONTRACTOR

AND SUB-CONTRACTORS MUST COORDINATE ALL INTERRELATED WORK.

13. WHERE NEW CONSTRUCTION ABUTS EXISTING CONSTRUCTION TO REMAIN, OR WORK DONE UNDER

SEPARATE CONTRACT, ALL CONDITIONS AFFECTING WORK PROGRESS AND CONFORMANCE TO

PLANS AND SPECIFICATIONS SHALL BE VERIFIED BY CONTRACTOR PRIOR TO START OF ANY WORK.

14. ALL WORK AND MATERIALS SHALL BE IN ACCORDANCE WITH CURRENT RULES AND

REGULATIONS OF FEDERAL, STATE, AND LOCAL CODES, LAWS, ORDINANCES, STATUES, AND

REGULATIONS. NOTHING IN THE CONTRACT DOCUMENTS SHALL BE CONSTRUED AS REQUIRING OR

AUTHORIZING WORK CONTRARY TO THESE RULES, REGULATIONS, AND CODES.

15. THE DRAWINGS INDICATE LOCATIONS, DIMENSIONS AND TYPICAL DETAILS OF CONSTRUCTION. THE DRAWINGS DO NOT ILLUSTRATE EVERY CONDITION; WORK NOT EXPRESSLY DETAILED SHALL BE OF CONSTRUCTION SIMILAR TO PARTS THAT ARE DETAILED. WHERE APPARENT DISCREPANCIES OCCUR, THEY SHALL BE REPORTED TO THE ARCHITECT IMMEDIATELY FOR RESOLUTION BEFORE

PROCEEDING WITH THE WORK.

16. THE CONTRACTOR SHALL EXAMINE WORK IN PLACE ON WHICH ADDITIONAL SPECIFIED

CONSTRUCTION IS TO BE APPLIED TO ENSURE THAT SUBSTRATE CONDITIONS ARE

SATISFACTORY FOR THE INSTALLATION OF SPECIFIED FINISH MATERIALS. VERIFY THAT

SUBSTRATES, APPURTENANCES, AND OTHER ACCESSORIES ARE IN PLACE AS REQUIRED BY

FINISH MATERIALS. REPORT IN WRITING TO THE COR ANY DEFECTS, OR CONDITIONS WHICH MAY

DELAY COMPLETION OF PERFORMANCE OF SPECIFIED FINISH WORK. FAILURE OF SUCH

NOTIFICATION WILL BE CONSTRUED AS ACCEPTANCE OF SUBSTRATES AND WORK IN PLACE.

CORRECTIVE WORK REQUIRED BY ARCHITECT OR COR DUE TO CONTRACTOR'S ACCEPTANCE OF

UNSATISFACTORY SUBSTRATE AND WORK IN PLACE CONDITIONS SHALL BE MADE AT NO ADDITIONAL

COST TO THE VA.

17. SEPARATE CONTRACTS: THE CONTRACTOR SHALL COORDINATE AND COOPERATE WITH THE WORK

OF SEPARATE CONTRACTS.

18. FINISH PROTECTION: THE CONTRACTOR SHALL PROTECT NEW FINISHES INSTALLED UNDER THIS CONTRACT AND SHALL REPAIR AND REPLACE OR REPAIR ANY DAMAGED FINISHES AT NO ADDITIONAL

COST TO THE VA UNTIL COR'S FINAL ACCEPTANCE OF FINISHES AT CONCLUSION OF WORK.

19. FIRESTOPPING AND FIRE RATED PENETRATIONS REQUIRED AT ALL FIRE RATED WALLS & FLOORS

SHALL COMPLY WITH ALL APPLICABLE CODES. CONTRACTOR SHALL SUBMIT MANUFACTURER'S

LITERATURE INCLUDING DATA FOR MATERIALS AND PREFABRICATED DEVICES, UNDERWRITER'S

LABORATORY APPROVAL NUMBERS FOR REQUIRED FIRE RATINGS, SHOP DRAWINGS FOR

MANUFACTURER'S INSTALLATION DETAILS AND CERTIFICATES OF COMPLIANCE SHOWING MATERIAL OR COMBINATION OF MATERIALS USED MEETS REQUIREMENTS SPECIFIED FOR FIRE RESISTANCE.

20. ACTIVE HEALTHCARE ENVIRONMENT: GENERAL CONTRACTOR & SUBCONTRACTORS SHALL BE

FAMILIAR WITH ALL VA WORKING REQUIREMENTS IN THE FACILITY INCLUDING BUT NOT LIMITED TO

HOURS OF WORK, MOVEMENT, MATERIAL STORAGE AND HANDLING. GC SHALL OBTAIN THE

APPROVAL OF COR PRIOR TO BEGINNING ANY WORK.

1. THE GENERAL CONTRACTOR SHALL VISIT THE SITE AND BE KNOWLEDGEABLE OF CONDITIONS THEREOF. HE SHALL INVESTIGATE, VERIFY AND BE RESPONSIBLE FOR ALL CONDITIONS OF THE PROJECT AND SHALL NOTIFY THE ARCHITECT AND COR IMMEDIATELY OF ANY INCONSISTENCIES OR

DISCREPANCIES WITH THE PLANS IN RELATION TO THE EXISTING FIELD CONDITIONS OR ANY

CONDITIONS REQUIRING MODIFICATION BEFORE PROCEEDING WITH THE WORK. COMMENCEMENT

OF WORK SHALL CONSTITUTE ACCEPTANCE OF EXISTING CONDITIONS.

2. SURVEY THE CONDITION OF THE BUILDING TO DETERMINE WHETHER REMOVING ANY ELEMENT MIGHT RESULT IN A STRUCTURAL DEFICIENCY OR UNPLANNED COLLAPSE OF ANY PORTION OF THE

STRUCTURE OR ADJACENT STRUCTURES DURING DEMOLITION AND NOTIFY COR & ARCHITECT

BEFORE PROCEEDING. DAILY SURVEYS ARE REQUIRED DURING DEMOLITION AT THE NORTH WALL

AND WEEKLY THERE AFTER.

3. CONTRACTOR TO COORDINATE & REVIEW ALL CONSTRUCTION DOCUMENTS, AS A WHOLE, TO

DETERMINE THE EXTENT OF DEMOLITION WORK, RELATION TO NEW WORK, & BECOME FAMILIAR

WITH THEM THOROUGHLY BEFORE PERFORMING ANY DEMOLITION WORK. BY THE ACT OF

SUBMITTING A BID, THE CONTRACTOR WILL BE DEEMED TO HAVE COMPLIED WITH THE FOREGOING

TO HAVE ACCEPTED SUCH CONDITIONS AND TO HAVE MADE ALLOWANCES THEREFORE IN

PREPARING HIS BID.

4. PLANS SHOW GENERAL DEMOLITION WORK TO BE PERFORMED AND DOES NOT RELIEVE THE

CONTRACTOR FROM OTHER DEMOLITION WORK REQUIRED TO PRODUCE THE BUILDING

MODIFICATIONS SHOWN ON THE REMAINING CONTRACT DOCUMENTS, INCLUDING ANY ENGINEERING

DRAWINGS. WORK INCLUDES REMOVAL AND LEGAL DISPOSAL OF ALL EXISTING CONSTRUCTION

ITEMS THAT ARE NOT UTILIZED IN THE FINISHED PROJECT. REMOVE ALL ITEMS SPECIFICALLY INDICATED IN THE DRAWINGS AND ITEMS WHICH ARE NECESSARY TO BE REMOVED IN ORDER TO

FACILITATE THE FINISHED PROJECT.

5. FIELD VERIFY ALL DIMENSIONS AND BRING ANY DISCREPANCIES TO THE ATTENTION OF THE

COR & ARCHITECT. DO NOT SCALE DRAWINGS. ALL DIMENSIONS LOCATING WALLS ARE TAKEN

FROM OUTSIDE FINISHED FACE OF EXISTING PARTITIONS UNLESS OTHERWISE INDICATED.

6. COMPLY WITH GOVERNING VA REGULATIONS BEFORE STARTING DEMOLITION. COMPLY WITH

HAULING AND DISPOSAL REGULATIONS OF AUTHORITIES HAVING JURISDICTION. REMOVE AND

LEGALLY DISPOSE OF ITEMS EXCEPT THOSE INDICATED TO BE REINSTALLED, SALVAGED, OR TO

REMAIN THE VA'S PROPERTY.

7. EXCEPT FOR ITEMS OR MATERIALS INDICATED TO BE REUSED, SALVAGED, OR DETERMINED BY COR

TO REMAIN THE VA'S PROPERTY, DEMOLISHED MATERIALS SHALL BECOME THE CONTRACTOR'S

PROPERTY AND SHALL BE REMOVED FROM THE SITE. PROMPTLY DISPOSE OF DEMOLISHED

MATERIALS. DO NOT ALLOW DEMOLISHED MATERIALS TO ACCUMULATE ON SITE. TRANSPORT

DEMOLISHED MATERIALS OFF VA'S PROPERTY AND LEGALLY DISPOSE OF THEM TO ENSURE MINIMAL INTERFERENCE WITH ROADS, STREETS, WALKS, AND OTHER ADJACENT OCCUPIED AREAS. REMOVE & TRANSPORT DEBRIS IN A MANNER THAT WILL PREVENT SPILLAGE ON ADJACENT SURFACES AND

AREAS.

8. STORAGE OR SALE OF REMOVED ITEMS OR MATERIALS ON-SITE IS NOT PERMITTED.

9. EXECUTE THE WORK IN A CAREFUL AND ORDERLY MANNER. COORDINATE ALL WORK WITH THE

COR TO VERIFY USE OF POWER, TEMPORARY STORAGE, SITE ACCESS, HOURS OF WORK ETC..

10. SUBMIT WRITTEN REQUEST TO COR IN ADVANCE OF CUTTING OR ALTERING ELEMENTS WHICH

AFFECT:

a. STRUCTURAL INTEGRITY OF ELEMENT

b. INTEGRITY OF WEATHER EXPOSED OR MOISTURE RESISTANT ELEMENTS.

11. PROVIDE TEMPORARY BRACING AND SHORING WITH CONNECTIONS OF SUFFICIENT STRENGTH TO BEAR IMPOSED LOADS, AND TO PROTECT ALL PERSONS AND PROPERTY, AND TO ENSURE PROPER ALIGNMENT. COMPLY WITH ALL STATE, O.S.H.A., VA REQUIREMENTS, AND LOCAL CODES. THE

CONTRACTOR SHALL ASSUME RESPONSIBILITY FOR PROVIDING ADEQUATE BRACING OF WALLS

DURING DEMOLITION. CONTRACTOR SHALL ASSUME ALL RESPONSIBILITY FOR DAMAGE DUE TO HIS

FAILURE TO TAKE SUCH PRECAUTIONS.

12. SURVEY THE CONDITION OF THE BUILDING TO DETERMINE WHETHER REMOVING ANY ELEMENT MIGHT RESULT IN STRUCTURAL DEFICIENCY OR UNPLANNED COLLAPSE OF ANY PORTION OF THE

STRUCTURE OR ADJACENT STRUCTURES DURING DEMOLITION.

13. REMOVE & REINSTALL ITEMS INDICATED; CLEAN, SERVICE, AND OTHERWISE PREPARE THEM FOR REUSE; STORE AND PROTECT AGAINST DAMAGE. REINSTALL ITEMS IN LOCATIONS APPROVED, IN

ADVANCE, BY THE COR.

14. THE CONTRACTOR SHALL PROTECT ALL UNALTERED PORTIONS OF THE EXISTING CONDITIONS, AS

NECESSARY. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL DAMAGE TO EXISTING WORK AND

WORK BY OTHERS.

15. MAINTAIN EXISTING UTILITIES WHERE APPLICABLE TO REMAIN IN SERVICE AND PROTECT THEM AGAINST DAMAGE DURING SELECTIVE DEMOLITION OPERATIONS. VERIFY THAT SERVICE IS NOT

DISCONNECTED IN OTHER ADJACENT SPACES DURING DEMOLITION.

16. PROTECT WALLS, FLOORS AND OTHER EXISTING FINISH WORK THAT ARE TO REMAIN AND ARE

EXPOSED DURING SELECTIVE DEMOLITION OPERATIONS. GENERAL CONTRACTOR TO REVIEW

CONDITION OF CONCRETE SLABS WITH COR AFTER DEMOLITION OF EXISTING WALLS, FLOORS, &

CEILINGS IS COMPLETE. GENERAL CONTRACTOR TO REVIEW PATCH LOCATIONS & COLOR FOR:

LOCATIONS NON-COMPLIANT CODE CONDITIONS; AND SIGNIFICANT COSMETIC DEFECTS WITH COR & ARCHITECT OF RECORD. ANY EXISTING FINISHED SURFACES TO REMAIN THAT ARE AFFECTED BY SELECTIVE DEMOLITION SHALL BE PATCHED TO MATCH EXISTING ADJACENT SURFACES & FINISHES

UNLESS CONCEALED BY NEW CONSTRUCTION.

17. WHERE NEW WORK ADJOINS EXISTING WORK, THE CONTRACTOR SHALL DO ALL NECESSARY

CUTTING, PATCHING AND FITTING. JUNCTURES OF NEW AND EXISTING OR OTHER WORK SHALL BE REPAIRED AND PATCHED TO MATCH ADJACENT EXISTING SURFACES. EXISTING WALLS REQUIRING MODIFICATION OF ANY KIND SHALL BE REFINISHED TO THE NEAREST OUTSIDE OR INSIDE CORNER.

18. DISCONNECT AND REMOVE AND/OR CAP ALL EXISTING UTILITIES (ELECTRIC) WHERE SCHEDULED

NOT TO BE REUSED, IN ACCORDANCE WITH AHJ AND GOVERNING CODE.

19. PROVIDE TEMPORARY LIGHTING/POWER AS REQUIRED, DURING AND AFTER DEMOLITION FOR ALL

AREAS WITHIN LIMITS OF THIS CONTRACT. GC SHALL OBTAIN APPROVAL FROM COR PRIOR TO

CONNECTING TO PANELS.

20. ALL EXISTING CONDUIT AND WIRE INTERFERING WITH THE NEW WORK SHALL BE REROUTED &

CONCEALED IN THE NEW CONSTRUCTION AND MUST BE COORDINATED WITH THE COR.

21. UPON COMPLETION OF THE NEW INSTALLATION WORK, DISCONNECT, REMOVE, AND PROPERLY

DISPOSE OF ALL TEMPORARY LIGHTING, POWER, AND WIRING.

22. CLEAN ALL SURFACES OF ACCUMULATED DUST AND DEBRIS. SWEEP THE AREA BROOM CLEAN

ON COMPLETION OF DEMOLITION OPERATION.

23. G.C. SHALL COORDINATE WORK WITH COR TO INSURE MINIMAL DISRUPTION TO FACILITY

OPERATIONS AND ADJACENT USERS. G.C. TO REUSE ANY EXISTING IMPROVEMENTS, EQUIPMENT

AND UTILITY SYSTEMS, PROVIDED THEY ACKNOWLEDGE RESPONSIBILITY FOR THE REPAIR,

REPLACEMENT OR UPGRADE OF SUCH IF DETERMINED TO BE NON COMPLAINT WITH LATEST CODE, NOT DESIGNED OR APPLICABLE FOR PROPOSED APPLICATION, DAMAGED OR NON OPERATIONAL.

24. HAZARDOUS MATERIALS: CONTRACTOR SHALL IMMEDIATELY INFORM THE COR IF ANY SUSPECTED

HAZARDOUS MATERIALS ARE ENCOUNTERED DURING DEMOLITION WORK. ANY REQUIRED

ABATEMENT SHALL BE APPROVED BY COR AND PERFORMED BY A LICENSED ABATEMENT

SPECIALIST.

DEMOLITION GENERAL NOTES

CODES & STANDARDS:

BUILDING CODE: 2021 INTERNATIONAL BUILDING CODE

FIRE CODE: 2021 INTERNATIONAL FIRE CODE

LIFE SAFETY: 2021 NFPA 101 LIFESAFETY CODE

ELECTRICAL CODE: 2020 NATIONAL ELECTRIC CODE (NFPA 70)

PLUMBING CODE: 2021 INTERNATIONAL PLUMING CODE

MECHANICAL CODE: 2021 INTERNATIONAL MECHANICAL CODE

FUEL GAS CODE: 2021 INTERNATIONAL FUEL GAS CODE

ENERGY CODE: 2018 INTERNATIONAL ENERGY CONSERVATION CODE WITH ILLINOIS AMENDMENTS ACCESSIBILITY: ARCHITECTURAL BARRIERS ACT STANDARDS 2015 (ABAAS) & VA BARRIER FREE DESIGN

STANDARD 2017 (PG-18-13)

VETERANS ADMINISTRATION DESIGN MANUALS

VA PHYSICAL SECURITY AND RESILIENCY DESIGN MANUAL (APRIL 1,2021)

GENERAL PROJECT DESCRIPTION: DEMOLITION OF AN EXISTING REMNANT STRUCTURE, PARTIAL RENOVATION &

SITE PARKING EXPANSION OF AN EXISTING AMBULATORY CLINIC

CONSTRUCTION TYPE: TYPE I-B (PER IBC CHAPTER 6)

TYPE II (222) (PER NFPA 220)

FIRE RESISTIVE RATINGS (TABLE 7.2.1.1 NFPA 5000)

EXTERIOR BEARING WALLS

SUPPORTING ONE FLOOR ONLY: 2 HOUR

SUPPORTING ROOFS ONLY: 2 HOUR

INTERIOR BEARING WALLS

SUPPORTING ONE FLOOR ONLY: 2 HOUR

SUPPORTING ROOFS ONLY: 1 HOUR

COLUMNS

SUPPORTING ONE FLOOR ONLY: 2 HOUR

SUPPORTING ROOFS ONLY: 1 HOUR

BEAMS, GIRDERS, & TRUSSES

SUPPORTING ONE FLOOR ONLY: 2 HOUR

SUPPORTING ROOFS ONLY: 1 HOUR

FLOOR/CEILING ASSEMBLIES: 2 HOUR

ROOF/CEILING ASSEMBLIES: 1 HOUR

OCCUPANCY CLASSIFICATION (NFPA 101): AMBULATORY HEALTH CARE, EXISTING

FULLY SPRINKLED BUILDING: YES (NFPA 13 COMPLIANT, EXISTING & NEW)

FIRE ALARM SYSTEM: EXISTING & NEW WORK (NFPA 72 COMPLIANT)

GROSS AREA OF CLINIC (EXISTING + NEW WORK):

BASEMENT: 32,170.62 GSF

FIRST FLOOR: 35,077.01 GSF

GRAND TOTAL: 67,247.63 GSF

OCCUPANCY LOAD: UNCHANGED

EXIT ACCESS TRAVEL DISTANCE: MAXIMUM - 300'

FINISHES:

WALL AND CEILING: CLASS 2 26 TO 75 FLAME SPREAD RATING, 0-450 SMOKE DEVELOPED

FLOOR COVERINGS: CLASS A

DECORATIVE TRIM: CLASS 1

PENETRATIONS: ALL PENETRATIONS THROUGH RATED ASSEMBLIES AND SMOKE BARRIERS SHALL

BE PROTECTED EQUAL TO THE ASSEMBLY WITH FIRESTOPPING OR

FIRESTOPPING SYSTEM.

PROJECT CODE INFORMATION

CODE ANALYSIS

444 W. Lake St. Suite 1700 Chicago, IL 60606

312.583.7023 www.virtualenergysolutions.com

Joliet Community Based Outpatient Clinic 1201 Eagle Street Joliet, Illinois 60432

Drawing No.

Scale:

Date:

Checked By:Drawn By:Designed By:

Drawing Title:

Contract No.

File No.Building No.

Client Project No.

Project Title:Approved: Chief, failites Management Services

Approved: Medical Center Director

Approved:

Approved: Location:

VES Project Number: 191006

AS NOTED

VA JOLIET CBOC

JOLIET, ILLINOIS

578-371 36C25219D0020

© 2020 Virtual Energy Solutions, INC.

10/11/2023

B

IM

/2

-M

A T

O C

-P a rk in g E x p a n s io n a t J o lie t C

B O

C

-3

/2

J o lie t

C B

O C

P a rk in g E x p a n s io n V

E S

A rc h

.r v t

-1

-0

:1 :1

P

M

GI 002

CODE ANALYSIS,

ACCESSIBILITY, & GENERAL

NOTES

PARKING EXPANSION AT

JOLIET CBOC

GCGIDGID

12" = 1'-0"

5 ACCESSIBILITY DIAGRAMS

ACCESSIBILITY GENERAL NOTES:

1. ARCHITECTURAL BARRIERS ACT STANDARDS 2015 (ABAAS) & VA BARRIER

FREE DESIGN STANDARD 2017 (PG-18-13) SHALL GOVERN.

2. ALL DIMENSIONS NOTED ON THIS SHEET ARE FROM FACE OF FINISHES

UNLESS NOTED OTHERWISE.

3. SOME SHEET DETAILS MAY NOT NECESSARILY APPLY TO THIS PROJECT

4. A LEVEL LANDING ON BOTH SIDES OF EXIT DOORS, NOT EXCEEDING 1/2" IN

LEVEL CHANGE, SHALL BE PROVIDED.

5. LANDING(S) AT STAIRS SHALL BE NO LESS THAN THE WIDTH, IN EACH

DIRECTION, OF NOT LESS THAT THE WIDTH OF THE STAIR ITSELF.

6. ALL EXPOSED LAVATORY/SINK DRAINS SHALL BE PROVIDED WITH INSULATION

OR PROTECTION TO PREVENT DIRECT CONTACT WITH DRAIN PIPE.

7. ANY APPARENT DISCREPANCY BETWEEN THESE DETAILS AND THOSE SHOWN

IN THE DRAWING SET SHALL BE REPORTED TO THE ARCHITECT.

8. THESE DETAILS AND DIMENSIONS SHALL GOVERN.

DOOR HARDWARE NOTES:

1. DOOR HARDWARE SHALL BE CAPABLE OF OPERATION WITH THE USE OF ONE (1)

HAND AND SHALL NOT REQUIRE TIGHT PINCHING, TIGHT GRASPING OR TWISTING

OF THE WRIST TO OPERATE.

2. THUMB TURN DEADBOLTS ARE PROHIBITED; LEVER OR PADDLE DEADBOLT

RELEASES ARE ACCEPTABLE.

3. DOOR CLOSERS SHALL HAVE A MAXIMUM OPENING FORCE OF: 5 lbs MAXIMUM FOR INTERIOR DOORS AND 8.5lbs FOR EXTERIOR DOORS

Revisions Date

ISSUED FOR 30% SD 10/07/2022

ISSUED FOR 60% DD 12/30/2022

ISSUED FOR 90% PRICING 02/02/2023

ISSUED FOR 90% CD 02/10/2023

ISSUED FOR 100% CD 03/07/2023

ISSUED FOR BID 03/24/2023

ISSUED FOR BID ADDENDUM 1 04/21/2023

ADDENDUM 3 REVIEW 09/22/2023

ADDENDUM 3 ISSUED FOR BID 10/11/2023

ARCHITECTURAL ABBREVIATIONS

ABA ARCHITECTURAL BARRIERS ACT

A/E ARCHITECT/ENGINEER

ACT ACOUSTICAL CEILING TILE

ADMIN ADMINISTRATION

AFF ABOVE FINISHED FLOOR

AHJ AUTHORITY HAVING JURISDICTION

AIA AMERICAN INSTITUTE OF ARCHITECTS

ALUM ALUMINUM

APPROX APPROXIMATE

AOR ARCHITECT OF RECORD

ARCH ARCHITECT

B LABEL CLASS B DOOR

BHMA BUILDER'S HARDWARE

MANUFACTURER'S ASSOCIATION

BLDG BUILDING

BOT BOTTOM

BSMT BASEMENT

CCTV CLOSED CIRCUIT TELEVISION

CD CONSTRUCTION DOCUMENTS OR

CONTRACT DOCUMENTS

CL CENTER LINE

CLG CEILING

CLR CLEAR

COL COLUMN

CONC CONCRETE

CONT CONTINUE

DEMO DEMOLITION

DEPT DEPARTMENT

DET DETAIL

DIM DIMENSION

DIV DIVIDE OR DIVISION

DWG DRAWING

E EAST

ENGR ENGINEER

EQ EQUAL

EQUIP EQUIPMENT

ETC AND SO FORTH OR ET CETERA

EXIST EXISTING

EXT GR EXTERIOR GRADE

F FAHRENHEIT OR FEMALE

FA FIRE ALARM

GC GENERAL CONTRACTOR

GWB GYPSUM WALL BOARD

GYP GYPSUM

HM HOLLOW METAL

J-BOX JUNCTION BOX

MC METAL COPING

NA NOT APPLICABLE

NIC NOT IN CONTRACT

N NORTH

OC ON CENTER

OH OPPOSITE HAND

PLAM PLASTIC LAMINATE

PTU PACKAGE TRANSFER UNIT

R RADIUS OR RISER

RCP REFLECTED CEILING PLAN

RO ROUGH OPENING

SPEC SPECIFICATION

S SOUTH

TYP TYPICAL

UL UNDERWRITERS LABORATORIES

UNO UNLESS NOTED OTHERWISE

VIF VERIFY IN FIELD

W WEST

W/ WITH

W/O WITHOUT

A101

SIM

Name Elevation

Room name

A101

SIM

A101

1 View Name 1/8" = 1'-0"

1i

NORTH ARROW

FLOOR/LEVEL ELEVATION

SPOT FLOOR/ROOF ELEVATION

VIEW NAME TAG & SCALE

ENLARGED PLAN CALL-OUT

SECTION MARK

ELEVATION TAG

KEYNOTE

PARTITION TYPE TAG

1 Ref

R e f

1 Ref

R e f

ARCHITECTURAL GENERAL SYMBOLS LEGEND

X

PLAN

NORTH

1i

FURNITURE, FIXTURE, & EQUIPMENT

INDICATOR

4'0 8' 16'

GRAPHIC SCALE (1/8" = 1'-0")

CENTERLINE

SIMILAR (SIM) OR OPPOSITE HAND (OH)

A101

SIM

DETAIL CALL-OUT

SIMILAR (SIM) OR OPPOSITE HAND (OH)

ROOM NAME/NUMBER

P3

NEW CONSTRUCTION

EXISTING CONSTRUCTION TO REMAIN

EXISTING CONSTRUCTION TO BE DEMOLISHED

0X

1i

STOREFRONT / WINDOW TAG: SEE SHEET AE 602,

WINDOW & STOREFRONT SCHEDULE & DETAILS

FOR SPECIFIC INFORMATION

OH

OH

SIMILAR (SIM) OR OPPOSITE HAND (OH)

OH

NEW COLUMN

GRID LINE

EXISTING COLUMN

GRID LINE

FLOOR

CEILING

BASE

N1

S1

W1 E1

ROOM FINISHES SEE SHEET AI 601 FINISH PLANS

AND FINISH SCHEDULES

PHOTOGRAPHY TAG (POSITION OF CAMERA &

ANGLE)

CEILING TYPE &

CEILING ELEVATION8'-0" AFF

ACT1

EARTH / BACK FILL

GRANULAR FILL

CONCRETE

CONCRETE MASONRY UNITS (CMU)

BRICK / BRICK VENEER

STEEL

STONE VENEER

RIGID INSULATION

BATT INSULATION

GYPSUM BOARD

EXISTING DOOR TO BE DEMOLISHED

EXISTING DOOR TO REMAIN

NEW DOOR SEE PLANS AND SHEET AE 601, DOOR

SCHEDULE & DETAILS SHEET FOR SPECIFIC DOOR

TYPES

DOOR TAG: SEE SHEET AE 601, DOOR

SCHEDULE & DETAILS SHEET FOR SPECIFIC

DOOR INFORMATION

PLYWOOD (FIRE RESISTANT TREATED)

2X4 TROFFER LIGHT TO REMAIN

EXISTING LAY-IN ACOUSTICAL

CEILING TILE TO BE REMOVED,

UNLESS NOTED OTHERWISE

EXISTING CAN LIGHT TO REMAIN

2X2 TROFFER LIGHT TO REMAIN

EXIT SIGN TO REMAIN

F2A 2X2 LED TROFFER LIGHT

F1A 1X4 LED TROFFER LIGHT,

SUSPENDED

F3 WATERPROOF LED CAN LIGHT

EC1: EXPOSED CONSTRUCTION

F1A

F2A

F3

EXISTING 2X4 LED TROFFER LIGHTX

GB1: EXISTING GYPSUM BOARD CEILING

OR SOFFIT.

LED EXIT SIGN

LED EMERGENCY LIGHT W/90 BATTERY

BACKUP

EM1

EX1

LIGHTINGCEILING TYPES

ALUMINUM

EXISTING ASPHALT PAVEMENT TO BE REMOVED

EXISTING ASPHALT PAVEMENT TO REMAIN

EXISTING NORTHEAST VESTIBULE FLOOR

OR COMPOSITE ROOF DECK TO BE REMOVED

ASPHALT PAVING

SHEET NUMBER

VIEW NUMBER

SHEET NUMBER

VIEW NUMBER

VIEW NUMBER

SHEET NUMBER

SHEET NUMBER

ROOFING SYSTEM

1 HOUR RATED FIRE WALL

2 HOUR RATED FIRE WALL

SMOKE BARRIER WALLS, 1 HOUR CONSTRUCTION

FE

EXISTING FIRE EXTINGUISHER

NEW FIRE EXTINGUISHER

LVT FLOORING

WOOD 2x, PRESSURE TREATED

PORCELAIN TILE

EXISTING 2X2 LAY-IN ACOUSTICAL CEILING

TO REMAIN

ACT 2: NEW 2X2 LAY-IN

ACOUSTICAL CEILING TILE.

NEW GRID AND EDGE TRIM.

ABUSE RESISTANT

FINISH TAG: SEE SHEET

AI 601, FINISH PLANS & FINISH SCHEDULE

FOR DETAILED FINISHES INFORMATION

B2 EXTERIOR FINISH TAG

THIN STONE VENEER (TSV)

BRICK VENEER, RUNNING

BOND

BRICK VENEER, STACKED

BOND

E TEMPORARY EXIT SIGN

ACT 1: NEW 2X2 LAY-IN

ACOUSTICAL CEILING TILE.

NEW GRID AND EDGE TRIM

X

X

EXISTING 2X4 TROFFER LIGHT

TO BE REMOVED

EXISTING 2X2 TROFFER LIGHT

TO BE REMOVED

EXISTING 2X2 TROFFER LIGHT

TO BE REMOVED - PRESERVE & PROTECT

FOR REINSTALLATION SAME LOCATION

EXISTING 2X4 TROFFER LIGHT

TO BE REMOVED - PRESERVE & PROTECT

FOR REINSTALLATION SAME LOCATION

EXISTING CAN LIGHT

TO BE REMOVED

X EXISTING CAN LIGHT

TO BE REMOVED - PRESERVE & PROTECT

FOR REINSTALLATION SAME LOCATION

EXISTING EXIT SIGN

TO BE REMOVED

444 W. Lake St. Suite 1700 Chicago, IL 60606

312.583.7023 www.virtualenergysolutions.com

Joliet Community Based Outpatient Clinic 1201 Eagle Street Joliet, Illinois 60432

Drawing No.

Scale:

Date:

Checked By:Drawn By:Designed By:

Drawing Title:

Contract No.

File No.Building No.

Client Project No.

Project Title:Approved: Chief, failites Management Services

Approved: Medical Center Director

Approved:

Approved: Location:

VES Project Number: 191006

AS NOTED

VA JOLIET CBOC

JOLIET, ILLINOIS

578-371 36C25219D0020

© 2020 Virtual Energy Solutions, INC.

10/11/2023

B

IM

/2

-M

A T

O C

-P a rk in g E x p a n s io n a t J o lie t C

B O

C

-3

/2

J o lie t

C B

O C

P a rk in g E x p a n s io n V

E S

A rc h

.r v t

-1

-0

:1 :1

P

M

GI 003

ARCHITECTURAL SYMBOLS &

ABBREVIATIONS

PARKING EXPANSION AT

JOLIET CBOC

GCGIDGID

Revisions Date

ISSUED FOR 90% CD 02/10/2023

ISSUED FOR 100% CD 03/07/2023

ISSUED FOR BID 03/24/2023

ISSUED FOR BID ADDENDUM 1 04/21/2023

UP

New North

Vestibule

Lobby 002 Elevator

E-2

Engineering

Space

Mach.

Room

003A

E X

IS

T

IN

G

S M

O K

E C

O M

P A

R T

M E

N T

B A

S E

M E

N T

S O

U T

H

,6

S

F E

X

IS

T

IN

G S

M O

K E

C O

M P

A R

T M

E N

T B

A S

E M

E N

T N

O R

T H

,5

S

F

EXIT

EXISTING STAIRS TO 1ST FLOOR LEVEL

EXISTING STAIRS TO 1ST FLOOR LEVEL

Corridor C1-15A

Lobby

Elevator E-2

Alcove

102A

Office

Vestibule

E X

IS

T

IN

G

S M

O K

E C

O M

P A

R T

M E

N T

F

IR

S T

F L O

O R

N O

R T

H

,9

S

F E

X

IS

T

IN

G S

M O

K E

C O

M P

A R

T M

E N

T F

IR

S

T F

L O

O R

S O

U T

H

,1

S

F

EXIT

EXIT

EXIT

EXIT

EXIT

NEW 1-HOUR

SHAFT WALL

NEW 1-HOUR

SHAFT WALL

NEW 1-HOUR

SHAFT WALL

Elev. Equip.

B003

Badge B004

Phone

B002C

Home

Based

Primary

Care

B002

Stair #2 S-2

Comm.

B005

Reception

B001

Women's

Restroom

B006

Men's

Restroom

B008

HAC

B007 Copy Room

B009

Phone

B002A

Phone

B002B

Phone

B017

Phone

B016

A.O.

B015

Clinical

Nurse

Manager

B014

Chief

Medical

Director B013

Patient

Education/Group

Room

B011

Patient

Education/Exercise

B010

Corridor

C0-2

Corridor

C0-3

Corridor

C0-4

Corridor

C0-1

Mech.

B018

Elec.

B019

Gen Room B020

PAS Call

Center

B024

Education

Storage

B022

Nutrition

Services

B021

Main

Conference

Room

B023

Mech.

B025

Patient

Education/Group

Room

B033

Patient

Education/Group

Room

B032

Patient

Ed/Internet

Cafe

B031

Corridor

C0-6

Corridor C0-8

Corridor C0-7

Staff

Lounge

B042

Men's Staff

Locker

B036

Women's

Staff Locker

B034

Mech.

Corridor

C0-9

Corridor

C0-5

Mech.

B026

Elec.

B029

Elec.

B028

Comm B030

Facility

Storage

B041

EMS

B038

Building

Operator

B039

FMS

B040

Stair #1 S-1

Elevator

EL-1

Vending

Cooking

Classroom

0023A

FMS

Elevator

EL-1

Stair #2

S-2

Corridor

C1-15

Rad Control

Dispensary

Storage 1116A

Diagnostic

Marco

Rad Room

Corridor C1-13

Corridor C1-14

Corridor

C1-11

Toilet

Toilet

HAC

Toilet 1112E

Soiled

Utility

1112A

Storage

1112B

PM&R

Treatment

1112D

Eye Tech

Visual

Fields

Treatment

1112C

Toilet

Toilet

1102A

Eye

Blood Draw 1114D

Eye

Blood Draw 1114C

Draw

Analysis

1114E

Toilet

1114F

Blood Draw

1114B

Eye

Eye

1-On-1

Room

1017C

Work Room

1017B Supervisor

Office

1017A

Nurse

Triage

Exam 1

Exam 2

Nurse

Triage

Women

Health

Exam 3

IT

Telemed

Telemed

Closet

Telemed

Telemed

Toilet

1043ATelemed

Telemed

Exam 17

Exam 16

PACT 2

PACT 1

Exam 15

Exam 14

Exam 12

Exam 13

Exam 5

Women

Health

Exam 4

Toilet

Toilet 1047A

Men's

Restroom

Women's

Restroom

Treatment

Room

Toilet

Treatment

Room

CWT

CWT

Security

Wheelchair

Storage

Group

Treatment

Treatment

Room

Group

Treatment

Treatment

Room

Treatment

Room

Treatment

Room

Treatment

Room

Soiled

Utility

Exam 6

Exam 7

Exam 8

Exam 9

Clean

Storage

Room B131

Exam10

Procedure 1

Shared

Gyno

Toilet 1059B

Toilet

Closet

1059A

Procedure 2

Exam 11

1065 Exam 19

Exam 18

PACT

PACT 4

Women

Health

Exam 21

Women

Health

Exam 20

Corridor C1-3

Telemed

HAC

Stair #1 S-1

Mobile Port

Waiting

Toilet

1068A

Toilet

1031A

Pharm. D

Pharm. D

Nutritionist

Teleretinal

Cardio/Pod

Shared

Office

Soiled

Utility

Clean Utility

Social

Worker

Shell Space

Corridor C1-10

Podiatry

Exam

Podiatry

Exam

Tech Work

Room

Audiology

Exam

Cast Room

Podiatry

Exam

Audiology

Exam

Oxygen

Evaluation

PFT Blood

Gas

Clean Utility

Soiled

Utility

Control

Sound

Booth

Control

Sound

Booth

1084Stor.

Corridor

C1-12

Corridor

C1-9

Corridor

Ambulance

Bay

C1-36

Corridor

C1-5

Corridor

C1-5

Corridor

C1-7

Corridor

C1-6

Corridor

C1-6

Corridor

C1-4

Corridor

C1-8

Corridor

C1-1

General

Waiting

Corridor

C1-2

Photo

Alcove

Reception

Equipment

Alcove

Nourishment

Alcove

Scale

Alcove

Meds

1065C

1065B

1065A

Elec. Clos.

1089A

Scale

Alcove

PAS

Elec.

1114 -- 1114A

Boiler Plant

1 HOUR RATED FIRE WALL

SYMBOLS LEGEND

2 HOUR RATED FIRE WALL

SMOKE BARRIER WALLS, 1 HOUR CONSTRUCTION

PATH OF EGRESS

FE

EXISTING FIRE EXTINGUISHER

Room name

NEW FIRE EXTINGUISHER

ROOM NAME/NUMBER

CODES & STANDARDS:

BUILDING CODE: 2021 INTERNATIONAL BUILDING CODE

FIRE CODE: 2021 INTERNATIONAL FIRE CODE

LIFE SAFETY: 2021 NFPA 101 LIFESAFETY CODE

ELECTRICAL CODE: 2020 NATIONAL ELECTRIC CODE (NFPA 70)

PLUMBING CODE: 2021 INTERNATIONAL PLUMING CODE

MECHANICAL CODE: 2021 INTERNATIONAL MECHANICAL CODE

FUEL GAS CODE: 2021 INTERNATIONAL FUEL GAS CODE

ENERGY CODE: 2018 INTERNATIONAL ENERGY CONSERVATION CODE WITH ILLINOIS AMENDMENTS ACCESSIBILITY: ARCHITECTURAL BARRIERS ACT STANDARDS 2015 (ABAAS) & VA BARRIER FREE DESIGN

STANDARD 2017 (PG-18-13)

VETERANS ADMINISTRATION DESIGN MANUALS

VA PHYSICAL SECURITY AND RESILIENCY DESIGN MANUAL (APRIL 1,2021)

GENERAL PROJECT DESCRIPTION: DEMOLITION OF AN EXISTING REMNANT STRUCTURE, PARTIAL RENOVATION &

SITE PARKING EXPANSION OF AN EXISTING AMBULATORY CLINIC

CONSTRUCTION TYPE: TYPE I-B (PER IBC CHAPTER 6)

TYPE II (222) (PER NFPA 220)

FIRE RESISTIVE RATINGS (TABLE 7.2.1.1 NFPA 5000)

EXTERIOR BEARING WALLS

SUPPORTING ONE FLOOR ONLY: 2 HOUR

SUPPORTING ROOFS ONLY: 2 HOUR

INTERIOR BEARING WALLS

SUPPORTING ONE FLOOR ONLY: 2 HOUR

SUPPORTING ROOFS ONLY: 1 HOUR

COLUMNS

SUPPORTING ONE FLOOR ONLY: 2 HOUR

SUPPORTING ROOFS ONLY: 1 HOUR

BEAMS, GIRDERS, & TRUSSES

SUPPORTING ONE FLOOR ONLY: 2 HOUR

SUPPORTING ROOFS ONLY: 1 HOUR

FLOOR/CEILING ASSEMBLIES: 2 HOUR

ROOF/CEILING ASSEMBLIES: 1 HOUR

OCCUPANCY CLASSIFICATION (NFPA 101): AMBULATORY HEALTH CARE, EXISTING

FULLY SPRINKLED BUILDING: YES (NFPA 13 COMPLIANT, EXISTING & NEW)

FIRE ALARM SYSTEM: EXISTING & NEW WORK (NFPA 72 COMPLIANT)

GROSS AREA OF CLINIC (EXISTING + NEW WORK):

BASEMENT: 32,170.62 GSF

FIRST FLOOR: 35,077.01 GSF

GRAND TOTAL: 67,247.63 GSF

OCCUPANCY LOAD: UNCHANGED

EXIT ACCESS TRAVEL DISTANCE: MAXIMUM - 300'

FINISHES:

WALL AND CEILING: CLASS 2 26 TO 75 FLAME SPREAD RATING, 0-450 SMOKE DEVELOPED

FLOOR COVERINGS: CLASS A

DECORATIVE TRIM: CLASS 1

PENETRATIONS: ALL PENETRATIONS THROUGH RATED ASSEMBLIES AND SMOKE BARRIERS SHALL

BE PROTECTED EQUAL TO THE ASSEMBLY WITH FIRESTOPPING OR

FIRESTOPPING SYSTEM.

PROJECT CODE INFORMATION

CODE ANALYSIS

GENERAL REQUIREMENTS:

ELEVATOR MUST COMPLY WITH THE REQUIREMENTS OF NFPA13, NFPA 70, NFPA 72, NFPA 101, AND ASME 17.1

PROVIDE SMOKE DETECTION FOR EMERGENCY RECALL OPERATION

ELEVATOR MAIN LINE POWER SHUT DOWN (SHUNT TRIP) IS REQUIRED

NEW ELEVATOR E-2 LIFESAFETY INFORMATION

1. THE GENERAL CONTRACTOR SHALL PROVIDE TEMPORARY BARRICADE PARTITIONS AS REQUIRED TO ISOLATE CONSTRUCTION AREAS

FROM AREAS TO REMAIN UNDISTURBED, AND SHALL COORDINATE THEIR EXACT LOCATION WITH THE COR. ADDITIONAL TEMPORARY

BARRICADE PARTITIONS OTHER THAN THOSE INDICATED ON THE PLANS SHALL BE REQUIRED AS NECESSARY TO ACCOMPLISH THE

CONSTRUCTION PROCESS, AND WHERE APPLICABLE, TO ISOLATE DIFFERENT PHASES OF THE WORK.

2. TEMPORARY BARRICADE PARTITIONS SHALL BE PROVIDED AROUND ANY AREA OF WORK CONSIDERED TO BE HAZARDOUS OR WHERE

THE SPRINKLER SYSTEM IS RENDERED INEFFECTIVE BY THE REMOVAL OF THE CEILING SYSTEM FOR MORE THAN A WORK SHIFT AT A

TIME.

3. MEANS OF EGRESS SHALL BE MAINTAINED FOR THE PUBLIC, STAFF, AND CONTRACTOR EMPLOYEES AT ALL TIMES.

4. ALL TEMPORARY BARRICADE PARTITIONS SHALL BE DUST PROOF AND SEALED AT ALL JUNCTIONS OF DISSIMILAR MATERIALS USING

GASKETING MATERIAL. ADEQUATE PRECAUTIONS SHALL ALSO BE TAKEN TO PREVENT DUST AND NOXIOUS VAPORS FROM ENTERING THE

RETURN AIR DUCTWORK IN THE AREAS OF CONSTRUCTION.

5. EXISTING WALLS UTILIZED AS PART OF THE CONSTRUCTION BARRIER MUST EXTEND TO THE DECK ABOVE AND ALL PENETRATIONS MUST

BE FIRESTOPPED.

TEMPORARY CONSTRUCTION BARRICADES

444 W. Lake St. Suite 1700 Chicago, IL 60606

312.583.7023 www.virtualenergysolutions.com

Joliet Community Based Outpatient Clinic 1201 Eagle Street Joliet, Illinois 60432

Drawing No.

Scale:

Date:

Checked By:Drawn By:Designed By:

Drawing Title:

Contract No.

File No.Building No.

Client Project No.

Project Title:Approved: Chief, failites Management Services

Approved: Medical Center Director

Approved:

Approved: Location:

VES Project Number: 191006

AS NOTED

VA JOLIET CBOC

JOLIET, ILLINOIS

578-371 36C25219D0020

© 2020 Virtual Energy Solutions, INC.

10/11/2023

B

IM

/2

-M

A T

O C

-P a rk in g E x p a n s io n a t J o lie t C

B O

C

-3

/2

J o lie t

C B

O C

P a rk in g E x p a n s io n V

E S

A rc h

.r v t

-1

-0

:1 :2

P

M

GI 004

LIFE SAFETY PLANS

PARKING EXPANSION AT

JOLIET CBOC

GCGIDGID

1/16" = 1'-0"

BASEMENT LEVEL LIFE SAFETY PLAN

1/16" = 1'-0"

FIRST FLOOR LEVEL LIFE SAFETY PLAN

0 8' 16' 32' 0 8' 16' 32'

FE

FE

AREA OF WORK

AREA OF WORK AREA OF WORK

AREA OF WORK

Revisions Date

ISSUED FOR 30% SD 10/07/2022

ISSUED FOR 60% DD 12/30/2022

ISSUED FOR 90% PRICING 02/02/2023

ISSUED FOR 90% CD 02/10/2023

ISSUED FOR 100% CD 03/07/2023

ISSUED FOR BID 03/24/2023

ISSUED FOR BID ADDENDUM 1 04/21/2023

Ex

Gx

Hx

Jx

Kx

K'x

Lx

1x 6x

12x 13x 14x

Cx

Bx

Ax

A1x

B1x

C1x

D1x

E1x

5.8x 8x

10x6.1x 15x9.5x1.2x

REMNANT STRUCTURE

TO BE DEMOLISHED-

SEE SHEET AD 100

NORTH PORTION

SOUTH PORTION

AD 100

Ex

Hx

Jx

Kx

K'x

Lx

1x 13x 14x

Cx

Bx

Ax

A1x

B1x

C1x

D1x

E1x

5.8x 8x 10x6.1x

Fx

REMNANT STRUCTURE

TO BE DEMOLISHED-

SEE SHEET AD 101

NORTH PORTION

SOUTH PORTION

AD 101

Ex

Gx

Hx

Jx

Kx

K'x

Lx

1x

4x

6x 9x 12x

13x

14x

Cx

Bx

Ax

A1x

B1x

C1x

D1x

E1x

3x

5x

5.8x

8x 10x

6.1x

Fx

15x

9.5x

1.2x

EXISTING ROOF SYSTEM INCLUDING

INSULATION, METAL COPING, & MEMBRANE

TO BE REMOVED. PREP EXISTING ROOF DECK

TO RECEIVE NEW ROOFING SYSTEM.

SEE SHEET AE 102N

EXISTING ROOF SYSTEM INCLUDING

INSULATION, METAL COPING, & MEMBRANE

TO BE REMOVED. PREP EXISTING ROOF DECK

TO RECEIVE NEW ROOFING SYSTEM.

SEE SHEET AE 102S

NORTH PORTION

SOUTH PORTION

AD 102

REMNANT STRUCTURE

TO BE DEMOLISHED-

SEE SHEET AD 102

REMOVE PORTION OF

ROOF FOR NEW ROOF

ACCESS STAIR

Elev. Equip.

B003

Badge B004

Phone B002C

Home

Based

Primary

Care

B002

Stair #2 S-2

Comm.

B005

Reception

B001 Women's

Restroom

B006

Men's

Restroom

B008

HAC

B007

Copy Room B009

Phone B002A

Phone B002B

Phone B017

Phone B016

A.O.

B015

Clinical

Nurse

Manager B014

Chief

Medical

Director B013

Patient

Education/Group

Room B011

Patient

Education/Exercise

B010

Corridor

C0-2

Corridor

C0-3

Corridor C0-4

Corridor C0-1

Mech.

B018

Elec.

B019

Gen Room

B020

PAS Call

Center

B024

Education

Storage

B022

Nutrition

Services

B021

Main

Conference

Room

B023

Mech.

B025

Patient

Education/Group

Room

B033

Patient

Education/Group

Room

B032

Patient

Ed/Internet

Cafe

B031

Corridor

C0-6

Corridor C0-8

Corridor

C0-7

Staff

Lounge

B042

Men's Staff

Locker

B036

Women's

Staff Locker

B034

Mech.

Corridor

C0-9

Corridor

C0-5

Mech.

B026

Elec.

B029

Elec.

B028

Comm

B030

Facility

Storage

B041

EMS

B038

Building

Operator

B039

FMS

B040

Stair #1 S-1

Elevator

EL-1

Vending

Cooking

Classroom

0023A

FMS

Elevator

EL-1

Stair #2

S-2

Corridor

C1-15

Rad Control

Dispensary

Storage 1116A

Diagnostic

Marco

Rad Room

Corridor C1-13

Corridor C1-14

Corridor

C1-11

Toilet

Toilet

HAC

Toilet

1112E

Soiled

Utility

1112A Storage

1112B

PM&R

Treatment

1112D

Eye Tech

Visual

Fields

Treatment

1112C

Toilet

Toilet

1102A

Eye

Blood Draw 1114D

Eye

Blood Draw 1114C

Draw

Analysis

1114E

Toilet

1114F

Blood Draw

1114B

Eye

Eye

1-On-1

Room

1017C

Work Room 1017B

Supervisor

Office

1017A

Nurse

Triage

Exam 1

Exam 2

Nurse

Triage

Women

Health

Exam 3

1043 IT

Telemed

Telemed

Closet

Telemed

Telemed

Toilet

1043A Telemed

Telemed

Exam 17

Exam 16

PACT 2

PACT 1

Exam 15

Exam 14

Exam 12

Exam 13

Exam 5

Women

Health

Exam 4

Toilet

Toilet

1047A

Men's

Restroom

Women's

Restroom

Treatment

Room

Toilet

Treatment

Room

CWT

CWT

Security

Wheelchair

Storage

Group

Treatment

Treatment

Room

Group

Treatment

Treatment

Room

Treatment

Room

Treatment

Room

Treatment

Room

Soiled

Utility

Exam 6

Exam 7

Exam 8

Exam 9

Clean

Storage

Room B131

Exam10

Procedure 1

Shared

Gyno

Toilet

1059B

Toilet

Closet 1059A

Procedure 2

Exam 11

1065 Exam 19

Exam 18

PACT

PACT 4

Women

Health

Exam 21

Women

Health

Exam 20

Corridor C1-3

Telemed

HAC

Stair #1 S-1

Mobile Port

Waiting

Toilet

1068A

Toilet

1031A

Pharm. D

Pharm. D

Nutritionist

Teleretinal

Cardio/Pod

Shared

Office

Soiled

Utility

Clean Utility

Social

Worker

Shell Space

Corridor C1-10

Podiatry

Exam

Podiatry

Exam

Tech Work

Room

Audiology

Exam

Cast Room

Podiatry

Exam

Audiology

Exam

Oxygen

Evaluation

PFT Blood

Gas

Clean Utility

Soiled

Utility

Control

Sound

Booth

Control

Sound

Booth

1084Stor.

Corridor

C1-12

Corridor

C1-9

Corridor

Ambulance

Bay

C1-36

Corridor

C1-5

Corridor

C1-5

Corridor

C1-7

Corridor

C1-6

Corridor

C1-6

Corridor

C1-4

Corridor

C1-8

Corridor

C1-1

General

Waiting

Corridor

C1-2

Photo

Alcove

Reception

Equipment

Alcove

Nourishment

Alcove

Scale

Alcove

Meds

1065C

1065B

1065A

Elec. Clos.

1089A

Scale

Alcove

PAS

Elec.

1114 -- 1114A

Boiler Plant

SYMBOLS LEGEND

EXISTING CONSTRUCTION TO REMAIN

EXISTING CONSTRUCTION TO BE DEMOLISHED

0 EXISTING COLUMN

GRID LINE X

Room name

ROOM NAME/NUMBER

1. THE GENERAL CONTRACTOR SHALL PROVIDE TEMPORARY BARRICADE PARTITIONS AS REQUIRED TO ISOLATE CONSTRUCTION AREAS

FROM AREAS TO REMAIN UNDISTURBED, AND SHALL COORDINATE THEIR EXACT LOCATION WITH THE COR. ADDITIONAL TEMPORARY

BARRICADE PARTITIONS OTHER THAN THOSE INDICATED ON THE PLANS SHALL BE REQUIRED AS NECESSARY TO ACCOMPLISH THE

CONSTRUCTION PROCESS, AND WHERE APPLICABLE, TO ISOLATE DIFFERENT PHASES OF THE WORK.

2. TEMPORARY BARRICADE PARTITIONS SHALL BE PROVIDED AROUND ANY AREA OF WORK CONSIDERED TO BE HAZARDOUS OR WHERE

THE SPRINKLER SYSTEM IS RENDERED INEFFECTIVE BY THE REMOVAL OF THE CEILING SYSTEM FOR MORE THAN A WORK SHIFT AT A

TIME.

3. MEANS OF EGRESS SHALL BE MAINTAINED FOR THE PUBLIC, STAFF, AND CONTRACTOR EMPLOYEES AT ALL TIMES.

4. ALL TEMPORARY BARRICADE PARTITIONS SHALL BE DUST PROOF AND SEALED AT ALL JUNCTIONS OF DISSIMILAR MATERIALS USING

GASKETING MATERIAL. ADEQUATE PRECAUTIONS SHALL ALSO BE TAKEN TO PREVENT DUST AND NOXIOUS VAPORS FROM ENTERING THE

RETURN AIR DUCTWORK IN THE AREAS OF CONSTRUCTION.

5. EXISTING WALLS UTILIZED AS PART OF THE CONSTRUCTION BARRIER MUST EXTEND TO THE DECK ABOVE AND ALL PENETRATIONS MUST

BE FIRESTOPPED.

TEMPORARY CONSTRUCTION BARRICADES

444 W. Lake St. Suite 1700 Chicago, IL 60606

312.583.7023 www.virtualenergysolutions.com

Joliet Community Based Outpatient Clinic 1201 Eagle Street Joliet, Illinois 60432

Drawing No.

Scale:

Date:

Checked By:Drawn By:Designed By:

Drawing Title:

Contract No.

File No.Building No.

Client Project No.

Project Title:Approved: Chief, failites Management Services

Approved: Medical Center Director

Approved:

Approved: Location:

VES Project Number: 191006

AS NOTED

VA JOLIET CBOC

JOLIET, ILLINOIS

578-371 36C25219D0020

© 2020 Virtual Energy Solutions, INC.

10/11/2023

B

IM

/2

-M

A T

O C

-P a rk in g E x p a n s io n a t J o lie t C

B O

C

-3

/2

J o lie t

C B

O C

P a rk in g E x p a n s io n V

E S

A rc h

.r v t

-1

-0

:1 :3

P

M

GC 001

GENERAL AREAS OF WORK -

ARCHITECTURAL DEMOLITION

PARKING EXPANSION AT

JOLIET CBOC

GCGIDGID

REPLACEMENT OF EXISTING ROOF SYSTEM:

THE SCOPE OF WORK INCLUDES THE REPLACEMENT OF THE ROOF SYSTEM FOR

THE CBOC. REFER TO SHEETS AE 102N & AE 102S FOR DETAILED INFORMATION

REGARDING THE EXTEND OF ROOF SYSTEM REPLACEMENT.

1" = 20'-0"

1 BASEMENT LEVEL DEMOLITION PLAN OVERALL GENERAL

1" = 20'-0"

2 FIRST FLOOR LEVEL DEMOLITION PLAN OVERALL GENERAL

1" = 20'-0" 3 ROOF LEVEL JOLIET CBOC - EXISTING ROOF SYSTEM REMOVAL 5'0 40'20' 5'0 40'20' 5'0 40'20'

GENERAL

AREA OF

WORK

GENERAL

AREA OF

WORK

Revisions Date

ISSUED FOR 30% SD 10/07/2022

ISSUED FOR 60% DD 12/30/2022

ISSUED FOR 90% PRICING 02/02/2023

ISSUED FOR 100% CD 03/07/2023

ISSUED FOR BID 03/24/2023

ISSUED FOR BID ADDENDUM 1 04/21/2023

F

Ex

Gx

Hx

Jx

Kx

K'x

Lx

1x 6x

12x 13x 14x

Cx

Bx

Ax

A1x

B1x

C1x

D1x

E1x

5.8x 8x

10x6.1x 15x9.5x1.2x

Engineering

Space

New North

Vestibule

Lobby

Elevator E-2

Mach.

Room

003A

AE 100

1 NEW WALL CLADDING & WINDOWS NEW NORTH VESTIBULE, ELEVATOR LOBBY,

& ENGINEERING SPACE. SEE SHEET AE 100

NORTH PORTION

SOUTH PORTION

C

Ex

Hx

Jx

Kx

K'x

Lx

1x 13x 14x

Cx

Bx

A1x

B1x

C1x

D1x

E1x

5.8x 8x 10x6.1x

Fx

A

3 4

B

1 2

F

AE 101

NORTH PORTION

SOUTH PORTION

NEW NORTHEAST VESTIBULE, OFFICE,

ELEV…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .