ATT 4 - Spec 01 31 00.01 Project Management and Coordination.pdf

PDF 18 KB Posted

Attached to
Y1DA- 635-418 | Construct Friendship House Replacement | OKC, OK Federal contract opportunity
Solicitation number
36C77625B0042
Issued by
Department of Veterans Affairs Technology Acquisition Center Austin

About this file

This document is a Project Management and Coordination specification section (Section 01 31 00.01) for the EHRM Infrastructure Upgrades project located in Grand Junction, Colorado. The specification details requirements for a web-based Project management software package that will be used to coordinate construction operations, with specific mandatory features including:

Key software requirements include compilation of project data, access control for different entities, document workflow planning, tracking of project communications (RFIs, submittals, change orders), real-time status tracking, PDF markup procedures, payment application processing, meeting minute distribution, document management, and construction progress photo management. The contractor must provide user licenses for the Owner, Architect, and consultants, deliver eight hours of software training, and at project completion, provide a digital archive in a readable format that is locked to prevent further changes. Acceptable software platforms include Procore, Oracle Primavera Submittal Exchange, or equivalent web-based project management solutions.

View the file

Other files for this federal contract opportunity

Other files attached to Y1DA- 635-418 | Construct Friendship House Replacement | OKC, OK, newest first.
File Type Posted
S06- Amendment 0010.pdf PDF
32 31 40 High Security Fences and Gates - SPECS.pdf PDF
635-418 Addendum 03 SPECS.pdf PDF
03215238 Replace Friendship GEO TECH Report.pdf PDF
WF 2025 XXX- Friendship House OKC Utility Plans.pdf PDF
S06- Amendment 0009.pdf PDF
S05- 635-418 - Technical questions responses - 090925.docx DOCX document
S06- Amendment 0008.pdf PDF
S06- Amendment 007- Extend bid due date 091125.pdf PDF
S06- Amendment 0006 - extend bid due date 09-04-25.pdf PDF
S06- Amendment 0005- Extend bid due date.pdf PDF
S06 - Latest David Bacon Wages Determination 07-25-2025.pdf PDF
S06- Amendment 0004 - latest DB Wages Det 07-25-25.pdf PDF
S04- 635-418 Site visit sign-in sheet - Signed.pdf PDF
S04- Amendment 0003 - Signed site visit sign-in sheet.pdf PDF
S06- Amendment 0002- Updated Site Visit Instructions.pdf PDF
S04- Updated Site Visit Instructions.pdf PDF
S06- 0001 amendment - Latest David Bacon Wages Determination.pdf PDF
S06 - Latest David Bacon Wages Determination 07-18-2-2025.pdf PDF
ATT 12 - Site Visit Instructions.pdf PDF
ATT 10 - Limitations on Subcontracting.docx DOCX document
ATT 5 - 635-418 Addendum 01.pdf PDF
ATT 1 - 100 CD Drawings Combined.pdf PDF
36C77625B0042 .pdf PDF
ATT 9 - 635-418 Addendum 02.pdf PDF
ATT 8 - V2 635-418 Addendum 1 CD Specs.pdf PDF
ATT 6- Combined Drawings - Addendum 1 CD.pdf PDF
ATT 3- V2 635-418 100 CD SPECS.pdf PDF
ATT 2- V1 635-418 100 CD SPECS.pdf PDF
ATT 11- Wages Determination OKC OK.pdf PDF
ATT 7 - V1 635-418 Addendum 1 CD Specs.pdf PDF
Show all 31

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project Number: 575-21-700

Project Name : EHRM Infrastructure Upgrades Project Location: Grand Junction CO

PROJECT MANAGEMENT AND COORDINATION

06-09-2025

01 31 00.01 - 1

SECTION 01 31 00.01

PROJECT MANAGEMENT AND COORDINATION

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary

Conditions and other Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY

A. Section includes administrative provision for coordinating construction operations on Project, including, but not limited to, the following:

1. Web-based Project management software package.

B. Each contractor shall participate in coordination requirements. Certain areas of responsibility are assigned to a specific contractor.

1.3 DEFINITIONS

A. BIM: Building Information Modeling.

B. RFI: Request for Information. Request from Owner, Architect, or Contractor seeking information required by or clarifications of the Contract Documents.

1.4 DIGITAL PROJECT MANAGEMENT PROCEDURES

A. Web-Based Project Management Software Package: Provide, administer, and use web-based

Project management software package for purposes of hosting and managing Project communication and documentation until Final Completion.

1. Basis of Specification: Procore, Oracle Primavera Submittal Exchange or other equivalent web-based project management software.

2. Web-based Project management software includes, at a minimum, the following features:

a. Compilation of Project data, including Contractor, subcontractors, Architect, Architect's consultants, Owner, and other entities involved in Project. Include names of individuals and contact information.

b. Access control for each entity for each workflow process, to determine entity's digital rights to create, modify, view, and print documents.

c. Document workflow planning, allowing customization of workflow between project entities.

d. Creation, logging, tracking, and notification for Project communications required in other Specification Sections, including, but not limited to, RFIs, submittals, Minor

Changes in the Work, Construction Change Directives, and Change Orders.

e. Track status of each Project communication in real time, and log time and date when responses are provided.

Project Number: 575-21-700

Project Name : EHRM Infrastructure Upgrades Project Location: Grand Junction CO

PROJECT MANAGEMENT AND COORDINATION

06-09-2025

01 31 00.01 - 2

f. Procedures for handling PDFs or similar file formats, allowing markups by each entity. Provide security features to lock markups against changes once submitted.

g. Processing and tracking of payment applications.

h. Processing and tracking of contract modifications.

i. Creating and distributing meeting minutes.

j. Document management for Drawings, Specifications, and coordination drawings, including revision control.

k. Management of construction progress photographs.

l. Mobile device compatibility, including smartphones and tablets.

3. Provide Project management software user licenses for use of Owner, Architect, and

Architect's consultants. Provide eight hours of software training for web-based Project software users.

4. At completion of Project, provide digital archive in format that is readable by common desktop software applications in format acceptable to Architect. Provide data in locked format to prevent further changes.

PART 2 - PRODUCTS (Not Used)

PART 3 - EXECUTION (Not Used)

- - - END - - -