ATT 4 - 0200000 F Management and Administration.docx
DOCX document 24 KB Posted
- Solicitation number
- N4008527R0009
About this file
This file is a Management and Administration attachment for a pest control support services solicitation at Naval Weapons Station Earle. The document supports the Request for Proposal (RFP) N4008527R0009, issued by the Department of the Navy Naval Facilities Engineering Command, for procurement of pest control support services at two locations: Colts Neck and Leonardo, New Jersey. This requirement carries a 100% set-aside for Small Business Concerns. The proposal submission deadline is 11:00 AM Eastern Daylight Time on Tuesday, 24 November 2026, with electronic submissions accepted via email to Jessica Mercurio (jessica.a.mercurio.civ@us.navy.mil) or through a DoD Safe Drop-Off Link upon request.
Offerors are encouraged to attend a mandatory site visit scheduled for Tuesday, 27 October 2026 at 0900 Eastern Standard Time at the Visitor Control Center, 201 Highway 34-S, Colts Neck, NJ. Registration is required by Monday, 26 October 2026 via email notification to Mr. Wayne Kolb (wayne.r.kolb.civ@us.navy.mil) or Mr. Nelson Jusino (nelson.r.jusino.civ@us.navy.mil) to ensure adequate transportation arrangements. Award evaluation factors and basis for award are detailed in Section M of the solicitation.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| ATT 5 - 0200000 J Management and Administration.docx | DOCX document | |
| ATT 8 - 1503020 FAP Pest Control.docx | DOCX document | |
| ATT 6 - 1503020 C Pest Control.docx | DOCX document | |
| ATT 1 - 1503020 BLANK ELINs Pest Control.xlsx | XLSX spreadsheet | |
| Solicitation - N4008527R0009.pdf | ||
| ATT 10 - 1503020 WBS Pest Control.docx | DOCX document | |
| ATT 2 - 0100000 C General Information.docx | DOCX document | |
| ATT 7 - 1503020 F Pest Control.docx | DOCX document | |
| ATT 9 - 1503020 J Pest Control.docx | DOCX document | |
| ATT 3 - 0200000 C Management and Administration.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Section F – 0200000 Management and Administration Section F 0200000 Deliveries or Performance
DELIVERABLES
| Spec Item |
| Form Attachment Number |
| Deliverable Title |
| Date (s) of Submission |
| Distribution |
| Frequency |
| Original |
| Copies (including original) |
| 2.2.1.2 |
| N/A |
| Request to Work Outside Government’s Regular Working Hours |
| At least seven calendar days prior to requested day. |
| KO and COR |
| 1 |
| As required |
| 2.3.4 |
| N/A |
| Permits and Licenses |
| Before work commences and as requested by the KO. |
| KO and COR |
| 1 |
| As specified |
| 2.3.5 |
| N/A |
| Certificate of Insurance |
| Within 15 calendar days prior to contract start. |
| KO and COR |
| 1 |
| As specified |
| 2.6.9.1 |
| N/A |
| Quality Management Plan |
| Within 15 calendar days prior to contract start. |
| KO and COR |
| 1 |
| As specified |
| 2.6.9.2 |
| N/A |
| QC Inspection File |
| Within five calendar days of completion/ termination of the contract. |
| KO and COR |
| 1 |
| As specified |
| 2.6.9.3 |
| N/A |
| Contractor Quality Inspection and Surveillance Report |
| First work day of each month. |
| KO and COR |
| 1 |
| Monthly |
| 2.7.1 |
| N/A |
| List of Key Personnel and Qualifications |
| Within 15 calendar days prior to contract start |
| KO and COR |
| 1 |
| As specified |
| 2.7.2.6 |
| N/A |
| Proof of Legal Residency |
| Prior to be admitted to site of work. |
| KO and COR |
| 1 |
| As specified |
| 2.7.2.6 |
| N/A |
| Proof of United States of America Citizenship |
| Prior to be admitted to site of work. |
| KO and COR |
| 1 |
| As specified |
| 2.7.3 |
| N/A |
| Service Contract Reporting (SCR) |
| No later than 31 October |
| KO and COR |
| 1 |
| Annually for labor executed during the period of performance during each Government fiscal year (FY) |
| 2.8.1 |
| N/A |
| Employee List |
| Within 15 calendar days prior to contract start and within seven calendar days of changes. |
| KO and COR |
| 1 |
| As required |
| 2.9.2 |
| N/A |
| Accident Prevention Plan |
| Within 15 calendar days prior to contract start and within seven calendar days of changes. |
| KO and COR |
| 1 |
| As specified |
| 2.9.3 |
| N/A |
| Activity Hazard Analysis |
| Together with the Accident Prevention Plan and within seven calendar days of and changes. |
| KO and COR |
| 1 |
| As specified |
| 2.9.4 |
| N/A |
| Compliance Plans, Programs, and Procedures |
| Together with the Accident Prevention Plan and within seven calendar days of and changes. |
| KO and COR |
| 1 |
| As specified |
| 2.9.6 |
| J-0200000-05 |
| NAVFAC Contractor Incident Reporting System (CIRS) |
| Within five calendar days of accident. |
| KO and COR |
| 1 |
| As required |
| 2.9.8 |
| N/A |
| Monthly On-Site Labor Report |
| First work day of each month. |
| KO and COR |
| 1 |
| Monthly |
| 2.9.9 |
| N/A |
| OSHA Citations and Violations Corrective Action Report |
| Within 48 hours after receiving a citation. |
| KO and COR |
| 1 |
| As required |
| 2.9.11 |
| N/A |
| Safety Certifications |
| Within 15 calendar days prior to contract start and as old certifications, expire. |
| KO and COR |
| 1 |
| As specified |
| 2.10.1.1 |
| N/A |
| Water Conservation Plan |
| Within 15 calendar days after award and for changes. |
| KO and COR |
| 1 |
| As specified |
| 2.10.2.8 |
| J-0200000-05 |
| Contractor Hazardous Material Inventory Log |
| Within 15 calendar days after the end of each calendar year and at termination of the contract. |
| KO and COR |
| 1 |
| Annually |
| 2.10.2.12 |
| N/A |
| Asbestos Containing Material (ACM) |
| Verbally notify the KO and COR within one hour and follow-up with written Notification within 24 hours |
| KO and COR |
| 1 |
| As specified |
| 2.10.3 |
| N/A |
| Sustainable Procurement and Practices Plan |
| Within 15 calendar days prior to contract start and within 15 calendar days after exercised option periods. |
| KO and COR |
| 1 |
| Annually |
| 2.10.3 |
| N/A |
| Sustainable Delivery of Services Report |
| Within five calendar days after each contract period. |
| KO and COR |
| 1 |
| Annually |
| 2.10.3.2 |
| N/A |
| Recovered Material Certification |
| As specified |
| KO and COR |
| 1 |
| When a product containing recovered materials is equal to or better than the original and could be used. |
File details come from the government source that posted it. Updated .