ATT 1 - 1503020 BLANK ELINs Pest Control.xlsx

XLSX spreadsheet 130 KB Posted

Attached to
Pest Control Support Services at Naval Weapons Station Earle
Solicitation number
N4008527R0009
Issued by

About this file

This is a blank Exhibit Line Item Number (ELIN) pricing template for a pest control services contract at Naval Weapons Station (NWS) Earle. The contract is an Indefinite Delivery/Indefinite Quantity (IDIQ) firm fixed price (FFP) arrangement with contract number N40085-26-X-XXXX, covering a base period from November 1, 2026 to October 31, 2027, followed by four one-year option periods through October 31, 2031. The solicitation is a 100% Small Business set-aside and carries a release date of November 24, 2026 at 11:00 AM Eastern Daylight Time.

The pricing template includes two primary service categories: (1) Firm Fixed Price facility pest control services for Region and BUMED (Bureau of Medicine) facilities with 12-month quantities, and (2) Indefinite Quantity pest control services including tick survey and control, gypsy moth ground spraying, aerial spray operations support, industrial and sidewalk weed control, termite and wood destroying organism surveys and control, unit-priced labor work, and material/equipment costs. All line items show $0.00 placeholder prices requiring offeror completion. The template encompasses ELINs A001-A709 for the base period with corresponding B, C, D, and E series ELINs for each option year. The contract also includes extensive fence maintenance and removal services pricing requirements organized by fence type (redwood, cedar, chain link, barbwire, ornamental steel, and wood fence) with unit prices per linear foot or per unit as applicable, though these appear to be template sections repeated throughout the document structure.

View the file

Other files

File Type Posted
ATT 5 - 0200000 J Management and Administration.docx DOCX document
ATT 8 - 1503020 FAP Pest Control.docx DOCX document
ATT 6 - 1503020 C Pest Control.docx DOCX document
ATT 4 - 0200000 F Management and Administration.docx DOCX document
Solicitation - N4008527R0009.pdf PDF
ATT 10 - 1503020 WBS Pest Control.docx DOCX document
ATT 2 - 0100000 C General Information.docx DOCX document
ATT 7 - 1503020 F Pest Control.docx DOCX document
ATT 9 - 1503020 J Pest Control.docx DOCX document
ATT 3 - 0200000 C Management and Administration.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Pestmaster Roll-Up

N40085-26-X-XXXX
NWS Earle Pest Control Services
BaseTOTAL(Base + 4)
PoP: 11/01/26 - 10/31/27FFP
FFP$0.00IDIQ
IDIQTOTAL0.00
Total$0.00
1st Option
PoP: 11/01/27 - 10/31/28
FFP
IDIQ
Total$0.00
2nd Option
PoP: 11/01/28- 10/31/29
FFP
IDIQ
Total$0.00
3rd Option
PoP: 11/01/29 - 10/31/30
FFP
IDIQ
Total
4th Option
PoP: 11/01/30 - 10/31/31
FFP
IDIQ
Total$0.00

ELINs-Base Period-FFP

ATTACHMENT J-0200000-09
EXHIBIT LINE ITEM NUMBERS
SOLICITATION CONTRACT #N40085-26-X-XXXX
EXHIBIT A - CLIN 9000
Line Item 0001 Firm Fixed Price - Base Period
PROVIDE PRICES TO PERFORM FACILITY SERVICES - FIRM FIXED PRICE - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3
ELINs A001 through A002
ELIN / Sub ELINDescriptionQuantityUnit of IssueUnit PriceTotalCAC
A001 - REGION - 1503020 Pest Control
Services for Region facilities/spaces listed in the Frequencies for Scheduled Work provided in J-1503020-06 performed at frequencies specified.12MO$0.00

REGION Subtotal $0.00

A002 - BUMED - 1503020 Pest Control
Services for BUMED facilities/spaces listed in the Frequencies for Scheduled Work provided in J-1503010-06 performed at frequencies specified.12MO$0.00

BUMED Subtotal $0.00

TOTAL FFP WORK $0.00

SECTION J

EXHIBIT A

PROVIDE PRICES TO MAINTAIN GROUNDS - FIRM FIXED PRICE

IN ACCORDANCE WITH SECTION C, Items 3.1, 3.2, 3.3, and 3.4 ELIN A001 through A0015 Line Item 0001 Base Year - Firm Fixed Price ELIN A001 through A0015

SECTION J

EXHIBIT A

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6'

Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Barbwire Fence.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Ornamental Steel Fence.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Wood Fence.

PROVIDE A UNIT PRICE FOR THE REMOVAL AND DISPOSAL OF FENCE COMPLETE, FENCE POSTS, BARBWIRE, BARBED TAPE.

IN ACCORDANCE WITH SECTION C, C.10.1.l

ELIN A001EW through A001FI

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence.

Including Fabric, Posts, Gates, Rails, Tension Wire, Barbwire/Barbed Tape.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence Gates including tracks (not posts).

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Ornamental Steel Fence. Including Posts and Gates

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Wood Fence. Including Posts and Gates.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Barbwire Fence. Including Posts and all wire.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to Provide Removal Service for Fence Posts. Post Cut-off Flush.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to Provide Removal Service for Fence Posts. Driven Post.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.

Posts Set in Concrete/Asphalt.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Square Foot to Patch and Refinish Concrete or Asphalt Surface.

Surface Depth to Match Surrounding.

Unit Price Each to Remove and Dispose of or Save and Store (for reuse) Barbwire Single Arm Support.

Unit Price Each to remove and Dispose of or Save and Store (for reuse) Barbwire Double (V) Arm Support.

Lump Sum Price for the recycling of removed materials. Based on a Percentage Added to Removal Item Ordered

Lump Sum Price for the Recycling of Removed Materials. Based on a Percentage Added to Removal Item Ordered, ELIN A001EK to A001EW. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.

PROVIDE A UNIT PRICE TO PERFORM EXPEDITED SERVICES.

IN ACCORDANCE WITH SECTION C, C.10.2

ELIN A001FJ

Lump Sum Price for Expedited Maintenance and Repair Services. Based on a Percentage Added to Task Order Total. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.

SECTION J

EXHIBIT A

PROVIDE A UNIT PRICE FOR THE RENTAL OF TEMPORARY CHAIN LINK FENCE.

IN ACCORDANCE WITH SECTION C, C.10.3

ELIN A001FK THROUGH A001FP

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Temporary Chain link Fence.

6' Fence Height Driven Posts

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

12' Panel, 6' Height

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

12' Panel, 6' Height, Free-Standing

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

With Barbwire, 7' Fence Height

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

12' Panel, With Barbwire, 7' Height

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

12' Panel, With Barbwire, 7' Height, Free-Standing

Line Item 0002 Base Year - Indefinite Quantity Work ELIN A0016 through A0030

PROVIDE UNIT PRICES FOR INDEFINITE QUANTITY WORK

IN ACCORDANCE WITH SECTION C, Item 4 ELIN A0016 through A0030

ELINs-BASE-IDIQ

ATTACHMENT J-0200000-09
EXHIBIT LINE ITEM NUMBERS
SOLICITATION CONTRACT #N40085-26-X-XXXX
EXHIBIT A - CLIN 9000
Line Item 0002 Indefinite Delivery/Indefinite Quantity Price - Base Period
PROVIDE PRICES TO PERFORM PEST CONTROL SERVICES - INDEFINITE DELIVERY/INDEFINITE QUANTITY - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4
ELINs A700 through A709
ELIN
Product NameDescription ExtendedEstimated QuantityUnit of issueUnit PriceExtended PriceIMAP CAC(s)
A700Tick Survey and Control OutdoorsProvide labor and materials to survey for and control of ticks outdoors as per as per Attachment J-1503020-08 Pest Group 017. Time Period to Respond: 3 calendar days after receipt of the task order. Complete work per time periods specified in task order.100AC$0.009220

92G0 A701 Gypsy Moth Ground Spraying Provide labor and materials to perform additional ground spraying of Gypsy Moth in designated Areas as per Attachment J-1503020-08 Pest Group 19. The IPMC shall schedule the Period to Respond: Complete work as per location and application schedule provided with task order. 300 AC $0.00 9220 92G0 A702 Aerial Spray Operations Provide labor of a certified Pest Control Technician to support aerial spray operations performed by the US Forestry Service, New Jersey Department and Monmouth County for Aerial Spraying Apploications when requested by the KO or his duly authorized representative. 80 HR $0.00 9220 92G0 A703 Industrial, Sidewalk, Substation, Vault, and Right-Of-Way Weed Control Provide labor and materials to provide bare ground weed control in cracks in sidewalks, and paved surfaces, at fenceline locations, and in transformer vaults, around fire hydrants, and other locations as designated by the KO. Time Period to Respond: 5 working days. Complete work per time periods. 25 1000 SF $0.00 9220 92G0 A704 Survey for Termite and Wood Destroying Organisms Provide labor and materials to survey for all termites species and other wood destroying organisms including fungal rots, carpenter ants, and wood boring beetles. Time Period to Respond: If swarm, immediately. Otherwise, 5 working days after receipt of the task order. Complete work per time periods specified in task order. 20 1,000 SF $0.00 9220 92G0 A705 Subterranean Termite Control Provide labor and materials to control infestations of subterranean termites in accordance with J-150302004 (Termite Control Specifications). Time Period to Respond: 5 working days after receipt of the task order. Complete work per time periods specified in task order. 20 100 LF $0.00 9220 92G0 A706 Other Wood Destroying Organism Control Provide labor and materials to prevent, manage, and control non-termite wood destroying organisms including, but not limited to powder post beetles (Lyctids and Bostrichids), Anobiids (furniture and deathwatch beetles), old house borer, carpenter ants, and carpenter bees. Time Period to Respond: 5 working days after receipt of the task order. Complete work per time periods specified in task 20 1000 SF $0.00 9220 92G0 A707 Unit Priced Labor Work - MUST BE

NEGOTIATED BY

KO

Provide labor to perform all Unit Priced Labor work subject to the Service Contract Act per the scope and delivery schedule specified in the task order. MUST

BE NEGOTIATED BY KO USING ETO PROCESS

1 LS $0.00 9220

92G0 A708 Material and/or Equipment Costs -

MUST BE

NEGOTIATED BY

KO

Provide materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the task order. Material and equipment costs MUST BE NEGOTIATED BY KO USING ETO PROCESS.

1 LS $0.00 9220

92G0

TOTAL INDEFINITE QUANTITY PRICE BASE YEAR $0.00

SECTION J

EXHIBIT A

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Ornamental Steel Fence.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

PROVIDE A UNIT PRICE FOR THE REMOVAL AND DISPOSAL OF FENCE COMPLETE, FENCE POSTS, BARBWIRE, BARBED TAPE.

ELIN A001EW through A001FI

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence Gates including tracks (not posts).

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Ornamental Steel Fence. Including Posts and Gates

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Barbwire Fence. Including Posts and all wire.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to remove and Dispose of or Save and Store (for reuse) Barbwire Double (V) Arm Support.

Lump Sum Price for the recycling of removed materials. Based on a Percentage Added to Removal Item Ordered

Lump Sum Price for the Recycling of Removed Materials. Based on a Percentage Added to Removal Item Ordered, ELIN A001EK to A001EW. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.

Lump Sum Price for Expedited Maintenance and Repair Services. Based on a Percentage Added to Task Order Total. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.

SECTION J

EXHIBIT A

PROVIDE A UNIT PRICE FOR THE RENTAL OF TEMPORARY CHAIN LINK FENCE.

IN ACCORDANCE WITH SECTION C, C.10.3

ELIN A001FK THROUGH A001FP

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

EXHIBIT A - CLIN 9001

PROVIDE PRICES TO MAINTAIN GROUNDS - FIRM FIXED PRICE

IN ACCORDANCE WITH SECTION C, Items 3.1, 3.2, 3.3, and 3.4 ELIN B011 through B211 (NOTE: Revise to match ELIN Structure) Line Item 0003 Option Year One - Firm Fixed Price Work ELIN B001 through B211 Line Item 0004 Option Year One- Indefinite Quantity Work ELIN B1001 through B1004

PROVIDE UNIT PRICES FOR INDEFINITE QUANTITY WORK

IN ACCORDANCE WITH SECTION C, Item 4 ELIN B1001 through B1004

ELINs-1st Opt Period-FFP

ATTACHMENT J-0200000-09
EXHIBIT LINE ITEM NUMBERS
SOLICITATION CONTRACT #N40085-26-X-XXXX
EXHIBIT A - CLIN 9000
Line Item 0003 Firm Fixed Price - First Option Period
PROVIDE PRICES TO PERFORM FACILITY SERVICES - FIRM FIXED PRICE - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3
ELINs B001 through B002
ELIN / Sub ELINDescriptionQuantityUnit of IssueUnit PriceTotalCAC
B001 - REGION - 1503020 Pest Control
Services for Region facilities/spaces listed in the Frequencies for Scheduled Work provided in J-1503020-06 performed at frequencies specified.12MO$0.00

REGION Subtotal $0.00

B002 - BUMED - 1503020 Pest Control
Services for BUMED facilities/spaces listed in the Frequencies for Scheduled Work provided in J-1503010-06 performed at frequencies specified.12MO$0.00

BUMED Subtotal $0.00

TOTAL FFP WORK $0.00

PROVIDE PRICES TO MAINTAIN GROUNDS - FIRM FIXED PRICE

IN ACCORDANCE WITH SECTION C, Items 3.1, 3.2, 3.3, and 3.4 ELIN A001 through A0015 Line Item 0001 Base Year - Firm Fixed Price ELIN A001 through A0015

SECTION J

EXHIBIT A

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Ornamental Steel Fence.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

PROVIDE A UNIT PRICE FOR THE REMOVAL AND DISPOSAL OF FENCE COMPLETE, FENCE POSTS, BARBWIRE, BARBED TAPE.

ELIN A001EW through A001FI

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence Gates including tracks (not posts).

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Ornamental Steel Fence. Including Posts and Gates

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Barbwire Fence. Including Posts and all wire.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to remove and Dispose of or Save and Store (for reuse) Barbwire Double (V) Arm Support.

Lump Sum Price for the recycling of removed materials. Based on a Percentage Added to Removal Item Ordered

Lump Sum Price for the Recycling of Removed Materials. Based on a Percentage Added to Removal Item Ordered, ELIN A001EK to A001EW. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.

Lump Sum Price for Expedited Maintenance and Repair Services. Based on a Percentage Added to Task Order Total. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.

SECTION J

EXHIBIT A

PROVIDE A UNIT PRICE FOR THE RENTAL OF TEMPORARY CHAIN LINK FENCE.

IN ACCORDANCE WITH SECTION C, C.10.3

ELIN A001FK THROUGH A001FP

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

PROVIDE UNIT PRICES FOR INDEFINITE QUANTITY WORK

IN ACCORDANCE WITH SECTION C, Item 4 ELIN A0016 through A0030

ELINs-1st Opt Period IDIQ

ATTACHMENT J-0200000-09
EXHIBIT LINE ITEM NUMBERS
SOLICITATION CONTRACT #N40085-26-X-XXXX
EXHIBIT A - CLIN 9000
Line Item 0004 Indefinite Delivery/Indefinite Quantity Price - First Option Period
PROVIDE PRICES TO PERFORM PEST CONTROL SERVICES - INDEFINITE DELIVERY/INDEFINITE QUANTITY - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4
ELINs B700 through B709
ELIN
Product NameDescription ExtendedEstimated QuantityUnit of issueUnit PriceExtended PriceIMAP CAC(s)
B700Tick Survey and Control OutdoorsProvide labor and materials to survey for and control of ticks outdoors as per as per Attachment J-1503020-08 Pest Group 017. Time Period to Respond: 3 calendar days after receipt of the task order. Complete work per time periods specified in task order.100AC$0.009220

92G0 B701 Gypsy Moth Ground Spraying Provide labor and materials to perform additional ground spraying of Gypsy Moth in designated Areas as per Attachment J-1503020-08 Pest Group 19. The IPMC shall schedule the Period to Respond: Complete work as per location and application schedule provided with task order. 300 AC $0.00 9220 92G0 B702 Aerial Spray Operations Provide labor of a certified Pest Control Technician to support aerial spray operations performed by the US Forestry Service, New Jersey Department and Monmouth County for Aerial Spraying Apploications when requested by the KO or his duly authorized representative. 80 HR $0.00 9220 92G0 B703 Industrial, Sidewalk, Substation, Vault, and Right-Of-Way Weed Control Provide labor and materials to provide bare ground weed control in cracks in sidewalks, and paved surfaces, at fenceline locations, and in transformer vaults, around fire hydrants, and other locations as designated by the KO. Time Period to Respond: 5 working days. Complete work per time periods. 25 1000 SF $0.00 9220 92G0 B704 Survey for Termite and Wood Destroying Organisms Provide labor and materials to survey for all termites species and other wood destroying organisms including fungal rots, carpenter ants, and wood boring beetles. Time Period to Respond: If swarm, immediately. Otherwise, 5 working days after receipt of the task order. Complete work per time periods specified in task order. 20 1,000 SF $0.00 9220 92G0 B705 Subterranean Termite Control Provide labor and materials to control infestations of subterranean termites in accordance with J-150302004 (Termite Control Specifications). Time Period to Respond: 5 working days after receipt of the task order. Complete work per time periods specified in task order. 20 100 LF $0.00 9220 92G0 B706 Other Wood Destroying Organism Control Provide labor and materials to prevent, manage, and control non-termite wood destroying organisms including, but not limited to powder post beetles (Lyctids and Bostrichids), Anobiids (furniture and deathwatch beetles), old house borer, carpenter ants, and carpenter bees. Time Period to Respond: 5 working days after receipt of the task order. Complete work per time periods specified in task 20 1000 SF $0.00 9220 92G0 B707 Unit Priced Labor Work - MUST BE

NEGOTIATED BY

KO

Provide labor to perform all Unit Priced Labor work subject to the Service Contract Act per the scope and delivery schedule specified in the task order. MUST

BE NEGOTIATED BY KO USING ETO PROCESS

1 LS $0.00 9220

92G0 B708 Material and/or Equipment Costs -

MUST BE

NEGOTIATED BY

KO

Provide materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the task order. Material and equipment costs MUST BE NEGOTIATED BY KO USING ETO PROCESS.

1 LS $0.00 9220

92G0

TOTAL INDEFINITE QUANTITY PRICE BASE YEAR $0.00

SECTION J

EXHIBIT A

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Ornamental Steel Fence.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

PROVIDE A UNIT PRICE FOR THE REMOVAL AND DISPOSAL OF FENCE COMPLETE, FENCE POSTS, BARBWIRE, BARBED TAPE.

ELIN A001EW through A001FI

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence Gates including tracks (not posts).

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Ornamental Steel Fence. Including Posts and Gates

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Barbwire Fence. Including Posts and all wire.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to remove and Dispose of or Save and Store (for reuse) Barbwire Double (V) Arm Support.

Lump Sum Price for the recycling of removed materials. Based on a Percentage Added to Removal Item Ordered

Lump Sum Price for the Recycling of Removed Materials. Based on a Percentage Added to Removal Item Ordered, ELIN A001EK to A001EW. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.

Lump Sum Price for Expedited Maintenance and Repair Services. Based on a Percentage Added to Task Order Total. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.

SECTION J

EXHIBIT A

PROVIDE A UNIT PRICE FOR THE RENTAL OF TEMPORARY CHAIN LINK FENCE.

IN ACCORDANCE WITH SECTION C, C.10.3

ELIN A001FK THROUGH A001FP

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

PROVIDE PRICES TO MAINTAIN GROUNDS - FIRM FIXED PRICE

IN ACCORDANCE WITH SECTION C, Items 3.1, 3.2, 3.3, and 3.4 ELIN B011 through B211 (NOTE: Revise to match ELIN Structure) Line Item 0003 Option Year One - Firm Fixed Price Work ELIN B001 through B211 Line Item 0004 Option Year One- Indefinite Quantity Work ELIN B1001 through B1004

PROVIDE UNIT PRICES FOR INDEFINITE QUANTITY WORK

IN ACCORDANCE WITH SECTION C, Item 4 ELIN B1001 through B1004

ELINs-2nd Opt Period-FFP

ATTACHMENT J-0200000-09
EXHIBIT LINE ITEM NUMBERS
SOLICITATION CONTRACT #N40085-26-X-XXXX
EXHIBIT A - CLIN 9000
Line Item 0005 Firm Fixed Price - Second Option Period
PROVIDE PRICES TO PERFORM FACILITY SERVICES - FIRM FIXED PRICE - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3
ELINs C001 through C002
ELIN / Sub ELINDescriptionQuantityUnit of IssueUnit PriceTotalCAC
C001 - REGION - 1503020 Pest Control
Services for Region facilities/spaces listed in the Frequencies for Scheduled Work provided in J-1503020-06 performed at frequencies specified.12MO$0.00

REGION Subtotal $0.00

C002 - BUMED - 1503020 Pest Control
Services for BUMED facilities/spaces listed in the Frequencies for Scheduled Work provided in J-1503010-06 performed at frequencies specified.12MO$0.00

BUMED Subtotal $0.00

TOTAL FFP WORK $0.00

PROVIDE PRICES TO MAINTAIN GROUNDS - FIRM FIXED PRICE

IN ACCORDANCE WITH SECTION C, Items 3.1, 3.2, 3.3, and 3.4 ELIN A001 through A0015 Line Item 0001 Base Year - Firm Fixed Price ELIN A001 through A0015

SECTION J

EXHIBIT A

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Ornamental Steel Fence.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

PROVIDE A UNIT PRICE FOR THE REMOVAL AND DISPOSAL OF FENCE COMPLETE, FENCE POSTS, BARBWIRE, BARBED TAPE.

ELIN A001EW through A001FI

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence Gates including tracks (not posts).

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Ornamental Steel Fence. Including Posts and Gates

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Barbwire Fence. Including Posts and all wire.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to remove and Dispose of or Save and Store (for reuse) Barbwire Double (V) Arm Support.

Lump Sum Price for the recycling of removed materials. Based on a Percentage Added to Removal Item Ordered

Lump Sum Price for the Recycling of Removed Materials. Based on a Percentage Added to Removal Item Ordered, ELIN A001EK to A001EW. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.

Lump Sum Price for Expedited Maintenance and Repair Services. Based on a Percentage Added to Task Order Total. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.

SECTION J

EXHIBIT A

PROVIDE A UNIT PRICE FOR THE RENTAL OF TEMPORARY CHAIN LINK FENCE.

IN ACCORDANCE WITH SECTION C, C.10.3

ELIN A001FK THROUGH A001FP

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

PROVIDE UNIT PRICES FOR INDEFINITE QUANTITY WORK

IN ACCORDANCE WITH SECTION C, Item 4 ELIN A0016 through A0030

ELINs-2nd Opt Period-IDIQ

ATTACHMENT J-0200000-09
EXHIBIT LINE ITEM NUMBERS
SOLICITATION CONTRACT #N40085-26-X-XXXX
EXHIBIT A - CLIN 9000
Line Item 0006 Indefinite Delivery/Indefinite Quantity Price - Second Option Period
PROVIDE PRICES TO PERFORM PEST CONTROL SERVICES - INDEFINITE DELIVERY / INDEFINITE QUANTITY - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4
ELINs C700 through C709
ELIN
Product NameDescription ExtendedEstimated QuantityUnit of issueUnit PriceExtended PriceIMAP CAC(s)
C700Tick Survey and Control OutdoorsProvide labor and materials to survey for and control of ticks outdoors as per as per Attachment J-1503020-08 Pest Group 017. Time Period to Respond: 3 calendar days after receipt of the task order. Complete work per time periods specified in task order.100AC9220

92G0 C701 Gypsy Moth Ground Spraying Provide labor and materials to perform additional ground spraying of Gypsy Moth in designated Areas as per Attachment J-1503020-08 Pest Group 19. The IPMC shall schedule the Period to Respond: Complete work as per location and application schedule provided with task order. 300 AC 9220 92G0 C702 Aerial Spray Operations Provide labor of a certified Pest Control Technician to support aerial spray operations performed by the US Forestry Service, New Jersey Department and Monmouth County for Aerial Spraying Apploications when requested by the KO or his duly authorized representative 80 HR 9220 92G0 C703 Industrial, Sidewalk, Substation, Vault, and Right-Of-Way Weed Control Provide labor and materials to provide bare ground weed control in cracks in sidewalks, and paved surfaces, at fenceline locations, and in transformer vaults, around fire hydrants, and other locations as designated by the KO. Time Period to Respond: 5 working days. Complete work per time periods specified in task order. 25 1000 SF 9220 92G0 C704 Survey for Termite and Wood Destroying Organisms

Provide labor and materials to survey for all termites species and other wood destroying organisms including fungal rots, carpenter ants, and wood boring beetles. Time Period to Respond: If swarm, immediately. Otherwise, 5 working days after receipt of the task order. Complete work per time periods specified in task order201,000 SF
9220

92G0 C705 Subterranean Termite Control Provide labor and materials to control infestations of subterranean termites in accordance with J-150302004 (Termite Control Specifications). Time Period to Respond: 5 working days after receipt of the task order. Complete work per time periods specified in task order. 20 100 LF 9220 92G0 C706 Other Wood Destroying Organism Control Provide labor and materials to prevent, manage, and control non-termite wood destroying organisms including, but not limited to powder post beetles (Lyctids and Bostrichids), Anobiids (furniture and deathwatch beetles), old house borer, carpenter ants, and carpenter bees. Time Period to Respond: 5 working days after receipt of the task order. Complete work per time periods specified in task order. 20 1,000 SF 9220 92G0 C707 Unit Priced Labor Work - MUST BE

NEGOTIATED BY

KO

Provide labor to perform all Unit Priced Labor work subject to the Service Contract Act per the scope and delivery schedule specified in the task order. MUST

BE NEGOTIATED BY KO USING ETO PROCESS

1 LS 9220

92G0 C708 Material and/or Equipment Costs -

MUST BE

NEGOTIATED BY

KO

Provide materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the task order. Material and equipment costs MUST BE NEGOTIATED BY KO USING ETO PROCESS.

1 LS 9220

92G0

TOTAL INDEFINITE QUANTITY PRICE BASE YEAR $ - 0 $0.00

SECTION J

EXHIBIT A

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Ornamental Steel Fence.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

PROVIDE A UNIT PRICE FOR THE REMOVAL AND DISPOSAL OF FENCE COMPLETE, FENCE POSTS, BARBWIRE, BARBED TAPE.

ELIN A001EW through A001FI

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence Gates including tracks (not posts).

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Ornamental Steel Fence. Including Posts and Gates

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Barbwire Fence. Including Posts and all wire.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to remove and Dispose of or Save and Store (for reuse) Barbwire Double (V) Arm Support.

Lump Sum Price for the recycling of removed materials. Based on a Percentage Added to Removal Item Ordered

Lump Sum Price for the Recycling of Removed Materials. Based on a Percentage Added to Removal Item Ordered, ELIN A001EK to A001EW. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.

Lump Sum Price for Expedited Maintenance and Repair Services. Based on a Percentage Added to Task Order Total. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.

SECTION J

EXHIBIT A

PROVIDE A UNIT PRICE FOR THE RENTAL OF TEMPORARY CHAIN LINK FENCE.

IN ACCORDANCE WITH SECTION C, C.10.3

ELIN A001FK THROUGH A001FP

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

PROVIDE PRICES TO MAINTAIN GROUNDS - FIRM FIXED PRICE

IN ACCORDANCE WITH SECTION C, Items 3.1, 3.2, 3.3, and 3.4 ELIN B011 through B211 (NOTE: Revise to match ELIN Structure) Line Item 0003 Option Year One - Firm Fixed Price Work ELIN B001 through B211 Line Item 0004 Option Year One- Indefinite Quantity Work ELIN B1001 through B1004

PROVIDE UNIT PRICES FOR INDEFINITE QUANTITY WORK

IN ACCORDANCE WITH SECTION C, Item 4 ELIN B1001 through B1004

ELINs-3rd Opt Period-FFP

ATTACHMENT J-0200000-09
EXHIBIT LINE ITEM NUMBERS
SOLICITATION CONTRACT #N40085-26-X-XXXX
EXHIBIT A - CLIN 9000
Line Item 0007 Firm Fixed Price - Third Option Period
PROVIDE PRICES TO PERFORM FACILITY SERVICES - FIRM FIXED PRICE - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3
ELINs D001 through D002
ELIN / Sub ELINDescriptionQuantityUnit of IssueUnit PriceTotalCAC
D001 - REGION - 1503020 Pest Control
Services for Region facilities/spaces listed in the Frequencies for Scheduled Work provided in J-1503020-06 performed at frequencies specified.12MO$0.00

REGION Subtotal $0.00

D002- BUMED - 1503020 Pest Control
Services for BUMED facilities/spaces listed in the Frequencies for Scheduled Work provided in J-1503010-06 performed at frequencies specified.12MO$0.00

BUMED Subtotal $0.00

TOTAL FFP WORK $0.00

PROVIDE PRICES TO MAINTAIN GROUNDS - FIRM FIXED PRICE

IN ACCORDANCE WITH SECTION C, Items 3.1, 3.2, 3.3, and 3.4 ELIN A001 through A0015 Line Item 0001 Base Year - Firm Fixed Price ELIN A001 through A0015

SECTION J

EXHIBIT A

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Ornamental Steel Fence.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

PROVIDE A UNIT PRICE FOR THE REMOVAL AND DISPOSAL OF FENCE COMPLETE, FENCE POSTS, BARBWIRE, BARBED TAPE.

ELIN A001EW through A001FI

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence Gates including tracks (not posts).

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Ornamental Steel Fence. Including Posts and Gates

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Barbwire Fence. Including Posts and all wire.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to remove and Dispose of or Save and Store (for reuse) Barbwire Double (V) Arm Support.

Lump Sum Price for the recycling of removed materials. Based on a Percentage Added to Removal Item Ordered

Lump Sum Price for the Recycling of Removed Materials. Based on a Percentage Added to Removal Item Ordered, ELIN A001EK to A001EW. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.

Lump Sum Price for Expedited Maintenance and Repair Services. Based on a Percentage Added to Task Order Total. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.

SECTION J

EXHIBIT A

PROVIDE A UNIT PRICE FOR THE RENTAL OF TEMPORARY CHAIN LINK FENCE.

IN ACCORDANCE WITH SECTION C, C.10.3

ELIN A001FK THROUGH A001FP

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

PROVIDE UNIT PRICES FOR INDEFINITE QUANTITY WORK

IN ACCORDANCE WITH SECTION C, Item 4 ELIN A0016 through A0030

ELINs-3rd Opt Period-IDIQ

ATTACHMENT J-0200000-09
EXHIBIT LINE ITEM NUMBERS
SOLICITATION CONTRACT #N40085-26-X-XXXX
EXHIBIT A - CLIN 9000
Line Item 0008 Indefinite Delivery/Indefinite Quantity Price - Third Option Period
PROVIDE PRICES TO PERFORM PEST CONTROL SERVICES - INDEFINITE DELIVERY / INDEFINITE QUANTITY - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4
ELINs C700 through C709
ELIN
Product NameDescription ExtendedEstimated QuantityUnit of issueUnit PriceExtended PriceIMAP CAC(s)
D700Tick Survey and Control OutdoorsProvide labor and materials to survey for and control of ticks outdoors as per as per Attachment J-1503020-08 Pest Group 017. Time Period to Respond: 3 calendar days after receipt of the task order. Complete work per time periods specified in task order.100AC$0.009220

92G0 D701 Gypsy Moth Ground Spraying Provide labor and materials to perform additional ground spraying of Gypsy Moth in designated Areas as per Attachment J-1503020-08 Pest Group 19. The IPMC shall schedule the Period to Respond: Complete work as per location and application schedule provided with task order. 300 AC $0.00 9220 92G0 D702 Aerial Spray Operations Provide labor of a certified Pest Control Technician to support aerial spray operations performed by the US Forestry Service, New Jersey Department and Monmouth County for Aerial Spraying Apploications when requested by the KO or his duly authorized representative 80 HR $0.00 9220 92G0 D703 Industrial, Sidewalk, Substation, Vault, and Right-Of-Way Weed Control Provide labor and…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .