Att 3 - Drawings - Grand Junction Data Center CD Set.pdf
PDF 30 MB Posted
- Attached to
- 575-221 - EHRM Infrastructure Upgrades Construction - Tier 2 Data Center - Grand Junction, CO Federal contract opportunity
- Solicitation number
- 36C77625B0038
About this file
This document is a comprehensive set of Construction Documents (CD Set) for the EHRM Infrastructure Upgrades Data Center project located at the Grand Junction VA Medical Center in Grand Junction, Colorado. The project involves upgrading the existing data center in Building 34, with construction documents spanning multiple disciplines including architectural, civil, structural, mechanical, electrical, telecommunications, fire protection, and auxiliary systems.
The CD Set includes detailed drawings and specifications for a complete renovation, covering aspects such as site planning, demolition, new infrastructure, equipment installation, power systems, telecommunications, access control, lightning protection, and grounding. Key components include new data center equipment rooms, electrical and telecommunications infrastructure upgrades, cable management systems, access control modifications, and comprehensive system integration. The project is solicited under VA Technology Acquisition Center Austin, with the solicitation number 36C77625B0038, and is structured as a Tier 2 Data Center infrastructure upgrade with a focus on modernizing the facility's technological capabilities.
View the file
Other files for this federal contract opportunity
Show all 21
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Medical Administration Service Group Practice Manager Director
Patient Advocate Whole Health Coordinator
Engineering Shops Continuous Survey Readiness ADPCS
Engineering Management Employee Health Manager CoS
Environmental Management Services Patient Safety Manager Capitalization Coordinator
Information Technology (IT) Safe Patient Handling Manager AD
Women Veterans Program Safety Manager Facility Planner
Supply Chain Management (Logistics) Infection Control Manager Garden Planner
Police Human Resources NAGE Representative
Education Telehealth Coordinator Privacy Officer
No.
7690241-2202
WILLIAM
N. FELT
L
IC
E N
S E D
PROFESS IONAL
E N G
I N E
E R
STATE OF UTAH
324 S. State St., Suite 400 Salt Lake City, UT 84111
800-678-7077 801-328-5151 fax: 801-328-5155 www.spectrum-engineers.com
STRUCTURALBHB
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
STAMPDESIGNER OF RECORD
7 8 9 10321 4 5 6
2766 South Main Street Salt Lake City, Utah 84115
801-355-5656 bhb@bhbengineers.com
SHEET TO BE VIEWED AND PRINTED IN COLOR
HCF Corporation 8184 South Highland Drive, Suite C-7
Sandy, Utah 84093 385-351-4886 https://hcfcorp.com 2024-02-07
A u to d e s k D o c s /2
G ra n d J u n c ti o n
V A
M C
E H
R M
I n fr a s tr u c tu re U p g ra d e s
D a ta C e n te r/
-E le c C e n tr a l.
rv t
/1
/2
:0
:3
P
M
CS001
COVER SHEET EHRM INFRASTRUCTURE
UPGRADES DATA CENTER GRAND
JUNCTION
575-221
BLDG 34
16 APR 2025 WNF PSS
CONSTRUCTION
DOCUMENTS
GRAND JUNCTION, CO 81501
EHRM INFRASTRUCTURE
UPGRADES DATA
CENTER GRAND
JUNCTION
575-221
2121 NORTH AVE.
GRAND JUNCTION, CO 81501
CONSTRUCTION DOCUMENTS
16 APR 2025
CS001 COVER SHEET
CS002 RISK ASSESSMENT
CS003 IT SECURITY CHECKLIST
CS004 GENERAL NOTES, SYMBOLS, ABBREVIATIONS
CS005 ARCHITECTURAL LOCATION PLAN
LP101 FIRST FLOOR LIFE SAFETY PLAN AND BUILDING
ANALYSIS
HA101 GENERAL INFORMATION SITE PLAN
HA102 1ST FLOOR ASBESTOS ABATEMENT PLANS
HA103 CONCEPTUAL SEQUENCING MAJOR CONSTRUCTION
PLAN
C100 CIVIL NOTES
C101 UTILITY/DEMOLITION SITE PLAN
C102 CIVIL GATE DESIGN
S-001 GENERAL STRUCTURAL NOTES
S-002 GENERAL STRUCTURAL NOTES
S-003 SPECIAL INSPECTIONS
S-010 LEGENDS AND ABBREVIATIONS
S-101 FOOTING AND FOUNDATION PLAN
S-111 ROOF FRAMING PLAN
S-501 DETAILS
S-502 DETAILS
S-511 DETAILS
S-601 SCHEDULES
S-602 SCHEDULES
AD101 FIRST FLOOR DEMOLITION PLAN
AD102 FIRST FLOOR REFLECTED CEILING DEMOLITION PLAN
AE101 FIRST FLOOR PLAN
AE102 FIRST FLOOR REFLECTED CEILING PLAN
AE103 ROOF PLAN
AE104 EQUIPMENT PLAN
AE201 EXTERIOR ELEVATIONS
AE301 BUILDING SECTIONS
AE303 WALL SECTIONS
AE501 ARCHITECTURAL DETAILS
AE601 DOOR SCHEDULES
AI101 FIRST FLOOR ROOM FINISH PLAN AND SCHEDULE
FA101 1ST FLOOR FIRE ALARM PLAN
FA601 FIRE ALARM RISER
FX101 LEVEL 1 FIRE PROTECTION PLAN
PE001 PLUMBING COVER SHEET
PE501 PLUMBING DETAILS AND SCHEDULES
PD101 LEVEL 1 PLUMBING DEMO PLAN
PL101 LEVEL 1 PLUMBING PLAN - DWV
PL102 LEVEL 1 PLUMBING PLAN - WATER
ME001 MECHANICAL COVER SHEET
ME501 MECHANICAL DETAILS
ME601 MECHANICAL SCHEDULES
ME602 MECHANICAL SCHEDULES
ME603 VRF SCHEMATIC
MD101 LEVEL 1 MECHANICAL DEMO PLAN
MH101 LEVEL 1 MECHANICAL PLAN
MH102 ROOF MECHANICAL PLAN
MP101 LEVEL 1 MECHANICAL PIPING PLAN
EE001 ELECTRICAL COVER SHEET
EE002 SYMBOLS LEGEND
EE003 TELECOM SCHEDULES AND NOTES
EE004 AUXILIARY SCHEDULES AND NOTES
EE501 ELECTRICAL DETAILS
EE601 GROUNDING RISER DIAGRAM
EE701 TYPICAL MOUNTING DETAILS
EE702 TYPICAL LABELING DETAILS
EE703 TYPICAL LABELING DETAILS
ES101 ELECTRICAL SITE PLAN
ES501 ELECTRICAL SITE DETAILS
NORTH 1 : 1800D1
VICINITY MAP
ED101 1ST FLOOR ELECTRICAL DEMOLITION PLAN
ED102 1ST FLOOR ELECTRICAL FEEDER DEMOLITION PLAN
EP101 1ST FLOOR POWER PLAN
EP102 1ST FLOOR NEW ELECTRICAL FEEDER PLAN
EP103 ROOF POWER PLAN
EP201 POWER ELEVATIONS
EP600 TEMPORARY POWER ONE-LINE DIAGRAM &
SCHEDULES
EP601 DEMOLITION ONE-LINE DIAGRAM
EP602 NEW ONE-LINE DIAGRAM
EP603 ELECTRICAL SCHEDULES
EP604 PANEL SCHEDULES
EP605 PANEL SCHEDULES
EL101 1ST FLOOR LIGHTING PLAN
EL102 1ST FLOOR EMERGENCY EGRESS PHOTOMETRIC PLAN
EL601 INTERIOR LIGHTING FIXTURE SCHEDULE
EL604 LIGHTING CONTROL SCHEDULES
ET101 1ST FLOOR TELECOM PLAN
ET102 1ST FLOOR LOWER CABLE RACEWAY PLAN
ET103 1ST FLOOR UPPER CABLE RACEWAY PLAN
ET401 TELECOM ENLARGED PLANS
ET501 TELECOM EQUIPMENT CABINET ELEVATIONS
ET502 TELECOM EQUIPMENT CABINET ELEVATIONS
ET503 TELECOM EQUIPMENT CABINET ELEVATIONS
ET504 TELECOM DETAILS
ET505 TELECOM DETAILS
ET506 TELECOM CABLE TRAY DETAILS
ET507 TELECOM EQUIPMENT RACK GROUNDING DETAIL
ET601 TELECOM CABLE RISER DIAGRAM (SERVER ROOM 107)
ET602 TELECOM RISER DIAGRAMS
EY101 LEVEL 1 AUXILIARY PLAN
EY501 AUXILIARY DETAILS
EY601 AUXILIARY RISER DIAGRAMS
EK101 LIGHTNING PROTECTION PLAN
EK501 LIGHTNING PROTECTION DETAILS
EK502 GROUNDING DETAILS
P:B
P:A
P:A4134
AREA OF WORK
Revisions: Date:
Construction Safety Risk Assessment Checklist, VA Salt Lake City Healthcare System
Project Name:
EHRM INFRASTRUCTURE UPGRADES
DATA CENTER Hazard Likelihood: High: 76% - 100%
Project Number: 575-221 Medium: 51% - 75%
Date: - Low: 0% - 50%
Project Manager: -
Pest Control within Construction Area
L L Y Pest control precautions must be utilized for any openings introduced to existing facility
Approval Signatures:
Project Manager: Date:
Contractor: Date:
Safety Manager: Date:
Svc./Section/Program Director: Date:
Identify Hazards Evaluator Is Hazard Likely?
H-M-L
Severity H-M-L
Mitigation Needed?
Y/N Mitigation Strategies
Mitigation Strategies
Implemented?
Comments
Hazard Communication
L L Y MSDS required to be maintained on site by contractor
Respiratory Protection
L L Y respiratory protection required when air debris present
Personal Protective Equipment
M M Y hearing protection Steel toed boots, clothing when required.
Fire Protection L L Y contractor required to follow VA hot work permit procedure& VA Interim Life Safety Measure
Traffic Control & Site Security
L L Y Work affecting traffic flow or site security must be coordinated with VA
Wire Rope and Rigging Equipment
M M Y OSHA Procedure to be followed
Trenching and Excavation
M M Y OSHA procedure to be followed
Motor Vehicles, Earthmoving, and Mechanized Equipment
M L Y Preventative maintenance logs required on site
Concrete and Masonry
M M Y OSHA procedure to be followed
Lead, Asbestos, and Silica
L L Y Coordination with VA required to identify all accessible suspect ACM building materials in affected facility where demolition will occur
Utility Interruptions L L Y Must receive approval from VA
Dust L L Y respiratory protection required when air debris present. Dust partitions must be utilized as needed
Moisture/Water Leaks L L Y Notification to VA required for all moisture/Water leaks
Demolition M M Y Any work causing noise or vibration to interior
Of Medical Center must be coordinated with
VA
Hand and Power Tools
L M Y OSHA Procedure to be followed
Electrical L L Y All hot work on electrical systems must receive prior approval by VA
Lockout / Tagout L L Y Lockout tagout procedure required in contractor submitted Safety plan (pre-construction)
Welding and Cutting L L Y VA signed hot work permit required to be obtained by contractor
Confined Spaces L L Y OSHA Procedures & VA Confined
Space Policy must be followed
Tunnels and Shafts L L Y OSHA Procedures & VA Confined
Space Policy must be followed
Identify Hazards Evaluator Is Hazard Likely?
H-M-L
Severity H-M-L
Mitigation Needed?
Y/N Mitigation Strategies
Mitigation Strategies
Implemented?
Comments
Process Safety Management - Piping Systems
L L Y Coordination with VA for affects on existing systems
Cranes and Hoists M H Y Rigging Plan to be approved by VA.
Preventative maintenance logs required on site
Steel Erection M H Y OSHA procedure to be followed
Fall Protection H H Y OSHA procedure to be followed
Scaffolds M M Y OSHA procedure to be followed
Ladders M M Y OSHA procedure to be followed
Vapors/Fumes L L Y Anything that may introduce vapor fumes to interior of Medical Center must be coordinated with VA prior to commencement
Noise M L Y Any work causing noise to interior Of Medical
Center must be coordinated with VA
Identify Hazards Evaluator Is Hazard Likely?
H-M-L
Severity H-M-L
Mitigation Needed?
Y/N Mitigation Strategies
Mitigation Strategies
Implemented?
Comments
Vibration L L Y Any work causing vibration to interior Of
Medical Center must be coordinated with VA
Open Outside Walls L M N All site security deficiencies that may be introduced must be coordinated with VA
Impact to Levels Above and Below
L M Y Coordinate with VA prior to impact to facility
Proximity of Air Intakes
M M Y Relocation of Intake
4. Coordinate air filter maintenance with Operations. approved disinfectant and dry before replacement. 6. Maintain negative pressure in construction area.
5. Contain area to one room with walls from floor to ceiling. 12. Use only designated elevators (e.g. utility) for debris removal.
Class IV In Addition to Class I, II, and III Precautions Above:
Water lines flushed at site & adjacent areas.
3. Transportation route or storage for clean supplies not 2. Install dust partitions (including work in ceilings) prior to start.
near contaminated materials Partitions must be well-sealed from floor to ceiling. Vent system cleaned & balanced after completion of
(Solid Wall) construction.
2. Educate VA staff regarding construction activity. 4. Mist debris-removal chutes & dumpsters.
10. Remove and replace wet ceiling tiles if the porous type.
3. Block & seal air vents before starting. (1C22 and 1C24) 5. Assure adjacent air filtering systems are functioning.
11. If ceiling tiles are nonporous, remove and clean with hospital
Class II In Addition to Class I Precautions: 8. Wet mop area daily & place "tack" mats at all entrances/exits.
Refresh tack mats frequently (at least daily). 3. Remove dust partitions carefully to minimize spread of Construction area thoroughly wet mopped and disinfected.
1. Consult Infection Control Nurse prior to beginning work. dust & dirt.
9. Use HEPA vacuum to capture dust during dust-producing work. Check room temperatures and adjust if needed.
6. Close non-access doors and duct tape frames and doors.
1. Consult Infection Control Nurse
7. Transport debris in covered containers that are wiped down.
2. Relocate patients to area remote from construction area.
Infectious Control Construction Precautions
Class I 1. Execute work by methods to minimize raising dust. 4. Worker traffic routes should minimize contact with patients. Class III In Addition to Class I and II Precautions Above:
(inside and outside)
2. Immediately replace ceiling tiles removed for inspection. 5. Minimize exposure of patients to construction and maintenance. 1. Consult Infection Control Nurse prior to beginning work. Prior to Patient Occupancy:
B) CONSTRUCTION ACTIVITY TYPES:
Type A Inspection and Non-Invasive Activities, includes but is not limited to, manipulation of ceiling tiles, painting (but not sanding), wallcovering, electrical trim work, minor plumbing, installation of telephone and computer cabling, and activities which do not (1) generate dust or (2) require cutting of walls.
Type B Small scale, short duration activities which create minimal dust. Includes, but is not limited to,
(1) access to chase spaces, (2) cutting of walls or ceilings, where dust migration can be controlled.
Type C Any work which generates a moderate to high level of dust or requires demolition or removal of any fixed building components or assemblies. Includes, but is not limited to,
(1) sanding of walls for painting or wall covering, (2) removal of floorcoverings, (3) multiple ceiling panels and (4) casework, (5) new wall construction, (6) minor duct work or (7) electrical work above ceilings, (8) major cabling activities, and
(9) any activity which can be contained within a single workshift.
Type D Major demolition and construction projects. Includes, but is not limited to, (1) activities which require consecutive work shifts,
(2) requires heavy demolition or (3) removal of a complete cabling system, (4) new construction.
and (5) any activity which cannot be contained within a single workshift.
STEP 3: Determine Class of Precautions Using Matrix Below:
CONSTRUCTION ACTIVITY/INFECTION CONTROL MATRIX TO DETERMINE CLASS
** ICN must be consulted when the assessment indicates that Class II, III, or IV precautions are required.
Infection Control Risk Assessment for Construction
Project Name / EWO Description: EHRM INFRASTRUCTURE UPGRADES DATA CENTER Project # / EWO # 575-221
Location of Activity: Start Date: Estimated Duration:
Project Manager: Contractor: ICN:
Project Manager Phone #: Contractor Phone #: ICN Phone #: ext.
STEP #1: Select Risk Group Below and Mark Bottom of Column
A) INFECTION CONTROL RISK GROUPS
Cardiology Pharmacy (In & Out Patient) Sterile Processing
Decontamination PT / OT Ambulatory Medicine Unit (2 West)
Dental Public Corridor (patient activity) Cardiac Cath/Angiography
Distribution Pulmonary / Bronchoscopy Dialysis Unit
G.I. Lab Telemetry Pharmacy IV Prep (Inpatient)
Hoptel
STEP #2: Select Activity Type Below:
Group 0 Group 1 Group 2 - Medium Risk Group 3 - Medium High Risk
Lowest Risk Low Risk Laboratories Imaging Emergency Room (ECU)
Nonmedical Office Areas 3 West Laundry Post Anesthesia Care associated spaces (associated with Acute Medicine (2 East, 2 North) Nuclear Medicine All ICUs
(no patient patient activity) B.2 Out Patient Clinics activity) B.3 Inpatient Mental Health Ward Out Patient Surgery Group 4 - Highest Risk
Canteen Kitchen Patient Kitchen & Dining All OR's
Construction Activity Type
Risk Level Type "A" Type "B" Type "C" Type"D"
Group 0 Refer to OSHA Requirements Refer to OSHA Requirements II II
Group 1 I I II III
Group 2 I II III IV
Group 3 I II III / IV IV
Group 4 II III III / IV IV
Safety Officer Review: ____________________________________ Date: _______________
Additional Assessment Notes :
Assessment Performed by: ________________________________ Date: ________________
Lacking a code complying fire or smoke barrier NO
Fire exit stairs discharge improperly
NO
Excessive travel distance to an approved exit NO
Lack of two remote exits
NO
Nonconforming building construction type
NO
Improperly protected vertical openings
NO
Large penetrations in fire or smoke barriers
NO
Corridor walls do not extend to the structure (or to drop ceiling smoke seal)
NO
Taking a fire alarm system off-line
NO
Taking a sprinkler system off-line
NO
Disconnecting alarm devices
NO
Other
Hazardous areas not properly protected
NO
Blocking off an approved exit
NO
Rerouting emergency room traffic
NO
Major renovation of an occupied floor
YES X X X X X X X X X X X
Replacing fire alarm system (out of service) > 4 hrs.
/ 24 hr. period
NO
Installing a sprinkler system (out of service) > 4 hrs.
/ 24 hr. period
NO
Significantly modifying smoke or fire barrier walls
NO
Adding an addition to an existing structure
YES X X X X X X X X X X X
INTERIM LIFE SAFETY MEASURES ASSESSMENT
Project Name and Number:
EHRM
INFRASTRUST
URE
UPGRADES
DATA
CENTER -
575-221
Y E
S /N
O
A
N o ti fy
E m e rg e n c y F o rc e s
Im p le m e n t
F ir e W a tc h
B
P o s t s ig n a g e i d e n ti fy in g lo c a ti o n o f a lt e rn a te e x it s
C
S p e c ia l m e a s u re
D
In s p e c t e x it s i n a ff e c te d a a d a ily
E
E n s u re f ir e a la rm a n e te c ti o n s y s te m s o r e q u iv a le n t
F
A d d it io n a l fi re
-f ig h ti g q u ip m e n t
G
T e m p o ra ry c o n s tr u c ti o b a rr ie rs
H
H a z a rd s u rv e ill a n c e o f b ld g s g ro u n d s e q u ip m e n t
I) E n fo rc e s to ra g e h s k p in g a n d d e b ri s r e m o v a l
J
A d d it io n a l tr a in in g o n u s e o f fi re
-f ig h ti n g e q u ip m e n t.
K
C o n d u c ti n g
A d d it io n a l F ir
D ri lls
P e r
S h if t in
A a
L
In s p e c t, T e s t, D o c u m e n t te m p o ra ry s y s te m s m o n th ly
M
E d u c a ti o n o f b ld g d e fs c o n s tr u c ti o n h a z a rd s
IL
S
M s
N
T ra in in g f o r im p a ir tr u c tu ra l o r c o m p a rt m e n ta l fi re s a fe ty f e a tu re s
Patient room door latching problem
NO
No.
7690241-2202
WILLIAM
N. FELT
L
IC
E N
S E D
PROFESS IONAL
E N G
I N E
E R
STATE OF UTAH
324 S. State St., Suite 400 Salt Lake City, UT 84111
800-678-7077 801-328-5151 fax: 801-328-5155 www.spectrum-engineers.com
STRUCTURALBHB
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
STAMPDESIGNER OF RECORD
7 8 9 10321 4 5 6
2766 South Main Street Salt Lake City, Utah 84115
801-355-5656 bhb@bhbengineers.com
SHEET TO BE VIEWED AND PRINTED IN COLOR
HCF Corporation 8184 South Highland Drive, Suite C-7
Sandy, Utah 84093 385-351-4886 https://hcfcorp.com 2024-02-07
A u to d e s k D o c s /2
G ra n d J u n c ti o n
V A
M C
E H
R M
I n fr a s tr u c tu re U p g ra d e s
D a ta C e n te r/
-E le c C e n tr a l.
rv t
/1
/2
:0
:3
P
M
CS002
RISK ASSESSMENT EHRM INFRASTRUCTURE
UPGRADES DATA CENTER GRAND
JUNCTION
575-221
BLDG 34
16 APR 2025 WNF PSS
CONSTRUCTION
DOCUMENTS
GRAND JUNCTION, CO 81501
YES__ NO__ NA__
a. The site positions information system components within the facility to minimize potential damage from physical and environmental hazards.
Construction Standards for New and Existing Areas
Containing Information Systems Equipment and/or Wiring
Construction
Documents
Compliant
THESE STANDARDS APPLY TO THE FOLLOWING: COMPUTER ROOMS, TELEPHONE SWITCH ROOMS,
COMMUNICATIONS/DATA CLOSETS CONTAINING IT EQUIPMENT AND/OR WIRING
1 Physical Access
YES__ NO__ NA__
a. Windows with access to facilities that contain information systems, below 12 m (40 ft.) from ground level or the roof of a lower abutment, or less than 7.5 m (25 ft.) from windows of an adjoining building, or accessible by a building ledge leading to
YES__ NO__ NA__
j. Electronic (magnetic) locking systems include a “request to exit” sensor and a “push to exit” manual lock release switch.
YES__ NO__ NA__
k. Interstitial (space between two parts or areas) overhead areas, which may enable entry into a secure room from an unsecured room, must be barricaded by the installation of a suitably secure partition which prevents “up and over” access.
YES__ NO__ NA__
l. Interstitial areas beneath raised floors, which may enable entry into a secure room from an unsecured room, must be barricaded by the installation of a suitably secure partition which prevents access.
YES__ NO__ NA__
m. Ventilation grills on doors and air circulation ducts that exceed 0.06 m2 (100 square inches) and may enable entry into a secure room from an unsecured room must be reinforced to prevent their removal from outside the room.
YES__ NO__ NA__
n. Other possible access means, such as dumbwaiter shafts, roof or wall ventilator housings, trapdoors, etc., shall be secured by appropriate means.
YES__ NO__ NA__
o. Room door lock keys and day lock combinations must NOT be mastered (as defined in VHA Supplement, MP-3, Part I, Chapter 2, Maintenance and Operations).
2 Intrusion Detection
YES__ NO__ NA__
b. Windows that require security mesh screening, the security screen mesh consists of #304 stainless steel woven mesh 0.7 mm (0.028 in.) wire diameter, with tensile strength of 15 kg/mm (800 pounds per lineal inch).
YES__ NO__ NA__
c. Doors to data communications areas containing information systems equipment and/or wiring shall be 45 mm (1-3/4 in.) solid core hardwood or hollow steel construction.
YES__ NO__ NA__
d. Dutch (a door divided horizontally such that the bottom half may remain shut while the top half opens) or half doors are not permitted in data communications areas containing information systems equipment and/or wiring.
YES__ NO__ NA__ e. Removable hinge pins on door exteriors shall be retained with set pins or spot-welded, preventing their removal.
YES__ NO__ NA__
f. Where mechanical lock systems are used, installed lock sets allow for single motion egress (user must make only one motion in order to open a door, typically by turning a knob or pushing a lever or attached bar) to exit.
YES__ NO__ NA__
g. For glass doors or doors with glass panes that have mechanical lock systems and are NOT set in steel frames, one of the two locks a jimmy proof rim dead lock.
YES__ NO__ NA__
h. Doors that have mechanical lock systems shall be fitted with a lock that is contained within the door, NOT attached to the surface of the door.
YES__ NO__ NA__
i. For doors that have mechanical lock systems, the day lock on the main door shall be automatically locking, with a minimum 19 mm (3/4 in.) dead bolt and inside thumb latch.
YES__ NO__ NA__ a. There must be an intrusion detection system.
YES__ NO__ NA__
b. The intrusion detection equipment must operate on principles OTHER THAN narrow beam interception, door contacts, microwave, or photoelectric eye.
YES__ NO__ NA__
c. The intrusion detection equipment must have both an internal, automatic charging DC standby power supply and a primary AC power operation.
YES__ NO__ NA__
d. The intrusion detection equipment must have a remote, key operated activation/deactivation switch installed outside the room and adjacent to the room entrance door frame and/or a central alarm ON-OFF control in the security guard office.
YES__ NO__ NA__ e. The intrusion detection equipment must have an automatic reset capability following intrusion detection.
YES__ NO__ NA__
f. The intrusion detection equipment must have a local alarm level of 80 dB (min) to 90 dB (max) within the configuration of the protected area?
YES__ NO__ NA__
g. The intrusion detection equipment must have an integral capability for the attachment of wiring for remote alarm and intrusion indicator equipment (visual or audio)?
YES__ NO__ NA__ h. The automatic emergency lighting system must properly cover emergency exits and evacuation routes.
5 Fire Safety/Security
YES__ NO__ NA__
a. The area containing information systems must employ fire detection devices/systems that activate in the event of a fire.
YES__ NO__ NA__ b. The area containing information systems must employ fire extinguishers in accordance with site policy.
YES__ NO__ NA__ c. Fire extinguishers must be in obvious locations and easily accessible.
6 Temperature/Humidity
3 Electrical Safety/Security
YES__ NO__ NA__ a. The area containing information systems must have an emergency electrical shutoff switch.
YES__ NO__ NA__ b. The emergency shutoff switch shall be easily located and in plain sight.
YES__ NO__ NA__ c. The emergency shutoff switch shall be protected by a plastic cover to prevent accidental activation.
YES__ NO__ NA__ d. The site shall provide a long-term alternate power supply for the information system.
YES__ NO__ NA__ e. The site must consistently provide an emergency power capability for the information system on an ongoing basis.
YES__ NO__ NA__
f. The site must provide a short-term uninterruptible power supply (UPS) to facilitate an orderly shutdown of the information system in the event of a primary power source loss.
YES__ NO__ NA__ g. The site must employ an automatic emergency lighting system that activates in the event of a power outage.
YES__ NO__ NA__ a. Temperature and humidity sensors must exist in areas containing information systems.
7 Water damage/security
YES__ NO__ NA__ a. No water pipes may be located in the ceiling above the information system.
YES__ NO__ NA__ b. No bathrooms, kitchens, or other facilities with running water may be positioned above the information system.
YES__ NO__ NA__
c. Facilities that contain information systems must have a raised or false floor, and water sensors located below the floor.
8 Location of information systems
No.
7690241-2202
WILLIAM
N. FELT
L
IC
E N
S E D
PROFESS IONAL
E N G
I N E
E R
STATE OF UTAH
324 S. State St., Suite 400 Salt Lake City, UT 84111
800-678-7077 801-328-5151 fax: 801-328-5155 www.spectrum-engineers.com
STRUCTURALBHB
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
STAMPDESIGNER OF RECORD
7 8 9 10321 4 5 6
2766 South Main Street Salt Lake City, Utah 84115
801-355-5656 bhb@bhbengineers.com
SHEET TO BE VIEWED AND PRINTED IN COLOR
HCF Corporation 8184 South Highland Drive, Suite C-7
Sandy, Utah 84093 385-351-4886 https://hcfcorp.com 2024-02-07
A u to d e s k D o c s /2
G ra n d J u n c ti o n
V A
M C
E H
R M
I n fr a s tr u c tu re U p g ra d e s
D a ta C e n te r/
-E le c C e n tr a l.
rv t
/1
/2
:0
:3
P
M
CS003
IT SECURITY CHECKLIST EHRM INFRASTRUCTURE
UPGRADES DATA CENTER GRAND
JUNCTION
575-221
BLDG 34
16 APR 2025 WNF PSS
CONSTRUCTION
DOCUMENTS
GRAND JUNCTION, CO 81501
ROOM DESIGNATION
DOOR DESIGNATION
WINDOW DESIGNATION
A1.1
ELEVATION, (VIEW)
ELEVATION, (DATUM)
NORTH ARROW
A101
1 SIM
DETAIL
1 1/8" = 1'-0"
View NameDRAWING TITLE
STANDARD SYMBOLS
1REVISION DESIGNATION
GRID HEAD
MATCH
PROPERTY
GRID
HIDDEN
REMOVAL
OVERHEAD
LINE TYPES
NORTH
ARCHITECTURAL MATERIALS
GYPSUM BOARD CEILING / WALL
LAY-IN ACOUSTICAL CEILING
STEEL STUD
CONCRETE
PLYWOOD (SECTION)
MASONRY WALL
TEMPORARY WALL
A
101A
Name
ROOM CODE
Room Number 150 (Desired Area )
COMMENT
RIGID INSULATION
GENERAL NOTES
1. ALL WORK SHALL CONFORM TO THE UNIFIED FACILITIES CRITERIA (UFC) AND THE
INTERNATIONAL BUILDING CODE (2021 EDITION), NFPA 101 (2021 EDITION) AND ALL LOCAL
CODES, INCLUDING ANY AND ALL COVENANTS, RULES AND REGULATIONS ADOPTED BY THE US
DEPARTMENT OF VETERANS AFFAIRS. INCLUDING BUT NOT LIMITED TO THE VA FIRE
PROTECTION DESIGN MANUAL 2021.
2. COORDINATION OF WORK: THE GENERAL CONTRACTOR SHALL COMPARE ARCHITECTURAL
SPECIFICATIONS AND DRAWINGS WITH MECHANICAL AND ELECTRICAL SPECIFICATIONS AND
DRAWINGS. IF THERE ARE ANY DISCREPANCIES BETWEEN THEM, HE SHALL REPORT THE SAME
TO THE ARCHITECT IN WRITING AND OBTAIN FROM THE ARCHITECT WRITTEN INSTRUCTIONS
FOR NECESSARY CHANGES.
3. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS ON THE DRAWINGS AND DIMENSIONS AND
CONDITIONS AT THE SITE.
4. ALL MATERIALS SHALL BE NEW (U.N.O.) AND BOTH MATERIALS AND WORKMANSHIP SHALL BE OF
BEST QUALITY.
5. THE CONTRACTOR SHALL BE RESPONSIBLE FOR SAFETY, SECURITY AND PROTECTION IN AND
AROUND THE JOB SITE AND ADJACENT PROPERTIES (IF APPLICABLE).
6. ALL DETAILS AND NOTES ON DRAWINGS ARE INTENDED TO BE TYPICAL AND SHALL APPLY TO
SIMILAR SITUATIONS ELSEWHERE UNLESS NOTED OR SHOWN OTHERWISE. CONSTRUCTION
NOT SPECIFICALLY SHOWN SHALL BE ACCOMPLISHED AS PER MINIMUM REQUIREMENTS OF THE
UNIFIED FACILITIES CRITERIA (UFC) AND THE INTERNATIONAL BUILDING CODE (2021 EDITION)
AND NFPA 101 (2021 EDITION).
7. THE CONTRACTOR SHALL REVIEW, APPROVE AND VERIFY ALL SHOP DRAWINGS, PRODUCT
DATA, SAMPLES AND SIMILAR SUBMITTALS TO ASSURE THEY COMPLY WITH THE
REQUIREMENTS OF THE CONTRACT DOCUMENTS. SHOP DRAWINGS, PRODUCT DATA, SAMPLES,
AND SIMILAR SUBMITTALS SUBMITTED TO THE ARCHITECT WHICH HAVE NOT BEEN REVIEWED,
APPROVED, VERIFIED, STAMPED AND SIGNED BY THE GENERAL CONTRACTOR WILL BE
RETURNED TO THE GENERAL CONTRACTOR WITHOUT ACTION BY THE ARCHITECT. THE
ARCHITECT WILL REVIEW THE SHOP DRAWINGS FOR GENERAL CONFORMANCE WITH THE
DESIGN CONCEPT. THIS REVIEW BY THE ARCHITECT SHALL NOT BE CONSTRUED AS APPROVAL.
THE CONTRACTOR SHALL NOT BE RELIEVED OF RESPONSIBILITY FOR ERRORS AND OMISSIONS
IN SHOP DRAWINGS, PRODUCT DATA, SAMPLES OR SIMILAR SUBMITTALS BY THE ARCHITECT'S
REVIEW.
JOSEPH L.
PURCELL III
13436330-0301
S T
OF
A T
E UTA
H
ARED CH
IT
E C T
N S
C E
L I
324 S. State St., Suite 400 Salt Lake City, UT 84111
800-678-7077 801-328-5151 fax: 801-328-5155 www.spectrum-engineers.com
STRUCTURALBHB
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
STAMPDESIGNER OF RECORD
7 8 9 10321 4 5 6
2766 South Main Street Salt Lake City, Utah 84115
801-355-5656 bhb@bhbengineers.com
SHEET TO BE VIEWED AND PRINTED IN COLOR
HCF Corporation 8184 South Highland Drive, Suite C-7
Sandy, Utah 84093 385-351-4886 https://hcfcorp.com
A u to d e s k D o c s /2
G ra n d J u n c ti o n V
A M
C E
H R
M I n fr a s tr u c tu re U p g ra d e s
D a ta
C e n te r/ E
H R
M I n fr a s tr u c tu re U p g ra d e s
D a ta
C e n te r G ra n d
J u n c ti o n
A rc h M o d e l.
rv t -F e b -2
:3
:4
P
M
CS004
GENERAL NOTES, SYMBOLS,
ABBREVIATIONS
EHRM INFRASTRUCTURE
UPGRADES DATA CENTER GRAND
JUNCTION
575-221
BLDG 34
06 FEB 2024 TP CJK
CONSTRUCTION
DOCUMENTS
GRAND JUNCTION, CO 81501
06 FEB 2024
ABBREVIATIONS/ACRONYMS
A.B. anchor bolt
A/C air conditioning
ABV above
ADA americans with disabilities act
ADD'L additional
AFF above finished floor
ALT alternate
ALUM aluminum
ANOD anodized
ANSI american national standards institute
APPR approved
APPROX approximate
ARCH architect(ural)
ASPH asphalt
AUTO automatic
BD board
BLDG building
BLK block
BO bottom of ________
BRG bearing
BSMT basement
BTWN between
CF cubic foot
CG center of gravity
CI cast iron
CJ construction joint
CL center line or column line
CLG ceiling
CLR clear(ance), category of logistical responsibility
CMU concrete masonry unit
COL column
CONC concrete
CONST construction
CONT continuous, continue
CPT carpet
CRS course(s)
CSMT casement
CY cubic yard
DE door elevation
DET detail
DF drinking fountain
DF-L douglas fir
DIA diameter
DIM dimension
DIV division
DL dead load
DOD department of defense
DPR dispenser
DR door
DWB deformed weldable bar
DWG drawing
E east
EA each
EJ expansion joint
ELEC electrical
ELEV, EL elevation
EMT electrical metallic tubing
EN edge nail
EQ equal
EQUIP equipment
EST estimate
EX existing
EXP expansion
EXT extinguisher f'c concrete 28 day strength f'm masonry strength
FD floor drain
FDN foundation
FE fire extinguisher
FEC fire extinguisher cabinet
FGL fiberglass
FHS fire hose station
FIN finish(ed)
FIN. FLR finished floor elevation
FP fireplace
FRT fire-retardant treated
FS footing step
FT feet
FTG footing
GA gage, guage
GALV galvanized
GB grab bar
GD grade(ing)
GF government furnished
GI government installed
GL glass
GLB glue laminated timber beam
GYP. BD. gypsum wall board
HAS headed anchor stud
HB hose bib
HC hollow core
HCAP handicap
HD holdown
HDR header
HDWR hardware
HM hollow metal
HOR horizontal
HR hour
HRDWD hardwood
HT height
HTG heating
HVAC heating/ventilating/air cond.
HWH hot water heater
ID inside diameter
INCL include(d), (ing)
INSUL insulate(d), (ion)
INT interior
JSN joint schedule number
JT joint
LAM laminate(d)
LAV lavatory
LF linear feet
LH left hand
LL live load
LP low pressure
LTL lintel
LVL laminated veneer lumber
LW lightweight
MAS masonry
MAT'L material(s)
MAX maximum
MB machine bolt
MBR member
MC medicine cabinet
MECH mechanic(al)
MED medium
MFR manufacture(r)
MIN minimum
MISC miscellaneous
MLB microllam beam
MMB membrane
MO masonry opening
MTL metal
MULL mullion
N north
NIC not in contract
No. number
NOM nominal
NTS not to scale
O.C. on center
OD outside diameter
OH overhead
OPG opening
OPP opposite
OPT optimum
PBD particle board
PCB polychlorinated biphenyls
PL plate
PNL panel
PSI pounds per square inch
PSIG pounds per square inch gauge
PT pressure treated or post tension
PTD painted
PTN partition
QTY quantity
R riser(s), radius
RAD radius
REA Rand Eardley & Associates
REINF'D reinforced
REQ'D required
REV revised
RM room
RO rough opening
S south
S.S. stainless steel
SCHED schedule(ed)
SECT section
SF square feet
SHT sheet
SIM similar
SPEC specifications
SQ square
STD standard
STG storage
STRUC structure(al)
SW shear wall
T tread(s)
T.O. top of ________
TC top of curb
TYP typical
UL underwriters laboratories
UNO unless noted otherwise
VB vapor barrier
VCT vinyl composition tile
VERT vertical
W west
W/ with
W/O without
WC water closet
WD wood
WF wide flange
WP water proof(ing)
WR water repellant
WS wall step
WSCT wainscot
WWF welded wire fabric
2021 IECC
CLIMATE ZONE 5B INSULATION REQUIREMENTS
ROOFS - INSULATION ENTIRELY ABOVE ROOF DECK: R-30CI
• (8) 1"LAYERS OF R-4 EXPANDED POLYSTYRENE = R-32
• (6) 1" LAYERS OF R-5 EXTRUDED POLYSTYRENE = R-30
• (4) 1" LAYERS OF R-7.5 FOIL-FACE POLYISOCYANRUATE = R-30
WALLS ABOVE GRADE - MASS: R-11.4CI
• (3) 1" LAYERS OF R-4 EXPANDED POLYSTYRENE = R-12
• (3) 1" LAYERS OF R-5 EXTRUDED POLYSTYRENE = R-15
• (2) 1" LAYERS OF R-7.5 FOIL-FACE POLYISOCYANRUATE = R-15
WALLS ABOVE GRADE - METAL FRAMED R-13 + R-10CI
• 4" FIBERGLASS BATT = R-16
• (3) 1" LAYERS OF R-4 RIGID = R-12
• (3) 1" LAYERS OF R-4 EXPANDED POLYSTYRENE = R-12
WALLS BELOW-GRADE: R-7.5CI
• (2) 1" LAYERS OF R-4 EXPANDED POLYSTYRENE = R-8
• (2) 1" LAYERS OF R-5 EXTRUDED POLYSTYRENE = R-10
• (2) 1" LAYERS OF R-7.5 FOIL-FACE POLYISOCYANRUATE = R-15
SLAB-ON-GRADE FLOORS - UNHEATED SLABS: R-15 FOR 24" BELOW
• (4) 1" LAYERS OF R-4 EXPANDED POLYSTYRENE = R-16
• (3) 1" LAYERS OF R-5 EXTRUDED POLYSTYRENE = R-15
• (2) 1" LAYERS OF R-7.5 FOIL-FACE POLYISOCYANRUATE = R-15
FIXED FENESTRATIONS: U-36 MIN.
16 APR 2025
F.E.F.E.C.
F .E
.C
NEW GATE LOCATION,
SEE CIVIL DRAWINGS
FOR ADDITIONAL
INFORMATION
JOSEPH L.
PURCELL III
13436330-0301
S T
OF
A T
E UTA
H
ARED CH
IT
E C T
N S
C E
L I
324 S. State St., Suite 400 Salt Lake City, UT 84111
800-678-7077 801-328-5151 fax: 801-328-5155 www.spectrum-engineers.com
STRUCTURALBHB
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
STAMPDESIGNER OF RECORD
7 8 9 10321 4 5 6
2766 South Main Street Salt Lake City, Utah 84115
801-355-5656 bhb@bhbengineers.com
SHEET TO BE VIEWED AND PRINTED IN COLOR
HCF Corporation 8184 South Highland Drive, Suite C-7
Sandy, Utah 84093 385-351-4886 https://hcfcorp.com
A u to d e s k D o c s /2
G ra n d J u n c ti o n V
A M
C E
H R
M I n fr a s tr u c tu re U p g ra d e s
D a ta
C e n te r/ E
H R
M I n fr a s tr u c tu re U p g ra d e s
D a ta
C e n te r G ra n d
J u n c ti o n
A rc h M o d e l.
rv t -F e b -2
:3
:4
P
M
CS005
ARCHITECTURAL LOCATION PLAN EHRM INFRASTRUCTURE
UPGRADES DATA CENTER GRAND
JUNCTION
575-221
BLDG 34
06 FEB 2024 TP CJK
CONSTRUCTION
DOCUMENTS
GRAND JUNCTION, CO 81501
06 FEB 2024
NORTH 1" = 50'-0"1
ARCHITECTURAL SITE PLAN
0' 25' 50' 100' 200'
GRAPHIC SCALE 1" = 50'-0"
F
MM MM
MM MM
MM MM MM R
CM
R
UPF.E.
F.E.C.
F .E
.C
F.E.
F.E.
AB
C
D
228.71 ft²
4 WORK STATIONS /
STORAGE (SRE01)
295.34 ft²
RECEPT / 2 WORK
STATIONS
192.77 ft²
4 WORK STATIONS
105B
181.24 ft²
TELE. / ELEC.
1,153.24 ft²
MAIN COMPUTER
ROOM (MCR)
212.26 ft²
ENTRY ROOM
147.24 ft²
OFFICE / OIT CHIEF
196.52 ft²
4 WORK STATIONS
105A
315.52 ft²
CORRIDOR
/2
6'
5'
/2
0"
51' - 0"
11' - 11 1/2" 25' - 9" 13' - 3 1/2"
ADDITION
51' - 0"
A D
D
IT
IO
N
/2
71' - 3"
16 sec
EXIT
7' - 5 3/4"
5'
D E
A D
-E N
D C
O R
R
ID
O R
5' - 0"
NOT IN SCOPE
RM 1426A
NOT IN SCOPE
CORR 1429
NOT IN SCOPE
RM 1425
NOT IN SCOPE
RM 1419
NOT IN SCOPE
STAIR 5
RM 1428
EXIT
NOT IN SCOPE
08.01
28' - 9"
7 sec
36' - 9"
8 sec
10.02
D
IA
G O
N A
L D
IS
TA
N C
E
EXIT SEPERATIO
N DISTANCE
26' - 9 13/16"
08.01
08.01
01.05
10.01
10.03
07.30
07.30
LIFE SAFETY EGRESS PATH
EXISTING 2-HOUR RATED FIRE BARRIER WALL
LIFE SAFETY PLAN LEGEND
TRAVEL DISTANCE TO PORTABLE FIRE EXTINGUISHER
1-HOUR RATED FIRE BARRIER WALL
LIFE SAFETY PLAN GENERAL NOTES
1. ALL CORRIDOR WALLS EXTEND TO UNDERSIDE OF STRUCTURE AND ARE SEALED TO
PREVENT THE PASSAGE OF SMOKE.
2. ALL TEMPORARY CONSTRUCTUION BARRIERS SHALL MAINTAIN EMERGENCY EGRESS
ROUTES THROUGHOUT CONSTRUCTION PROCESS.
3. TO CONFORM WITH STATION POLICY SOP 575-138-1042, CONTRACTOR’S SITE
SUPERVISOR SHALL IDENTIFY ALL FIREWALL AND SMOKE PARTITIONS PRIOR TO
STARTING WORK AND REQUEST FROM THE COR A PERMIT AUTHORIZING THE WORK.
THIS REQUIREMENT MUST BE COMMUNICATED TO ALL CONTRACTOR PERSONNEL AND
SUBCONTRACTORS THAT WORK ON THE PROJECT. AT THEN END OF EACH WORK DAY,
CONTRACTOR’S SITE SUPERVISOR SHALL PERFORM AN INSPECTION TO ENSURE THAT
ANY FIREWALL AND/OR SMOKE PARTITION PENETRATIONS HAVE BEEN PROPERLY
REPAIRED, AND MAKE ANY NECESSARY REPAIRS BEFORE LEAVING THE SITE. WHEN
WORK ON THE FIRE/SMOKE BARRIERS IS COMPLETE, CONTRACTOR MUST REQUEST AN
INSPECTION FROM THE COR TO CLOSE OUT THE PERMIT. CONTRACTOR IS
RESPONSIBLE FOR SCHEDULING THE INSPECTION BEFORE THE WORK IS COVERED.
CONTRACTOR WILL BE REQUIRED TO UNCOVER UNINSPECTED WORK AND REPLACE IT
AT NO COST TO THE GOVERNMENT.
4. CONTRACTOR TO MAINTAIN CONTINUITY OF ALL FIRE RATED ASSEMBLIES BY ENSURING
ALL PENETRATIONS ARE TREATED WITH PRODUCTS LISTED FOR THE APPROPRIATELY
RATED CONDITION. PRODUCTS SHOULD BE APPROVED BY THE FACILITY. THE GRAND
JUNCTION VA PREFERS THE USE OF 3M FIRE PROTECTION PRODUCTS OR EQUIVALENT.
1,316.74 ft²
ADDITION AREA
1,653.49 ft²
EXISTING BLDG 34
GROSS SQ. FT.
ADDITION AREA
EXISTING BLDG 1
EXISTING BLDG 34
NOT IN SCOPE
361.71 ft²
EXISTING BLDG 1
1,185.47 ft²
ADDITION AREA
1,566.23 ft²
EXISTING BLDG 34
310.64 ft²
EXISTING BLDG 1
NET SQ. FEET
ADDITION AREA
EXISTING BLDG 1
EXISTING BLDG 34
NOT IN SCOPE
NFPA 101 CODE ANALYSIS
CHAPTER 4 GENERAL
4.4.2 PRESCRIPTIVE BASED OPTION
CHAPTER 6 CLASSIFICATION OF OCCUPANCY AND HAZARD CONTENTS
CHAPTER 38 NEW BUSINESS OCCUPANCIES
CHAPTER 39 EXISTING BUSINESS OCCUPANCIES
NFPA 5000 TABLE 7.4.1
ALLOWABLE AREA: 23,000 SF
ALLOWABLE HEIGHT: 75 FT
MAX STORIES: 5
CONSTRUCTION - TYPE II (000) (NFPA 220 TABLE 4.1.1)
FIRE RESISTANCE FOR BUILDING ELEMENTS (TABLE 8.2.1.2):
BUILDING ELEMENT RATING REQ'D PROVIDED
EXTERIOR BEARING WALL: 0 HR 0 HR
INTERIOR BEARING WALL: 0 HR 0 HR
COLUMNS:
• TUBE STEEL: 0 HR 0 HR
BEAMS, GIRDERS, TRUSSES: 0 HR 0 HR
FLOOR CONSTRUCTION: 0 HR 0 HR
ROOF CONSTRUCTION: 0 HR 0 HR
EXTERIOR NON-BEARING WALL: 0 HR 0 HR
6.2 HAZARD OF CONTENTS: LOW HAZARD
CHAPTER 7 MEANS OF EGRESS
OCCUPANT LOAD (7.3.1.2): 150 SF / OCC
OCCUPANT COUNT: 3062 SF / 150 = 21 OCC
TOTAL OCCUPANTS: 21
EGRESS CAPACITY (7.3.3):
• STAIRWAYS: NA
• DOORS: 32" MIN CLEAR WIDTH PER LEAF
• CORRIDORS: 36" MIN
NUMBER OF MEANS OF EGRESS (7.4): 2 REQ'D, 2 PROVIDED
ARRANGEMENT OF MEANS OF EGRESS (7.5):
• DEAD END CORRIDORS (38.2.5.3): 50 FT MAX
• COMMON PATH OF TRAVEL (38.2.5.3.1): 100 FT MAX
• TRAVEL DISTANCE (38.2.6.3): 300 FT MAX
• CORRIDORS WITH SPRINKLER SYSTEM (38.3.6.1): NO RATING
• OPENINGS: NO RATING
• ENCLOSURE AND PROTECTION OF STAIRS (7.2.2.5): NA
• VERTICAL OPENINGS: NA
• FLOOR SMOKE BARRIERS (8.6.1): NA
• SHAFTS (8.6.5): NA
FIRE DOORS AND WINDOW (TABLE 8.3.4.2):
• ELEVATOR HOISTWAYS: NA
• STAIRWAYS: NA
• 1-HR FIRE BARRIERS: 3/4 HR
• 2-HR FIRE BARRIERS: 1-1/2 HR
• SMOKE BARRIERS: 1/3 HR
CHAPTER 9 FIRE PROTECTION SYSTEMS
FIRE SPRINKLER SYSTEM TO BE PROVIDED PER 903.1
HAZARDOUS AREAS (38.3.2): NONE
BUILDING CODE ANALYSIS
PROJECT NAME: GJVA EHRM DATA CENTER
ADDITIONS AND LEVEL 3 ALTERATIONS
CODE YEAR: 2021
BUILDING DATA
STORY: 1
EXISTING: BLDG 34 DATA CENTER = 1649 SF
ADDITION: MAIN COMPUTER ROOM = 1317 SF
TOTAL AREA = 2966 SF
BUSINESS OCCUPANCY
SPRINKLER TYPE: NFPA 13
TYPE OF CONSTRUCTION: II (000)
HIGH RISE: NO
PLUMBING - ALL LOCATED ADJACENT BUILDING 1
REQUIRED PLUMBING FIXTURES
FIXTURES BY FLOOR
STORY: 1
OCCUPANCY GROUP: B
OCCUPANCY LOAD: 23
WATER CLOSETS:
• MALE: 1
• FEMALE: 1
LAVATORIES:
• MALE: 1
• FEMALE: 1
BATHTUBS AND SHOWERS: 0
DRINKING FOUNDTAINS: 1
FIXTURE RATIO
WATER CLOSETS:
• MALE: 1 PER 25 FOR FIRST 50 AND 1 PER 50 FOR REMAINDER EXCEEDING 50
• FEMALE: 1 PER 25 FOR FIRST 50 AND 1 PER 50 FOR REMAINDER EXCEEDING 50
LAVATORIES:
• MALE: 1 PER 40 FOR FIRST 80 AND 1 PER 50 FOR REMAINDER EXCEEDING 80
• FEMALE: 1 PER 40 FOR FIRST 80 AND 1 PER 50 FOR REMAINDER EXCEEDING 80
BATHTUBS AND SHOWERS: 0
DRINKING FOUNTAINS: 1 PER 100
JOSEPH L.
PURCELL III
13436330-0301
S T
OF
A T
E UTA
H
ARED CH
IT
E C T
NS
C E
L I
324 S. State St., Suite 400 Salt Lake City, UT 84111
800-678-7077 801-328-5151 fax: 801-328-5155 www.spectrum-engineers.com
STRUCTURALBHB
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
STAMPDESIGNER OF RECORD
7 8 9 10321 4 5 6
2766 South Main Street Salt Lake City, Utah 84115
801-355-5656 bhb@bhbengineers.com
SHEET TO BE VIEWED AND PRINTED IN COLOR
HCF Corporation 8184 South Highland Drive, Suite C-7
Sandy, Utah 84093 385-351-4886 https://hcfcorp.com
A u to d e s k D o c s /2
G ra n d
J u n c ti o n
V A
M C
E H
R M
I n fr a s tr u c tu re U p g ra d e s
D a ta C e n te r/ E
H R
M I n fr a s tr u c tu re U p g ra d e s
D a ta C e n te r
G ra n d
J u n c ti o n
A rc h
M o d e l.
rv t
/7 /2
:2
:1
P M
LP101
FIRST FLOOR LIFE SAFETY PLAN
AND BUILDING ANALYSIS
EHRM INFRASTRUCTURE
UPGRADES DATA CENTER GRAND
JUNCTION
575-221
BLDG 34
06 FEB 2024 TP CJK
CONSTRUCTION
DOCUMENTS
GRAND JUNCTION, CO 81501
06 FEB 2024
NORTH 1/4" = 1'-0"3
1ST FLOOR LIFE SAFETY PLAN
NORTH 1/16" = 1'-0"1
1ST FLOOR GROSS AREA PLAN
AREA - GROSS SQUARE FEET
AREA NAME AREA
ADDITION AREA 1,316.74 ft²
EXISTING BLDG 1 361.71 ft²
EXISTING BLDG 34 1,653.49 ft²
TOTAL GROSS
AREA
3,331.94 ft²
APPROVED STATE BUILDING CODES
2021 INTERNATIONAL BUILDING CODE (IBC)
2021 EXISTING BUILDING CODE
2021 NFPA 101
2021 NFPA 220
2021 NFPA 5000
0' 2' 4' 8' 16'
GRAPHIC SCALE 1/4" = 1'-0"
1'
0' 8' 16' 32' 64'
GRAPHIC SCALE 1/16" = 1'-0"
4'
NORTH 1/16" = 1'-0"2
1ST FLOOR NET AREA PLAN
AREA - NET SQUARE FEET
AREA NAME AREA
ADDITION AREA 1,185.47 ft²
EXISTING BLDG 34 1,566.23 ft²
EXISTING BLDG 1 310.64 ft²
TOTAL NET AREA 3,062.34 ft²
NOTE: TEMPORARY EGRESS ROUTES DURING CONSTRUCTION
WILL BE BASED ON CONSTRUCTION PHASING, YET TO BE
DETERMINED
KEYED NOTES
01.05 EXTERIOR AREA OF ASSISTED RESCUE
07.30 MAINTAIN CONTINUITY OF EXISTING FIRE RATED WALL ASSEMBLY BY
PROVIDING A RATED JUNCTION BOX ASSEMBLY
08.01 INSTALL ADA COMPLIANT DOOR OPENER AND PUSH BUTTON FOR
ACCESSIBILITY
10.01 RECESSED FIRE EXTINGUISHER CABINET, MINIMUM 27" (H) x 12" (D) x 8" (W), WITH CLASS A 2.5 GALLON PRESSURIZED WATER EXTINGUISHER, LABELED
CLASS A, WITH MARKINGS THAT MEET NFPA 10 STANDARDS, INSTALLED SO
THAT TOP OF EXTINGUISHER IS NO MORE THAN 5' ABOVE FINISHED FLOOR
10.02 WALL MOUNTED TYPE C 5 LB. PORTABLE FIRE EXTINGUISHER, LABELED
CLASS C, WITH MARKING THAT MEET NFPA 10 STANDARDS, INSTALLED SO
TOP OF EXTINGUISHER IS NO MORE THAN 5' ABOVE FINISHED FLOOR
10.03 RECESSED FIRE EXTINGUISHER CABINET, MINIMUM 27" (H) x 12" (D) x 8" (W), WITH CLASS C 2.5 GALLON CLEAN AGENT EXTINGUISHER, LABELED CLASS C, WITH MARKINGS THAT MEET NFPA 10 STANDARDS, INSTALLED SO THAT TOP
OF EXTINGUISHER IS NO MORE THAN 5' ABOVE FINISHED FLOOR
L 1DP1
P
CONTRACTOR
STAGING
AREAS
CONTRACTOR IS RESPONSIBLE TO PROTECT IN
PLACE FOUR 4 BY 4 POSTS DURING CONSTRUCTION.
IF ANY DAMAGE OCCURS DURING CONSTRUCTION,
CONTRACTOR IS RESPONSIBLE TO REPLACE THE
POSTS. CONTRACTOR IS RESPONSIBLE TO PROVIDE
PICNIC BACK TO VA DURING CONSTRUCTION.
KEEP FENCING A MINIMUM OF 6 INCHES
AWAY FROM EXISTING SITE LIGHTING.
No.
7690241-2202
WILLIAM
N. FELT
L
IC
E N
S E D
PROFESS IONAL
E N G
I N E
E R
STATE OF UTAH
324 S. State St., Suite 400 Salt Lake City, UT 84111
800-678-7077 801-328-5151 fax: 801-328-5155 www.spectrum-engineers.com
STRUCTURALBHB
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
STAMPDESIGNER OF RECORD
7 8 9 10321 4 5 6
2766 South Main Street Salt Lake City, Utah 84115
801-355-5656 bhb@bhbengineers.com
SHEET TO BE VIEWED AND PRINTED IN COLOR
HCF Corporation 8184 South Highland Drive, Suite C-7
Sandy, Utah 84093 385-351-4886 https://hcfcorp.com 2024-02-07
A u to d e s k D o c s /2
G ra n d J u n c ti o n
V A
M C
E H
R M
I n fr a s tr u c tu re U p g ra d e s
D a ta C e n te r/
-E le c C e n tr a l.
rv t
/1
/2
:0
:4
P
M
HA101
GENERAL INFORMATION SITE
PLAN
EHRM INFRASTRUCTURE
UPGRADES DATA CENTER GRAND
JUNCTION
575-221
BLDG 34
16 APR 2025 WNF PSS
CONSTRUCTION
DOCUMENTS
GRAND JUNCTION, CO 81501
NORTH 1" = 30'-0"F1
GENERAL INFORMATION SITE PLAN
AB
C
D
No.
7690241-2202
WILLIAM
N. FELT
L
IC
E N
S E D
PROFESS IONAL
E N G
I N E
E R
STATE OF UTAH
324 S. State St., Suite 400 Salt Lake City, UT 84111
800-678-7077 801-328-5151 fax: 801-328-5155 www.spectrum-engineers.com
STRUCTURALBHB
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
STAMPDESIGNER OF RECORD
7 8 9 10321 4 5 6
2766 South Main Street Salt Lake City, Utah 84115
801-355-5656 bhb@bhbengineers.com
SHEET TO BE VIEWED AND PRINTED IN COLOR
HCF Corporation 8184 South Highland Drive, Suite C-7
Sandy, Utah 84093 385-351-4886 https://hcfcorp.com 2024-02-07
A u to d e s k D o c s /2
G ra n d J u n c ti o n
V A
M C
E H
R M
I n fr a s tr u c tu re U p g ra d e s
D a ta C e n te r/
-E le c C e n tr a l.
rv t
/1
/2
:0
:4
P
M
HA102
1ST FLOOR ASBESTOS
ABATEMENT PLANS
EHRM INFRASTRUCTURE
UPGRADES DATA CENTER GRAND
JUNCTION
575-221
BLDG 34
16 APR 2025 WNF PSS
CONSTRUCTION
DOCUMENTS
GRAND JUNCTION, CO 81501
1 REFER TO SPECIFICATION SECTION 02 82 11 FOR PROCEDURES. PREPARE ALL
ACM BEFORE REMOVEL.
2 REMOVE ALL ASBESTOS CONTAINING MATERIAL.
GENERAL SHEET NOTES
SHEET KEYNOTES
NORTH 1/4" = 1'-0"F1
1ST FLOOR ASBESTOS ABATEMENT PLAN
1 REMOVE ASBESTOS CONTAINING MATERIAL, ALL DRY WALL IN ROOM.
2 REMOVED ASBESTOS CONTAINING MATERIAL, DOOR FRAME.
L 1DP1
AB
C
D
No.
7690241-2202
WILLIAM
N. FELT
L
IC
E N
S E D
PROFESS IONAL
E N G
I N E
E R
STATE OF UTAH
324 S. State St., Suite 400 Salt Lake City, UT 84111
800-678-7077 801-328-5151 fax: 801-328-5155 www.spectrum-engineers.com
STRUCTURALBHB
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
STAMPDESIGNER OF RECORD
7 8 9 10321 4 5 6
2766 South Main Street Salt Lake City, Utah 84115
801-355-5656 bhb@bhbengineers.com
SHEET TO BE VIEWED AND PRINTED IN COLOR
HCF Corporation 8184 South Highland Drive, Suite C-7
Sandy, Utah 84093 385-351-4886 https://hcfcorp.com 2024-02-07
A u to d e s k D o c s /2
G ra n d J u n c ti o n
V A
M C
E H
R M
I n fr a s tr u c tu re U p g ra d e s
D a ta C e n te r/
-E le c C e n tr a l.
rv t
/1
/2
:0
:5
P
M
HA103
CONCEPTUAL SEQUENCING
MAJOR CONSTRUCTION PLAN
EHRM INFRASTRUCTURE
UPGRADES DATA CENTER GRAND
JUNCTION
575-221
BLDG 34
16 APR 2025 WNF PSS
CONSTRUCTION
DOCUMENTS
GRAND JUNCTION, CO 81501
GENERAL SEQUENCE OF
OVERALL WORK
NORTH 1/4" = 1'-0"F1
CONCEPTUAL SEQUENCING MAJOR CONSTRUCTION PLAN
1 BUILD NEW DATA CENTER. BUILD NEW ENTERY ROOM. REFINISH OIT
RECEPTION ROOM. UPGRADE ELECTRICAL SYSTEM TO SUPPORT
NEW DATA CENTER. PROVIDE NEW CRAC UNITS AND HVAC TO
SUPPORT NEW DATA CENTER. OLD DATA CENTER IS TO REMAIN
OPERATIONAL DURING PHASE 1. ALSO, OPEN OFFIC SPACE IS TO
REMAIN FUNCTIONAL DURING CONSTRUCTION OF PHASE 1.
CONTRACTOR TO PROVIDE PROTECTION FOR ACCESS TO AND
FROM SAID SPACES DURNING CONSTRUCTION. GENERAL
CONTRACTOR IS CONNECT ALL CAMPUS DATA TO NEW DATA
CENTER AND IS TO COMMISSION DATA CENTER BEFORE PHASE 2 IS
TO BEGIN.
2 DEMOLISH OLD DATA CENTER AND REMAINING OFFICE SPACE.
BUILD NEW OFFICE SPACE AS SHOWN ON THE DRAWINGS.
RECEPTION ROOM AND NEW DATA CENTER ARE TO REMAIN
OPERATIONAL DURING THE CONSTRUCTION OF THIS PHASE.
3 FOR MORE DETAILED TELECOMMUNICATIONS COORDINATION AND
SEQUENCING SEE SHEETS ET102, ET103, AND ET601. THESE SHEETS
INCLUDE SEQUENNCING AND COORDINATION WITH OTHER EHRM
PROJECTS THAT ARE EXPECTED TO BE COMPLETE BEFORE THIS
PROJECT. THIS EHRM PROJECT WILL BE UPDATING THE FIBER
BACKBONE THROUGH-OUT THE CAMPUS.
4 FOR MORE DETAILED ELECTRICAL DISTRIBUTION SEQUENCING SEE
SHEETS ED101, EP101, AND EP601. THESE SHEETS DETAIL HOW TO
GET TEMPORARY POWER TO THE OLD DATA CENTER, WHILE THE
NEW DATA CENTER IS BEING CONSTRUCTED.
GENERAL
1. CONTRACTING OFFICER REPRESENTATIVE (COR) AND OWNER'S
REPRESENTATIVE ARE THE SAME
2. IF THE FOLLOWING NOTES CONFLICT WITH THE SPECIFICATIONS, THE
SPECIFICATIONS SHALL PREVAIL UNLESS OTHERWISE DIRECTED BY THE
CONTRACTING OFFICER REPRESENTATIVE (COR).
3. ALL DIMENSIONS ARE TAKEN FROM CURB FACE, BUILDING FACE, OR EDGE OF
PAVING, UNLESS OTHERWISE NOTED ON PLAN. THE DIMENSION ARE SHOWN
FOR APPROXIMATE LINE AND ALL RADII AND CURVES ARE TO HAVE CONTINUOUS
AND SMOOTH TRANSITIONS WITHOUT ABRUPT CHANGES OR BENDS.
4. ALL FORMS AND ALIGNMENT OF PAVING ARE SUBJECT TO REVIEW BY OWNER'S
REPRESENTATIVE PRIOR TO POURING FOR APPROVAL. CONTRACTOR SHALL
GIVE A MINIMUM OF 48 HOURS NOTICE.
5. CONTRACTOR SHALL VERIFY LOCATION OF ALL UTILITIES PRIOR TO
CONSTRUCTION AND SHALL BE HELD LIABLE FOR ALL DAMAGES INCURRED.
CONTRACTOR SHALL REPLACE ANY DAMAGED UTILITIES TO THE OWNER'S OR
OWNER'S REPRESENTATIVE'S SATISFACTION AT NO ADDITIONAL COST TO
OWNER.
6. NOT USED
7. EXPANSION JOINTS SHALL BE PROVIDED WHERE CONCRETE FLAT WORK ABUTS
WALLS, STAIRS, BUILDINGS, CURBS, COLUMNS, AND ANY EXISTING CONCRETE
PAVING OR STRUCTURE UNLESS OTHERWISE NOTED.
8. ALL EXPANSION JOINTS SHALL BE AS PER VETERANS AFFAIRS STANDARDS.
9. ALL CONSTRUCTION AND WORKMANSHIP SHALL CONFORM TO THE LATEST
VETERAN AFFAIRS STANDARDS.
10. THESE NOTES SHALL BE USED IN CONJUNCTION WITH THE PLANS, DETAILS, AND
SPECIFICATIONS. ANY DISCREPANCIES SHALL BE BROUGHT TO THE ATTENTION
OF AND RESOLVED WITH THE COR.
11. CONTRACTOR SHALL CHECK ALL DIMENSIONS, FRAMING CONDITIONS, AND SITE
CONDITIONS BEFORE STARTING WORK. COR SHALL BE NOTIFIED IMMEDIATELY
OF ANY DISCREPANCIES OR POSSIBLE DEFICIENCIES.
12. CONDITIONS NOT SPECIFICALLY SHOWN SHALL BE CONSTRUCTED SIMILAR TO
THE DETAILS FOR THE RESPECTIVE MATERIAL AND/OR MANUFACTURE'S
RECOMMENDATIONS AND SPECIFICATIONS.
13. DRAWINGS AND SPECIFICATIONS REPRESENT THE FINISHED WORK. ALL
BRACING, TEMPORARY SUPPORTS, SHORING, ETC. IS THE SOLE RESPONSIBILITY
OF THE CONTRACTOR. OBSERVATION VISITS TO THE JOB SITE BY COR DO NOT
INCLUDE INSPECTION OF CONSTRUCTION METHODS AND SAFETY CONDITIONS
AT THE WORK SITE. THESE VISITS SHALL NOT BE CONSTRUED AS CONTINUOUS
AND DETAILED INSPECTIONS.
14. DESIGN, MATERIALS, EQUIPMENT, AND PRODUCTS OTHER THAN THOSE
DESCRIBED BELOW OR INDICATED ON THE DRAWINGS MAY BE CONSIDERED FOR
USE, PROVIDED PRIOR APPROVAL IS OBTAINED FROM THE DESIGN
PROFESSIONAL AND COR.
15. NOT USED
16. WHERE WATER PROOFING IS INDICATED ON THE PLANS OR DETAILS FOR
RETAINING WALLS, PLANTER WALLS, FLASH WALLS OR ANY OTHER VERTICAL
WHERE WATER PROOFING IS INDICATED ON THE PLANS OR DETAILS FOR
MOISTURE BARRIER, THE WATERPROOFING SHALL CONSIST OF YELLOW JACKET
MEMBRANE AND AN APPROVED WATER PROOFING COMPOUND SUCH AS
THOROSEAL UNLESS OTHERWISE NOTE ON PLANS AND DETAILS.
17. COORDINATE DOWN TIME OF UTILITIES WITH COR. PROVIDE A MINIMUM OF 72
HOUR NOTICE PRIOR TO SHUT DOWN OR ACCORDING TO SPECIFICATION,
WHICHEVER IS GREATER.
18. CONTRACTOR SHALL PROVIDE SUBMITTALS OF ALL EQUIPMENT, SEATS, SITE
FURNISHINGS, SHADE STRUCTURES, ETC. AS PER THE CONTRACT DOCUMENTS
PRIOR TO CONSTRUCTION FOR APPROVAL. FOR VERIFICATION OF COLOR,
CONTRACTOR SHALL SUBMIT ACTUAL SAMPLES OF COLOR AS PART OF THE
SUBMITTAL PACKAGE.
19. CONTRACTOR SHALL COMPLETE WORK AND COORDINATE LOUD WORK ONLY
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .