Att 14 - ED102 - Addendum 1.pdf
PDF 433 KB Posted
- Attached to
- 575-221 - EHRM Infrastructure Upgrades Construction - Tier 2 Data Center - Grand Junction, CO Federal contract opportunity
- Solicitation number
- 36C77625B0038
About this file
This document is an electrical demolition plan (Drawing ED102) for the EHRM Infrastructure Upgrades Data Center project at the Grand Junction VA Medical Center in Colorado. The detailed floor plan shows the first floor electrical feeder demolition layout, with specific instructions for removing electrical infrastructure, including lighting fixtures, devices, equipment, conduits, and wiring. Key demolition notes include requirements to salvage certain equipment for the owner, verify inactive equipment before removal, re-route active raceways, maintain fire alarm system functionality, remove abandoned electrical components, and trace and label existing loads that will need to be re-fed from new panels in a subsequent construction phase. The drawing is part of construction documents issued on 16 April 2025, prepared by HCF Corporation and Spectrum Engineers for the U.S. Department of Veterans Affairs Office of Construction and Facilities Management.
View the file
Other files for this federal contract opportunity
Show all 21
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
S−5
S
104 103
14231422 1411B
141814121420
1426A
142514191417
1411A
1410 14081406
1241 1235
1243 1240 1239
1237 S-41236
12021212
1211 1210
12051206
12031204
S-3 P-2 P-1
1007A
1020101810131011
10021021
1001A
1708 1703A
1666A
16321631
16361637
1678A 1678 1686A
16811680
1694 1693
16911690
17071706
169917001668
1695 16971669
140914071405 1401
1645 16461647 1648 1649 1676 1677
1657B
1657A
16531672
1619A
1619B
1658B
16081606 1604
1603 1600
P-3
1663A
16131612A 1612B
1658A
16591660
1603A
1007B
STAIR 9 STAIR 8
STAIR 7
STAIR 5 STAIR 6
STAIR 1
STAIR 2
STAIR 3
STAIR 4
STORAGE
AMBULANCE BAY
1612A
1612B1612C
C R
EXISTING POWER FEEDERS IN
CRAWLSPACE/BASEMENT.
REMOVE EXISTING
CONDUCTOR, INSTALL NEW
PULL CORDS, AND CAP ENDS
FOR FUTURE USE.
"ATS-34"
"DPQ"(EX) PANEL
"EPD2"
"OIT"
"MSA"(EX)
(EX) PANEL
(EX) PANEL
"ATS"(EX)
(EX) SUBSTATION
(EX) PANEL "EDP1"
EXISTING POWER FEEDERS IN
CRAWLSPACE/BASEMENT AND
UNDERGROUND. REMOVE
EXISTING CONDUCTOR,
INSTALL NEW PULL CORDS,
AND CAP ENDS FOR FUTURE
USE.
No.
7690241-2202
WILLIAM
N. FELT
L
IC
E N
S E D
PROFESS IONAL
E N G
I N E
E R
STATE OF UTAH
324 S. State St., Suite 400 Salt Lake City, UT 84111
800-678-7077 801-328-5151 fax: 801-328-5155 www.spectrum-engineers.com
STRUCTURALBHB
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
STAMPDESIGNER OF RECORD
7 8 9 10321 4 5 6
2766 South Main Street Salt Lake City, Utah 84115
801-355-5656 bhb@bhbengineers.com
SHEET TO BE VIEWED AND PRINTED IN COLOR
HCF Corporation 8184 South Highland Drive, Suite C-7
Sandy, Utah 84093 385-351-4886 https://hcfcorp.com 2024-02-07
A u to d e s k D o c s /2
G ra n d J u n c ti o n
V A
M C
E H
R M
I n fr a s tr u c tu re U p g ra d e s
D a ta C e n te r/
-E le c C e n tr a l.
rv t
/2
/2
:4
:5
P
M
ED102
1ST FLOOR ELECTRICAL FEEDER
DEMOLITION PLAN
EHRM INFRASTRUCTURE
UPGRADES DATA CENTER GRAND
JUNCTION
575-221
BLDG 34
16 APR 2025 WNF SJT, PSS
CONSTRUCTION
DOCUMENTS
GRAND JUNCTION, CO 81501
1 UNLESS NOTED OTHERWISE REMOVE ALL LIGHTING FIXTURES DEVICES AND
EQUIPMENT SHOWN DASHED. REMOVE CONDUIT AND WIRING BACK TO PANELBOARD
OF ORIGIN OR TO FIRST ACTIVE DEVICE THAT REMAINS.
2 SALVAGE ALL LIGHT FIXTURES, TWIST-LOCK RECEPTACLES AND WALLPLATES, CEILING
SPEAKERS AND SECURITY AND FIRE ALARM DEVICES TO OWNER. PROTECT SALVAGED
EQUIPMENT FROM DAMAGE.
3 PRIOR TO SUBMITTING BID, VISIT THE SITE AND FIELD VERIFY THE EXTENT OF
ELECTRICAL DEMOLITION WORK TO MEET THE INTENT OF THE BID DOCUMENTS AND
INCLUDE ALL COSTS IN BID.
4 PRIOR TO REMOVAL OF ANY ELECTRICAL EQUIPMENT OR WIRING, FIELD VERIFY THAT
THE EQUIPMENT OR WIRING IS INACTIVE OR NO LONGER IN USE.
5 REMOVE ALL DEVICES, RACEWAYS AND WIRING FROM WALLS TO BE REMOVED. WHERE
ACTIVE RACEWAYS OCCUR IN WALLS TO BE REMOVED, RE-ROUTE THE RACEWAY WITH
ASSOCIATED WIRING TO KEEP THE CIRCUIT OPERATIONAL.
6 REMOVE ALL FIRE ALARM DEVICES WHERE EXISTING WALLS AND CEILINGS ARE BEING
REMOVED, WITH ASSOCIATED CONDUIT AND WIRING. EXISTING FIRE ALARM DEVICES
AND SYSTEM NOT INDICATED FOR REMOVAL SHALL REMAIN ACTIVE THROUGHOUT
DEMOLITION AND CONSTRUCTION UNTIL THE NEW SYSTEM IS TESTED AND
OPERATIONAL. MAINTAIN ALL CLASS A FIRE ALARM INITIATING AND INDICATING LOOPS
WHERE EXISTING DEVICES ARE REMOVED.
7 REMOVE ALL ABANDONED RACEWAY, CONDUIT, WIRING AND CABLING WHETHER
ABANDONED PREVIOUS TO THIS PROJECT OR AS A RESULT OF THIS PROJECT. NOT ALL
ABANDONED ITEMS ARE SHOWN ON THESE PLANS AND FIELD VERIFICATION OF
DEMOLITION SCOPE EXTENT IS REQUIRED.
8 DEVICES MARKED "RR" ARE TO BE REMOVED AND RELOCATED PER NEW PLANS.
EXTEND CIRCUITING AS REQUIRED FOR RELOCATION.
9 REFER TO ARCHITECTURAL DRAWINGS FOR REMOVAL OF MOTORS, CONDUIT,
CONDUCTOR AND CONTROL WIRING ASSOCIATED WITH EXISTING MOTORIZED DOORS,
PARTITIONS AND LIGHTING.
10 DEMOLISH ALL DATA AND WI-FI ACCESS POINTS WHETHER SHOWN ON DRAWINGS OR
NOT WITHIN SCOPE OF WORK AREA.
11 REMOVE FEEDERS FOR ALL DEMOLISHED PANELS, DISCONNETS, ETC. BACK TO
SOURCE
12 ALL ITEMS INDICATED TO REMAIN SHALL BE PROTECTED DURING ALL PHASES OF
CONSTRUCTION.
13 CONTRACTOR TO TRACE AND LABEL ALL EXISTING LOADS TO REMAIN, THAT ARE
CURRENTLY FED FROM PANELS THAT ARE BEING DEMOLISHED IN THIS PHASE. THESE
LOADS TO BE RE-FED FROM NEW PANELS IN NEXT PHASE.
14 ALL HVAC UNITS TO BE REMOVED BY MECHANICAL CONTRACTOR UNLESS NOTED
OTHERWISE. REMOVE ALL ASSOCIATED RACEWAYS AND CONDUCTORS BACK TO
SOURCE.
15 REMOVE ALL DATA DEVICES AND ASSOCIATED PATHWAYS AND CABLING FROM WAO
LOCATION TO POINT OF ORIGIN IN THE TR. RETURN ANY ACTIVE NETWORK
COMPONENTS THAT WERE REMOVED, AS PART OF THE DEMOLITION WORK, TO THE VA
IT STAFF (IE WIRELESS ACCESS POINTS, ETC.).
GENERAL SHEET NOTES
SHEET KEYNOTES
NORTH 1" = 20'-0"F4
1ST FLOOR ELECTRICAL FEEDER DEMOLITION PLAN
Revisions: Date:
Addendum 1 07/25/2025
| Sheets |
| ED102 - 1ST FLOOR ELECTRICAL FEEDER DEMOLITION PLAN |
File details come from the government source that posted it. Updated .