Att 08 TDL CDRL attachment COR_TPOC.xlsx

XLSX spreadsheet 59 KB Posted

Attached to
NAWCAD WOLF Aegis
Solicitation number
N00421-25-R-0004
Issued by

About this file

This Excel document is a Technical Direction Letter (TDL) CDRL attachment template for a Contracting Officer's Representative (COR) management report. The template is designed for tracking and reporting contract performance across multiple technical direction letters, with detailed sections for labor, travel, material purchases, and other direct costs. Each TDL (Technical Direction Letter) includes comprehensive financial tracking, including funded amounts, expenditures, estimated at completion (EAC), and monthly funding breakdowns.

The template requires contractors to provide detailed reporting on six key areas: (a) progress against milestones, (b) problem area identification, (c) schedule status, (d) deliverable status, (e) upcoming activity plans, and (f) subcontractor information. The document is associated with a Naval Air Warfare Center Aircraft Division (NAWCAD) procurement for the Webster Outlying Field (WOLF) Ship & Air Integrated Warfare (SAIW) Division, specifically for an Aegis Radio Communication System (RCS) procurement. The template supports tracking of contract performance with granular financial and operational details across multiple technical direction letters.

View the file

Other files

File Type Posted
N00421-25-R-0004 Draft RFP Final.pdf PDF
Att 01 DD254.pdf PDF
Att 03 Data Item Transmittal Form.docx DOCX document
Att C2 Cost Reimbursable Narrative.docx DOCX document
Att C4 Government Labor Hours.xlsx XLSX spreadsheet
Att T1 Sample Tasks.docx DOCX document
Exhibit A CDRLs.docx DOCX document
Att 04 COR Designation Letter.pdf PDF
Att 06 List of Approved Subcontractors.pdf PDF
Att 07 QASP_CSP.docx DOCX document
Att 10 Small Business Subcontracting Plan.pdf PDF
Att T2 Key Personnel.docx DOCX document
Att 02 Authorized Key Personnel.pdf PDF
Att 05 OCI List.docx DOCX document
Att 09 TDL CDRL attachment COR only.xlsx XLSX spreadsheet
Attachment C1 - Cost Reimbursable Workbook.xlsx XLSX spreadsheet
Att C3 Fixed Price TM Narrative.docx DOCX document
Att C5 Contract CLIN Structure.pdf PDF
Att S1 SBPCD.docx DOCX document
Att 11 Wage Determinations.pdf PDF
Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Title Page Definition

Title Page
TitleDefinition
Contractor's NameEnter the name of the contractor
Contractor's AddressEnter the address of the contractor
Title of ReportEnter the Title of Report ( Contracting Officer’s Representative (COR) Management Report for Technical Direction Letters (TDLs))
CDRL #Enter the CDRL number (Pull from awarded CDRLs)
Date of ReportEnter the date the report is being generated
Period Covered by ReportEnter the dates this report covers (start date through end date)
Contract NumberEnter the contract number
Task Order NumberEnter the task order number
Name of issuing Government AgencyProvide the name of the Government Agency (NAWCAD WOLF XXXX Division)
Program/System NomenclatureEnter the name of the Contract
Security Classification or other appropriate markingsEnter the security classification or other appropriate markings (i.e. CUI, Proprietary)

Title Page

TDL CDRL attachment COR/TPOC December 2024
Contractor's Name
Contractor's Address
Title of Report
CDRL #
Date of Report
Period Covered by Report
Contract Number
Task Order Number
Name of issuing Government Agency
Program/System Nomenclature
Security Classification or other appropriate markings
Instructions:
A tab should be added for each individual TDL
Data in all cells on all tabs is sample data only
Rows can be added, do not change the columns
Ensure work accomplishments sections a - f are completed for each TDL

CDRL# & Title TO Number

TDL Breakout Definition TDL 1 Breakout One tab per TDL - Definition

Column TitleDefinitions
Prime Contract NoEnter the Prime Contract Number
TO NumberEnter the Task Order (TO) Number
Invoice NumberEnter the Contractor Invoice Number
Invoice DateEnter the date the Invoice is generated
PoP StartEnter the TO/Option Period of Performance Start date
PoP EndEnter the TO/Option Period of Performance End date
Billing PeriodEnter the Billing Period (Start Date through End Date)
Project NameEnter the Technical Direction Letter Title
CLINEnter the CLIN number
TDL #Enter the Technical Direction Letter Number
Subtask # (If Applicable)Enter the Subtask number (If Applicable)
DescriptionEnter a high level description of the TDL
LCATEnter the Labor Categories applicable to the TDL (Note: Rows can be added as needed)
Employee IdentifierEnter the Employee's Contractor Identification Number
Date IssuedEnter the Date TDL was signed by the KO
LABOREstimated Amount $Enter the Estimated TDL Value (numbers)
Estimated HRSEnter the Estimated TDL Hours
Funding Received $Enter the Funding Received per the latest MOD (dollar amount)
Funded HrsEnter the Funded Hours per the latest MOD
Current ExpendituresEnter the Expenditures for the current reporting period (dollar amount)
Funding BalanceEnter the funding balance (Funding Received - Cost Incurred To-Date)
Funded HRS BalEnter the funding hours balance (Funded Hours - Total Current Hours)
Outstanding CommitmentsEnter any outstanding labor commitments (i.e. subcontractor costs)
Cost Incurred To-Date (Total)Enter total Cumulative Expenditures to-date to include outstanding labor commitments
Current Reg HrsEnter the Current Regular Hours expended for the reporting period
Current UT/TTA HrsEnter in current Uncompensated Time/Total Time Accounting hours for the reporting period
Total Current HrsEnter the Total Current Expended Hours for the reporting period (Current Reg Hrs. + Current UT/TTA Hrs.)
Cumulative Reg HrsEnter the Cumulative Reg Hours Expended for the TO/Option PoP
Cumulative UT/TTA HrsEnter the Cumulative Uncompensated Time/Total Time Accounting Hours Expended for the TO/Option PoP
Total Cumulative HrsEnter the Cumulative Hours Expended for the TO/Option PoP (Cumulative Reg Hours + Cumulative UT/TTA Hrs.)
EACEnter the projected Estimate at Completion (What will the total cost be at the end of the TO/Option PoP)
Projected date for 75% notification (Based on expenditure to-date)Enter the date when 75% of the funding will be exhausted
TRAVELCurrent TravelEnter the current travel cost for the reporting period
Cumulative TravelEnter the total cumulative travel cost for the TO/Option PoP
Outstanding CommitmentsEnter any outstanding travel commitments
MATERIALCurrent MaterialEnter the current material cost for the reporting period
Cumulative MaterialEnter the cumulative material cost for the TO/Option PoP
Outstanding CommitmentsEnter any outstanding material commitments
OTHER ODCCurrent Other ODCEnter the current cost for any other ODCs for the reporting period (i.e. field services)
Cumulative Other ODCEnter the cumulative cost for any other ODCs for the TO/Option PoP (i.e. field services)
Outstanding CommitmentsEnter any other outstanding ODC commitments (i.e. field services)
MATERIAL PURCHASESPO#Enter the Purchase Order Number for the material
Subtask (if applicable)Enter the Subtask number if Material is specific to a Subtask on the TDL
DescriptionEnter a high level description of the Material purchased
Invoice NumberEnter the Invoice Number the Material was purchased under
PurposeEnter the reason for the Material purchase (this should include the specific project supported)
VendorEnter the Vendor the material was purchased from
QuantityEnter the Quantity purchased
Unit PriceEnter the Unit Price for the Material
Estimated CostEnter the Estimated Cost for the Material
Actual CostEnter the Actual Cost for the Material
Variance (between estimated and actual costs)Enter the Difference in the cost (Actual Cost - Estimated Cost)
Gov Approver if required by ContractWho from the Government approved the material purchase, if under approval thresholds, who was the material purchased for.
DispositionWhat is the disposition of the Material (i.e. has the material been transferred to the Government; is it still in the Contractor's possession)
Cumulative Total:Enter the Cumulative Total of Material purchased during the reporting period (should match the Current Material column)
TRAVELTravelerEnter the Traveler's name
Subtask (if applicable)Enter the Subtask number if Travel is specific to a Subtask on the TDL
DestinationEnter the Traveler's destination
PurposeEnter the reason for the travel
Date of TravelEnter the date the travel commenced
Length (days)Enter the total number of days for the trip
Estimated CostEnter the estimated cost for the trip
Actual CostEnter the actual Cost for the trip
Variance (between estimated and actual costs)Enter the Difference in the cost (Actual Cost - Estimated Cost)
JustificationEnter the Justification for the travel (this should include the specific project supported)
Government approverEnter the Government Approver
Government approval dateEnter the date the Government provided Approval
Cumulative Total:Enter the Cumulative Total of Travel during the reporting period (should match the Current Travel column)

TDL 1 Breakout One tab per TDL

TDL CDRL attachment COR/TPOC December 2024
Prime Contract No
TO Number
Invoice Number
Invoice Date
PoP Start
PoP End
Billing Period
LABORTravelMaterialOther ODC
Project NameCLINTDL #Subtask # (If Applicable)DescriptionLCATEmployee IdentifierDate IssuedEstimated Amount $Estimated HRSFunding Received $Funded HrsCurrent ExpendituresFunding BalanceFunded HRS BalOutstanding CommitmentsCost Incurred To-Date (Total)Current Reg HrsCurrent UT/TTA HrsTotal Current HrsCumulative Reg HrsCumulative UT/TTA HrsTotal Cumulative HrsEACProjected date for 75% notification (Based on expenditure to-date)Current TravelCumulative TravelOutstanding CommitmentsCurrent MaterialCumulative MaterialOutstanding CommitmentsCurrent Other ODCCumulative Other ODCOutstanding Commitments
TDL1SME SPT LOE 12 moAnalyst, Senior500123451-Oct-20$ 150,000.001250.00$ 75,000.00625$ 37,500.00$ 37,500.00145$ 3,600.00$ 41,100.00160016048010490$ 1,248.0025-Mar-21001350000000
*Add Rows as needed
Material Purchases
PO#Subtask (if applicable)DescriptionInvoice NumberPurposeVendorQuantityUnit PriceEstimated CostActual CostVariance (between estimated and actual costs)Gov Approver if required by ContractDisposition

Cumulative Total:

Travel
TravelerSubtask (if applicable)DestinationPurposeDate of TravelLength (days)Estimated CostActual CostVariance (between estimated and actual costs)JustificationGovernment approverGovernment approval date

Cumulative Total:

*Field Services or other ODC fields to be added based on specific procurement requirements

Month 1Month 2Month 3Month 4Month 5Month 6Month 7Month 8Month 9Month 10Month 11Month 12*Adjust Title and Columns/Rows as needed (i.e. Pop/Invoice # or title or add additional months if needed)
FUNDED$ 25,000.00$ 25,000.00$ 25,000.00$ 120,000.00$ 350,000.00$ 15,000,000.00$ 15,000,000.00$ 15,000,000.00$ 15,000,000.00$ 15,000,000.00$ 15,000,000.00$ 15,000,000.00*Total TDL Funding based on the data provided above
Expenditures to Date$ 15,000.00$ 22,500.00$ 24,500.00$ 50,000.00$ 75,000.00$ 100,000.00$ 13,000,000.00$ 14,000,000.00$ 14,100,000.00$ 14,589,000.00$ 15,552,412.00$ 15,860,000.00*Total TDL Expenditures to date based on the data provided above
EAC$ 15,000,000.00$ 15,000,000.00$ 15,860,000.00$ 15,860,000.00$ 15,860,000.00$ 15,860,000.00$ 15,860,000.00$ 15,860,000.00$ 15,860,000.00$ 15,860,000.00$ 15,860,000.00$ 15,860,000.00*Total TDL EAC based on the data provided above
Estimate$ 15,000,000.00$ 15,000,000.00$ 15,000,000.00$ 15,000,000.00$ 15,000,000.00$ 15,000,000.00$ 15,000,000.00$ 15,000,000.00$ 15,000,000.00$ 15,000,000.00$ 15,000,000.00$ 15,000,000.00*Total TDL Estimate based on the data provided above

a. Description of the progress made against milestones during the reporting period. Specifically address the value-added tasks performed by the prime contractor when work is performed by a subcontractor; clearly identify the key and non-key personnel performing the tasks described.

b. Identification of problem areas affecting technical, scheduling, or costs elements with background and any recommendations for solutions beyond the scope of the contract. Specifically, address results, positive or negative, obtained related to previously-identified program areas, with conclusions and recommendations for solutions.

c. Whether the task is on schedule, ahead of schedule, or behind schedule. Discuss what steps are being or will be taken to complete all requirements on time if possible, or provide a proposed revised schedule based on best current estimates if behind schedule.

d. The status of all assigned deliverables, including title, CDRL number, due date, date delivered, Contractor point of contact and description or title of deliverable(s). The report for each contract period shall include a cumulative list of all deliverable items provided.

e. Plans and recommendations for activities at TDL level during the next reporting period;

f. Identify any new subcontractors approved during the reporting period and any proposed subcontractors/consultants for the next reporting period. Their capability set and areas of expertise shall be thoroughly addressed.

FUNDED Month 1 Month 2 Month 3 Month 4 Month 5 Month 6 Month 7 Month 8 Month 9 Month 10 Month 11 Month 12 25000 25000 25000 120000 350000 15000000 15000000 15000000 15000000 15000000 15000000 15000000 Expenditures to Date Month 1 Month 2 Month 3 Month 4 Month 5 Month 6 Month 7 Month 8 Month 9 Month 10 Month 11 Month 12 15000 22500 24500 50000 75000 100000 13000000 14000000 14100000 14589000 15552412 15860000 EAC Month 1 Month 2 Month 3 Month 4 Month 5 Month 6 Month 7 Month 8 Month 9 Month 10 Month 11 Month 12 15000000 15000000 15860000 15860000 15860000 15860000 15860000 15860000 15860000 15860000 15860000 15860000 Estimate Month 1 Month 2 Month 3 Month 4 Month 5 Month 6 Month 7 Month 8 Month 9 Month 10 Month 11 Month 12 15000000 15000000 15000000 15000000 15000000 15000000 15000000 15000000 15000000 15000000 15000000 15000000

This section of the deliverable may be submitted in Microsoft Word or as a Separate PDF document.

TDL 2 Breakout

TDL CDRL attachment COR/TPOC December 2024
Prime Contract No
TO Number
Invoice Number
Invoice Date
PoP Start
PoP End
Billing Period
LABORTravelMaterialOther ODC
Project NameCLINTDL #Subtask # (If Applicable)DescriptionLCATEmployee IdentifierDate IssuedEstimated Amount $Estimated HRSFunding Received $Funded HrsCurrent ExpendituresFunding BalanceFunded HRS BalOutstanding CommitmentsCost Incurred To-Date (Total)Current Reg HrsCurrent UT/TTA HrsTotal Current HrsCumulative Reg HrsCumulative UT/TTA HrsTotal Cumulative HrsEACProjected date for 75% notification (Based on expenditure to-date)Current TravelCumulative TravelOutstanding CommitmentsCurrent MaterialCumulative MaterialOutstanding CommitmentsCurrent Other ODCCumulative Other ODCOutstanding Commitments
TDL2System "X" InstallationAnalyst, Senior500123451-Oct-20$ 150,000.001250.00$ 75,000.00625$ 37,500.00$ 37,500.00145$ 3,600.00$ 41,100.00160016048010490$ 1,248.0025-Mar-21001350000000
*Add Rows as needed
Material Purchases
PO#Subtask (if applicable)DescriptionInvoice NumberPurposeVendorQuantityUnit PriceEstimated CostActual CostVariance (between estimated and actual costs)Gov Approver if required by ContractDisposition

Cumulative Total:

Travel
TravelerSubtask (if applicable)DestinationPurposeDate of TravelLength (days)Estimated CostActual CostVariance (between estimated and actual costs)JustificationGovernment approverGovernment approval date

Cumulative Total:

*Field Services or other ODC fields to be added based on specific procurement requirements

Month 1Month 2Month 3Month 4Month 5Month 6Month 7Month 8Month 9Month 10Month 11Month 12*Adjust Title and Columns/Rows as needed (i.e. Pop/Invoice # or title or add additional months if needed)
FUNDED$ 25,000.00$ 25,000.00$ 25,000.00$ 120,000.00$ 350,000.00$ 15,000,000.00$ 15,000,000.00$ 15,000,000.00$ 15,000,000.00$ 15,000,000.00$ 15,000,000.00$ 15,000,000.00*Total TDL Funding based on the data provided above
Expenditures to Date$ 15,000.00$ 22,500.00$ 24,500.00$ 50,000.00$ 75,000.00$ 100,000.00$ 13,000,000.00$ 14,000,000.00$ 14,100,000.00$ 14,589,000.00$ 15,552,412.00$ 15,860,000.00*Total TDL Expenditures to date based on the data provided above
EAC$ 15,000,000.00$ 15,000,000.00$ 15,860,000.00$ 15,860,000.00$ 15,860,000.00$ 15,860,000.00$ 15,860,000.00$ 15,860,000.00$ 15,860,000.00$ 15,860,000.00$ 15,860,000.00$ 15,860,000.00*Total TDL EAC based on the data provided above
Estimate$ 15,000,000.00$ 15,000,000.00$ 15,000,000.00$ 15,000,000.00$ 15,000,000.00$ 15,000,000.00$ 15,000,000.00$ 15,000,000.00$ 15,000,000.00$ 15,000,000.00$ 15,000,000.00$ 15,000,000.00*Total TDL Estimate based on the data provided above

a. Description of the progress made against milestones during the reporting period. Specifically address the value-added tasks performed by the prime contractor when work is performed by a subcontractor; clearly identify the key and non-key personnel performing the tasks described.

b. Identification of problem areas affecting technical, scheduling, or costs elements with background and any recommendations for solutions beyond the scope of the contract. Specifically, address results, positive or negative, obtained related to previously-identified program areas, with conclusions and recommendations for solutions.

c. Whether the task is on schedule, ahead of schedule, or behind schedule. Discuss what steps are being or will be taken to complete all requirements on time if possible, or provide a proposed revised schedule based on best current estimates if behind schedule.

d. The status of all assigned deliverables, including title, CDRL number, due date, date delivered, Contractor point of contact and description or title of deliverable(s). The report for each contract period shall include a cumulative list of all deliverable items provided.

e. Plans and recommendations for activities at TDL level during the next reporting period;

f. Identify any new subcontractors approved during the reporting period and any proposed subcontractors/consultants for the next reporting period. Their capability set and areas of expertise shall be thoroughly addressed.

FUNDED Month 1 Month 2 Month 3 Month 4 Month 5 Month 6 Month 7 Month 8 Month 9 Month 10 Month 11 Month 12 25000 25000 25000 120000 350000 15000000 15000000 15000000 15000000 15000000 15000000 15000000 Expenditures to Date Month 1 Month 2 Month 3 Month 4 Month 5 Month 6 Month 7 Month 8 Month 9 Month 10 Month 11 Month 12 15000 22500 24500 50000 75000 100000 13000000 14000000 14100000 14589000 15552412 15860000 EAC Month 1 Month 2 Month 3 Month 4 Month 5 Month 6 Month 7 Month 8 Month 9 Month 10 Month 11 Month 12 15000000 15000000 15860000 15860000 15860000 15860000 15860000 15860000 15860000 15860000 15860000 15860000 Estimate Month 1 Month 2 Month 3 Month 4 Month 5 Month 6 Month 7 Month 8 Month 9 Month 10 Month 11 Month 12 15000000 15000000 15000000 15000000 15000000 15000000 15000000 15000000 15000000 15000000 15000000 15000000

This section of the deliverable may be submitted in Microsoft Word or as a Separate PDF document.

Sheet1

File details come from the government source that posted it. Updated .