This document is an environmental permit issued by the Michigan Department of Environment, Great Lakes, and Energy (EGLE) to the US Forest Service for the Grand Island Rim Trail Improvement Culvert Replacement Project in Alger County, Michigan. The permit authorizes the replacement of three existing culverts along multiple unnamed streams within the Hiawatha National Forest:

  1. Replace a 24-foot-long by 15-inch-diameter culvert with a 24-foot-long by 45-inch-wide by 29-inch-tall elliptical culvert at a 3.3% slope, including placement of 2 cubic yards of riprap at the outlet.
  2. Replace a 31-foot-long by 12-inch-diameter pipe with a 32-foot-long by 5-foot-wide by 38-inch-tall elliptical culvert at a 5.9% slope, including mechanical dredging of a 5-foot by 15-foot area to remove sediment.
  3. Replace a 32-foot-long by 12-inch-diameter culvert with a 36-foot-long by 36-inch-diameter round culvert at a 5.3% slope.

The permit is valid from June 11, 2024, to June 11, 2029, and requires adherence to specific environmental protection and construction guidelines, including erosion control, stream substrate preservation, and proper culvert installation.

View the file

Other files

File Type Posted
SF 30 (11_2016).pdf PDF
12445525Q0061.pdf PDF
Att 04_GI Trail Maps.docx DOCX document
Att 01_Schedule of Items (250520).docx DOCX document
Att 02_SOW (250520).docx DOCX document
Att 03_GI Rim Trail Culvert Plan.pdf PDF
Att 05_Trail Design Parameters.pdf PDF
Att 06_Standard Trail Detail Sheets Combined.pdf PDF
Att 08_Wage Determination MI20250001 05.16.2025.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

This notice must be displayed at the site of work.

Laminating this notice or utilizing sheet protectors is recommended.

Please refer to the above permit number with any questions or concerns.

NOTICE OF AUTHORIZATION

Permit Number: WRP041626 v. 1 Date Issued: June 11, 2024 Site Name: 02-Grand Island Trail Improvement Culvert Replacements-Grand Island Twp

Expiration Date: June 11, 2029

The Michigan Department of Environment, Great Lakes, and Energy (EGLE), Water Resources Division, P.O. Box 30458, Lansing, Michigan 48909-7958, under provisions of the Natural Resources and Environmental Protection Act, 1994 PA 451, as amended; specifically:

Part 31, Floodplain Regulatory Authority of the Water Resources Protection.

Part 301, Inland Lakes and Streams.

Part 303, Wetlands Protection.

Part 315, Dam Safety.

Part 323, Shorelands Protection and Management.

Part 325, Great Lakes Submerged Lands.

Part 353, Sand Dunes Protection and Management.

Authorized Activity:

Remove a 24-foot-long by 15-inch-diameter culvert and replace with a 24-foot-long by 45-inch-wide by 29-inch-tall elliptical culvert at a 3.3% slope, and place 2 cubic yards of riprap at the outlet of the culvert. Remove a 31-foot-long by 12-inch-diameter pipe and replace with a 32-foot-long by 5-foot-wide by 38-inch-tall elliptical culvert at a 5.9% slope, mechanically dredge an area 5 feet wide by 15 feet long to the natural stream substrate immediately upstream of the culvert to remove excess sediment and facilitate culvert replacement. Remove a 32-foot-long by 12-inch-diameter culvert and replace with a 36-foot-long by 36-inch-diameter round culvert at a 5.3% slope.

Waterbody Affected: Multiple unnamed streams Property Location: Alger County, Grand Island Township, T48N R19W Sec 20

Permittee:

US Forest Service Attn: David DeVet 8181 US Highway 2 Rapid River, MI 49878

Larissa Schmock Marquette District Office Water Resources Division 906-250-6176

EGLE

WRP041626 v1.0

Approved Issued On:06/11/2024

Expires On:06/11/2029

MICHIGAN DEPARTMENT OF ENVIRONMENT, GREAT LAKES, AND ENERGY

WATER RESOURCES DIVISION

PERMIT

Issued To:

US Forest Service Attn: David DeVet 8181 US Highway 2 Rapid River, MI 49878

Permit No: WRP041626 v.1 Submission No.: HQ2-1VV6-TQ9NF Site Name: 02-Grand Island Trail Improvement Culvert Replacements-Grand Island Twp Issued: June 11, 2024 Expires: June 11, 2029

This permit is being issued by the Michigan Department of Environment, Great Lakes, and Energy (EGLE), Water Resources Division, under the provisions of the Natural Resources and Environmental Protection Act, 1994 PA 451, as amended (NREPA); specifically:

Part 301, Inland Lakes and Streams Part 323, Shorelands Protection and Management Part 303, Wetlands Protection Part 325, Great Lakes Submerged Lands Part 315, Dam Safety Part 353, Sand Dunes Protection and Management Part 31, Water Resources Protection (Floodplain Regulatory Authority)

EGLE certifies that the activities authorized under this permit are in compliance with the State Coastal Zone Management Program and certifies without conditions under the Federal Clean Water Act, Section 401 that the discharge from the activities authorized under this permit will comply with Michigan’s water quality requirements in Part 31, Water Resources Protection, of the NREPA and associated administrative rules, where applicable.

Permission is hereby granted, based on permittee assurance of adherence to State of Michigan requirements and permit conditions, to:

Authorized Activity:

Remove a 24-foot-long by 15-inch-diameter culvert and replace with a 24-foot-long by 45-inch-wide by 29-inch-tall elliptical culvert at a 3.3% slope, and place 2 cubic yards of riprap at the outlet of the culvert. Remove a 31-foot-long by 12-inch-diameter pipe and replace with a 32-foot-long by 5-foot-wide by 38-inch-tall elliptical culvert at a 5.9% slope, mechanically dredge an area 5 feet wide by 15 feet long to the natural stream substrate immediately upstream of the culvert to remove excess sediment and facilitate culvert replacement. Remove a 32-foot-long by 12-inch-diameter culvert and replace with a 36-foot-long by 36-inch-diameter round culvert at a 5.3% slope.

Waterbody Affected: Multiple unnamed streams Property Location: Alger County, Grand Island Township, T48N R19W Sec 20

EGLE

WRP041626 v1.0

Approved

US Forest Service 2 WRP041626 v.1

Authority granted by this permit is subject to the following limitations:

A. Initiation of any work on the permitted project confirms the permittee's acceptance and agreement to comply with all terms and conditions of this permit.

B. The permittee, in exercising the authority granted by this permit, shall not cause unlawful pollution as defined by Part 31 of the NREPA.

C. This permit shall be kept at the site of the work and available for inspection at all times during the duration of the project or until its date of expiration.

D. All work shall be completed in accordance with the approved plans and specifications submitted with the application and/or plans and specifications attached to this permit.

E. No attempt shall be made by the permittee to forbid the full and free use by the public of public waters at or adjacent to the structure or work approved.

F. It is made a requirement of this permit that the permittee give notice to public utilities in accordance with

2013 PA 174 (Act 174) and comply with each of the requirements of Act 174.

G. This permit does not convey property rights in either real estate or material, nor does it authorize any injury to private property or invasion of public or private rights, nor does it waive the necessity of seeking federal assent, all local permits, or complying with other state statutes.

H. This permit does not prejudice or limit the right of a riparian owner or other person to institute proceedings in any circuit court of this state when necessary to protect his rights.

I. This permit shall not be assigned or transferred without the written approval of EGLE.

J. Failure to comply with conditions of this permit may subject the permittee to revocation of permit and criminal and/or civil action as cited by the specific state act, federal act, and/or rule under which this permit is granted.

K. All dredged or excavated materials shall be disposed of in an upland site (outside of floodplains, unless exempt under Part 31 of the NREPA, and wetlands).

L. In issuing this permit, EGLE has relied on the information and data that the permittee has provided in connection with the submitted application for permit. If, subsequent to the issuance of a permit, such information and data prove to be false, incomplete, or inaccurate, EGLE may modify, revoke, or suspend the permit, in whole or in part, in accordance with the new information.

M. The permittee shall indemnify and hold harmless the State of Michigan and its departments, agencies, officials, employees, agents, and representatives for any and all claims or causes of action arising from acts or omissions of the permittee, or employees, agents, or representative of the permittee, undertaken in connection with this permit. The permittee's obligation to indemnify the State of Michigan applies only if the state: (1) provides the permittee or its designated representative written notice of the claim or cause of action within 30 days after it is received by the state, and (2) consents to the permittee's participation in the proceeding on the claim or cause of action. It does not apply to contested case proceedings under the Administrative Procedures Act, 1969 PA 306, as amended, challenging the permit. This permit shall not be construed as an indemnity by the State of Michigan for the benefit of the permittee or any other person.

N. Noncompliance with these terms and conditions and/or the initiation of other regulated activities not specifically authorized shall be cause for the modification, suspension, or revocation of this permit, in whole or in part. Further, EGLE may initiate criminal and/or civil proceedings as may be deemed necessary to correct project deficiencies, protect natural resource values, and secure compliance with statutes.

O. If any change or deviation from the permitted activity becomes necessary, the permittee shall request, in writing, a revision of the permitted activity from EGLE. Such revision request shall include complete documentation supporting the modification and revised plans detailing the proposed modification.

Proposed modifications must be approved, in writing, by EGLE prior to being implemented.

P. This permit may be transferred to another person upon written approval of EGLE. The permittee must submit a written request to EGLE to transfer the permit to the new owner. The new owner must also submit a written request to EGLE to accept transfer. The new owner must agree, in writing, to accept all conditions of the permit. A single letter signed by both parties that includes all the above information may be provided to EGLE. EGLE will review the request and, if approved, will provide written notification to the new owner.

Q. Prior to initiating permitted construction, the permittee is required to provide a copy of the permit to the contractor(s) for review. The property owner, contractor(s), and any agent involved in exercising the permit

EGLE

WRP041626 v1.0

Approved

US Forest Service 3 WRP041626 v.1 are held responsible to ensure that the project is constructed in accordance with all drawings and specifications. The contractor is required to provide a copy of the permit to all subcontractors doing work authorized by the permit.

R. Construction must be undertaken and completed during the dry period of the wetland. If the area does not dry out, construction shall be done on equipment mats to prevent compaction of the soil.

S. Authority granted by this permit does not waive permit requirements under Part 91, Soil Erosion and Sedimentation Control, of the NREPA, or the need to acquire applicable permits from the County Enforcing Agent (CEA).

T. Authority granted by this permit does not waive permit requirements under the authority of Part 305, Natural Rivers, of the NREPA. A Natural Rivers Zoning Permit may be required for construction, land alteration, streambank stabilization, or vegetation removal along or near a natural river.

U. The permittee is cautioned that grade changes resulting in increased runoff onto adjacent property is subject to civil damage litigation.

V. Unless specifically stated in this permit, construction pads, haul roads, temporary structures, or other structural appurtenances to be placed in a wetland or on bottomland of the water body are not authorized and shall not be constructed unless authorized by a separate permit or permit revision granted in accordance with the applicable law.

W. For projects with potential impacts to fish spawning or migration, no work shall occur within fish spawning or migration timelines (i.e., windows) unless otherwise approved in writing by the Michigan Department of Natural Resources, Fisheries Division.

X. Work to be done under authority of this permit is further subject to the following special instructions and specifications:

1. Authority granted by this permit does not waive permit or program requirements under Part 91 of the

NREPA or the need to acquire applicable permits from the CEA. To locate the Soil Erosion Program Administrator for your county, visit https://www.michigan.gov/egle/about/organization/water-resources/soil-erosion/sesc-overview and select “Soil Erosion and Sedimentation Control Agencies”.

2. The authority to conduct the activity as authorized by this permit is granted solely under the provisions of the governing act as identified above. This permit does not convey, provide, or otherwise imply approval of any other governing act, ordinance, or regulation, nor does it waive the permittee's obligation to acquire any local, county, state, or federal approval or authorization necessary to conduct the activity.

3. No fill, excess soil, or other material shall be placed in any wetland, floodplain, or surface water area not specifically authorized by this permit, its plans, and specifications.

4. This permit does not authorize or sanction work that has been completed in violation of applicable federal, state, or local statutes.

5. The permit placard shall be kept posted at the work site in a prominent location at all times for the duration of the project or until permit expiration.

6. During removal or repair of the existing structure, every precaution shall be taken to prevent debris from entering any watercourse. Any debris reaching the watercourse during the removal and/or reconstruction of the structure shall be immediately retrieved from the water. All material shall be disposed of in an acceptable manner consistent with local, state, and federal regulations.

7. The placement of the new culvert and the initial placement of fill in the stream shall be done immediately after removal of the existing culvert. The placement shall be conducted in such a manner that all flow is immediately passed through the new culverts, allowing the major placement of fill to be done in the dry or in still water where erosion and siltation will be minimized. The fill material used in this initial placement shall be washed gravel, coarse aggregate, or rock and shall be placed at both ends of the culvert to a level above normal water level before backfill material is placed.

8. The culvert shall be installed to align with the center line of the existing stream at both the inlet and outlet ends, and must be buried below the stream bed to provide a natural channel substrate through the structure as shown on the approved plans.

9. All other road fill slopes, ditches, and other raw areas draining directly to the stream may be protected with riprap, sod and/or seed and mulch as may be necessary to provide effective erosion protection.

EGLE

WRP041626 v1.0

Approved Issued On:06/11/2024

Expires On:06/11/2029 https://www.michigan.gov/egle/about/organization/water-resources/soil-erosion/sesc-overview https://www.michigan.gov/egle/about/organization/water-resources/soil-erosion/sesc-overview

US Forest Service 4 WRP041626 v.1

The placement of riprap shall be limited to the minimum necessary to ensure proper stabilization of the side slopes and fill in the immediate vicinity of the structure.

10. If the project, or any portion of the project, is stopped and lies incomplete for any length of time other than that encountered in a normal work week, every precaution shall be taken to protect the incomplete work from erosion, including the placement of temporary gravel bag riprap, temporary seed and mulch, or other acceptable temporary protection.

11. No work shall be done in the stream during periods of above-normal flows except as necessary to prevent erosion.

12. This permit is being issued for the maximum time allowed and no extensions of this permit will be granted. Initiation of the construction work authorized by this permit indicates the permittee's acceptance of this condition. The permit, when signed by EGLE, will be for a five-year period beginning on the date of issuance. If the project is not completed by the expiration date, a new permit must be sought.

Issued By:

Larissa Schmock MarquetteDistrict Office Water Resources Division 906-250-6176

THIS PERMIT MUST BE SIGNED BY THE PERMITTEE TO BE VALID.

I hereby assure that I have read, am familiar with, and agree to adhere to the terms and conditions of this permit.

Permittee Signature Date cc: Grand Island Township Clerk Alger County Clerk Alger CEA

EGLE

WRP041626 v1.0

Approved

EGLE

WRP041626 v1.0

Approved

Approved

Approved

Approved

Approved

Approved

Approved

Approved

Placard (WORD)
Resources Individual or Minor Permit (WORD)
Project Plans

File details come from the government source that posted it. Updated .