This document is a detailed engineering plan set for the Grand Island Rim Trail Improvement Project Culvert Replacement, prepared by the USDA Forest Service for the Hiawatha National Forest in Alger County, Michigan. The plan covers three specific culvert replacement sites (Sites #47, #48, and #50), each with comprehensive site plans, cross-section views, and profile layouts.

Key technical details include replacing existing culverts with new galvanized elliptical or round pipes, installing silt fences for erosion control, placing road gravel for surfacing, adding nonwoven geotextile beneath riprap, and ensuring proper grading and substrate installation. Each site has specific elevation measurements, pipe dimensions, and installation requirements. The culvert replacements range from 15" to 38" in diameter, with precise inlet and outlet invert elevations documented. The project involves removing existing clay or galvanized pipes and installing new culverts with natural stream substrate, maintaining a consistent trail width and managing surrounding terrain to ensure proper drainage and trail integrity.

View the file

Other files

File Type Posted
SF 30 (11_2016).pdf PDF
Att 01_Schedule of Items (250520).docx DOCX document
12445525Q0061.pdf PDF
Att 04_GI Trail Maps.docx DOCX document
Att 02_SOW (250520).docx DOCX document
Att 05_Trail Design Parameters.pdf PDF
Att 06_Standard Trail Detail Sheets Combined.pdf PDF
Att 07_EGLE Permit.pdf PDF
Att 08_Wage Determination MI20250001 05.16.2025.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .