Att 06_Standard Trail Detail Sheets Combined.pdf
PDF 533 KB Posted
- Attached to
- Hiawatha NF GAOA Grand Island Trails Improvement
- Solicitation number
- 12445525Q0061
- Issued by
-
Department of Agriculture Forest Service
About this file
These standard trail plan documents for the West Rim Trail Project at Hiawatha National Forest's Munising Ranger District provide comprehensive technical specifications for trail construction and infrastructure. The documents detail four key components:
-
Standard Trail Terms (Sheet 1): Specifies trail corridor design with precise measurements including 18' clearing width, 12' tread width, 10' clearing height, and detailed slope and ground interface specifications. The design includes elements like catchpoint, existing ground, backslope, and a 2" wide ditch.
-
Standard Trail Section (Sheet 2): Illustrates two trail section types - a "V" ditch section and a flat bottom ditch section. The documentation includes specific guidelines for backfill, compaction, native material usage, and outlet ditch construction, with detailed dimensional tables for different trail configuration parameters.
-
Standard Culvert Design (Sheet 3): Provides comprehensive culvert installation specifications, including end and elevation views. The documentation covers culvert types (including CMP-Galv, HDPE, Plastic), bedding materials, minimum cover requirements, and pipe placement guidelines.
-
Post and Rail Fence Design (Sheet 4): Details fence construction standards with specifications for post height (42"), embedment depth, rail dimensions, and preservative treatment types. The documentation includes multiple fence section configurations and installation details, with notes referencing additional construction guidelines.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SF 30 (11_2016).pdf | ||
| 12445525Q0061.pdf | ||
| Att 04_GI Trail Maps.docx | DOCX document | |
| Att 01_Schedule of Items (250520).docx | DOCX document | |
| Att 02_SOW (250520).docx | DOCX document | |
| Att 03_GI Rim Trail Culvert Plan.pdf | ||
| Att 05_Trail Design Parameters.pdf | ||
| Att 07_EGLE Permit.pdf | ||
| Att 08_Wage Determination MI20250001 05.16.2025.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .