This is a Relevant Experience Project template for solicitation FA461025R0006 (WOOKIE MACC). The template requires offerors to submit up to 30 past performance projects across 10 specific categories, with 3 projects required per category. The categories are: 1) Erosion Stabilization, 2) Electrical Distribution/Generation/Transmission Lines, 3) Asbestos/Hazardous Material/Lead-Based Paint Abatement, 4) Blast Resistant Windows/Vehicle Barriers/Traffic Check Houses/Entry Control Points, 5) General Facility Renovation, 6) Fire Suppression/Fire Alarm/Mass Notification Systems, 7) Electrical System Work including Generation/Switchgear, 8) HVAC/CRAC Systems, 9) ICD 705 Secured Room Construction, and 10) Special Interest Projects.

For each project submission, contractors must provide detailed information including contractor name, contract/order numbers, project title, customer information, point of contact details, period of performance, and project value. Supporting documentation is required within Volume II of the proposal to validate all submitted information, with highlights and references to specific sections that substantiate claims made in accordance with Section L paragraph L-2 subparagraph 2.2.1.6 of the Self-Scoring Worksheet.

View the file

Other files

File Type Posted
Solicitation - FA461025R0006 Conformed Through Amendment 0003.pdf PDF
Solicitation Amendment FA461025R00060003 SF 30.pdf PDF
WOOKIE MACC Industry Day - QR Sign-In Report 2-20-25.pdf PDF
WOOKIE MACC Industry Day - Microsoft Teams Attendance Report 2-20-25.pdf PDF
Solicitation - FA461025R0006 Conformed Through Amendment 0002.pdf PDF
ATT 05_Volume II_HTRO Self-Scoring Worksheet_20250227.xlsx XLSX spreadsheet
WOOKIE MACC_RFI Responses_20250228.pdf PDF
Solicitation Amendment FA461025R00060002 SF 30.pdf PDF
ATT 06_Volume II_Relevant Experience Project Template_20250227.docx DOCX document
ATT 01_SOW_20250219.pdf PDF
WOOKIE MACC_RFI Responses_20250219.pdf PDF
Solicitation Amendment FA461025R00060001 SF 30.pdf PDF
ATT 03_Volume I_Price Proposal Template_20250127.xlsx XLSX spreadsheet
ATT 12_Construction Cost Estimate Breakdown.xlsx XLSX spreadsheet
ATT 09_Monterey - San Mateo Wage Determination_20250207.pdf PDF
ATT 05_Volume II_HTRO Self-Scoring Worksheet_20241029.xlsx XLSX spreadsheet
ATT 15_VSFB CAD Standards_Aug 2019.pdf PDF
ATT 11_Schedule Material Submittals.xlsx XLSX spreadsheet
ATT 02_Volume I_Executive Summary Sheet_20241024.docx DOCX document
ATT 13_01 00 00 General VSFB Specs.pdf PDF
Solicitation - FA461025R0006.pdf PDF
ATT 04_Volume II_Project Category Definitions_20241218.pdf PDF
ATT 14_01 57 20 Environmental Specs.pdf PDF
ATT 07_SB Wage Determination_20241108.pdf PDF
ATT 08_Ventura Wage Determination_20241108.pdf PDF
ATT 01_SOW_20241120.pdf PDF
ATT 10_AF Form 103.pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

WOOKIE MACC

SOLICITATION: FA461025R0006

ATT 06_Volume II_Relevant Experience Project Template

ATTACHMENT 06

RELEVANT EXPERIENCE PROJECT (REP) TEMPLATE

INSTRUCTIONS:

Reference Section L paragraph L-2 subparagraph 2.2.1.6 for complete instructions. See Section M for how Offerors will be evaluated.

1. This template is to be used for each specific Relevant Experience Project submitted.

2. The Offeror may submit up to thirty (30) projects.

3. Offerors shall respond to all questions and requests, as applicable.

4. All proposal documentation associated with this template shall be submitted in PDF format.

5. All file documentation for validation shall be included in Volume II_Technical of the Offeror’s proposal submission.

RELEVANT EXPERIENCE PROJECT IDENTIFICATION AND DESCRIPTION

1. Three (3) Relevant Experience Projects performing Erosion Stabilization. The submitted projects must meet the conditions listed in Att 04_Volume II_Project Category Definitions.

Project 1 – Erosion Stabilization

CONTRACTOR NAME:
Click Here and Enter Contractor Name
CONTRACT NUMBER:
Click Here Enter Contract Number
ORDER NUMBER (if applicable):
Click Here and Enter Order Number (if applicable)
PROJECT TITLE:
Click Here and Enter Project Title
CUSTOMER:
Click Here and Enter Project Customer
CUSTOMER POINT OF CONTACT:
Click Here and Enter Project Customer Point of Contact
CUSTOMER PHONE:
Click Here and Enter Project Customer Phone
CUSTOMER EMAIL ADDRESS:
Click Here and Enter Project Customer Email
TOTAL PERIOD OF PERFORMANCE (INCLUDING OPTIONS):
Click Here and Enter a Date
TO
Click Here and Enter a Date
PROJECT VALUE:
Click Here and Enter Project Value

Note: Offeror shall provide excerpts of Contract, Task Order, and/or Award documentation that substantiates the information above within Volume II of the proposal submission. Highlight this information in the submission to include document references/titles, page numbers, section/paragraph headings, as applicable.

For the response provided in Section L paragraph L-2 subparagraph 2.2.1.6 of the Self-Scoring Worksheet for this REP, as applicable, briefly explain the rationale supporting your claim to include the identification/explanation of the excerpts of documentation that substantiate the information to include identification of document references/titles, page numbers, section/paragraph headings, as applicable.

Project 2 – Erosion Stabilization

CONTRACTOR NAME:
Click Here and Enter Contractor Name
CONTRACT NUMBER:
Click Here Enter Contract Number
ORDER NUMBER (if applicable):
Click Here and Enter Order Number (if applicable)
PROJECT TITLE:
Click Here and Enter Project Title
CUSTOMER:
Click Here and Enter Project Customer
CUSTOMER POINT OF CONTACT:
Click Here and Enter Project Customer Point of Contact
CUSTOMER PHONE:
Click Here and Enter Project Customer Phone
CUSTOMER EMAIL ADDRESS:
Click Here and Enter Project Customer Email
TOTAL PERIOD OF PERFORMANCE (INCLUDING OPTIONS):
Click Here and Enter a Date
TO
Click Here and Enter a Date
PROJECT VALUE:
Click Here and Enter Project Value

Note: Offeror shall provide excerpts of Contract, Task Order, and/or Award documentation that substantiates the information above within Volume II of the proposal submission. Highlight this information in the submission to include document references/titles, page numbers, section/paragraph headings, as applicable.

For the response provided in Section L paragraph L-2 subparagraph 2.2.1.6 of the Self-Scoring Worksheet for this REP, as applicable, briefly explain the rationale supporting your claim to include the identification/explanation of the excerpts of documentation that substantiate the information to include identification of document references/titles, page numbers, section/paragraph headings, as applicable.

Project 3 – Erosion Stabilization

CONTRACTOR NAME:
Click Here and Enter Contractor Name
CONTRACT NUMBER:
Click Here Enter Contract Number
ORDER NUMBER (if applicable):
Click Here and Enter Order Number (if applicable)
PROJECT TITLE:
Click Here and Enter Project Title
CUSTOMER:
Click Here and Enter Project Customer
CUSTOMER POINT OF CONTACT:
Click Here and Enter Project Customer Point of Contact
CUSTOMER PHONE:
Click Here and Enter Project Customer Phone
CUSTOMER EMAIL ADDRESS:
Click Here and Enter Project Customer Email
TOTAL PERIOD OF PERFORMANCE (INCLUDING OPTIONS):
Click Here and Enter a Date
TO
Click Here and Enter a Date
PROJECT VALUE:
Click Here and Enter Project Value

Note: Offeror shall provide excerpts of Contract, Task Order, and/or Award documentation that substantiates the information above within Volume II of the proposal submission. Highlight this information in the submission to include document references/titles, page numbers, section/paragraph headings, as applicable.

For the response provided in Section L paragraph L-2 subparagraph 2.2.1.6 of the Self-Scoring Worksheet for this REP, as applicable, briefly explain the rationale supporting your claim to include the identification/explanation of the excerpts of documentation that substantiate the information to include identification of document references/titles, page numbers, section/paragraph headings, as applicable.

2. Three (3) Relevant Experience Projects performing Electrical Distribution, Generation, and/or Transmission Lines. The submitted projects must meet the conditions listed in Att 04_Volume II_Project Category Definitions.

Project 1 - Electrical Distribution, Generation, and/or Transmission Lines

CONTRACTOR NAME:
Click Here and Enter Contractor Name
CONTRACT NUMBER:
Click Here Enter Contract Number
ORDER NUMBER (if applicable):
Click Here and Enter Order Number (if applicable)
PROJECT TITLE:
Click Here and Enter Project Title
CUSTOMER:
Click Here and Enter Project Customer
CUSTOMER POINT OF CONTACT:
Click Here and Enter Project Customer Point of Contact
CUSTOMER PHONE:
Click Here and Enter Project Customer Phone
CUSTOMER EMAIL ADDRESS:
Click Here and Enter Project Customer Email
TOTAL PERIOD OF PERFORMANCE (INCLUDING OPTIONS):
Click Here and Enter a Date
TO
Click Here and Enter a Date
PROJECT VALUE:
Click Here and Enter Project Value

Note: Offeror shall provide excerpts of Contract, Task Order, and/or Award documentation that substantiates the information above within Volume II of the proposal submission. Highlight this information in the submission to include document references/titles, page numbers, section/paragraph headings, as applicable.

For the response provided in Section L paragraph L-2 subparagraph 2.2.1.6 of the Self-Scoring Worksheet for this REP, as applicable, briefly explain the rationale supporting your claim to include the identification/explanation of the excerpts of documentation that substantiate the information to include identification of document references/titles, page numbers, section/paragraph headings, as applicable.

Project 2 - Electrical Distribution, Generation, and/or Transmission Lines

CONTRACTOR NAME:
Click Here and Enter Contractor Name
CONTRACT NUMBER:
Click Here Enter Contract Number
ORDER NUMBER (if applicable):
Click Here and Enter Order Number (if applicable)
PROJECT TITLE:
Click Here and Enter Project Title
CUSTOMER:
Click Here and Enter Project Customer
CUSTOMER POINT OF CONTACT:
Click Here and Enter Project Customer Point of Contact
CUSTOMER PHONE:
Click Here and Enter Project Customer Phone
CUSTOMER EMAIL ADDRESS:
Click Here and Enter Project Customer Email
TOTAL PERIOD OF PERFORMANCE (INCLUDING OPTIONS):
Click Here and Enter a Date
TO
Click Here and Enter a Date
PROJECT VALUE:
Click Here and Enter Project Value

Note: Offeror shall provide excerpts of Contract, Task Order, and/or Award documentation that substantiates the information above within Volume II of the proposal submission. Highlight this information in the submission to include document references/titles, page numbers, section/paragraph headings, as applicable.

For the response provided in Section L paragraph L-2 subparagraph 2.2.1.6 of the Self-Scoring Worksheet for this REP, as applicable, briefly explain the rationale supporting your claim to include the identification/explanation of the excerpts of documentation that substantiate the information to include identification of document references/titles, page numbers, section/paragraph headings, as applicable.

Project 3 - Electrical Distribution, Generation, and/or Transmission Lines

CONTRACTOR NAME:
Click Here and Enter Contractor Name
CONTRACT NUMBER:
Click Here Enter Contract Number
ORDER NUMBER (if applicable):
Click Here and Enter Order Number (if applicable)
PROJECT TITLE:
Click Here and Enter Project Title
CUSTOMER:
Click Here and Enter Project Customer
CUSTOMER POINT OF CONTACT:
Click Here and Enter Project Customer Point of Contact
CUSTOMER PHONE:
Click Here and Enter Project Customer Phone
CUSTOMER EMAIL ADDRESS:
Click Here and Enter Project Customer Email
TOTAL PERIOD OF PERFORMANCE (INCLUDING OPTIONS):
Click Here and Enter a Date
TO
Click Here and Enter a Date
PROJECT VALUE:
Click Here and Enter Project Value

Note: Offeror shall provide excerpts of Contract, Task Order, and/or Award documentation that substantiates the information above within Volume II of the proposal submission. Highlight this information in the submission to include document references/titles, page numbers, section/paragraph headings, as applicable.

For the response provided in Section L paragraph L-2 subparagraph 2.2.1.6 of the Self-Scoring Worksheet for this REP, as applicable, briefly explain the rationale supporting your claim to include the identification/explanation of the excerpts of documentation that substantiate the information to include identification of document references/titles, page numbers, section/paragraph headings, as applicable.

3. Three (3) Relevant Experience Projects performing Asbestos Abatement, Hazardous Material, and/or Lead-Based Paint Abatement. The submitted projects must meet the conditions listed in Att 04_Volume II_Project Category Definitions.

Project 1 - Asbestos Abatement, Hazardous Material, and/or Lead-Based Paint Abatement

CONTRACTOR NAME:
Click Here and Enter Contractor Name
CONTRACT NUMBER:
Click Here Enter Contract Number
ORDER NUMBER (if applicable):
Click Here and Enter Order Number (if applicable)
PROJECT TITLE:
Click Here and Enter Project Title
CUSTOMER:
Click Here and Enter Project Customer
CUSTOMER POINT OF CONTACT:
Click Here and Enter Project Customer Point of Contact
CUSTOMER PHONE:
Click Here and Enter Project Customer Phone
CUSTOMER EMAIL ADDRESS:
Click Here and Enter Project Customer Email
TOTAL PERIOD OF PERFORMANCE (INCLUDING OPTIONS):
Click Here and Enter a Date
TO
Click Here and Enter a Date
PROJECT VALUE:
Click Here and Enter Project Value

Note: Offeror shall provide excerpts of Contract, Task Order, and/or Award documentation that substantiates the information above within Volume II of the proposal submission. Highlight this information in the submission to include document references/titles, page numbers, section/paragraph headings, as applicable.

For the response provided in Section L paragraph L-2 subparagraph 2.2.1.6 of the Self-Scoring Worksheet for this REP, as applicable, briefly explain the rationale supporting your claim to include the identification/explanation of the excerpts of documentation that substantiate the information to include identification of document references/titles, page numbers, section/paragraph headings, as applicable.

Project 2 - Asbestos Abatement, Hazardous Material, and/or Lead-Based Paint Abatement

CONTRACTOR NAME:
Click Here and Enter Contractor Name
CONTRACT NUMBER:
Click Here Enter Contract Number
ORDER NUMBER (if applicable):
Click Here and Enter Order Number (if applicable)
PROJECT TITLE:
Click Here and Enter Project Title
CUSTOMER:
Click Here and Enter Project Customer
CUSTOMER POINT OF CONTACT:
Click Here and Enter Project Customer Point of Contact
CUSTOMER PHONE:
Click Here and Enter Project Customer Phone
CUSTOMER EMAIL ADDRESS:
Click Here and Enter Project Customer Email
TOTAL PERIOD OF PERFORMANCE (INCLUDING OPTIONS):
Click Here and Enter a Date
TO
Click Here and Enter a Date
PROJECT VALUE:
Click Here and Enter Project Value

Note: Offeror shall provide excerpts of Contract, Task Order, and/or Award documentation that substantiates the information above within Volume II of the proposal submission. Highlight this information in the submission to include document references/titles, page numbers, section/paragraph headings, as applicable.

For the response provided in Section L paragraph L-2 subparagraph 2.2.1.6 of the Self-Scoring Worksheet for this REP, as applicable, briefly explain the rationale supporting your claim to include the identification/explanation of the excerpts of documentation that substantiate the information to include identification of document references/titles, page numbers, section/paragraph headings, as applicable.

Project 3 - Asbestos Abatement, Hazardous Material, and/or Lead-Based Paint Abatement

CONTRACTOR NAME:
Click Here and Enter Contractor Name
CONTRACT NUMBER:
Click Here Enter Contract Number
ORDER NUMBER (if applicable):
Click Here and Enter Order Number (if applicable)
PROJECT TITLE:
Click Here and Enter Project Title
CUSTOMER:
Click Here and Enter Project Customer
CUSTOMER POINT OF CONTACT:
Click Here and Enter Project Customer Point of Contact
CUSTOMER PHONE:
Click Here and Enter Project Customer Phone
CUSTOMER EMAIL ADDRESS:
Click Here and Enter Project Customer Email
TOTAL PERIOD OF PERFORMANCE (INCLUDING OPTIONS):
Click Here and Enter a Date
TO
Click Here and Enter a Date
PROJECT VALUE:
Click Here and Enter Project Value

Note: Offeror shall provide excerpts of Contract, Task Order, and/or Award documentation that substantiates the information above within Volume II of the proposal submission. Highlight this information in the submission to include document references/titles, page numbers, section/paragraph headings, as applicable.

For the response provided in Section L paragraph L-2 subparagraph 2.2.1.6 of the Self-Scoring Worksheet for this REP, as applicable, briefly explain the rationale supporting your claim to include the identification/explanation of the excerpts of documentation that substantiate the information to include identification of document references/titles, page numbers, section/paragraph headings, as applicable.

4. Three (3) Relevant Experience Projects installing Blast Resistant Windows, Active Vehicle Barriers, Traffic Check Houses, and/or Entry Control Points (for Federal Facilities). The submitted projects must meet the conditions listed in Att 04_Volume II_Project Category Definitions.

Project 1 - Blast Resistant Windows, Active Vehicle Barriers, Traffic Check Houses, and/or Entry Control Points (for Federal Facilities)

CONTRACTOR NAME:
Click Here and Enter Contractor Name
CONTRACT NUMBER:
Click Here Enter Contract Number
ORDER NUMBER (if applicable):
Click Here and Enter Order Number (if applicable)
PROJECT TITLE:
Click Here and Enter Project Title
CUSTOMER:
Click Here and Enter Project Customer
CUSTOMER POINT OF CONTACT:
Click Here and Enter Project Customer Point of Contact
CUSTOMER PHONE:
Click Here and Enter Project Customer Phone
CUSTOMER EMAIL ADDRESS:
Click Here and Enter Project Customer Email
TOTAL PERIOD OF PERFORMANCE (INCLUDING OPTIONS):
Click Here and Enter a Date
TO
Click Here and Enter a Date
PROJECT VALUE:
Click Here and Enter Project Value

Note: Offeror shall provide excerpts of Contract, Task Order, and/or Award documentation that substantiates the information above within Volume II of the proposal submission. Highlight this information in the submission to include document references/titles, page numbers, section/paragraph headings, as applicable.

For the response provided in Section L paragraph L-2 subparagraph 2.2.1.6 of the Self-Scoring Worksheet for this REP, as applicable, briefly explain the rationale supporting your claim to include the identification/explanation of the excerpts of documentation that substantiate the information to include identification of document references/titles, page numbers, section/paragraph headings, as applicable.

Project 2 - Blast Resistant Windows, Active Vehicle Barriers, Traffic Check Houses, and/or Entry Control Points (for Federal Facilities)

CONTRACTOR NAME:
Click Here and Enter Contractor Name
CONTRACT NUMBER:
Click Here Enter Contract Number
ORDER NUMBER (if applicable):
Click Here and Enter Order Number (if applicable)
PROJECT TITLE:
Click Here and Enter Project Title
CUSTOMER:
Click Here and Enter Project Customer
CUSTOMER POINT OF CONTACT:
Click Here and Enter Project Customer Point of Contact
CUSTOMER PHONE:
Click Here and Enter Project Customer Phone
CUSTOMER EMAIL ADDRESS:
Click Here and Enter Project Customer Email
TOTAL PERIOD OF PERFORMANCE (INCLUDING OPTIONS):
Click Here and Enter a Date
TO
Click Here and Enter a Date
PROJECT VALUE:
Click Here and Enter Project Value

Note: Offeror shall provide excerpts of Contract, Task Order, and/or Award documentation that substantiates the information above within Volume II of the proposal submission. Highlight this information in the submission to include document references/titles, page numbers, section/paragraph headings, as applicable.

For the response provided in Section L paragraph L-2 subparagraph 2.2.1.6 of the Self-Scoring Worksheet for this REP, as applicable, briefly explain the rationale supporting your claim to include the identification/explanation of the excerpts of documentation that substantiate the information to include identification of document references/titles, page numbers, section/paragraph headings, as applicable.

Project 3 - Blast Resistant Windows, Active Vehicle Barriers, Traffic Check Houses, and/or Entry Control Points (for Federal Facilities)

CONTRACTOR NAME:
Click Here and Enter Contractor Name
CONTRACT NUMBER:
Click Here Enter Contract Number
ORDER NUMBER (if applicable):
Click Here and Enter Order Number (if applicable)
PROJECT TITLE:
Click Here and Enter Project Title
CUSTOMER:
Click Here and Enter Project Customer
CUSTOMER POINT OF CONTACT:
Click Here and Enter Project Customer Point of Contact
CUSTOMER PHONE:
Click Here and Enter Project Customer Phone
CUSTOMER EMAIL ADDRESS:
Click Here and Enter Project Customer Email
TOTAL PERIOD OF PERFORMANCE (INCLUDING OPTIONS):
Click Here and Enter a Date
TO
Click Here and Enter a Date
PROJECT VALUE:
Click Here and Enter Project Value

Note: Offeror shall provide excerpts of Contract, Task Order, and/or Award documentation that substantiates the information above within Volume II of the proposal submission. Highlight this information in the submission to include document references/titles, page numbers, section/paragraph headings, as applicable.

For the response provided in Section L paragraph L-2 subparagraph 2.2.1.6 of the Self-Scoring Worksheet for this REP, as applicable, briefly explain the rationale supporting your claim to include the identification/explanation of the excerpts of documentation that substantiate the information to include identification of document references/titles, page numbers, section/paragraph headings, as applicable.

5.

Three (3) Relevant Experience Projects performing General Facility Renovation. The submitted projects must meet the conditions listed in Att 04_Volume II_Project Category Definitions.

Project 1 - General Facility Renovation

CONTRACTOR NAME:
Click Here and Enter Contractor Name
CONTRACT NUMBER:
Click Here Enter Contract Number
ORDER NUMBER (if applicable):
Click Here and Enter Order Number (if applicable)
PROJECT TITLE:
Click Here and Enter Project Title
CUSTOMER:
Click Here and Enter Project Customer
CUSTOMER POINT OF CONTACT:
Click Here and Enter Project Customer Point of Contact
CUSTOMER PHONE:
Click Here and Enter Project Customer Phone
CUSTOMER EMAIL ADDRESS:
Click Here and Enter Project Customer Email
TOTAL PERIOD OF PERFORMANCE (INCLUDING OPTIONS):
Click Here and Enter a Date
TO
Click Here and Enter a Date
PROJECT VALUE:
Click Here and Enter Project Value

Note: Offeror shall provide excerpts of Contract, Task Order, and/or Award documentation that substantiates the information above within Volume II of the proposal submission. Highlight this information in the submission to include document references/titles, page numbers, section/paragraph headings, as applicable.

For the response provided in Section L paragraph L-2 subparagraph 2.2.1.6 of the Self-Scoring Worksheet for this REP, as applicable, briefly explain the rationale supporting your claim to include the identification/explanation of the excerpts of documentation that substantiate the information to include identification of document references/titles, page numbers, section/paragraph headings, as applicable.

Project 2 - General Facility Renovation

CONTRACTOR NAME:
Click Here and Enter Contractor Name
CONTRACT NUMBER:
Click Here Enter Contract Number
ORDER NUMBER (if applicable):
Click Here and Enter Order Number (if applicable)
PROJECT TITLE:
Click Here and Enter Project Title
CUSTOMER:
Click Here and Enter Project Customer
CUSTOMER POINT OF CONTACT:
Click Here and Enter Project Customer Point of Contact
CUSTOMER PHONE:
Click Here and Enter Project Customer Phone
CUSTOMER EMAIL ADDRESS:
Click Here and Enter Project Customer Email
TOTAL PERIOD OF PERFORMANCE (INCLUDING OPTIONS):
Click Here and Enter a Date
TO
Click Here and Enter a Date
PROJECT VALUE:
Click Here and Enter Project Value

Note: Offeror shall provide excerpts of Contract, Task Order, and/or Award documentation that substantiates the information above within Volume II of the proposal submission. Highlight this information in the submission to include document references/titles, page numbers, section/paragraph headings, as applicable.

For the response provided in Section L paragraph L-2 subparagraph 2.2.1.6 of the Self-Scoring Worksheet for this REP, as applicable, briefly explain the rationale supporting your claim to include the identification/explanation of the excerpts of documentation that substantiate the information to include identification of document references/titles, page numbers, section/paragraph headings, as applicable.

Project 3 - General Facility Renovation

CONTRACTOR NAME:
Click Here and Enter Contractor Name
CONTRACT NUMBER:
Click Here Enter Contract Number
ORDER NUMBER (if applicable):
Click Here and Enter Order Number (if applicable)
PROJECT TITLE:
Click Here and Enter Project Title
CUSTOMER:
Click Here and Enter Project Customer
CUSTOMER POINT OF CONTACT:
Click Here and Enter Project Customer Point of Contact
CUSTOMER PHONE:
Click Here and Enter Project Customer Phone
CUSTOMER EMAIL ADDRESS:
Click Here and Enter Project Customer Email
TOTAL PERIOD OF PERFORMANCE (INCLUDING OPTIONS):
Click Here and Enter a Date
TO
Click Here and Enter a Date
PROJECT VALUE:
Click Here and Enter Project Value

Note: Offeror shall provide excerpts of Contract, Task Order, and/or Award documentation that substantiates the information above within Volume II of the proposal submission. Highlight this information in the submission to include document references/titles, page numbers, section/paragraph headings, as applicable.

For the response provided in Section L paragraph L-2 subparagraph 2.2.1.6 of the Self-Scoring Worksheet for this REP, as applicable, briefly explain the rationale supporting your claim to include the identification/explanation of the excerpts of documentation that substantiate the information to include identification of document references/titles, page numbers, section/paragraph headings, as applicable.

6.

Three (3) Relevant Experience Projects performing Fire Suppression, Fire Alarm, and/or Mass Notification Systems Repair, Replacement, Upgrade, or Installation. The submitted projects must meet the conditions listed in Att 04_Volume II_Project Category Definitions.

Project 1 - Fire Suppression, Fire Alarm, and/or Mass Notification Systems Repair, Replacement, Upgrade, or Installation

CONTRACTOR NAME:
Click Here and Enter Contractor Name
CONTRACT NUMBER:
Click Here Enter Contract Number
ORDER NUMBER (if applicable):
Click Here and Enter Order Number (if applicable)
PROJECT TITLE:
Click Here and Enter Project Title
CUSTOMER:
Click Here and Enter Project Customer
CUSTOMER POINT OF CONTACT:
Click Here and Enter Project Customer Point of Contact
CUSTOMER PHONE:
Click Here and Enter Project Customer Phone
CUSTOMER EMAIL ADDRESS:
Click Here and Enter Project Customer Email
TOTAL PERIOD OF PERFORMANCE (INCLUDING OPTIONS):
Click Here and Enter a Date
TO
Click Here and Enter a Date
PROJECT VALUE:
Click Here and Enter Project Value

Note: Offeror shall provide excerpts of Contract, Task Order, and/or Award documentation that substantiates the information above within Volume II of the proposal submission. Highlight this information in the submission to include document references/titles, page numbers, section/paragraph headings, as applicable.

For the response provided in Section L paragraph L-2 subparagraph 2.2.1.6 of the Self-Scoring Worksheet for this REP, as applicable, briefly explain the rationale supporting your claim to include the identification/explanation of the excerpts of documentation that substantiate the information to include identification of document references/titles, page numbers, section/paragraph headings, as applicable.

Project 2 - Fire Suppression, Fire Alarm, and/or Mass Notification Systems Repair, Replacement, Upgrade, or Installation

CONTRACTOR NAME:
Click Here and Enter Contractor Name
CONTRACT NUMBER:
Click Here Enter Contract Number
ORDER NUMBER (if applicable):
Click Here and Enter Order Number (if applicable)
PROJECT TITLE:
Click Here and Enter Project Title
CUSTOMER:
Click Here and Enter Project Customer
CUSTOMER POINT OF CONTACT:
Click Here and Enter Project Customer Point of Contact
CUSTOMER PHONE:
Click Here and Enter Project Customer Phone
CUSTOMER EMAIL ADDRESS:
Click Here and Enter Project Customer Email
TOTAL PERIOD OF PERFORMANCE (INCLUDING OPTIONS):
Click Here and Enter a Date
TO
Click Here and Enter a Date
PROJECT VALUE:
Click Here and Enter Project Value

Note: Offeror shall provide excerpts of Contract, Task Order, and/or Award documentation that substantiates the information above within Volume II of the proposal submission. Highlight this information in the submission to include document references/titles, page numbers, section/paragraph headings, as applicable.

For the response provided in Section L paragraph L-2 subparagraph 2.2.1.6 of the Self-Scoring Worksheet for this REP, as applicable, briefly explain the rationale supporting your claim to include the identification/explanation of the excerpts of documentation that substantiate the information to include identification of document references/titles, page numbers, section/paragraph headings, as applicable.

Project 3 - Fire Suppression, Fire Alarm, and/or Mass Notification Systems Repair, Replacement, Upgrade, or Installation

CONTRACTOR NAME:
Click Here and Enter Contractor Name
CONTRACT NUMBER:
Click Here Enter Contract Number
ORDER NUMBER (if applicable):
Click Here and Enter Order Number (if applicable)
PROJECT TITLE:
Click Here and Enter Project Title
CUSTOMER:
Click Here and Enter Project Customer
CUSTOMER POINT OF CONTACT:
Click Here and Enter Project Customer Point of Contact
CUSTOMER PHONE:
Click Here and Enter Project Customer Phone
CUSTOMER EMAIL ADDRESS:
Click Here and Enter Project Customer Email
TOTAL PERIOD OF PERFORMANCE (INCLUDING OPTIONS):
Click Here and Enter a Date
TO
Click Here and Enter a Date
PROJECT VALUE:
Click Here and Enter Project Value

Note: Offeror shall provide excerpts of Contract, Task Order, and/or Award documentation that substantiates the information above within Volume II of the proposal submission. Highlight this information in the submission to include document references/titles, page numbers, section/paragraph headings, as applicable.

For the response provided in Section L paragraph L-2 subparagraph 2.2.1.6 of the Self-Scoring Worksheet for this REP, as applicable, briefly explain the rationale supporting your claim to include the identification/explanation of the excerpts of documentation that substantiate the information to include identification of document references/titles, page numbers, section/paragraph headings, as applicable.

7. Three (3) Relevant Experience Projects performing Electrical System Repair, Replacement, Upgrade, or Installation including Electrical Generation and/or Switchgear. The submitted projects must meet the conditions listed in Att 04_Volume II_Project Category Definitions.

Project 1 - Electrical System Repair, Replacement, Upgrade, or Installation including Electrical Generation and/or Switchgear

CONTRACTOR NAME:
Click Here and Enter Contractor Name
CONTRACT NUMBER:
Click Here Enter Contract Number
ORDER NUMBER (if applicable):
Click Here and Enter Order Number (if applicable)
PROJECT TITLE:
Click Here and Enter Project Title
CUSTOMER:
Click Here and Enter Project Customer
CUSTOMER POINT OF CONTACT:
Click Here and Enter Project Customer Point of Contact
CUSTOMER PHONE:
Click Here and Enter Project Customer Phone
CUSTOMER EMAIL ADDRESS:
Click Here and Enter Project Customer Email
TOTAL PERIOD OF PERFORMANCE (INCLUDING OPTIONS):
Click Here and Enter a Date
TO
Click Here and Enter a Date
PROJECT VALUE:
Click Here and Enter Project Value

Note: Offeror shall provide excerpts of Contract, Task Order, and/or Award documentation that substantiates the information above within Volume II of the proposal submission. Highlight this information in the submission to include document references/titles, page numbers, section/paragraph headings, as applicable.

For the response provided in Section L paragraph L-2 subparagraph 2.2.1.6 of the Self-Scoring Worksheet for this REP, as applicable, briefly explain the rationale supporting your claim to include the identification/explanation of the excerpts of documentation that substantiate the information to include identification of document references/titles, page numbers, section/paragraph headings, as applicable.

Project 2 - Electrical System Repair, Replacement, Upgrade, or Installation including Electrical Generation and/or Switchgear

CONTRACTOR NAME:
Click Here and Enter Contractor Name
CONTRACT NUMBER:
Click Here Enter Contract Number
ORDER NUMBER (if applicable):
Click Here and Enter Order Number (if applicable)
PROJECT TITLE:
Click Here and Enter Project Title
CUSTOMER:
Click Here and Enter Project Customer
CUSTOMER POINT OF CONTACT:
Click Here and Enter Project Customer Point of Contact
CUSTOMER PHONE:
Click Here and Enter Project Customer Phone
CUSTOMER EMAIL ADDRESS:
Click Here and Enter Project Customer Email
TOTAL PERIOD OF PERFORMANCE (INCLUDING OPTIONS):
Click Here and Enter a Date
TO
Click Here and Enter a Date
PROJECT VALUE:
Click Here and Enter Project Value

Note: Offeror shall provide excerpts of Contract, Task Order, and/or Award documentation that substantiates the information above within Volume II of the proposal submission. Highlight this information in the submission to include document references/titles, page numbers, section/paragraph headings, as applicable.

For the response provided in Section L paragraph L-2 subparagraph 2.2.1.6 of the Self-Scoring Worksheet for this REP, as applicable, briefly explain the rationale supporting your claim to include the identification/explanation of the excerpts of documentation that substantiate the information to include identification of document references/titles, page numbers, section/paragraph headings, as applicable.

Project 3 - Electrical System Repair, Replacement, Upgrade, or Installation including Electrical Generation and/or Switchgear

CONTRACTOR NAME:
Click Here and Enter Contractor Name
CONTRACT NUMBER:
Click Here Enter Contract Number
ORDER NUMBER (if applicable):
Click Here and Enter Order Number (if applicable)
PROJECT TITLE:
Click Here and Enter Project Title
CUSTOMER:
Click Here and Enter Project Customer
CUSTOMER POINT OF CONTACT:
Click Here and Enter Project Customer Point of Contact
CUSTOMER PHONE:
Click Here and Enter Project Customer Phone
CUSTOMER EMAIL ADDRESS:
Click Here and Enter Project Customer Email
TOTAL PERIOD OF PERFORMANCE (INCLUDING OPTIONS):
Click Here and Enter a Date
TO
Click Here and Enter a Date
PROJECT VALUE:
Click Here and Enter Project Value

Note: Offeror shall provide excerpts of Contract, Task Order, and/or Award documentation that substantiates the information above within Volume II of the proposal submission. Highlight this information in the submission to include document references/titles, page numbers, section/paragraph headings, as applicable.

For the response provided in Section L paragraph L-2 subparagraph 2.2.1.6 of the Self-Scoring Worksheet for this REP, as applicable, briefly explain the rationale supporting your claim to include the identification/explanation of the excerpts of documentation that substantiate the information to include identification of document references/titles, page numbers, section/paragraph headings, as applicable.

8. Three (3) Relevant Experience Projects performing Heating, Ventilation, and Air Conditioning (HVAC) System, including Computer Room Air Conditioning (CRAC) Units Repair, Replacement, Upgrade, or Installation. The submitted projects must meet the conditions listed in Att 04_Volume II_Project Category Definitions.

Project 1 - Heating, Ventilation, and Air Conditioning (HVAC) System, including Computer Room Air Conditioning (CRAC) Units Repair, Replacement, Upgrade, or Installation

CONTRACTOR NAME:
Click Here and Enter Contractor Name
CONTRACT NUMBER:
Click Here Enter Contract Number
ORDER NUMBER (if applicable):
Click Here and Enter Order Number (if applicable)
PROJECT TITLE:
Click Here and Enter Project Title
CUSTOMER:
Click Here and Enter Project Customer
CUSTOMER POINT OF CONTACT:
Click Here and Enter Project Customer Point of Contact
CUSTOMER PHONE:
Click Here and Enter Project Customer Phone
CUSTOMER EMAIL ADDRESS:
Click Here and Enter Project Customer Email
TOTAL PERIOD OF PERFORMANCE (INCLUDING OPTIONS):
Click Here and Enter a Date
TO
Click Here and Enter a Date
PROJECT VALUE:
Click Here and Enter Project Value

Note: Offeror shall provide excerpts of Contract, Task Order, and/or Award documentation that substantiates the information above within Volume II of the proposal submission. Highlight this information in the submission to include document references/titles, page numbers, section/paragraph headings, as applicable.

For the response provided in Section L paragraph L-2 subparagraph 2.2.1.6 of the Self-Scoring Worksheet for this REP, as applicable, briefly explain the rationale supporting your claim to include the identification/explanation of the excerpts of documentation that substantiate the information to include identification of document references/titles, page numbers, section/paragraph headings, as applicable.

Project 2 - Heating, Ventilation, and Air Conditioning (HVAC) System, including Computer Room Air Conditioning (CRAC) Units Repair, Replacement, Upgrade, or Installation

CONTRACTOR NAME:
Click Here and Enter Contractor Name
CONTRACT NUMBER:
Click Here Enter Contract Number
ORDER NUMBER (if applicable):
Click Here and Enter Order Number (if applicable)
PROJECT TITLE:
Click Here and Enter Project Title
CUSTOMER:
Click Here and Enter Project Customer
CUSTOMER POINT OF CONTACT:
Click Here and Enter Project Customer Point of Contact
CUSTOMER PHONE:
Click Here and Enter Project Customer Phone
CUSTOMER EMAIL ADDRESS:
Click Here and Enter Project Customer Email
TOTAL PERIOD OF PERFORMANCE (INCLUDING OPTIONS):
Click Here and Enter a Date
TO
Click Here and Enter a Date
PROJECT VALUE:
Click Here and Enter Project Value

Note: Offeror shall provide excerpts of Contract, Task Order, and/or Award documentation that substantiates the information above within Volume II of the proposal submission. Highlight this information in the submission to include document references/titles, page numbers, section/paragraph headings, as applicable.

For the response provided in Section L paragraph L-2 subparagraph 2.2.1.6 of the Self-Scoring Worksheet for this REP, as applicable, briefly explain the rationale supporting your claim to include the identification/explanation of the excerpts of documentation that substantiate the information to include identification of document references/titles, page numbers, section/paragraph headings, as applicable.

Project 3 - Heating, Ventilation, and Air Conditioning (HVAC) System, including Computer Room Air Conditioning (CRAC) Units Repair, Replacement, Upgrade, or Installation

CONTRACTOR NAME:
Click Here and Enter Contractor Name
CONTRACT NUMBER:
Click Here Enter Contract Number
ORDER NUMBER (if applicable):
Click Here and Enter Order Number (if applicable)
PROJECT TITLE:
Click Here and Enter Project Title
CUSTOMER:
Click Here and Enter Project Customer
CUSTOMER POINT OF CONTACT:
Click Here and Enter Project Customer Point of Contact
CUSTOMER PHONE:
Click Here and Enter Project Customer Phone
CUSTOMER EMAIL ADDRESS:
Click Here and Enter Project Customer Email
TOTAL PERIOD OF PERFORMANCE (INCLUDING OPTIONS):
Click Here and Enter a Date
TO
Click Here and Enter a Date
PROJECT VALUE:
Click Here and Enter Project Value

Note: Offeror shall provide excerpts of Contract, Task Order, and/or Award documentation that substantiates the information above within Volume II of the proposal submission. Highlight this information in the submission to include document references/titles, page numbers, section/paragraph headings, as applicable.

For the response provided in Section L paragraph L-2 subparagraph 2.2.1.6 of the Self-Scoring Worksheet for this REP, as applicable, briefly explain the rationale supporting your claim to include the identification/explanation of the excerpts of documentation that substantiate the information to include identification of document references/titles, page numbers, section/paragraph headings, as applicable.

9. Three (3) Relevant Experience Projects performing Secured Room Construction in accordance with ICD 705 Specifications. The submitted projects must meet the conditions listed in Att 04_Volume II_Project Category Definitions.

Project 1 - Secured Room Construction

CONTRACTOR NAME:
Click Here and Enter Contractor Name
CONTRACT NUMBER:
Click Here Enter Contract Number
ORDER NUMBER (if applicable):
Click Here and Enter Order Number (if applicable)
PROJECT TITLE:
Click Here and Enter Project Title
CUSTOMER:
Click Here and Enter Project Customer
CUSTOMER POINT OF CONTACT:
Click Here and Enter Project Customer Point of Contact
CUSTOMER PHONE:
Click Here and Enter Project Customer Phone
CUSTOMER EMAIL ADDRESS:
Click Here and Enter Project Customer Email
TOTAL PERIOD OF PERFORMANCE (INCLUDING OPTIONS):
Click Here and Enter a Date
TO
Click Here and Enter a Date
PROJECT VALUE:
Click Here and Enter Project Value

Note: Offeror shall provide excerpts of Contract, Task Order, and/or Award documentation that substantiates the information above within Volume II of the proposal submission. Highlight this information in the submission to include document references/titles, page numbers, section/paragraph headings, as applicable.

For the response provided in Section L paragraph L-2 subparagraph 2.2.1.6 of the Self-Scoring Worksheet for this REP, as applicable, briefly explain the rationale supporting your claim to include the identification/explanation of the excerpts of documentation that substantiate the information to include identification of document references/titles, page numbers, section/paragraph headings, as applicable.

Project 2 - Secured Room Construction

CONTRACTOR NAME:
Click Here and Enter Contractor Name
CONTRACT NUMBER:
Click Here Enter Contract Number
ORDER NUMBER (if applicable):
Click Here and Enter Order Number (if applicable)
PROJECT TITLE:
Click Here and Enter Project Title
CUSTOMER:
Click Here and Enter Project Customer
CUSTOMER POINT OF CONTACT:
Click Here and Enter Project Customer Point of Contact
CUSTOMER PHONE:
Click Here and Enter Project Customer Phone
CUSTOMER EMAIL ADDRESS:
Click Here and Enter Project Customer Email
TOTAL PERIOD OF PERFORMANCE (INCLUDING OPTIONS):
Click Here and Enter a Date
TO
Click Here and Enter a Date
PROJECT VALUE:
Click Here and Enter Project Value

Note: Offeror shall provide excerpts of Contract, Task Order, and/or Award documentation that substantiates the information above within Volume II of the proposal submission. Highlight this information in the submission to include document references/titles, page numbers, section/paragraph headings, as applicable.

For the response provided in Section L paragraph L-2 subparagraph 2.2.1.6 of the Self-Scoring Worksheet for this REP, as applicable, briefly explain the rationale supporting your claim to include the identification/explanation of the excerpts of documentation that substantiate the information to include identification of document references/titles, page numbers, section/paragraph headings, as applicable.

Project 3 - Secured Room Construction

CONTRACTOR NAME:
Click Here and Enter Contractor Name
CONTRACT NUMBER:
Click Here Enter Contract Number
ORDER NUMBER (if applicable):
Click Here and Enter Order Number (if applicable)
PROJECT TITLE:
Click Here and Enter Project Title
CUSTOMER:
Click Here and Enter Project Customer
CUSTOMER POINT OF CONTACT:
Click Here and Enter Project Customer Point of Contact
CUSTOMER PHONE:
Click Here and Enter Project Customer Phone
CUSTOMER EMAIL ADDRESS:
Click Here and Enter Project Customer Email
TOTAL PERIOD OF PERFORMANCE (INCLUDING OPTIONS):
Click Here and Enter a Date
TO
Click Here and Enter a Date
PROJECT VALUE:
Click Here and Enter Project Value

Note: Offeror shall provide excerpts of Contract, Task Order, and/or Award documentation that substantiates the information above within Volume II of the proposal submission. Highlight this information in the submission to include document references/titles, page numbers, section/paragraph headings, as applicable.

For the response provided in Section L paragraph L-2 subparagraph 2.2.1.6 of the Self-Scoring Worksheet for this REP, as applicable, briefly explain the rationale supporting your claim to include the identification/explanation of the excerpts of documentation that substantiate the information to include identification of document references/titles, page numbers, section/paragraph headings, as applicable.

10. Three (3) Relevant Experience Projects performing Special Interest Project. The submitted projects must meet the conditions listed in Att 04_Volume II_Project Category Definitions.

Project 1 - Special Interest Project

CONTRACTOR NAME:
Click Here and Enter Contractor Name
CONTRACT NUMBER:
Click Here Enter Contract Number
ORDER NUMBER (if applicable):
Click Here and Enter Order Number (if applicable)
PROJECT TITLE:
Click Here and Enter Project Title
CUSTOMER:
Click Here and Enter Project Customer
CUSTOMER POINT OF CONTACT:
Click Here and Enter Project Customer Point of Contact
CUSTOMER PHONE:
Click Here and Enter Project Customer Phone
CUSTOMER EMAIL ADDRESS:
Click Here and Enter Project Customer Email
TOTAL PERIOD OF PERFORMANCE (INCLUDING OPTIONS):
Click Here and Enter a Date
TO
Click Here and Enter a Date
PROJECT VALUE:
Click Here and Enter Project Value

Note: Offeror shall provide excerpts of Contract, Task Order, and/or Award documentation that substantiates the information above within Volume II of the proposal submission. Highlight this information in the submission to include document references/titles, page numbers, section/paragraph headings, as applicable.

For the response provided in Section L paragraph L-2 subparagraph 2.2.1.6 of the Self-Scoring Worksheet for this REP, as applicable, briefly explain the rationale supporting your claim to include the identification/explanation of the excerpts of documentation that substantiate the information to include identification of document references/titles, page numbers, section/paragraph headings, as applicable.

Project 2 - Special Interest Project

CONTRACTOR NAME:
Click Here and Enter Contractor Name
CONTRACT NUMBER:
Click Here Enter Contract Number
ORDER NUMBER (if applicable):
Click Here and Enter Order Number (if applicable)
PROJECT TITLE:
Click Here and Enter Project Title
CUSTOMER:
Click Here and Enter Project Customer
CUSTOMER POINT OF CONTACT:
Click Here and Enter Project Customer Point of Contact
CUSTOMER PHONE:
Click Here and Enter Project Customer Phone
CUSTOMER EMAIL ADDRESS:
Click Here and Enter Project Customer Email
TOTAL PERIOD OF PERFORMANCE (INCLUDING OPTIONS):
Click Here and Enter a Date
TO
Click Here and Enter a Date
PROJECT VALUE:
Click Here and Enter Project Value

Note: Offeror shall provide excerpts of Contract, Task Order, and/or Award documentation that substantiates the information above within Volume II of the proposal submission. Highlight this information in the submission to include document references/titles, page numbers, section/paragraph headings, as applicable.

For the response provided in Section L paragraph L-2 subparagraph 2.2.1.6 of the Self-Scoring Worksheet for this REP, as applicable, briefly explain the rationale supporting your claim to include the identification/explanation of the excerpts of documentation that substantiate the information to include identification of document references/titles, page numbers, section/paragraph headings, as applicable.

Project 3 - Special Interest Project

CONTRACTOR NAME:
Click Here and Enter Contractor Name
CONTRACT NUMBER:
Click Here Enter Contract Number
ORDER NUMBER (if applicable):
Click Here and Enter Order Number (if applicable)
PROJECT TITLE:
Click Here and Enter Project Title
CUSTOMER:
Click Here and Enter Project Customer
CUSTOMER POINT OF CONTACT:
Click Here and Enter Project Customer Point of Contact
CUSTOMER PHONE:
Click Here and Enter Project Customer Phone
CUSTOMER EMAIL ADDRESS:
Click Here and Enter Project Customer Email
TOTAL PERIOD OF PERFORMANCE (INCLUDING OPTIONS):
Click Here and Enter a Date
TO
Click Here and Enter a Date
PROJECT VALUE:
Click Here and Enter Project Value

Note: Offeror shall provide excerpts of Contract, Task Order, and/or Award documentation that substantiates the information above within Volume II of the proposal submission. Highlight this information in the submission to include document references/titles, page numbers, section/paragraph headings, as applicable.

For the response provided in Section L paragraph L-2 subparagraph 2.2.1.6 of the Self-Scoring Worksheet for this REP, as applicable, briefly explain the rationale supporting your claim to include the identification/explanation of the excerpts of documentation that substantiate the information to include identification of document references/titles, page numbers, section/paragraph headings, as applicable.

2 | Page

File details come from the government source that posted it. Updated .