Att 05 Contract Surveillance Plan (CSP) 26-R-3005 (SENSS).pdf

PDF 179 KB Posted

Attached to
NAWCAD WOLF ASI Secure Executive Network Software Support (SENSS)
Solicitation number
N0042126R3005
Issued by

About this file

This is a Contract Surveillance Plan (CSP) for a SeaPort-Next Generation (NxG) Multiple Award Contract Task Order supporting the Naval Air Warfare Center Aircraft Division (NAWCAD) Webster Outlying Field Airborne Systems Integration Division. The plan establishes Quality Assurance methods for systematic oversight of contractor performance rather than defining specific deliverables or services.

The Task Order will provide support for development, design, prototyping, low-rate production, demonstration, testing, integration, technical installation, transition through Initial Operational Capability, and maintenance in the domains of cyber, Maritime Domain Awareness, situational awareness, data management and dissemination, and rapid capability software requirements. The contract structure includes Cost-Plus-Fixed-Fee (CPFF) labor CLINs with corresponding cost reimbursable CLINs for Other Direct Costs, organized in a base period plus four option years. The CSP document is a government-developed template that defines surveillance responsibilities and procedures rather than contract terms. It designates the Contracting Officer (KO), Contracting Officer's Representative (COR), Alternate COR, and Government Project Leads as responsible parties for oversight. Surveillance methods include quarterly assessments of quality, schedule, cost control, business relations, management, Small Business utilization, and other performance areas using Contractor Performance Assessment Reporting System (CPARS) ratings. The enclosures provide checklists for evaluating performance against Statement of Work paragraphs and Contract Data Requirements Lists (CDRLs), with annual summaries compiled from quarterly ratings. Five performance rating levels are defined: Exceptional, Very Good, Satisfactory, Marginal, and Unsatisfactory.

View the file

Other files

File Type Posted
Att 18_L1 Section L - Instructions Conditions and Notices 26-R-3005 (SENSS)_AMD 0006.pdf PDF
N00421-26-R-3005 AMD 0006.pdf PDF
N00421-26-R-3005 AMD 0005.pdf PDF
Att 21_Q1 Q and As (15May2026)_AMD 0005.xlsx XLSX spreadsheet
Att 18_L1 Section L - Instructions Conditions and Notices 26-R-3005 (SENSS)_AMD 0004.pdf PDF
Att 21_Q1 Q and As (11May2026)_AMD 0004.xlsx XLSX spreadsheet
N00421-26-R-3005 AMD 0004.pdf PDF
Att 17_C4 Government Labor Hours 26-R-3005 (SENSS)_AMD 0003.xlsx XLSX spreadsheet
Att 21_Q1 Q and As (11May2026)_AMD 0003.xlsx XLSX spreadsheet
Att 14_C1 Cost Workbook 26-R-3005 (SENSS)_AMD 0003.xlsx XLSX spreadsheet
N00421-26-R-3005 AMD 0003.pdf PDF
Att 01 Statement of Work (SOW) 26-R-3005 (SENSS)_AMD 0002.pdf PDF
Att 17_C4 Government Labor Hours 26-R-3005 (SENSS)_AMD 0002.xlsx XLSX spreadsheet
Att 18_L1 Section L - Instructions Conditions and Notices 26-R-3005 (SENSS)_AMD 0002.pdf PDF
Att 21 Q1 Q and As (7May2026)_AMD 0002.xlsx XLSX spreadsheet
Att 14_C1 Cost Workbook 26-R-3005 (SENSS)_AMD 0002.xlsx XLSX spreadsheet
Att 10 Wage Determination 26-R-3005_AMD 0002.pdf PDF
Att 16_C3 Fixed T and M Price Narrative 26-R-3005 (SENSS)_AMD 0002.docx DOCX document
N00421-26-R-3005 AMD 0002.pdf PDF
Att 01 Statement of Work 26-R-3005 (SENSS) Rev 01_AMD 01.pdf PDF
Att Q1 Q and As (23April2026).xlsx XLSX spreadsheet
N00421-26-R-3005 AMD 0001.pdf PDF
Att 18 Section L - Instructions Conditions and Notices 26-R-3005 (SENSS) Rev 01_AMD 01.pdf PDF
Att 12 TDL CDRL ATT COR TPOC 26-R-3005 (SENSS).xlsx XLSX spreadsheet
Att 09 List of Approved Subcontractors 26-R-3005 (SENSS).pdf PDF
Att 07 COR Designation Letters 26-R-3005 (SENSS).pdf PDF
Att 02 DD254 26-R-3005 (SENSS).pdf PDF
Att 20 Key Personnel 26-R-3005 (SENSS).docx DOCX document
Att 14 Cost Workbook 26-R-3005 (SENSS).xlsx XLSX spreadsheet
Att 10 Wage Determination 26-R-3005 (SENSS).pdf PDF
Att 01 Statement of Work 26-R-3005 (SENSS).pdf PDF
Exh A CDRLs 26-R-3005 (SENSS).pdf PDF
Att 19 Section M - Evaluation Factors for Award 26-R-3005 (SENSS).pdf PDF
Att 18 Section L - Instructions Conditions and Notices 26-R-3005 (SENSS).pdf PDF
Att 16 Fixed T and M Price Narrative 26-R-3005 (SENSS).docx DOCX document
Att 06 Data Item Transmittal Form 26-R-3005 (SENSS).pdf PDF
Att 03 Authorized Key Personnel 26-R-3005 (SENSS).pdf PDF
Att 17 Government Labor Hours 26-R-3005 (SENSS).xlsx XLSX spreadsheet
Att 15 Cost Reimbursable Narrative 26-R-3005 (SENSS).docx DOCX document
Att 13 SBPCD 26-R-3005 (SENSS).docx DOCX document
Att 11 TDL CDRL ATT COR Only 26-R-3005 (SENSS).xlsx XLSX spreadsheet
Att 08 OCI List 26-R-3005 (SENSS).pdf PDF
Att 04 CSWF Foundational Qualifications Matrix 26-R-3005 (SENSS).xlsx XLSX spreadsheet
N00421-26-R-3005.pdf PDF
Show all 44

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Contract Surveillance Plan for Secure Executive Network Software Support

1. Purpose

This Contract Surveillance Plan (CSP) is a Government developed and applied document used to ensure systematic Quality Assurance (QA) methods are used in the administration and surveillance of tasking under the Task Order (TO). The intent is to ensure the Contractor performs In Accordance With (IAW) the Statement of Work (SOW) and the Government receives the quality of services called for in the SeaPort-Next Generation (NxG) Multiple Award Contract (MAC) TO.

The Naval Air Warfare Center Aircraft Division (NAWCAD) Webster Outlying Field (WOLF) Airborne Systems Integration (ASI) Division has a requirement to support development, design, prototyping, low-rate production, demonstration, testing, integration, technical installation, transition through Initial Operational Capability (IOC), and maintenance in the domains of cyber, Maritime Domain Awareness (MDA), situational awareness, data management and dissemination, and other rapid capability software requirements.

This TO will have Cost-Plus-Fixed-Fee (CPFF) term Contract Line Item Numbers (CLINs) for labor and corresponding cost reimbursable CLINs for Other Direct Costs (ODCs). The TO will have a base period and four option years. A properly executed CSP will assist the Government in achieving the objectives of this procurement.

2. Authority

Authority for issuance of this CSP is provided under TO Section E – Inspection and Acceptance, which provides for inspections and acceptance of the services, products, and documentation called for in the TO that will be executed by the Contracting Officer (KO) or a duly authorized representative.

3. Scope

To fully understand the roles and responsibilities of the parties, it is important to first define the distinction in terminology between Quality Control Plan (QCP) and the CSP. The Contractor, and not the Government, is responsible for the QCP, which defines the management and quality control actions necessary to meet the quality standards set forth in the TO.

The CSP provides Government surveillance oversight of the Contractor’s efforts to assure they are timely, effective, and delivering the results specified in the TO.

4. Government Resources

The following definitions for Government resources are applicable to this plan:

KO: A person duly appointed with the authority to enter into a contract (Procuring Contracting Officer (PCO)), or a person with the authority to administer contracts (Administrative

Contracting Officer (ACO)) and make related determinations and findings on behalf of the Government. The ACO will be designated in the resulting TO. KOs are designated via a written warrant that sets forth limitations of authority.

Contracting Officer’s Representative (COR): An individual appointed in writing by the PCO to act as their authorized representative to assist in administering the TO. The COR will be appointed in the resulting TO. The limitations of authority are contained in the letter of appointment.

Alternate Contracting Officer’s Representative (ACOR): An individual appointed in writing by the PCO to act as their authorized representative, in the absence of the COR, to assist in administering the TO. The ACOR will be appointed in the resulting TO. The limitations of authority are contained in a written letter of appointment.

Government Project Lead (GPL): The COR designates individual GPLs to assist in administering specific efforts under the TO.

5. Responsibilities

The following Government resources will have responsibility for the implementation of this

CSP:

KO: The KO (PCO or ACO) ensures performance of all necessary actions for effective contracting, ensures compliance with the terms of the TO, and safeguards the interests of the United States in the contractual relationship. The KO assures that the Contractor receives impartial, fair, and equitable treatment under the TO. The KO is ultimately responsible for the final determination of the adequacy of the Contractor’s performance.

COR: The COR is responsible for technical administration of the TO and assures proper Government surveillance of the Contractor’s performance. The COR is not empowered to make any contractual commitments or to authorize any changes on the Government’s behalf. Any changes that the Contractor deems may affect the TO price, terms, or conditions shall be referred to the KO for action.

ACOR: The ACOR assists the COR for technical administration of the TO and assures proper Government surveillance of the Contractor’s performance. The ACOR is not empowered to make any contractual commitments or to authorize any changes on the Government’s behalf.

Any changes that the Contractor deems may affect the TO price, terms, or conditions shall be referred to the KO for action.

GPL: The GPL is responsible for assisting in administering specific efforts under the TO. A GPL cannot, in any manner, alter the scope of the TO, make commitments, or authorize any changes on the Government’s behalf.

6. Methods of QA Surveillance

a. Contractor Performance Assessment Reporting System (CPARS): The marketplace for this type of effort is very competitive. As such, the successful Offeror has a vested interest in the Government generated CPARS under this TO. Additionally, an evaluation using the CPARS format will be performed at the end of each base or option year. This evaluation will be one determinant in the award of future TOs or option exercises. The Government will address the quality of product or service, schedule, cost control, business relations, management, utilization of Small Business (SB), and other important areas for this procurement. Some of the monitoring methods to be used will be Government observation, review of reports, customer feedback, and review of Contract Data Requirements Lists (CDRLs). As this information may affect future source selections throughout the Department of Defense (DoD), as well as the continuation of this tasking, the annual Government assessment will be used appropriately as an additional performance oversight and communication tool within the policies of this CSP.

b. CSP: This document will be used by the COR, ACOR, and GPLs in the technical administration of this TO. In addition to the below instructions, the form to be used for documentation of QA surveillance is the Surveillance Activity Checklist (SAC).

7. Surveillance

Enclosure (2) sets forth the performance standards, incentives, and surveillance methods for the Contractor, COR, ACOR, and GPLs while Enclosures (1) and (3) provide the checklist and means for the COR to document the results of the surveillance and will be provided to the KO.

8. Documentation

In addition to providing reports to the KO, the COR will maintain a complete QA file. The file will contain copies of all reports, evaluations, recommendations, and any actions related to the Government’s performance of the QA function, including the originals of the QA Checklists. All such records will be maintained for the life of the TO. The COR shall forward these records to the KO at termination or completion of the TO.

9. Enclosures

Enclosure (1): Surveillance Activity Checklist (SAC) Enclosure (2): Quarterly Evaluation by Contract Data Requirements List (CDRL) Enclosure (3): Annual Surveillance Summary

Enclosure (1)

ENCLOSURE (1): SURVEILLANCE ACTIVITY CHECKLIST (SAC)

Quarterly Surveillance:

The Contracting Officer’s Representative (COR) will perform a quarterly assessment of quality, schedule, cost control, business relations, management, utilization of Small Business (SB), and other areas as applicable utilizing the Contractor Performance Assessment Reporting System (CPARS) evaluation rating definitions listed in Enclosure (3).

QUARTERLY EVALUATION BY SOW PARAGRAPH

Description Surveillance Method/Measure Dates Quality

Assessment Schedule

Assessment Cost Control Assessment

Business Relations

Assessment

Management Assessment

Utilization of SB

Assessment

Other Areas

Assessment

3.3.1 Software

Support

100% Inspection by COR, ACOR, and/or GPLs.

3.3.2 Information

Technology Support

100% Inspection by COR, ACOR, and/or GPLs.

3.3.3 Cyber

Assessment, Accreditation, and Resilience Support

100% Inspection by COR, ACOR, and/or GPLs.

3.3.4 Product

Assurance, Training, Documentation, and Configuration Management Support

100% Inspection by COR, ACOR, and/or GPLs.

Enclosure (2)

ENCLOSURE (2): QUARTERLY EVALUATION BY CONTRACT DATA REQUIREMENTS LIST (CDRL)

Description Surveillance Method/Measure Dates Due

Dates Completed

No.

Submittals

No. of Req’d

Rework

Percentage On Time Comments

A009 Computer Software Product End Items

100% Inspection by COR, ACOR, and/or GPLs.

A010 Software Requirements Specification (SRS)

100% Inspection by COR, ACOR, and/or GPLs.

A011 Software Design Description

(SDD)

100% Inspection by COR, ACOR, and/or GPLs.

A013 Requirements Traceability Verification Matrix (RVTM)

100% Inspection by COR, ACOR, and/or GPLs.

A015 Software Version Description

(SVD)

100% Inspection by COR, ACOR, and/or GPLs.

A016 Interface Requirements Specification (IRS)

100% Inspection by COR, ACOR, and/or GPLs.

A017 Interface Design Description

(IDD)

100% Inspection by COR, ACOR, and/or GPLs.

A018 System/Subsystem Design Description (SSDD)

100% Inspection by COR, ACOR, and/or GPLs.

A020 Systems Architecture Deliverable

100% Inspection by COR, ACOR, and/or GPLs.

A021 Functional Flow Diagrams 100% Inspection by COR, ACOR, and/or GPLs.

A022 Schematic Block Diagrams 100% Inspection by COR, ACOR, and/or GPLs.

A023 Developmental Design Drawings/Models and Associated Lists

100% Inspection by COR, ACOR, and/or GPLs.

A024 Technical Data Package (TDP) 100% Inspection by COR, ACOR, and/or GPLs.

A025 Product Engineering Design Data and Associated Lists

100% Inspection by COR, ACOR, and/or GPLs.

Enclosure (2)

Description Surveillance Method/Measure Dates Due

Dates Completed

No.

Submittals

No. of Req’d

Rework

Percentage On Time Comments

A026 DoD Information Assurance Certification and Accreditation Process (DIACAP) and Risk Management Framework (RMF) Deliverable Data

100% Inspection by COR, ACOR, and/or GPLs.

A027 Cybersecurity Implementation Plan

100% Inspection by COR, ACOR, and/or GPLs.

A028 Cybersecurity Vulnerability Report

100% Inspection by COR, ACOR, and/or GPLs.

A029 Training Materials 100% Inspection by COR, ACOR, and/or GPLs.

A030 Technical Report – Study/Services

100% Inspection by COR, ACOR, and/or GPLs.

A031 Software User Manual (SUM) 100% Inspection by COR, ACOR, and/or GPLs.

A032 Computer Operation Manual

(COM)

100% Inspection by COR, ACOR, and/or GPLs.

A033 Presentation Material 100% Inspection by COR, ACOR, and/or GPLs.

A034 Technical Assist Visit Report 100% Inspection by COR, ACOR, and/or GPLs.

Metric Summary:

Current Period

Cumulative

Total Number of Deliverables Submitted:

Total Number of Deliverables Submitted Late:

Total Number of Deliverables Requiring Revision:

Percentage of Deliverables Submitted Late:

Percentage of Deliverables Requiring Revision:

Enclosure (3)

ENCLOSURE (3): ANNUAL SURVEILLANCE SUMMARY

The Contracting Officer’s Representative (COR) will perform an assessment of overall Task Order (TO) performance utilizing the Contractor Performance Assessment Reporting System (CPARS) evaluation rating definitions listed in Enclosure (3) below. This assessment will be completed annually covering the previous 12 months.

Description Surveillance Method/Measure Date Planned Date Completed Summary Rating/Results Quality of Product or Service Review of Quarterly Ratings Schedule Review of Quarterly Ratings Cost Control Review of Quarterly Ratings Business Relations Review of Quarterly Ratings Management Review of Quarterly Ratings Utilization of Small Business (SB) Review of Quarterly Ratings

Other Areas Review of Quarterly Ratings

Annual Surveillance Completed By: _______________________

Date Completed: ________________

All Statement of Work (SOW) and Contract Data Requirements List (CDRL) tasks, including sub-tasks, will be assessed focusing on the following.

Quality of product or service: Assess the Contractor’s effort to transform operational needs and requirements into an integrated solution. Areas of focus may include the planning and management of program tasks, the quality of support provided throughout all phases of TO execution, the integration of program management specialties, management of interfaces and the management of a totally integrated effort of all program management concerns to meet cost, performance and schedule objectives. Assess how successfully the Contractor meets program quality.

Schedule: Assess the Contractor’s adherence to the required delivery schedule by assessing the Contractor’s efforts during the assessment period that contribute to or effect the schedule variance. Also address significance of scheduled events (e.g., design reviews), discuss causes, and assess the effectiveness of Contractor corrective actions.

Cost control: Assess the Contractor’s effectiveness in forecasting, managing, and controlling TO cost. Is the Contractor experiencing cost growth or under-run? If so, discuss the causes and contractor-proposed solutions for the cost overruns. For TOs where task or TO sizing is based upon contractor-provided person hour estimates, the relationship of these estimates to ultimate cost should be assessed.

In addition, the extent to which the Contractor demonstrates a sense of cost responsibility through the efficient use of resources in each work effort will be assessed.

Business relations: Assess the timeliness, completeness, and quality of problem identification, corrective action plans, proposal submittals, the Contractor’s reasonable and cooperative behavior, effective business relations, and customer satisfaction.

Management: Assess the Contractor’s success with timely award and management of subcontracts. Discuss the extent to which the Contractor discharges its responsibility for integration and coordination of all activity needed to execute the TO; identifies and applies resources required to meet schedule requirements; assigns responsibility for tasks/actions required by the TO; and communicates appropriate information to affected program elements in a timely manner. Assess the Contractor’s risk mitigation plans.

Utilization of Small Business (SB): The Request for Proposal (RFP) and FAR Subpart 19.7 and 15 U.S.C. 637 contains statutory requirements for complying with the SB Subcontracting Program. Assess whether the Contractor provided maximum practicable opportunity for SB (including Alaska Native Corporations (ANCs) and Indian Tribes) (including Small-Disadvantaged Businesses (SDBs) (which also includes ANCs and Indian Tribes), Women-Owned SBs (WOSBs), HUBZone, Veteran-Owned SBs (VOSBs), Service-Disabled Veteran Owned SBs (SDVOSBs), and ANCs and Indian Tribes that are not SDBs or SBs to participate in TO performance consistent with efficient performance of the TO. Evaluation will focus on the metrics of actual SB utilization as compared to the TO required targets and the Contractor’s submitted SB plan.

Other areas: Assess additional evaluation areas unique to the TO or that cannot be captured elsewhere.

The evaluation ratings are as follows:

Exceptional Performance: Performance meets contractual requirements and exceeds many to the Government’s benefit. The contractual performance of the element or sub-element being evaluated was accomplished with few minor problems for which corrective actions taken by the Contractor were highly effective.

Very Good Performance: Performance meets contractual requirements and exceeds some to the Government’s benefit. The contractual performance of the element or sub-element being evaluated was accomplished with some minor problems for which corrective actions taken by the Contractor were effective.

Satisfactory Performance: Performance meets contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the Contractor appear or were satisfactory.

Marginal Performance: Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being evaluated reflects a serious problem for which the Contractor has not yet identified corrective actions. The Contractor’s proposed actions appear only marginally effective or were not fully implemented.

Unsatisfactory Performance: Performance does not meet most contractual requirements and recovery is not likely in a timely manner.

The contractual performance of the element or sub-element contains a serious problem(s) for which the Contractor’s corrective actions appear or were ineffective.

1. Purpose
2. Authority
3. Scope
4. Government Resources
5. Responsibilities
6. Methods of QA Surveillance
7. Surveillance
8. Documentation
9. Enclosures