About this file

This document outlines requirements for a design-build project to modify facilities at the Minneapolis VA Health Care System to improve centralized services, social distancing, and patient flow in response to the COVID-19 pandemic. Key aspects of the project include designing and constructing an expanded centralized intake and service area on the fourth floor to serve three primary care clinics; decentralizing blood draw services to this area; installing social distancing elements in various clinic waiting rooms throughout the facility, including building partitions and reconfiguring seating; and adding barriers to reception desks. The design-build contractor must meet milestones such as submitting 35%, 65%, 95%, and 100% design packages for review and approval, with construction to be completed within 340 days of the notice to proceed. Deliverables include specifications, drawings, and BIM models following VA standards.

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .