This file is a Price Breakout Schedule for a VA Medical Center concrete repair project located in Mountain Home, Tennessee. The solicitation (36C24926R0030) covers concrete repairs and replacements at five buildings (B2, B43, B45, B160, and B162), including demolishing and replacing a basketball court and repairing sidewalks with 6-inch steel-reinforced concrete. The project requires a detailed cost breakdown across multiple divisions including general conditions, existing conditions, concrete work, earthwork, and exterior improvements, with specific requirements for itemizing labor, materials, equipment, overhead, and profit. The contract has a 39-calendar day performance period after Notice to Proceed, includes a one-year warranty, and is being executed by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 9, with the contractor responsible for all labor, materials, and coordinating work to minimize traffic and pedestrian disruptions.

View the file

Other files

File Type Posted
Atch 8 Drawings.pdf PDF
Atch 9 Specification.pdf PDF
36C24926R0030 0001.docx DOCX document
Atch 4 Contractor EMR Certification Form.docx DOCX document
Atch 1 WD Washington County Building TN20260191 dated 01012026.pdf PDF
36C24926R0030_1.docx DOCX document
Atch 5 General Conditions Breakout.xlsx XLSX spreadsheet
Atch 3 Calculation of Contractor Self Performed Work.xlsx XLSX spreadsheet
Atch 2 TAX ID UEI Information.docx DOCX document
Atch 7 RFI Form.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Breakdown

LOCATION:Solicitation Number:Project NumberProject TitleProposal Due Date
Mountain Home, TN36C24926R0030Concrete Repairs B2, B43, B45, B160 & B162
PRICE BREAKOUT SCHEDULE
When entering a line item for General Conditions costs on Schedule of Values, a breakout of the General Conditions costs must be provided. Per VAAR 852.243-70 Contract Changes-Supplement, paragraph (c)(1), the following contractual restrictions apply: Overhead and Contractor's fee percentages shall be considered to include insurance other than mentioned herein, field and office supervisors and assistants, security police, use of small tools, incidental job burdens, and general home office expenses and no separate allowance will be made. Assistants to office supervisors include all clerical, stenographic and general office help. Incidental job burdens include, but are not necessarily limited to, office equipment and supplies, temporary toilets, telephone and conformance to OSHA requirements. Items such as, but not necessarily limited to, review and coordination, estimating and expediting relative to contract changes are associated with field and office supervision and are considered to be included in the Contractor's overhead and/or fee percentage.
SPEC/COST CODEDESCRIPTIONLABORMATERIALEQUIPMENTDIVISION TOTALS
GENERAL CONDITIONS$0.00
Superintendent
Project Manager
Field Office Engineer
Builder's Risk Insurance
Other Project Specific Liability Insurance
Site Maintenance and Protection
Progress Photos (per contract specifications)
Dumpsters
Office Trailer
Storage Trailer/POD/CONEX
Telephone (Cell and/or Landline)
Signage (per contract specifications and/or drawings)
Travel (must comply with Federal Travel Regulations)
Lodging (must comply with Federal Travel Regulations)
Record Document Preparation
As-builts (per contract specifications)
Weather Protection (per contract specifications)
Infection Control (per contract specifications)
Information Technology (Internet, etc.)
DIVISION 1GENERAL REQUIREMENTS$0.00
01 00 00General Requirements
01 32 16.15Project Schedules
01 33 23Shop Drawings, Product Data, & Samples
01 35 26Safety Requirements
01 42 19Reference Standards
01 45 00Quality Control
01 57 19Temporary Environmental Controls
01 74 19Construction Waste Management
01 81 13Sustainable Construction Requirements
DIVISION 2EXISTING CONDITIONS$0.00
02 41 00Demolition
DIVISION 3CONCRETE$0.00
03 23 00Stressing Tendons
03 30 00Cast-In-Place Concrete
03 30 53Short Form Cast-In-Place Concrete
03 37 13Shotcrete
03 41 13Precast Concrete Hollow Core Planks
03 41 33Precast Structural Pretensioned Concrete
03 45 00Precast Architectural Concrete
03 51 13Cementitious Wood Fiber Decks
03 51 16Gypsum Concrete Roof Decks
03 52 00Lightweight Concrete Roof Insulation
03 55 11Gypsum Concrete Floor Decks
DIVISION 31EARTHWORK$0.00
31 20 00Earthwork
31 20 11Earthwork (Short Form)
31 23 19Dewatering
31 23 23.33Flowable Fill
31 32 23Pressure Grouting Soil Stabilization
31 62 00Driven Piles
31 63 16Auger Cast Grout Piles
31 63 26Drilled Caissons
DIVISION 32EXTERIOR IMPROVEMENTS$0.00
32 05 23Cement and Concrete for Exterior Improvements
32 12 16Asphalt Paving
32 14 16Brick Unit Paving
32 17 23Pavement Markings
32 31 13Chain Link Fences and Gates
32 31 40High Security Fences and Gates
32 84 00Planting Irrigation
32 90 00Planting
DIVISION$0.00
TOTALS
TOTAL LABOR$0.00

TOTAL MATERIALS $0.00

TAX FOR MATERIALS 6% $0.00

TOTAL EQUIPMENT $0.00

DIVISION GRAND TOTALS $0.00

DIVISION GRAND TOTALS$0INSTRUCTIONS
TAX FOR MATERIALS$0
1. Contract breakdowns must include the applicable VA Medical Center, the date the proposal was provided to the VA, the job title, project number, and the solicitation number;
SUBTOTAL$0
OVERHEAD10%$02. Lump sum price breakdowns will not be accepted. Lump sum price breakdowns are defined as a single price provided by the contractor for one division or subdivision when each division or subdivision can be broken down by price to a greater degree;
PROFIT10%$0
SUBTOTAL$0
3. Divisions must still be listed even if not applicable to the construction requirement;
BOND/FEE
PERMITS/LICENSES3%$04. The template above does not include all possible divisions or subdivisions needed for the fictitious requirement referenced above. It is only provided as an example of what would be acceptable to the VA Network Contracting Office 9 -Construction Team as of 6-30-2016. Contractors shall provide all prices for each categorical column above and break down each specific division to the greatest degree possible, similar to what is referenced above. Utilizing this template in the contractor's proposal does not in any way require the Government to accept any subsequent price breakdown that is provided by the contractor or prevent the Government from requesting a further price breakdown. Therefore, it is in the Governments and contractor’s best interest to provide a thorough price breakdown initially; and

GRAND TOTAL $0

5. This template, or another template that would be provide the same kind of information referenced above, is required for all proposals provided to the VA Network Contracting Office 9 - Construction as of 6-30-2016.