Atch 6 Price Breakout Schedule.xlsx
XLSX spreadsheet 19 KB Posted
- Attached to
- Y1PZ--Concrete Repairs B2, B43, B45, B160 & B162
- Solicitation number
- 36C24926R0030
About this file
This file is a Price Breakout Schedule for a VA Medical Center concrete repair project located in Mountain Home, Tennessee. The solicitation (36C24926R0030) covers concrete repairs and replacements at five buildings (B2, B43, B45, B160, and B162), including demolishing and replacing a basketball court and repairing sidewalks with 6-inch steel-reinforced concrete. The project requires a detailed cost breakdown across multiple divisions including general conditions, existing conditions, concrete work, earthwork, and exterior improvements, with specific requirements for itemizing labor, materials, equipment, overhead, and profit. The contract has a 39-calendar day performance period after Notice to Proceed, includes a one-year warranty, and is being executed by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 9, with the contractor responsible for all labor, materials, and coordinating work to minimize traffic and pedestrian disruptions.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Atch 8 Drawings.pdf | ||
| Atch 9 Specification.pdf | ||
| 36C24926R0030 0001.docx | DOCX document | |
| Atch 4 Contractor EMR Certification Form.docx | DOCX document | |
| Atch 1 WD Washington County Building TN20260191 dated 01012026.pdf | ||
| 36C24926R0030_1.docx | DOCX document | |
| Atch 5 General Conditions Breakout.xlsx | XLSX spreadsheet | |
| Atch 3 Calculation of Contractor Self Performed Work.xlsx | XLSX spreadsheet | |
| Atch 2 TAX ID UEI Information.docx | DOCX document | |
| Atch 7 RFI Form.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Breakdown
| LOCATION: | Solicitation Number: | Project Number | Project Title | Proposal Due Date | |
| Mountain Home, TN | 36C24926R0030 | Concrete Repairs B2, B43, B45, B160 & B162 | |||
| PRICE BREAKOUT SCHEDULE | |||||
| When entering a line item for General Conditions costs on Schedule of Values, a breakout of the General Conditions costs must be provided. Per VAAR 852.243-70 Contract Changes-Supplement, paragraph (c)(1), the following contractual restrictions apply: Overhead and Contractor's fee percentages shall be considered to include insurance other than mentioned herein, field and office supervisors and assistants, security police, use of small tools, incidental job burdens, and general home office expenses and no separate allowance will be made. Assistants to office supervisors include all clerical, stenographic and general office help. Incidental job burdens include, but are not necessarily limited to, office equipment and supplies, temporary toilets, telephone and conformance to OSHA requirements. Items such as, but not necessarily limited to, review and coordination, estimating and expediting relative to contract changes are associated with field and office supervision and are considered to be included in the Contractor's overhead and/or fee percentage. | |||||
| SPEC/COST CODE | DESCRIPTION | LABOR | MATERIAL | EQUIPMENT | DIVISION TOTALS |
| GENERAL CONDITIONS | $0.00 | |
| Superintendent | ||
| Project Manager | ||
| Field Office Engineer | ||
| Builder's Risk Insurance | ||
| Other Project Specific Liability Insurance | ||
| Site Maintenance and Protection | ||
| Progress Photos (per contract specifications) | ||
| Dumpsters | ||
| Office Trailer | ||
| Storage Trailer/POD/CONEX | ||
| Telephone (Cell and/or Landline) | ||
| Signage (per contract specifications and/or drawings) | ||
| Travel (must comply with Federal Travel Regulations) | ||
| Lodging (must comply with Federal Travel Regulations) | ||
| Record Document Preparation | ||
| As-builts (per contract specifications) | ||
| Weather Protection (per contract specifications) | ||
| Infection Control (per contract specifications) | ||
| Information Technology (Internet, etc.) | ||
| DIVISION 1 | GENERAL REQUIREMENTS | $0.00 |
| 01 00 00 | General Requirements | |
| 01 32 16.15 | Project Schedules | |
| 01 33 23 | Shop Drawings, Product Data, & Samples | |
| 01 35 26 | Safety Requirements | |
| 01 42 19 | Reference Standards | |
| 01 45 00 | Quality Control | |
| 01 57 19 | Temporary Environmental Controls | |
| 01 74 19 | Construction Waste Management | |
| 01 81 13 | Sustainable Construction Requirements | |
| DIVISION 2 | EXISTING CONDITIONS | $0.00 |
| 02 41 00 | Demolition | |
| DIVISION 3 | CONCRETE | $0.00 |
| 03 23 00 | Stressing Tendons | |
| 03 30 00 | Cast-In-Place Concrete | |
| 03 30 53 | Short Form Cast-In-Place Concrete | |
| 03 37 13 | Shotcrete | |
| 03 41 13 | Precast Concrete Hollow Core Planks | |
| 03 41 33 | Precast Structural Pretensioned Concrete | |
| 03 45 00 | Precast Architectural Concrete | |
| 03 51 13 | Cementitious Wood Fiber Decks | |
| 03 51 16 | Gypsum Concrete Roof Decks | |
| 03 52 00 | Lightweight Concrete Roof Insulation | |
| 03 55 11 | Gypsum Concrete Floor Decks | |
| DIVISION 31 | EARTHWORK | $0.00 |
| 31 20 00 | Earthwork | |
| 31 20 11 | Earthwork (Short Form) | |
| 31 23 19 | Dewatering | |
| 31 23 23.33 | Flowable Fill | |
| 31 32 23 | Pressure Grouting Soil Stabilization | |
| 31 62 00 | Driven Piles | |
| 31 63 16 | Auger Cast Grout Piles | |
| 31 63 26 | Drilled Caissons | |
| DIVISION 32 | EXTERIOR IMPROVEMENTS | $0.00 |
| 32 05 23 | Cement and Concrete for Exterior Improvements | |
| 32 12 16 | Asphalt Paving | |
| 32 14 16 | Brick Unit Paving | |
| 32 17 23 | Pavement Markings | |
| 32 31 13 | Chain Link Fences and Gates | |
| 32 31 40 | High Security Fences and Gates | |
| 32 84 00 | Planting Irrigation | |
| 32 90 00 | Planting | |
| DIVISION | $0.00 |
| TOTALS | |
| TOTAL LABOR | $0.00 |
TOTAL MATERIALS $0.00
TAX FOR MATERIALS 6% $0.00
TOTAL EQUIPMENT $0.00
DIVISION GRAND TOTALS $0.00
| DIVISION GRAND TOTALS | $0 | INSTRUCTIONS |
| TAX FOR MATERIALS | $0 | |
| 1. Contract breakdowns must include the applicable VA Medical Center, the date the proposal was provided to the VA, the job title, project number, and the solicitation number; | ||
| SUBTOTAL | $0 |
| OVERHEAD | 10% | $0 | 2. Lump sum price breakdowns will not be accepted. Lump sum price breakdowns are defined as a single price provided by the contractor for one division or subdivision when each division or subdivision can be broken down by price to a greater degree; |
| PROFIT | 10% | $0 |
| SUBTOTAL | $0 | ||
| 3. Divisions must still be listed even if not applicable to the construction requirement; | |||
| BOND/FEE | |||
| PERMITS/LICENSES | 3% | $0 | 4. The template above does not include all possible divisions or subdivisions needed for the fictitious requirement referenced above. It is only provided as an example of what would be acceptable to the VA Network Contracting Office 9 -Construction Team as of 6-30-2016. Contractors shall provide all prices for each categorical column above and break down each specific division to the greatest degree possible, similar to what is referenced above. Utilizing this template in the contractor's proposal does not in any way require the Government to accept any subsequent price breakdown that is provided by the contractor or prevent the Government from requesting a further price breakdown. Therefore, it is in the Governments and contractor’s best interest to provide a thorough price breakdown initially; and |
GRAND TOTAL $0