The document is an Excel template for calculating contractor self-performed work for Solicitation 36C24926R0030, a concrete repair project at James H. Quillen VA Medical Center in Mountain Home, Tennessee. The solicitation requires Service Disabled Veteran Owned Small Business (SDVOSB) contractors to self-perform at least 15% of contract personnel costs, with a detailed breakdown of personnel and material costs by specification division.

The project scope includes concrete repairs and replacements at multiple buildings (B2, B45, B46, B160, B162), involving demolition and installation of new reinforced concrete sidewalks and a basketball court. Specific tasks include leveling concrete, removing trip hazards, installing new 3500 psi reinforced concrete, and replacing a basketball court slab. The contract has a 39-calendar day performance period, requires proper debris disposal, and includes a one-year warranty. The solicitation is issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 9.

View the file

Other files

File Type Posted
Atch 9 Specification.pdf PDF
Atch 8 Drawings.pdf PDF
36C24926R0030 0001.docx DOCX document
Atch 7 RFI Form.docx DOCX document
Atch 4 Contractor EMR Certification Form.docx DOCX document
Atch 1 WD Washington County Building TN20260191 dated 01012026.pdf PDF
36C24926R0030_1.docx DOCX document
Atch 5 General Conditions Breakout.xlsx XLSX spreadsheet
Atch 2 TAX ID UEI Information.docx DOCX document
Atch 6 Price Breakout Schedule.xlsx XLSX spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Table 1

CALCULATION OF SELF-PERFORMED/SUBCONTRACTED WORK 36C24926R0030
Offerors for Contractors (NAICS code 238110) must provide at least 15 percent (general construction) of the cost of the contract performance incurred for personnel must be performed by the Service Disabled Veteran Owned Small Business (SDVOSB) awardee or those of a verified SDVOSB subcontractor. Provide a breakdown of material and personnel costs, by specification division listed for the project. Home Office overhead, profit/fee and bond costs shall be added after a subtotal of personnel and material/Equipment costs has been calculated. Clearly identify the personnel costs you will be performing, and the personnel costs of other eligible service disabled veteran-owned small business concerns. Below is a suggested format.
Specification DivisionSB Vendor (Y or N)Personnel CostMaterial/Equipment Costs
Prime$0.00$0.00
Sub$0.00$0.00
Sub$0.00$0.00
Sub$0.00$0.00
Sub$0.00$0.00
Sub$0.00$0.00
Sub$0.00$0.00
Sub$0.00$0.00
Sub$0.00$0.00
Sub$0.00$0.00
Sub$0.00$0.00
(Add additional lines as necessary for each Division applicable to this project)$0.00$0.00
Sub Total (Personnel Costs, Material /Equipment Costs)$0.00
Percentage0Profit$0.00
Percentage0Home Office Overhead$0.00
Percentage0Bond$0.00
Grand Total$0.00
Calculation of self-performed personnel costs:
1. Total personnel costs * both prime and all subcontractors:$0.00
2. Subtract all subcontractor personnel costs* that are not SDVOSB
companies that will perform work on this contract:$0.00
3. Remainder is ‘Total amount of work to be self-performed under the
Contract:$0.00
4. Self-performed work = Line 3/Line 1 x 100 =ERROR:#DIV/0!
*personnel costs include labors, mechanics, other tradesmen, and office personnel directly