Atch 5 General Conditions Breakout.xlsx
XLSX spreadsheet 13 KB Posted
- Attached to
- Y1PZ--Concrete Repairs B2, B43, B45, B160 & B162
- Solicitation number
- 36C24926R0030
About this file
This file is a General Conditions Breakout spreadsheet for a VA Medical Center concrete repair project. The document provides a detailed cost breakdown of general conditions line items, including zero-dollar allocations for project management roles (Project Manager, Superintendent, Safety Manager), site conditions (temporary power, water, fencing), and administrative expenses. The associated federal contract opportunity involves concrete repairs at multiple buildings (B2, B45, B46, B160, B162) at the James H. Quillen VA Medical Center in Mountain Home, Tennessee. The project scope includes demolishing and replacing damaged sidewalks, repairing trip hazards, and reconstructing a basketball court, with a 39-calendar day performance period and a one-year warranty. The repairs are intended to mitigate dangerous trip and fall hazards in high-traffic areas used by patients, pedestrians, and employees.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Atch 9 Specification.pdf | ||
| Atch 8 Drawings.pdf | ||
| 36C24926R0030 0001.docx | DOCX document | |
| Atch 3 Calculation of Contractor Self Performed Work.xlsx | XLSX spreadsheet | |
| Atch 2 TAX ID UEI Information.docx | DOCX document | |
| Atch 7 RFI Form.docx | DOCX document | |
| Atch 4 Contractor EMR Certification Form.docx | DOCX document | |
| Atch 1 WD Washington County Building TN20260191 dated 01012026.pdf | ||
| 36C24926R0030_1.docx | DOCX document | |
| Atch 6 Price Breakout Schedule.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GC Breakout
| GENERAL CONDITIONS BREAKOUT | ||
| When entering a line item for General Conditions costs on Schedule of Values, a breakout of the General Conditions costs must be provided. Per VAAR 852.243-70 Construction Contract Changes-Supplement, paragraph (c)(1), the following contractual restrictions apply: Overhead and Contractor's fee percentages shall be considered to include insurance other than mentioned herein, field and office supervisors and assistants, security police, use of small tools, incidental job burdens, and general home office expenses and no separate allowance will be made. Assistants to office supervisors include all clerical, stenographic and general office help. Incidental job burdens include, but are not necessarily limited to, office equipment and supplies, temporary toilets, telephone and conformance to OSHA requirements. Items such as, but not necessarily limited to, review and coordination, estimating and expediting relative to contract changes are associated with field and office supervision and are considered to be included in the Contractor's overhead and/or fee percentage. | ||
| General Condition Description | Value | |
| Project Management: | $ - 0 | |
| Superintendent(s) | $ - 0 | |
| Safety Manager | $ - 0 | |
| CPM Scheduler | $ - 0 | |
| Quality Assurance/Quality Control | $ - 0 | |
| Project Manager (s) | $ - 0 | |
| Project Executive | $ - 0 | |
| Field Office Engineer | $ - 0 | |
| Field Office Support Staff | $ - 0 | |
| Project Expeditor | $ - 0 | |
| Assistant Superintendent (s) | $ - 0 | |
| Project Manager Subtotal: | $ - 0 | |
| Bonds and Insurance (excluding any for Subcontractors): | $ - 0 | |
| Builder’s Risk Insurance | $ - 0 | |
| General Liability Insurance | $ - 0 | |
| Security, Payment & Performance Bonds | $ - 0 | |
| Bonds and Insurance Subtotal: | $ - 0 | |
| Site Conditions: | $ - 0 | |
| Temporary Power Consumption (Offices) | $ - 0 | |
| Temporary Power Consumption (General Site Use) | $ - 0 | |
| Temporary Water and Sewer Consumption | $ - 0 | |
| Temporary Water Hookup, Distribution & Meters | $ - 0 | |
| Temporary Electrical Hookup, Distribution & Meters | $ - 0 | |
| Temporary Telephone & Network System Installation | $ - 0 | |
| Temporary Telephone & Internet Consumption Fees | $ - 0 | |
| Temporary Fire Protection | $ - 0 | |
| Temporary Heating & Cooling | $ - 0 | |
| Temporary Fencing | $ - 0 | |
| Temporary Covered Walkways | $ - 0 | |
| SWPPP Measures | $ - 0 | |
| Temporary Entries and Truck Washes | $ - 0 | |
| Street Cleaning (by G.C.) | $ - 0 | |
| Traffic Control Measures | $ - 0 | |
| Temporary Barricades & Signage | $ - 0 | |
| Temporary Roads & Walkways (install & maintenance) | $ - 0 | |
| Temporary Lighting | $ - 0 | |
| Temporary Partitions & Covered Floor Openings | $ - 0 | |
| Temporary Toilets/Sanitary Measures | $ - 0 | |
| Temporary Laydown (prep and restoration) | $ - 0 | |
| Security System/Watchman | $ - 0 | |
| Pre-construction Photo Documentation | $ - 0 | |
| Progress Photos | $ - 0 | |
| Temporary Protection (in place work/adjacent structures) | $ - 0 | |
| $ - 0 | ||
| $ - 0 | ||
| $ - 0 | ||
| General Conditions Total | $ - 0 |