Atch 9 Specification.pdf
PDF 680 KB Posted
- Attached to
- Y1PZ--Concrete Repairs B2, B43, B45, B160 & B162
- Solicitation number
- 36C24926R0030
About this file
These are technical specification documents for a concrete repair project (Project #621-26-005) at a VA (Veterans Affairs) medical center. The documents cover multiple sections including general requirements, project schedules, submittal procedures, quality control, environmental controls, construction waste management, demolition, earthwork, concrete materials, and exterior improvements.
Key technical requirements include concrete repairs involving site preparation, demolition of existing structures, earthwork, subbase preparation, concrete placement, reinforcement, joint construction, finishing, curing, and protective coating. The specifications provide detailed instructions for contractors on materials, methods, tolerances, testing, and quality control. The project involves preparing subgrade, installing concrete for walks, curbs, gutters, equipment pads, and other exterior improvements with specific requirements for concrete mix design, compaction, joint placement, surface finishing, and environmental protections. The documents emphasize precise technical standards for concrete work, including minimum strength requirements, slump specifications, curing methods, and field quality control measures.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24926R0030 0001.docx | DOCX document | |
| Atch 8 Drawings.pdf | ||
| Atch 7 RFI Form.docx | DOCX document | |
| Atch 5 General Conditions Breakout.xlsx | XLSX spreadsheet | |
| Atch 3 Calculation of Contractor Self Performed Work.xlsx | XLSX spreadsheet | |
| Atch 2 TAX ID UEI Information.docx | DOCX document | |
| Atch 6 Price Breakout Schedule.xlsx | XLSX spreadsheet | |
| Atch 4 Contractor EMR Certification Form.docx | DOCX document | |
| Atch 1 WD Washington County Building TN20260191 dated 01012026.pdf | ||
| 36C24926R0030_1.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
01 00 00 -1
SECTION 01 00 00
SECTION 01 00 00
GENERAL REQUIREMENTS
GENERAL
1.1 SAFETY REQUIREMENTS
A. Refer to section 01 35 26, SAFETY REQUIREMENTS for safety and infection control requirements.
1.2 GENERAL INTENTION
Contractor shall completely prepare site for building operations, including demolition and removal of existing structures, and furnish labor and materials and perform work for Project #
A. Install Signs and Historical Site Enhance as required by drawings and specifications.
B. Visits to the site by Bidders shall be made only by appointment with the C.O.R.
C. Offices of FFE Inc, as Architect-Engineers, will render certain technical services during construction. Such services shall be considered as advisory to the Government and shall not be construed as expressing or implying a contractual act of the Government without affirmations by Contracting Officer or his duly authorized representative.
D. All employees of general contractor and subcontractors shall comply with VA security management program and obtain permission of the VA police, be identified by project and employer, and restricted from unauthorized access.
1.3 STATEMENT OF BID ITEM(S)
A. ITEM I, GENERAL CONSTRUCTION BASE BID : Work includes general construction, alterations, walks, necessary removal of existing structures and construction and certain other items.
B. ALTERNATE NO.1: BASE BID except delete “gazebo historical rehabilitation” shown on sheet A103 and E101B.
C. ALTERNATE NO.2: BASE BID except delete ALTERNATE 1 and pavilion detailed on A104 and E101B.
D. Drawings and contract documents may be obtained from the website where the solicitation is posted. Additional copies will be at Contractor's expense.
1.4 CONSTRUCTION SECURITY REQUIREMENTS
A. Security Plan:
VHAMOULopezJ Typewritten Text 621-26-005
VHAMOULopezJ Typewritten Text 621-26-005 Concrete Repairs
01 32 16.15 - 1
PROJECT SCHEDULES
SECTION 01 32 16.15
PROJECT SCHEDULES
(SMALL PROJECTS – DESIGN/BID/BUILD)
PART 1- GENERAL
1.1 DESCRIPTION:
A. The Contractor shall develop a Critical Path Method (CPM) plan and schedule demonstrating fulfillment of the contract requirements (Project Schedule), and shall keep the Project Schedule up-to-date in accordance with the requirements of this section and shall utilize the plan for scheduling, coordinating and monitoring work under this contract (including all activities of subcontractors, equipment vendors and suppliers). Conventional
Critical Path Method (CPM) technique shall be utilized to satisfy both time and cost applications.
1.2 CONTRACTOR'S REPRESENTATIVE:
A. The Contractor shall designate an authorized representative responsible for the Project Schedule including preparation, review and progress reporting with and to the Contracting Officer's Representative (COR).
B. The Contractor's representative shall have direct project control and complete authority to act on behalf of the Contractor in fulfilling the requirements of this specification section.
C. The Contractor’s representative shall have the option of developing the project schedule within their organization or to engage the services of an outside consultant. If an outside scheduling consultant is utilized, Section 1.3 of this specification will apply.
1.3 CONTRACTOR'S CONSULTANT:
A. The Contractor shall submit a qualification proposal to the COR, within 10 days of bid acceptance. The qualification proposal shall include:
1. The name and address of the proposed consultant.
2. Information to show that the proposed consultant has the qualifications to meet the requirements specified in the preceding paragraph.
3. A representative sample of prior construction projects, which the proposed consultant has performed complete project scheduling services.
These representative samples shall be of similar size and scope.
B. The Contracting Officer has the right to approve or disapprove the proposed consultant, and will notify the Contractor of the VA decision
VHAMOULopezJ
01 33 23 - 1
SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES
SECTION 01 33 23
SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES
PART 1 – GENERAL
1.1 DESCRIPTION
A. This specification defines the general requirements and procedures for submittals. A submittal is information submitted for VA review to establish compliance with the contract documents.
B. Detailed submittal requirements are found in the technical sections of the contract specifications. The Contracting Officer may request submittals in addition to those specified when deemed necessary to adequately describe the work covered in the respective technical specifications at no additional cost to the government.
C. VA approval of a submittal does not relieve the Contractor of the responsibility for any error which may exist. The Contractor is responsible for fully complying with all contract requirements and the satisfactory construction of all work, including the need to check, confirm, and coordinate the work of all subcontractors for the project. Non-compliant material incorporated in the work will be removed and replaced at the
Contractor’s expense.
1.2 DEFINITIONS
A. Preconstruction Submittals: Submittals which are required prior to issuing contract notice to proceed or starting construction. For example, Certificates of insurance; Surety bonds; Site-specific safety plan;
Construction progress schedule; Schedule of values; Submittal register; List of proposed subcontractors.
B. Shop Drawings: Drawings, diagrams, and schedules specifically prepared to illustrate some portion of the work. Drawings prepared by or for the
Contractor to show how multiple systems and interdisciplinary work will be integrated and coordinated.
C. Product Data: Catalog cuts, illustrations, schedules, diagrams, performance charts, instructions, and brochures, which describe and illustrate size, physical appearance, and other characteristics of materials, systems, or equipment for some portion of the work. Samples of warranty language when the contract requires extended product warranties.
VHAMOULopezJ
01 45 00 - 1
QUALITY CONTROL
SECTION 01 45 00
QUALITY CONTROL
PART 1 - GENERAL
1.1 DESCRIPTION
This section specifies requirements for Contractor Quality Control (CQC) for Design-Bid-
Build (DBB) construction projects.
1.2 APPLICABLE PUBLICATIONS
A. The publication listed below form a part of this specification to the extent referenced.
The publications are referred to within the text by the basic designation only.
B. ASTM International (ASTM)
1. D3740 - (2012a) Minimum Requirements for Agencies Engaged in the Testing and/or
Inspection of Soil and Rock as Used in Engineering Design and Construction
2. E329 - (2014a) Standard Specification for Agencies Engaged in the Testing and/or
Inspection of Materials Used in Construction
1.3 SUBMITTALS
Government approval is required for all submittals. CQC inspection reports shall be submitted under this Specification section and follow the [Applicable CQC Control Phase
(Preparatory, Initial, or Follow-Up)]: [Applicable Specification section] naming convention.
1. Preconstruction Submittals
a. Interim CQC Plan
b. CQC Plan
c. Additional Requirements for Design Quality Control (DQC) Plan
2. Design Data
a. Discipline-Specific Checklists
b. Design Quality Control
3. Test Reports
a. Verification Statement
VHAMOULopezJ
01 57 19 -1
TEMPORARY ENVIRONMENTAL CONTROLS
SECTION 01 57 19
PART 1 - GENERAL
1.1 DESCRIPTION
This section specifies the control of environmental pollution and damage that the Contractor must consider for water, and land resources.
It includes management of visual aesthetics, solid waste, as well as other pollutants and resources encountered or generated by the
Contractor. The Contractor is obligated to consider specified control measures with the costs included within the various contract items of work.
Environmental pollution and damage are defined as the presence of chemical, physical, or biological elements or agents which:
1. Adversely affect human health or welfare,
2. Unfavorably alter ecological balances of importance to human life,
3. Effect other species of importance to humankind; or
4. Degrade the utility of the environment for aesthetic, cultural, and historical purposes.
Definitions of Pollutants:
1. Debris: Combustible and noncombustible wastes, such as leaves, tree trimmings, ashes, and waste materials resulting from construction or maintenance and repair work.
2. Sediment: Soil and other debris that has been eroded and transported by runoff water.
3. Surface Discharge: The term "Surface Discharge" implies that the water is discharged with possible sheeting action and subsequent soil erosion may occur. Waters that are surface discharged may terminate in drainage ditches, storm sewers, creeks, and/or "water of the United States" and would require a permit to discharge water from the governing agency.
1.2 QUALITY CONTROL
Establish and maintain quality control for the environmental protection of all items set forth herein.
Record on daily reports any problems in complying with laws, regulations, and ordinances. Note any corrective action taken.
VHAMOULopezJ
01 57 19 -2
1.3 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by basic designation only.
Tennessee Erosion & Sediment Control Handbook prepared by the Tennessee
Department of Environment and Conservation (TDEC)
(http://www.tn.gov/environment/wpc/sed_ero_controlhandbook/).
1.4 SUBMITTALS
In accordance with Section, 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND
SAMPLES, furnish the following:
1. Environmental Protection Plan: After the contract is awarded and prior to the commencement of the work, the Contractor shall meet with the Contracting Officer’s Representative (COR) to discuss the proposed Environmental Protection Plan and to develop mutual understanding relative to details of environmental protection. Not more than 20 days after the meeting, the Contractor shall prepare and submit to the Contracting Officer’s Representative for approval, a written and/or graphic Environmental Protection Plan including, but not limited to, the following:
a. Name(s) of person(s) within the Contractor's organization who is
(are) responsible for ensuring adherence to the Environmental
Protection Plan.
b. Methods for protection of features to be preserved within authorized work areas including trees, landscape features, and archeological and cultural resources.
c. Procedures to provide the environmental protection that comply with the applicable laws and regulations. Describe the procedures to correct pollution of the environment due to accident, natural causes, or failure to follow the procedures as described in the
Environmental Protection Plan.
d. Drawings showing locations of any proposed material storage areas, structures, and stockpiles of excess or spoil materials.
Include as part of an Erosion Control Plan approved by the
District Office of the U.S. Soil Conservation Service and the
Department of Veterans Affairs.
e. Work Area Plan showing the proposed activity in each portion of the area and identifying the areas of limited use or nonuse. Plan
VHAMOULopezJ
01 57 19 -3 should include measures for marking the limits of use areas. This plan may be incorporated within the Erosion Control Plan.
f. Inclusion of “best management practices” and methodologies.
Approval of the Contractor's Environmental Protection Plan will not relieve the Contractor of responsibility for adequate and continued control of pollutants and other environmental protection measures.
1.5 PROTECTION OF ENVIRONMENTAL RESOURCES
Protect environmental resources within the project boundaries and those affected outside the limits of permanent work during the entire period of this contract. Confine activities to areas defined by the specifications and drawings.
Protection of Land Resources: Prior to construction, identify all land resources to be preserved within the work area. Do not remove, cut, deface, injure, or destroy land resources including trees, shrubs, vines, grasses, topsoil, and landforms without permission from the COR.
Do not fasten or attach ropes, cables, or guys to trees for anchorage unless specifically authorized, or where special emergency use is permitted. Provide erosion control plans, in phases where required.
1. Work Area Limits: Prior to any construction, mark the areas that require work to be performed under this contract. Mark or fence isolated areas within the general work area that are to be saved and protected. Protect monuments, works of art, and markers before construction operations begin. Convey to all personnel the purpose of marking and protecting all necessary objects.
2. Protection of Landscape: Protect trees, shrubs, vines, grasses, land forms, and other landscape features shown on the drawings to be preserved by marking, fencing, or using any other approved techniques.
a. Box and protect from damage existing trees and shrubs to remain on the construction site.
b. Immediately repair all damage to existing trees and shrubs by trimming, cleaning, and painting with antiseptic tree paint.
c. Do not store building materials or perform construction activities closer to existing trees or shrubs than the farthest extension of their limbs.
3. Temporary Protection of Disturbed Areas: Construct diversion ditches, benches, and berms to retard and divert runoff from the
VHAMOULopezJ
01 57 19 -4 construction site to protected drainage areas approved under paragraph 208 of the Clean Water Act.
4. Erosion and Sedimentation Control Devices: The erosion and sediment controls selected and maintained by the Contractor shall be such that water quality standards are not violated as a result of the
Contractor's activities. Construct or install all temporary and permanent erosion and sedimentation control features shown. on the
Environmental Protection Plan. Maintain temporary erosion and sediment control measures such as berms, dikes, drains, grassing, and mulching, until permanent drainage and erosion control facilities are completed and operative.
5. Manage and control spoil areas on Government property to limit spoil to areas shown on the Environmental Protection Plan and prevent erosion of soil or sediment from entering nearby water courses or lakes.
6. Protect adjacent areas from despoilment by temporary excavations and embankments.
7. Handle and dispose of solid wastes in such a manner that will prevent contamination of the environment. Place solid wastes
(excluding clearing debris) in containers that are emptied on a regular schedule. Transport all solid waste off Government property and dispose of waste in compliance with Federal, State, and local requirements.
8. Handle discarded materials other than those included in the solid waste category as directed by the COR.
Restoration of Damaged Property: If any direct or indirect damage is done to public or private property resulting from any act, omission, neglect, or misconduct, the Contractor shall restore the damaged property to a condition equal to that existing before the damage at no additional cost to the Government. Repair, rebuild, or restore property as directed or make good such damage in an acceptable manner.
Final Clean-up: On completion of project and after removal of all debris, rubbish, and temporary construction, Contractor shall leave the construction area in a clean condition satisfactory to the COR.
Cleaning shall include off the station disposal of all items and materials not required to be salvaged, as well as all debris and rubbish resulting from demolition and new work operations.
- - - E N D - - -
VHAMOULopezJ
01 74 19 - 1
CONSTRUCTION WASTE MANAGEMENT
SECTION 01 74 19
CONSTRUCTION WASTE MANAGEMENT
PART 1 - GENERAL
1.1 DESCRIPTION
A. This section specifies the requirements for the management of non-hazardous building construction and demolition waste.
B. Waste disposal in landfills shall be minimized to the greatest extent possible. Of the inevitable waste that is generated, as much of the waste material as economically feasible shall be salvaged, recycled or reused.
C. Contractor shall use all reasonable means to divert construction and demolition waste from landfills and incinerators, and facilitate their salvage and recycle not limited to the following:
D. Waste Management Plan development and implementation.
E. Techniques to minimize waste generation.
F. Sorting and separating of waste materials.
G. Salvage of existing materials and items for reuse or resale.
H. Recycling of materials that cannot be reused or sold.
I. At a minimum the following waste categories shall be diverted from landfills:
J. Soil.
K. Inerts (eg, concrete, masonry and asphalt).
L. Clean dimensional wood and palette wood.
M. Green waste (biodegradable landscaping materials).
N. Metal products (eg, steel, wire, beverage containers, copper, etc).
O. Cardboard, paper and packaging.
P. Bitumen roofing materials.
Q. Plastics (eg, ABS, PVC).
R. Insulation.
S. Paint.
1.2 RELATED WORK
A. Section 02 41 00, DEMOLITION.
B. Section 01 00 00, GENERAL REQUIREMENTS.
1.3 QUALITY ASSURANCE
A. Contractor shall practice efficient waste management when sizing, cutting and installing building products. Processes shall be employed to ensure the generation of as little waste as possible. Construction
/Demolition waste includes products of the following:
VHAMOULopezJ
02 41 00 - 1
DEMOLITION
SECTION 02 41 00
DEMOLITION
PART 1 - GENERAL
1.1 DESCRIPTION:
This section specifies demolition and removal of buildings, portions of buildings, utilities, other structures and debris from trash dumps shown.
1.2 RELATED WORK:
A. Demolition and removal of roads, walks, curbs, and on-grade slabs outside buildings to be demolished: Section 31 20 11, EARTH MOVING
(SHORT FORM).
B. Safety Requirements: Section 01 35 26 Safety Requirements Article, ACCIDENT PREVENTION PLAN (APP).
C. Disconnecting utility services prior to demolition: Section 01 00 00, GENERAL REQUIREMENTS.
D. Reserved items that are to remain the property of the Government:
Section 01 00 00, GENERAL REQUIREMENTS.
E. Environmental Protection: Section 01 57 19, TEMPORARY ENVIRONMENTAL
CONTROLS.
F. Construction Waste Management: Section 01 74 19 CONSTRUCTION WASTE
MANAGEMENT.
G. Infectious Control: Section 01 35 26, SAFETY REQUIREMENTS.
1.3 PROTECTION:
A. Perform demolition in such manner as to eliminate hazards to persons and property; to minimize interference with use of adjacent areas, utilities and structures or interruption of use of such utilities; and to provide free passage to and from such adjacent areas of structures.
Comply with requirements of GENERAL CONDITIONS Article, ACCIDENT
PREVENTION.
B. Provide safeguards, including warning signs, barricades, temporary fences, warning lights, and other similar items that are required for protection of all personnel during demolition and removal operations.
Comply with requirements of Section 01 00 00, GENERAL REQUIREMENTS, Article PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT, UTILITIES AND IMPROVEMENTS.
C. Maintain fences, barricades, lights, and other similar items around exposed excavations until such excavations have been completely filled.
VHAMOULopezJ
03 30 53 - 1
(SHORT FORM) CAST-IN-PLACE CONCRETE
SECTION 03 30 53
(SHORT FORM) CAST-IN-PLACE CONCRETE
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Footings.
1.2 RELATED WORK
A. Section 32 05 23, CEMENT AND CONCRETE FOR EXTERIOR IMPROVEMENTS:
Concrete Roads, Walks, and Similar Exterior Site Work.
1.3 APPLICABLE PUBLICATIONS
A. Comply with references to extent specified in this Section.
B. American Concrete Institute (ACI):
117-10(R2015) ..........Specification for Tolerances for Concrete
Construction and Materials and Commentary
211.1-91(R2009) ........Standard Practice for Selecting Proportions for
Normal, Heavyweight, and Mass Concrete.
211.2-98(R2004) ........Standard Practice for Selecting Proportions for
Structural Lightweight Concrete.
301/301M-16 ............Specifications for Structural Concrete.
305.1-14 - ............Hot Weather Concreting.
306.1-90(R2002) ........Cold Weather Concreting.
318/318M-19 ............Building Code Requirements for Structural
Concrete and Commentary
347R-14 - .............Guide to Formwork for Concrete.
SP-66-04- ..............ACI Detailing Manual.
C. ASTM International(ASTM):
A615/A615M-20 ..........Standard Specification for Deformed and Plain
Carbon Steel Bars for Concrete Reinforcement
A996/A996M-16 ..........Standard Specification for Rail Steel and Axle
Steel Deformed Bars for Concrete Reinforcement
A1064/A1064M-18a .......Standard Specification for Carbon-Steel Wire and Welded Wire Reinforcement, Plain and
Deformed, for Concrete
C33/C33M-18 ............Standard Specification for Concrete Aggregates.
C39/C39M-20 ............Standard Test Method for Compressive Strength of Cylindrical Concrete Specimens.
VHAMOULopezJ
31 20 11 - 1
EARTHWORK (SHORT FORM)
SECTION 31 20 11
PART 1 - GENERAL
1.1 DESCRIPTION:
This section specifies the requirements for furnishing all equipment, materials, labor and techniques for earthwork including excavation, fill, backfill and site restoration utilizing fertilizer, seed and/or sod.
1.2 DEFINITIONS:
A. Unsuitable Materials:
1. Fills: Topsoil, frozen materials; construction materials and materials subject to decomposition; clods of clay and stones larger than 75 mm (3 inches); organic materials, including silts, which are unstable; and inorganic materials, including silts, too wet to be stable.
2. Existing Subgrade (except footings): Same materials as above paragraph, that are not capable of direct support of slabs, pavement, and similar items, with the possible exception of improvement by compaction, proofrolling, or similar methods of improvement.
B. Earthwork: Earthwork operations required within the new construction area.
C. Degree of Compaction: Degree of compaction is expressed as a percentage of maximum density obtained by the test procedure presented in AASHTO
T180 Method A. ASTM D698 Method A.
D. The term fill means fill or backfill as appropriate.
1.3 RELATED WORK:
A. Protection of existing utilities, existing equipment, roads, and pavements: Section 01 00 00, GENERAL REQUIREMENTS.
1.4 CLASSIFICATION OF EXCAVATION:
A. Unclassified Excavation: Removal and disposal of pavements and other man-made obstructions visible on the surface; together with any type of materials regardless of character of material and obstructions encountered.
B. Classified Excavation: Removal and disposal of all material not defined as rock.
VHAMOULopezJ
31 20 11 - 2
1. Boulders or other detached stones each having a volume of 0.4 m3
(1/2 cubic yard) or more.
1.5 MEASUREMENT AND PAYMENT FOR EXCAVATION:
Measurement: The unit of measurement for excavation and borrow will be the cubic yard, computed by the average end area method from cross sections taken before and after the excavation and borrow operations, including the excavation for ditches, gutters, and channel changes, when the material is acceptably utilized or disposed of as herein specified. The measurement will not include the volume of subgrade material or other material used for purposes other than directed. The volume of overburden stripped from borrow pits and the volume of excavation for ditches to drain borrow its, unless used as borrow material, will not be measured for payment. The measurement will not include the volume of any excavation performed prior to taking of elevations and measurements of the undisturbed grade.
1.6 SUBMITTALS:
A. Submit in accordance with Section 01 33 23, SHOP DRAWINGS, PRODUCT
DATA, AND SAMPLES.
B. Contractor shall submit procedure and location for disposal of unused satisfactory material. Proposed source of borrow material. Notification of encountering rock in the project. Advance notice on the opening of excavation or borrow areas..
1.7 APPLICABLE PUBLICATIONS:
A. Publications listed below form a part of this specification to the extent referenced. Publications are referenced in the text by the basic designation only.
B. American Nursery and Landscape Association (ANLA):
2004....................American Standard for Nursery Stock
C. American Association of State Highway and Transportation Officials
(AASHTO):
T99-10..................Moisture-Density Relations of Soils Using a 2.5 kg (5.5 lb) Rammer and a 305 mm (12 inch) Drop
T180-10.................Standard Method of Test for Moisture-Density
Relations of Soils Using a 4.54-kg [10 lb]
Rammer and a 457 mm (18 inch) Drop
D. American Society for Testing and Materials (ASTM):
C33-03..................Concrete Aggregate
VHAMOULopezJ
31 20 11 - 3
D698-e1.................Laboratory Compaction Characteristics of Soil
Using Standard Effort
D1140-00................Amount of Material in Soils Finer than the No.
200 (75-micrometer) Sieve
D1556-00................Standard Test Method for Density and Unit
Weight of Soil in Place by the Sand-Cone Method
D1557-09................Laboratory Compaction Characteristics of Soil
Using Modified Effort
D2167-94 (2001).........Standard Test Method for Density and Unit
Weight of Soil in Place by the Rubber Balloon
Method
D2487-06................Standard Classification of Soil for Engineering
Purposes (Unified Soil Classification System)
D6938-10................Standard Test Methods for Density of Soil and
Soil-Aggregate in Place by Nuclear Methods
(Shallow Depth)
E. Standard Specifications of Tennessee State
Department of Transportation, latest revision.
PART 2 - PRODUCTS
2.1 MATERIALS:
A. Fertilizer: (5-10-5) delivered to site in unopened containers that clearly display the manufacturer's label, indicating the analysis of the contents.
B. Seed: Grass mixture comparable to existing turf delivered to site in unopened containers that clearly display the manufacturer's label, indicating the analysis of the contents.
C. Sod: Comparable species with existing turf. Use State Certified or
State Approved sod when available. Deliver sod to site immediately after cutting and in a moist condition. Thickness of cut must be 19 mm to 32 mm (3/4 inch to 1 1/4 inches) excluding top growth. There shall be no broken pads and torn or uneven ends
PART 3 - EXECUTION
3.1 SITE PREPARATION:
A. Clearing: Clearing within the limits of earthwork operations as described or designated by the C.O.R. Work includes removal of trees, shrubs, incidental structures, paving, debris, trash and any other obstructions. Remove materials from the Medical Center
VHAMOULopezJ
31 20 11 - 4
B. Grubbing: Remove stumps and roots 75 mm (3 inches) and larger diameter.
Undisturbed sound stumps, roots up to 75 mm (3 inches) diameter, and nonperishable solid objects which will be a minimum of 900 mm (3 feet) below subgrade or finished embankment may be left.
C. Stripping Topsoil: Unless otherwise indicated on the drawings, the limits of earthwork operations shall extend anywhere the existing grade is filled or cut or where construction operations have compacted or otherwise disturbed the existing grade or turf. Strip topsoil as defined herein, or as indicated in the geotechnical report, from within the limits of earthwork operations as specified above unless specifically indicated or specified elsewhere in the specifications or shown on the drawings. Topsoil shall be fertile, friable, natural topsoil of loamy character and characteristic of the locality. Topsoil shall be capable of growing healthy horticultural crops of grasses.
Stockpile topsoil and protect as directed by the C.O.R. Eliminate foreign material, such as weeds, roots, stones, subsoil, frozen clods, and similar foreign materials, larger than 0.014 m3 (1/2 cubic foot) in volume, from soil as it is stockpiled. Retain topsoil on the station.
Remove foreign materials larger than 50 mm (2 inches) in any dimension from topsoil used in final grading. Topsoil work, such as stripping, stockpiling, and similar topsoil work, shall not, under any circumstances, be carried out when the soil is wet so that the tilth of the soil will be destroyed.
1. Concrete Slabs and Paving: Score deeply or saw cut to insure a neat, straight cut, sections of existing concrete slabs and paving to be removed where excavation or trenching occurs. Extend pavement section to be removed a minimum of 300 mm (12 inches) on each side of widest part of trench excavation and ensure final score lines are approximately parallel unless otherwise indicated. Remove material from the Medical Center
D. Disposal: All materials removed from the property shall be disposed of at a legally approved site, for the specific materials, and all removals shall be in accordance with all applicable Federal, State and local regulations. No burning of materials is permitted onsite.
3.2 EXCAVATION:
A. Site Earthwork: Excavation shall be accomplished as required by drawings and specifications. Remove subgrade materials that are determined by the C.O.R. as unsuitable, and replace with acceptable
VHAMOULopezJ
31 20 11 - 5 material. If there is a question as to whether material is unsuitable or not, the Contractor shall obtain samples of the material, under the direction of the C.O.R., and the materials shall be examined by an independent testing laboratory for soil classification to determine whether it is unsuitable or not. Testing of the soil shall be performed by the TN Testing Laboratory. When unsuitable material is encountered and removed, the contract price and time will be adjusted in accordance with Articles, DIFFERING SITE CONDITIONS, CHANGES and CHANGES-
SUPPLEMENT of the GENERAL CONDITIONS as applicable. Adjustments to be based on meters (yardage) in cut section only.
B. Finished elevation of subgrade shall be as follows:
1. Pavement Areas - bottom of the pavement or base course as applicable.
2. Planting and Lawn Areas - 100 mm (4 inches) below the finished grade, unless otherwise specified or indicated on the drawings.
3.3 FILLING AND BACKFILLING:
A. General: Do not fill or backfill until all debris, unsatisfactory soil materials, obstructions, and deleterious materials have been removed from the excavation. Proof-roll exposed subgrades with a fully loaded dump truck. Use excavated materials or borrow for fill and backfill, as applicable. Do not use unsuitable excavated materials. Do not backfill until foundation walls have been completed above grade and adequately braced, waterproofing or dampproofing applied, and pipes coming in contact with backfill have been installed and inspected and approved by
C.O.R.
B. Proof-rolling Existing Subgrade: - Proof rolling shall be done on an exposed subgrade free of surface water (wet conditions resulting from rainfall) which would promote degradation of an otherwise acceptable subgrade. After stripping, proof roll the existing subgrade of the disturbed area with six passes of a 13.6 meter tons (15 ton), pneumatic-tired roller. Operate the roller in a systematic manner to ensure the number of passes over all areas, and at speeds between 4 to
5.5 km/hour (2 1/2 to 3 1/2 mph). When proof rolling, one-half of the passes made with the roller shall be in a direction perpendicular to the other passes. Notify the C.O.R. a minimum of 3 days prior to proof rolling. Proof rolling shall be performed in the presence of the
C.O.R.
VHAMOULopezJ
31 20 11 - 6
C. Placing: Place material in horizontal layers not exceeding 200 mm (8 inches) in loose depth and then compacted. Do not place material on surfaces that are muddy, frozen, or contain frost.
D. Compaction: Use approved equipment (hand or mechanical) well suited to the type of material being compacted. Do not operate mechanized vibratory compaction equipment within 3000 mm (10 feet) of new or existing building walls without the prior approval of the C.O.R.
Moisten or aerate material as necessary to provide the moisture content that will readily facilitate obtaining the specified compaction with the equipment used. Compact each layer to not less than 95 percent of the maximum density determined in accordance with the following test method AASHTO T180 Method A ASTM D698 Method A. Backfill adjacent to any and all types of structures shall be placed and compacted to at least 90 percent laboratory maximum density for cohesive materials or
95 percent laboratory maximum density for cohesionless materials to prevent wedging action or eccentric loading upon or against the structure.
3.4 GRADING:
A. General: Uniformly grade the areas within the limits of this section, including adjacent transition areas. Smooth the finished surface within specified tolerance. Provide uniform levels or slopes between points where elevations are indicated, or between such points and existing finished grades. Provide a smooth transition between abrupt changes in slope.
B. Cut rough or sloping rock to level beds for foundations. In unfinished areas fill low spots and level off with coarse sand or fine gravel.
C. Slope backfill outside the building away from the building walls for a minimum distance of 3048 mm (10 feet)at a minimum five percent (5%) slope.
D. The finished grade shall be 150 mm (6 inches) below bottom line of windows or other building wall openings unless greater depth is shown.
E. Place crushed stone or gravel fill under concrete slabs on grade tamped and leveled. The thickness of the fill shall be 150 mm (6 inches), unless otherwise indicated.
F. Finish subgrade in a condition acceptable to the C.O.R. at least one day in advance of the paving operations. Maintain finished subgrade in a smooth and compacted condition until the succeeding operation has been accomplished. Scarify, compact, and grade the subgrade prior to
VHAMOULopezJ
31 20 11 - 7 further construction when approved compacted subgrade is disturbed by contractor's subsequent operations or adverse weather.
G. Grading for Paved Areas: Provide final grades for both subgrade and base course to +/- 6 mm (0.25 inches) of indicated grades.
3.5 LAWN AREAS:
A. General: Harrow and till to a depth of 100 mm (4 inches), new or existing lawn areas to remain, which are disturbed during construction.
Establish existing or design grades by dragging or similar operations.
Do not carry out lawn areas earthwork out when the soil is wet so that the tilth of the soil will be destroyed. Plant bed must be approved by
C.O.R. before seeding or sodding operation begins.
B. Finished Grading: Begin finish grading after rough grading has had sufficient time for settlement. Scarify subgrade surface in lawn areas to a depth of 100 mm (4 inches). Apply topsoil so that after normal compaction, dragging and raking operations (to bring surface to indicated finish grades) there will be a minimum of 100 mm (4 inches) of topsoil over all lawn areas; make smooth, even surface and true grades, which will not allow water to stand at any point. Shape top and bottom of banks to form reverse curves in section; make junctions with undisturbed areas to conform to existing topography. Solid lines within grading limits indicate finished contours. Existing contours, indicated by broken lines are believed approximately correct but are not guaranteed.
C. Fertilizing: Incorporate fertilizer into the soil to a depth of 100 mm
(4 inches) at a rate of 12 kg/100 m2 (25 pounds per 1000 square feet).
D. Seeding: Seed at a rate of 2 kg/100 m2 (4 pounds per 1000 square feet) and accomplished only during periods when uniform distribution may be assured. Lightly rake seed into bed immediately after seeding. Roll seeded area immediately with a roller not to exceed 225 kg/m (150 pounds per foot) of roller width.
E. Sodding: Topsoil shall be firmed by rolling and during periods of high temperature the topsoil shall be watered lightly immediately prior to laying sod. Sod strips shall be tightly butted at the ends and staggered in a running bond fashion. Placement on slopes shall be from the bottom to top of slope with sod strips running across slope. Secure sodded slopes by pegging or other approved methods. Roll sodded area with a roller not to exceed 225 kg/m (150 pounds per foot) of the roller width to improve contact of sod with the soil.
VHAMOULopezJ
31 20 11 - 8
F. Watering: The C.O.R. is responsible for having adequate water available at the site. As sodding is completed in any one section, the entire sodded area shall be thoroughly irrigated by the contractor, to a sufficient depth, that the underside of the new sod pad and soil, immediately below sod, is thoroughly wet. C.O.R. will be responsible for sod after installation and acceptance.
3.6 DISPOSAL OF UNSUITABLE AND EXCESS EXCAVATED MATERIAL:
A. Disposal: Transport surplus satisfactory soil to designated storage areas on Medical Center property. Stockpile or spread soil as directed by C.O.R.
1. Remove waste material, including unsatisfactory soil, trash, and debris, and legally dispose of it off Medical Center property.
B. Place excess excavated materials suitable for fill and/or backfill on site where directed.
C. Remove from site and dispose of any excess excavated materials after all fill and backfill operations have been completed.
D. Segregate all excavated contaminated soil designated by the C.O.R. from all other excavated soils, and stockpile on site on two 0.15 mm (6 mil) polyethylene sheets with a polyethylene cover. A designated area shall be selected for this purpose. Dispose of excavated contaminated material in accordance with State and Local requirements.
3.7 CLEAN-UP:
Upon completion of earthwork operations, clean areas within contract limits, remove tools, and equipment. Provide site clear, clean, free of debris, and suitable for subsequent construction operations. Remove debris, rubbish, and excess material from the Medical Center.
- - - E N D - - -
VHAMOULopezJ
32 05 23 - 1
CEMENT AND CONCRETE FOR EXTERIOR IMPROVEMENTS
SECTION 32 05 23
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Subbase for concrete pavements.
2. Walks, curb and gutter, ADA accessible curb ramps, bench pads, pavilion pads and base for brick unit paving.
1.2 RELATED WORK
A. Subgrade Preparation and Subbase Compaction: Section 31 20 11, EARTHWORK (SHORT FORM).
B. Base for Brick Unit Paving: Section 32 14 16, BRICK UNIT PAVING.
C. Bench pads: Section 32 33 00, SITE FURNISHINGS.
1.3 APPLICABLE PUBLICATIONS
A. Comply with references to extent specified in this section.
B. American Association of State Highway and Transportation Officials
(AASHTO):
1. M147-65-UL-04 - Materials for Aggregate and Soil-Aggregate Subbase, Base and Surface Courses.
2. M233-86 - Boiled Linseed Oil Mixture for Treatment of Portland
Cement Concrete.
C. American Concrete Institute (ACI):
1. 305R-10 - Guide to Hot Weather Concreting.
2. 306R-10 - Guide to Cold Weather Concreting.
D. American National Standards Institute (ANSI):
1. B101.3 - Wet DOCF of Common Hard Surface Floor Materials (Including
Action and Limit Thresholds for the Suitable Assessment of the
Measured Values).
E. ASTM International (ASTM):
1. A615/A615M-16 - Deformed and Plain Carbon Steel Bars for Concrete
Reinforcement.
2. A996/A996M-15 - Rail-Steel and Axle-Steel Deformed Bars for Concrete
Reinforcement.
3. A1064/A1064M-16 - Carbon-Steel Wire and Welded Wire Reinforcement, Plain and Deformed, for Concrete.
4. C33/C33M-16 - Concrete Aggregates.
VHAMOULopezJ
32 05 23 - 2
5. C94/C94M-16 - Ready Mixed Concrete.
6. C143/C143M-15a - Slump of Hydraulic Cement Concrete.
7. C150/C150M-16 - Portland Cement.
8. C171-16 - Sheet Materials for Curing Concrete.
9. C260/C260M-10a - Air Entraining Admixtures for Concrete.
10. C309-11 - Liquid Membrane Forming Compounds for Curing Concrete.
11. C494/C494M-15a - Chemical Admixtures for Concrete.
12. C618-15 - Coal Fly Ash and Raw or Calcined Natural Pozzolan for Use in Concrete.
13. C979/C979M-16 - Pigments for Integrally Colored Concrete.
14. C989/C989M-14 - Slag Cement for Use in Concrete and Mortars.
15. C1240-15 - Silica Fume Used in Cementitious Mixtures.
16. D1751-04(2013)e1 - Preformed Expansion Joint Filler for Concrete
Paving and Structural Construction (Nonextruding and Resilient
Bituminous Types).
17. D5893/D5893M-10 - Cold Applied, Single Component, Chemically Curing
Silicone Joint Sealant for Portland Cement Concrete Pavements.
18. D6690-15 - Joint and Crack Sealants, Hot Applied, for Concrete and
Asphalt Pavements.
1.4 PREINSTALLATION MEETINGS
A. Conduct preinstallation meeting at project site minimum 30 days before beginning Work of this section.
1. Required Participants:
a. Contracting Officer's Representative.
b. Contractor.
c. Installer.
d. Other installers responsible for adjacent and intersecting work, including excavation, plantings, and asphalt pavement.
2. Meeting Agenda: Distribute agenda to participants minimum 3 days before meeting.
a. Installation schedule.
b. Installation sequence.
c. Preparatory work.
d. Protection before, during, and after installation.
e. Installation.
f. Terminations.
g. Transitions and connections to other work.
VHAMOULopezJ
32 05 23 - 3
h. Inspecting and testing.
i. Other items affecting successful completion.
3. Document and distribute meeting minutes to participants to record decisions affecting installation.
1.5 SUBMITTALS
A. Submittal Procedures: Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES.
B. Submittal Drawings:
1. Show size, configuration, and fabrication and installation details.
2. Show reinforcing.
3. Include jointing plan for concrete pavements, curbs and gutters.
C. Manufacturer's Literature and Data:
1. Description of each product.
2. Installation instructions.
D. Test reports: Certify products comply with specifications.
1. Concrete materials.
2. Select subbase materials.
3. Field test reports.
E. Certificates: Certify products comply with specifications.
1. Expansion joint filler.
2. Reinforcement.
3. Curing materials.
4. Concrete protective coating.
F. Qualifications: Substantiate qualifications comply with specifications.
1. Installer with project experience list (See 1.6.A.2 below).
2. Land surveyor.
G. Concrete mix design.
H. Select subbase job-mix design.
I. Proposed hot and cold weather concreting methods.
J. Land surveyor's construction staking notes, before placing concrete.
1. Identify discrepancies between field conditions and Drawings.
1.6 QUALITY ASSURANCE
A. Installer Qualifications:
1. Regularly installs specified products.
2. Installed specified products with satisfactory service on five similar installations.
VHAMOULopezJ
32 05 23 - 4
a. Project Experience List: Provide contact names and addresses for completed projects.
B. Preconstruction Testing:
1. Engage independent testing laboratory to perform tests and submit reports.
a. Deliver samples to laboratory in number and quantity required for testing.
2. Concrete mix design.
3. Select subbase job-mix design. Report the following:
a. Material sources.
b. Gradation.
c. Plasticity index.
d. Liquid limit.
e. Laboratory compaction curves indicating maximum density at optimum moisture content.
1.7 DELIVERY
A. Deliver steel reinforcement to prevent damage.
B. Before installation, return or dispose of distorted or damaged steel reinforcement.
C. Bulk Products: Deliver bulk products away from buildings, utilities, pavement, and existing turf and planted areas. Maintain dry bulk product storage away from contaminants.
1.8 STORAGE AND HANDLING
A. Store products indoors in dry, weathertight facility.
B. Protect products from damage during handling and construction operations.
1.9 FIELD CONDITIONS
A. Hot Weather Concreting Procedures: ACI 305R.
B. Cold Weather Concreting Procedures: ACI 306R.
1. Use non-corrosive, non-chloride accelerator admixture.
2. Do not use calcium chloride, thiocyanates or admixtures containing more than 0.05 percent chloride ions.
1.10 WARRANTY
A. Construction Warranty: FAR clause 52.246-21, "Warranty of
Construction."
VHAMOULopezJ
32 05 23 - 5
PART 2 - PRODUCTS
2.1 CONCRETE MATERIALS
A. Portland Cement: ASTM C150/C150M, Type I or II.
B. Coarse Aggregate: ASTM C33/C33M; size to suit application.
C. Fine Aggregate: ASTM C33/C33M.
D. Mixing Water: Fresh, clean, and potable.
E. Air-Entraining Admixture: ASTM C260/C260M.
F. Chemical Admixtures: ASTM C494/C494M.
G. Reinforcing Steel: ASTM A615/A615M, Grade 420 (60); deformed.
H. Welded Wire Fabric: ASTM A1064/A1064M, sized as indicated.
I. Expansion Joint Filler: ASTM D1751.
J. Sheet Materials for Curing Concrete: ASTM C171.
2.2 SELECT SUBBASE
A. Subbase: AASHTO M147; Grade E or Grade F.
1. Select granular material composed of sand, sand-gravel, crushed stone, crushed or granulated slag, with or without soil binder, or combinations of these materials.
SUBBASE GRADING REQUIREMENTS
Sieve Size Percentage Passing by Mass
Grades
(mm) (in) A B C D E F
50 2 100 100
25 1 75-95 100 100 100 100
9.5 3/8 30-65 40-75 50-85 60-100
4.47 No. 4 25-55 30-60 35-65 50-85 55-100 70-100
2.00 No. 10 15-40 20-45 25-50 40-70 40-100 55-100
0.425 No. 40 8-20 15-30 15-30 25-45 20-50 30-70
0.075 No. 200 2-8 5-20 5-15 5-20 6-20 8-25
B. Other Acceptable Gradations: Materials within three to five percent, plus or minus, of specified gradation, or as recommended by the geotechnical engineer and approved by the Contracting Officer's
Representative.
VHAMOULopezJ
32 05 23 - 6
2.3 FORMS
A. Forms: Wood, plywood, metal, or other materials, approved by
Contracting Officer's Representative, of grade or type suitable to obtain type of finish specified.
1. Plywood: Exterior grade, free of defects and patches on contact surface.
2. Lumber: Sound, grade-marked, S4S stress graded softwood, minimum
50 mm (2 inches) thick, free from warp, twist, loose knots, splits, or other defects.
3. Form Coating: As recommended by Architect/Engineer.
B. Provide forms suitable in cross-section, depth, and strength to resist springing during depositing and consolidating concrete.
1. Do not use forms varying from straight line more than 3 mm in
3000 mm (1/8 inch in 10 feet), horizontally and vertically.
C. Provide flexible or curved forms for forming radii.
2.4 CONCRETE CURING MATERIALS
A. Concrete curing materials, conform to one of the following:
1. Burlap: Minimum 233 g/sq. m (7 ounces/sq. yd.) dry.
2. Sheet Materials for Curing Concrete: ASTM C171.
3. Curing Compound: ASTM C309, Type 1 clear; liquid membrane forming type, without paraffin or petroleum.
2.5 CONCRETE MIXES
A. Design concrete mixes according to ASTM C94/C94M, Option C.
B. Concrete Type: Air-entrained. See Table I.
TABLE I - CONCRETE TYPES
Concrete
Type
Minimum 28 Day
Compressive
Strength f'c
MPa (psi)
Non-Air-Entrained Air-Entrained
Min. Cement kg/cu. m
(lbs./cu. yd.)
Max.
Water
Cement
Ratio
Min. Cement kg/cu. m
(lbs./cu. yd.)
Max.
Water
Cement
Ratio
A 35 (5000)1,3 375 (630) 0.45 385 (650) 0.40
B 30 (4000)1,3 325 (550) 0.55 340 (570) 0.50
C 25 (3000)1,3 280 (470) 0.65 290 (490) 0.55
D 25 (3000)1,2 300 (500) * 310 (520) *
Footnotes:
1. If trial mixes are used, achieve compressive strength 8.3 MPa (1,200 psi)
VHAMOULopezJ
A
32 05 23 - 7
C. Maximum Slump: ASTM C143/C143M. See Table II.
TABLE II - MAXIMUM SLUMP
APPLICATION MAXIMUM SLUMP
Curb & Gutter 75 mm (3 inches)
Pedestrian Pavement 75 mm (3 inches)
Vehicular Pavement 50 mm (2 inches) Machine Finished
100 mm (4 inches) Hand Finished
Equipment Pad 75 to 100 mm (3 to 4 inches)
2.6 ACCESSORIES
A. Equipment and Tools: Obtain Contracting Officer's Representative's, approval of equipment and tools needed for handling materials and performing work before work begins.
B. Maintain equipment and tools in satisfactory working condition.
C. Joint Filler
1. Joint filler shall be 1/2” preformed bituminous expansion joint material conforming to ASTM D1751.
D. Joint Sealants:
1. Concrete Paving Expansion Joints: ASTM D5893/D5893M, Type SL, single component, self-leveling, silicone joint sealant.
2. Concrete Paving Joints: ASTM D6690, Type IV, hot-applied, single component joint sealant.
E. Concrete Protective Coating: AASHTO M233 linseed oil mixture.
PART 3 - EXECUTION
3.1 PREPARATION
A. Examine and verify substrate suitability for product installation.
B. Protect existing construction and completed work from damage.
C. Prepare, construct, and finish subgrade. See Section 31 20 00, EARTHWORK.
in excess of f'c. For concrete strengths greater than 35 MPa (5,000 psi), achieve compressive strength 9.7 MPa (1,400 psi) in excess of f’c.
2. For Concrete Exposed to High Sulfate Content Soils: Maximum water cement ratio is 0.44.
3. Laboratory Determined according to ACI 211.1 for normal weight concrete.
VHAMOULopezJ
32 05 23 - 8
D. Maintain subgrade in smooth, compacted condition, in conformance with the required section and established grade until the succeeding operation has been accomplished.
3.2 SELECT SUBBASE
A. Placing:
1. Place subbase material on prepared subgrade in uniform layer to required contour and grades, and to maximum 200 mm (8 inches) loose depth.
2. When required compacted thickness exceeds 150 mm (6 inches), place subbase material in equal thickness layers.
3. When subbase elevation is 13 mm (1/2 inch) or more below required grade, excavate subbase minimum 75 mm (3 inches) deep. Place and compact subbase to required grade.
B. Compaction:
1. Perform compaction with approved hand or mechanical equipment well suited to the material being compacted.
2. Maintain subbase at optimum moisture content for compaction.
3. Compact each subbase layer to minimum 95 percent of maximum density as specified in AASHTO T180 or AASHTO T99, respectively.
C. Subbase Tolerances:
1. Variation from Indicated Grade: Maximum 9 mm (3/8 inch).
2. Variation from Indicated Thickness: Maximum 13 mm (1/2 inch).
D. Protection:
1. Protect subbase from damage until concrete is placed.
2. Reconstruct damaged subbase before placing concrete.
3.3 SETTING FORMS
A. Form Substrate:
1. Compact form substrate to uniformly support forms along entire length.
2. Correct substrate imperfections and variations by cutting, filling, and compacting.
B. Form Setting:
1. Set forms to indicated line and grade with tight joints. Rigidly brace forms preventing movement.
2. Remove forms when removal will not damage concrete and when required for finishing.
3. Clean and oil forms before each use.
VHAMOULopezJ
32 05 23 - 9
4. Correct forms, when required, immediately before placing concrete.
5. Notify Contracting Officer's Representative immediately when discrepancies exist between field conditions and drawings.
6. Correct discrepancies greater than 25 mm (1 inch) before placing concrete.
C. Form Tolerances:
1. Variation from Indicated Line: Maximum 6 mm (1/4 inch).
2. Variation from Indicated Grade: Maximum 3 mm in 3000 mm (1/8…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .